Loading...
HomeMy WebLinkAbout20200990 Ver 1_2020 0728 - FINAL JD Waters Impact Plan-1red_20200731FINAL DRAWING - FOR REVIEW PURPOSES ONLYFILE PATH:M:\Projects\Piedmont Natural Gas\2019019500CL - PNG Prospect Church (Airport) Road Replacement\CADD\Plan Set\Permitting\2019019500_C_SHT_STREAM WETLAND PERMITTING.dwg, LTRIPP, 7/28/2020 10:19:39 AMWKD PROJ. NO.: DRAWING NUMBER: PROJ. DATE: PROJ. MGR.: DESIGN BY: DRAWN BY:COPYRIGHT ©, W.K. DICKSON & CO., INC. ALL RIGHTS RESERVED. REPRODUCTION OR USE OF THE CONTENTS OF THIS DOCUMENT; ADDITIONS ORDELETIONS TO THIS DOCUMENT, IN WHOLE OR IN PART, WITHOUT WRITTEN CONSENT OF W.K. DICKSON & CO., INC., IS PROHIBITED. ONLY COPIESFROM THE ORIGINAL OF THIS DOCUMENT, MARKED WITH AN ORIGINAL SIGNATURE AND SEAL SHALL BE CONSIDERED TO BE VALID, TRUE COPIES.PROJECT NAME:DRAWING TITLE:community infrastructure consultants 1213 W. MOREHEAD STREET SUITE 300 CHARLOTTE, NC 28208 (t)704-334-5348 WWW.WKDICKSON.COM NC LICENSE NO.F-0374 WGB GLT GLT JULY 2020 20190195.00.CLPNG PROSPECT CHURCH PROJECTPIEDMONT NATURAL GASIMPACT PLAN KEY MAP & LEGENDSTANLY COUNTYALBEMARLE, NORTH CAROLINA1 OF 15 Know what'sbelow.before you digCall AREA 1 - SHEET 2 AREA 2 - SHEET 3 AREA 3 - SHEET 4 AREA 4 - SHEET 5 AREA 5 - SHEET 6 AREA 6 - SHEET 7 AREA 7 - SHEET 8 AREA 8 - SHEET 9 AREA 9 - SHEET 10 AREA 10 - SHEET 11 MOUNTAINCREEK RD (S .R . 1522 )CARTER RD(S.R. 1523)S A W M I L L R D (S . R . 1 5 2 5 )CSX RAILROADCSX RAILROADMOUNTAIN VIEWCHURCH RD(S.R. 1545)PALESTI N E R D (S.R. 1535)PROSPECT CHURCH RD (S.R. 1524) AIRPORT R D (S.R. 1524) AIRPO R T R D (S.R. 1549) CAR T E R ACR E S R D (S.R. 1 5 2 4 )RIDGE ST(S.R. 1542)NORFOLKSOUTHERNRAILROADPROP. ≈15,212 LF OF 8" 11.5 SDR MDPE NATURAL GAS PIPELINE TO BE INSTALLED BY OPEN-TRENCH OR DRY BORE (OR OTHER APPROVED NCDOT TRENCHLESS METHOD) PROP. ≈2,904 LF OF 2" 11 SDR MDPE NATURAL GAS PIPELINE TO BE INSTALLED BY OPEN-TRENCH OR DRY BORE (OR OTHER APPROVED NCDOT TRENCHLESS METHOD) PROP. ≈490 LF OF 8" 11.5 SDR MDPE NATURAL GAS PIPELINE TO BE INSTALLED BY OPEN-TRENCH OR DRY BORE (OR OTHER APPROVED NCDOT TRENCHLESS METHOD) PROP. ≈678 LF OF AWG #2 HMWPE CABLE TO BE INSTALLED BY OPEN-TRENCH AND/OR DRY BORE (OR OTHER APPROVED NCDOT TRENCHLESS METHOD) LOWDER RD (S.R. 1418) HOLT RD GREENWOOD PARK CIR CLOVER FORK CIR 1500'3000' SCALE: 1" = 1500' 0 750' JURISDICTIONAL WATERS OF THE U.S. - IMPACT PLAN FOR PNG PROSPECT CHURCH (AIRPORT) ROAD REPLACEMENT STANLY COUNTY, NC R/W NCDOT RIGHT-OF-WAY RR R/W RR R/W CSXT RIGHT-OF-WAY PL PL PL EXISTING