HomeMy WebLinkAboutNCG080678_Notice of Violation_20200804ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
BRIAN WRENN
Director
NORTH CAROLINA
Environmental Quality
August 4, 2020
CERTIFIED MAIL: 7019 0700 0000 8867 4612
RETURN RECEIPT REQUESTED
Burke County General Services
Attn: Miles Champion, County Engineer
Post Office Box 1486
Morganton, North Carolina 28680
Subject: NOTICE OF VIOLATION (NOV-2020-PC-0347)
NPDES Stormwater General Permit NCGO80000
Burke County General Services
Burke County Garage, Certificate of Coverage NCGNCGO80678
Dear Mr. Champion:
On July 7, 2020, Isaiah Reed from the Asheville Regional Office of the Division of Energy,
Mineral and Land Resources (DEMLR), conducted a site inspection for the Burke County
Garage facility located at 2500 Marsh Trail, Burke County, North Carolina. A copy of the
Compliance Inspection Report is enclosed for your review. The site visit and file review
revealed that the subject facility is covered by NPDES Stormwater General Permit
NCG080000 under Certificate of Coverage NCG080678. Permit coverage authorizes the
discharge of stormwater from the facility to receiving waters designated as The Catawba
River, a Class WS-IV,B;CA waterbody in the Catawba River Basin.
As a result of the site inspection, the following permit conditions violation(s) are noted:
1) Stormwater Pollution Prevention Plan (SPPP)
A Stormwater Pollution Prevention Plan (SPPP) has not been developed, recorded, or
properly implemented.
2) Qualitative Monitoring
Qualitative monitoring has not been conducted and recorded in accordance with permit
requirements.
3) Analytical Monitoring
Analytical monitoring has not been conducted and recorded in accordance with permit
requirements.
North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
E Asheville Regional Office 12090 U.S. Highway 70 1 Swannanoa, North Carolina 28778
o rvww:mmrvuw,mwamiry 828.296.4500
Requested Response:
You are asked to respond to this office, in writing, within 30 calendar days from receipt of
this notice. Your written response should include a reasonable explanation as to why the
aforementioned violation(s) have occurred as well as a Plan of Action to prevent these
violation(s) from recurring.
Thank you for your attention to this matter. This Office is considering sending a
recommendation for enforcement to the Director of the Division of Energy, Mineral & Land
Resources regarding these issues. Your above -mentioned response to this correspondence
will be considered in this process. This office requires that the violations, as detailed
above, be properly resolved. These violations and any future violations are subject to
a civil penalty assessment of up to $25,000 per day for each violation. Should you have
any questions regarding these matters, please contact Isaiah Reed or myself at (828) 296-
4500.
Sincerely,
Stanley E. Aiken EGA
Regional Eng' eer
Land Quality Section
Enclosure:
Inspection Report
ec: Alaina Morman, Environmental Specialist Alaina.mormangncdenr.gov
Stanley E. Aiken- Regional Engineer stan.aiken@ncdenr.gov
Compliance Inspection Report
Permit: NCG080678 Effective: 11/01/18 Expiration: 05/31/21 Owner: Burke County General Services
SOC: Effective: Expiration: Facility: Burke County Garage
County: Burke 2500 Marsh Trl
Region: Asheville
Morganton NC 28655
Contact Person: Carson Fisher Title: Phone:828-439-4394
Directions to Facility:
System Classifications:
Primary ORC:
Secondary ORC(s):
On -Site Representative(s):
Related Permits:
Inspection Date: 07/07/2020
Primary Inspector: Isaiah L Reed
Secondary Inspector(s):
Certification: Phone:
Entry Time 10:45AM Exit Time: 11:15AM
Phone: 828-296-4614
Reason for Inspection: Routine Inspection Type: Compliance Evaluation
Permit Inspection Type: Transportation wNehicle Maintenance/Petroleum Bulk/Oil Water Separator Stormwater Discharge COC
Facility Status: ❑ Compliant Not Compliant
Question Areas:
Storm Water
(See attachment summary)
Page 1 of 3
Permit: NCGO80678 Owner - Facility: Burke County General Services
Inspection Date: 07/07/2020 Inspection Type: Compliance Evaluation Reason for Visit: Routine
Inspection Summary:
On July 7, 2020 this facility was inspected for compliance. I met with Miles Champion and David Ingram on site. During the
inspection, the following items were noted:
1) No Stormwater Pollution Prevention Plan was available on site at the time of the inspection. The permittee is directed to
immediately begin efforts to create a Stormwater Pollution Prevention Plan as outlined in the NCGO80000 General Permit.
2) No qualitative or analytical monitoring data was available on site. the permittee is directed to immediately begin
monitoring as outlined in the NCGO80000 General Permit.
Please give the above items your immediate attention. This facility will be re -inspected on or after September 1, 2020. If the
above items have not been addressed, further action will be taken.
If you have any questions, please contact this office at (828) 296-4614.
Page 2 of 3
Permit: NOG080678 Owner - Facility: Burke County General Services
Inspection Date: 07/07/2020 Inspection Type: Compliance Evaluation
Reason for Visit: Routine
Stormwater Pollution Prevention Plan
Yes No NA NE
Does the site have a Stormwater Pollution Prevention Plan?
❑ 0 ❑ ❑
# Does the Plan include a General Location (USGS) map?
❑ 0 ❑ ❑
# Does the Plan include a "Narrative Description of Practices"?
❑ 0 ❑ ❑
# Does the Plan include a detailed site map including outfall locations and drainage areas?
❑ 0 ❑ ❑
# Does the Plan include a list of significant spills occurring during the past 3 years?
❑ 0 ❑ ❑
# Has the facility evaluated feasible alternatives to current practices?
❑ 0 ❑ ❑
# Does the facility provide all necessary secondary containment?
❑ 0 ❑ ❑
# Does the Plan include a BMP summary?
❑ 0 ❑ ❑
# Does the Plan include a Spill Prevention and Response Plan (SPRP)?
❑ 0 ❑ ❑
# Does the Plan include a Preventative Maintenance and Good Housekeeping Plan?
❑ 0 ❑ ❑
# Does the facility provide and document Employee Training?
❑ 0 ❑ ❑
# Does the Plan include a list of Responsible Pany(s)?
❑ 0 ❑ ❑
# Is the Plan reviewed and updated annually?
❑ 0. ❑ ❑
# Does the Plan include a Stormwater Facility Inspection Program?
❑ 0 ❑ ❑
Has the Stormwater Pollution Prevention Plan been implemented?
❑ 0 ❑ ❑
Comment: No Stormwater Pollution Prevention Plan was available on site.
Qualitative Monitorina
Yes No NA NE
Has the facility conducted its Qualitative Monitoring semi-annually?
❑ 0 ❑ ❑
Comment: No Qualitative Monitorina was available on site
Analytical Monitorina Yes No NA NE
Has the facility conducted its Analytical monitoring? 1:10 ❑ ❑
# Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ 0 ❑ ❑
Comment: No Analytical Monitorina data was available on site.
Permit and Outfalls
Yes No NA NE
# Is a copy of the Permit and the Certificate of Coverage available at the site? ❑ 0 ❑ ❑
# Were all outfalls observed during the inspection? 0 ❑ ❑ ❑
# If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ E ❑
# Has the facility evaluated all illicit (non stormwater) discharges? ❑ 0 ❑ ❑
Comment:
Page 3 of 3