PROPERTY LINEPROPOSED LIMIT OF DISTURBANCE GAS GAS GAS PROPOSED NATURAL GAS PIPELINE - OPEN-TRENCH GAS GAS GAS WET WET WET WET WETWETWETWETWETWET TB TB TB PROPOSED NATURAL GAS PIPELINE - TRENCHLESSPROPOSED PERMANENT EASEMENTPROPOSED TEMPORARY EASEMENT PROPOSED LIMIT OF DISTURBANCE G G G EXISTING NATURAL GAS PIPELINE EXISTING RAILROAD EXISTING EDGE OF PAVED ROADEXISTING ROAD CENTERLINE EXISTING STORM DRAIN EXISTING JURISDICTIONAL STREAM TOP OF BANK BB BB BB EXISTING JURISDICTIONAL STREAM BOTTOM OF BANK OE OE OE EXISTING OVERHEAD ELECTRIC FM FM FM EXISTING FORCE MAIN SS SS SS EXISTING SANITARY SEWEREXISTING TREE LINE PROPOSED 15' STREAM/WETLAND BUFFER EXISTING JURISDICTIONAL STREAM CENTERLINE EXISTING JURISDICTIONAL WETLAND LEGEND APPROX. LOCATION OF PROP. CONSTRUCTION LAYDOWN YARD AREA 11 - SHEET 12 OEOE OE OE OE OE OE OE OE R/W R/W R/W R/W R/W R/W P L P L P L P L P L P L P L P L P L P L P L PL GAS GAS GAS GAS GAS GAS GAS GAS GAS 569568567 566 565 564 563 562 561 560 559 558 559 560 561 PRELIMINARY - NOT RELEASED FOR CONSTRUCTION, RECORDATION, CONVEYANCES, OR SALESFILE PATH:M:\Projects\Piedmont Natural Gas\2019019500CL - PNG Prospect Church (Airport) Road Replacement\CADD\Plan Set\Permitting\2019019500_C_SHT_STREAM WETLAND PERMITTING.dwg, LTRIPP, 7/28/2020 10:19:48 AM1213 W. MOREHEAD STREET SUITE 300 CHARLOTTE, NC 28208 (t)704-334-5348 WWW.WKDICKSON.COM NC LICENSE NO.F-0374 WGB GLT GLT JULY 2020 2 OF 15 20190195.00.CL WKD PROJ. NO.: DRAWING NUMBER: PROJ. DATE: PROJ. MGR.: DESIGN BY: DRAWN BY:PROJECT NAME:DRAWING TITLE:COPYRIGHT ©, W.K. DICKSON & CO., INC. ALL RIGHTS RESERVED. REPRODUCTION OR USE OF THE CONTENTS OF THIS DOCUMENT; ADDITIONS ORDELETIONS TO THIS DOCUMENT, IN WHOLE OR IN PART, WITHOUT WRITTEN CONSENT OF W.K. DICKSON & CO., INC., IS PROHIBITED. ONLY COPIESFROM THE ORIGINAL OF THIS DOCUMENT, MARKED WITH AN ORIGINAL SIGNATURE AND SEAL SHALL BE CONSIDERED TO BE VALID, TRUE COPIES.community infrastructure consultants PROSPECT C H U R C H R O A D (S.R. 1524) (NCDOT , 60' R/W PER M.B. 21, P G . 1 2 8 ) Know what'sbelow.before you digCall 30'60' SCALE: 1" = 30' 0 15'PNG PROSPECT CHURCH (AIRPORT) ROADREPLACEMENT PROJECTPIEDMONT NATURAL GASAREA 1 IMPACT PLAN - 35.402056° N, 80.196022° WSTANLY COUNTYALBEMARLE, NORTH CAROLINAAREA 1 IMPACT TABLE IMPACT TYPE & SITE #VALUE UNIT PERMANENT STREAM 0 LF PERMANENT WETLAND 0 AC TEMPORARY STREAM 0 LF TEMPORARY WETLAND 0 AC NOTE: SEE SHEET 1 FOR KEY MAP & LEGEND PROP. TEMPORARY EASEMENT (TYP.) PROP. LIMIT OF DISTURBANCE PROP. 8" 11.5 SDR MDPE NATURAL GAS PIPELINE TO BE INSTALLED BY OPEN-TRENCH, MIN. 36" DEEP EX. JURISDICTIONAL STREAM - UT1 LITTLE LONG CREEK APPROX. EXTENT OF EX. 30' OVERHEAD UTILITY EASEMENT (TYP.) PROP. PERMANENT EASEMENT (TYP.) PROP. 15' STREAM BUFFER FLO W OEOEOEOEOEOEOEOETBTBBBBBBBBBBBBBBBBBBBBBBBTBTBTBTBTBTBTBTBTB TBTBTBTBR/WR/WR/WR/WR/WR/WR/WSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSGAS GASGASGASGASGASGASGASGAS516 51 5 51 4 51 3 5 1 3 51 4 515 51 6 51 7 5 1 2 5 1 0 517518 519 PRELIMINARY - NOT RELEASED FOR CONSTRUCTION, RECORDATION, CONVEYANCES, OR SALESFILE PATH:M:\Projects\Piedmont Natural Gas\2019019500CL - PNG Prospect Church (Airport) Road Replacement\CADD\Plan Set\Permitting\2019019500_C_SHT_STREAM WETLAND PERMITTING.dwg, LTRIPP, 7/28/2020 10:19:55 AM1213 W. MOREHEAD STREET SUITE 300 CHARLOTTE, NC 28208 (t)704-334-5348 WWW.WKDICKSON.COM NC LICENSE NO.F-0374 WKD PROJ. NO.: DRAWING NUMBER: PROJ. DATE: PROJ. MGR.: DESIGN BY: DRAWN BY:PROJECT NAME:DRAWING TITLE:COPYRIGHT ©, W.K. DICKSON & CO., INC. ALL RIGHTS RESERVED. REPRODUCTION OR USE OF THE CONTENTS OF THIS DOCUMENT; ADDITIONS ORDELETIONS TO THIS DOCUMENT, IN WHOLE OR IN PART, WITHOUT WRITTEN CONSENT OF W.K. DICKSON & CO., INC., IS PROHIBITED. ONLY COPIESFROM THE ORIGINAL OF THIS DOCUMENT, MARKED WITH AN ORIGINAL SIGNATURE AND SEAL SHALL BE CONSIDERED TO BE VALID, TRUE COPIES.community infrastructure consultants PROSPECT CHURCH ROAD(S.R. 1524)(NCDOT, 60' R/WPER M.B. 21, PG. 128)Know what'sbelow.before you digCall WGB GLT GLT JULY 2020 3 OF 15 20190195.00.CLSTANLY COUNTYALBEMARLE, NORTH CAROLINA30'60' SCALE: 1" = 30' 0 15' INV. IN: 511.68' PROP. 15' STREAM BUFFER INV. IN: 510.31' 96" C M P 96" C M P INV. OUT: 511.27' INV. OUT: 510.12' PROP. LIMIT OF DISTURBANCE EX. SAN ITARYSEWER (TYP . ) PROP. TEMPORARY EASEMENT (TYP.) PROP. PERMANENT EASEMENT (TYP.)FLOWPROP. 8" 11.5 SDR MDPE NATURAL GAS PIPELINE TO BE INSTALLED BY OPEN-TRENCH, MIN. 36" DEEP AREA 2 IMPACT TABLE IMPACT TYPE & SITE #VALUE UNIT PERMANENT STREAM 0 LF PERMANENT WETLAND 0 AC TEMPORARY STREAM; S1 21 LF TEMPORARY WETLAND 0 AC PNG PROSPECT CHURCH (AIRPORT) ROADREPLACEMENT PROJECTPIEDMONT NATURAL GASAREA 2 IMPACT PLAN - 35.404414° N, 80.194069° WEX. JURISDICTIONAL STREAM - LITTLE LONG CREEK NOTE: SEE SHEET 1 FOR KEY MAP & LEGEND S1APPROX. LOCATION OF PROP. TEMPORARY PUMP-AROUND (TYP.) (SEE DETAILS ON SHEET 13 - 14) OE OE OE OE OE OE OE OEOE OEOEOE OE OE OE OE OE BBB B BBBBBBBBBBTBTBTBTBT B TBTBTBR/W R/W R/W R/W R/W PLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPLPL PL PL PL PL PL GAS GAS GAS GAS GAS GAS GAS GAS GAS 55 0 5455405355355 3 7 5 3 8 54 0 54 5 54 2 5385375 3 9 54 1 PRELIMINARY - NOT RELEASED FOR CONSTRUCTION, RECORDATION, CONVEYANCES, OR SALESFILE PATH:M:\Projects\Piedmont Natural Gas\2019019500CL - PNG Prospect Church (Airport) Road Replacement\CADD\Plan Set\Permitting\2019019500_C_SHT_STREAM WETLAND PERMITTING.dwg, LTRIPP, 7/28/2020 10:20:03 AM1213 W. MOREHEAD STREET SUITE 300 CHARLOTTE, NC 28208 (t)704-334-5348 WWW.WKDICKSON.COM NC LICENSE NO.F-0374 WKD PROJ. NO.: DRAWING NUMBER: PROJ. DATE: PROJ. MGR.: DESIGN BY: DRAWN BY:PROJECT NAME:DRAWING TITLE:COPYRIGHT ©, W.K. DICKSON & CO., INC. ALL RIGHTS RESERVED. REPRODUCTION OR USE OF THE CONTENTS OF THIS DOCUMENT; ADDITIONS ORDELETIONS TO THIS DOCUMENT, IN WHOLE OR IN PART, WITHOUT WRITTEN CONSENT OF W.K. DICKSON & CO., INC., IS PROHIBITED. ONLY COPIESFROM THE ORIGINAL OF THIS DOCUMENT, MARKED WITH AN ORIGINAL SIGNATURE AND SEAL SHALL BE CONSIDERED TO BE VALID, TRUE COPIES.community infrastructure consultants Know what'sbelow.before you digCall WGB GLT GLT JULY 2020 4 OF 15 20190195.00.CL 30'60' SCALE: 1" = 30' 0 15'STANLY COUNTYALBEMARLE, NORTH CAROLINAPROP. 15' STREAM BUFFER72" CMP PROP. LIMIT OF DISTURBANCE PROP. TEMPORARY EASEMENT (TYP.) PROP. PERMANENT EASEMENT (TYP.) AIRPORT ROAD (S.R. 1524) (NCDOT , 60' R/W PER M.B. 21, PG. 001) INV. OUT: 532.86'FLOW18" RCP INV. OUT: 540.33' EX. DROP INLET RIM: 545.32' INV. 18" RCP IN: 542.77'PROP. 8" 11.5 SDR MDPE NATURAL GAS PIPELINE TO BE INSTALLED BY OPEN-TRENCH, MIN. 36" DEEP APPROX. EXTENT OF EX. 30' OVERHEAD UTILITY EASEMENT (TYP.) AREA 3 IMPACT TABLE IMPACT TYPE & SITE #VALUE UNIT PERMANENT STREAM 0 LF PERMANENT WETLAND 0 AC TEMPORARY STREAM; S2 26 LF TEMPORARY WETLAND 0 AC PNG PROSPECT CHURCH (AIRPORT) ROADREPLACEMENT PROJECTPIEDMONT NATURAL GASAREA 3 IMPACT PLAN - 35.405358° N, 80.184550° WNOTE: SEE SHEET 1 FOR KEY MAP & LEGEND EX. JURISDICTIONAL STREAM - UT2 LITTLE LONG CREEK S2 APPROX. LOCATION OF PROP. TEMPORARY PUMP-AROUND (TYP.) (SEE DETAILS ON SHEET 13 - 14) OE OE OE OE OE OE OE OE OE OE OE OE OE OEOEOER/W R/W R/W R/W OE OE OE PL GAS GAS GAS GAS GAS GAS GAS GAS 5 3 7 5 3 8 54 0 54 2 5 3 9 54 1 54 3 54 4 545 546 547 5425435 4 4 54 5546 5 4 7 5 4 8 5 4 9 5 5 0 5 5 1 552553PRELIMINARY - NOT RELEASED FOR CONSTRUCTION, RECORDATION, CONVEYANCES, OR SALESFILE PATH:M:\Projects\Piedmont Natural Gas\2019019500CL - PNG Prospect Church (Airport) Road Replacement\CADD\Plan Set\Permitting\2019019500_C_SHT_STREAM WETLAND PERMITTING.dwg, LTRIPP, 7/28/2020 10:20:09 AM1213 W. MOREHEAD STREET SUITE 300 CHARLOTTE, NC 28208 (t)704-334-5348 WWW.WKDICKSON.COM NC LICENSE NO.F-0374 WKD PROJ. NO.: DRAWING NUMBER: PROJ. DATE: PROJ. MGR.: DESIGN BY: DRAWN BY:PROJECT NAME:DRAWING TITLE:COPYRIGHT ©, W.K. DICKSON & CO., INC. ALL RIGHTS RESERVED. REPRODUCTION OR USE OF THE CONTENTS OF THIS DOCUMENT; ADDITIONS ORDELETIONS TO THIS DOCUMENT, IN WHOLE OR IN PART, WITHOUT WRITTEN CONSENT OF W.K. DICKSON & CO., INC., IS PROHIBITED. ONLY COPIESFROM THE ORIGINAL OF THIS DOCUMENT, MARKED WITH AN ORIGINAL SIGNATURE AND SEAL SHALL BE CONSIDERED TO BE VALID, TRUE COPIES.community infrastructure consultants Know what'sbelow.before you digCall WGB GLT GLT JULY 2020 5 OF 15 20190195.00.CL 30'60' SCALE: 1" = 30' 0 15'STANLY COUNTYALBEMARLE, NORTH CAROLINAAREA 4 IMPACT TABLE IMPACT TYPE & SITE #VALUE UNIT PERMANENT STREAM 0 LF PERMANENT WETLAND 0 AC TEMPORARY STREAM 0 LF TEMPORARY WETLAND 0 AC PNG PROSPECT CHURCH (AIRPORT) ROADREPLACEMENT PROJECTPIEDMONT NATURAL GASAREA 4 IMPACT PLAN - 35.405419° N, 80.183875° WNOTE: SEE SHEET 1 FOR KEY MAP & LEGEND PROP. 15' WETLAND BUFFER PROP. LIMIT OF DISTURBANCE PROP. TEMPORARY EASEMENT (TYP.)PROP. PERMANENT EASEMENT (TYP.) AIRPORT ROAD (S.R. 1524) (NCDOT , 60' R/W PER M.B. 21, PG. 001)24" RCPINV. OUT: 544.40' PROP. 8" 11.5 SDR MDPE NATURAL GAS PIPELINE TO BE INSTALLED BY OPEN-TRENCH, MIN. 36" DEEP APPROX. EXTENT OF EX. 30' OVERHEAD UTILITY EASEMENT (TYP.) EX. JURISDICTIONAL WETLAND EX. NON-JURISDICTIONAL DITCH OEOEOEOEOEOEOEOETBBBBBBBBBBB BB BB BBR/WR/WR/WR/WR/WR/WR/WR/WTBTBTBTBTBPL PL PL PL PL PL PL PL PL PL PL PL PLPLPLPLPLGASGASGAS GASGASGASGASGAS556 555 557556555557558559 560 557556PRELIMINARY - NOT RELEASED FOR CONSTRUCTION, RECORDATION, CONVEYANCES, OR SALES FILE PATH:M:\Projects\Piedmont Natural Gas\2019019500CL - PNG Prospect Church (Airport) Road Replacement\CADD\Plan Set\Permitting\2019019500_C_SHT_STREAM WETLAND PERMITTING.dwg, LTRIPP, 7/28/2020 10:20:22 AM 1213 W. MOREHEAD STREETSUITE 300CHARLOTTE, NC 28208(t)704-334-5348WWW.WKDICKSON.COMNC LICENSE NO.F-0374WKD PROJ. NO.:DRAWING NUMBER:PROJ. DATE:PROJ. MGR.:DESIGN BY:DRAWN BY:PROJECT NAME: DRAWING TITLE: COPYRIGHT ©, W.K. DICKSON & CO., INC. ALL RIGHTS RESERVED. REPRODUCTION OR USE OF THE CONTENTS OF THIS DOCUMENT; ADDITIONS ORDELETIONS TO THIS DOCUMENT, IN WHOLE OR IN PART, WITHOUT WRITTEN CONSENT OF W.K. DICKSON & CO., INC., IS PROHIBITED. ONLY COPIESFROM THE ORIGINAL OF THIS DOCUMENT, MARKED WITH AN ORIGINAL SIGNATURE AND SEAL SHALL BE CONSIDERED TO BE VALID, TRUE COPIES.community infrastructure consultantsKnow what'sbelow.before you digCallWGBGLTGLTJULY 20206 OF 1520190195.00.CL60'120'SCALE: 1" = 60'0 30' STANLY COUNTY ALBEMARLE, NORTH CAROLINAAREA 5 IMPACT TABLEIMPACT TYPE &SITE #VALUEUNITPERMANENTSTREAM0LFPERMANENTWETLAND0ACTEMPORARYSTREAM0LFTEMPORARYWETLAND0ACPNG PROSPECT CHURCH (AIRPORT) ROAD REPLACEMENT PROJECT PIEDMONT NATURAL GAS AREA 5 IMPACT PLAN - 35.404336° N, 80.171919° WNOTE: SEE SHEET 1 FORKEY MAP & LEGENDPROP. 15' WETLANDBUFFERPROP. LIMIT OFDISTURBANCEPROP. PERMANENTEASEMENT (TYP.)AIRPORT ROAD(S.R. 1524)(NCDOT, 60' R/WPER M.B. 21, PG. 001)FLOW 15" RCP INV. IN: 555.84'PROP. 8" 11.5 SDR MDPE NATURALGAS PIPELINE TO BE INSTALLED BYHORIZONTAL DIRECTIONAL DRILLAPPROX. EXTENT OF EX.30' OVERHEAD UTILITYEASEMENT (TYP.)EX. JURISDICTIONAL STREAM -MOUNTAIN CREEKEX. JURISDICTIONAL WETLAND15" RCP INV. OUT: 555.44'15" RCP INV. IN: 558.04'15" RCP INV. OUT: 557.60'DATA PLOT 5-2DATA PLOT 5-1 OE OE OE OE OE OE OE OE TB TBBBR/W R/W R/W R/W GAS GAS G A S G A S GAS GAS GASGAS GAS575 57457357 3 57 4 575 576 577 575 576 577 578 57 2 FILE PATH:M:\Projects\Piedmont Natural Gas\2019019500CL - PNG Prospect Church (Airport) Road Replacement\CADD\Plan Set\Permitting\2019019500_C_SHT_STREAM WETLAND PERMITTING.dwg, LTRIPP, 7/28/2020 10:20:28 AM1213 W. MOREHEAD STREET SUITE 300 CHARLOTTE, NC 28208 (t)704-334-5348 WWW.WKDICKSON.COM NC LICENSE NO.F-0374 WKD PROJ. NO.: DRAWING NUMBER: PROJ. DATE: PROJ. MGR.: DESIGN BY: DRAWN BY:PROJECT NAME:DRAWING TITLE:COPYRIGHT ©, W.K. DICKSON & CO., INC. ALL RIGHTS RESERVED. REPRODUCTION OR USE OF THE CONTENTS OF THIS DOCUMENT; ADDITIONS ORDELETIONS TO THIS DOCUMENT, IN WHOLE OR IN PART, WITHOUT WRITTEN CONSENT OF W.K. DICKSON & CO., INC., IS PROHIBITED. ONLY COPIESFROM THE ORIGINAL OF THIS DOCUMENT, MARKED WITH AN ORIGINAL SIGNATURE AND SEAL SHALL BE CONSIDERED TO BE VALID, TRUE COPIES.community infrastructure consultants Know what'sbelow.before you digCall WGB GLT GLT JULY 2020 7 OF 15 20190195.00.CL 20'40' SCALE: 1" = 20' 0 10'STANLY COUNTYALBEMARLE, NORTH CAROLINAAREA 6 IMPACT TABLE IMPACT TYPE & SITE #VALUE UNIT PERMANENT STREAM 0 LF PERMANENT WETLAND 0 AC TEMPORARY STREAM 0 LF TEMPORARY WETLAND 0 AC PNG PROSPECT CHURCH (AIRPORT) ROADREPLACEMENT PROJECTPIEDMONT NATURAL GASAREA 6 IMPACT PLAN - 35.404181° N, 80.168642° WNOTE: SEE SHEET 1 FOR KEY MAP & LEGEND PROP. 15' WETLAND BUFFER PROP. LIMIT OF DISTURBANCE PROP. TEMPORARY EASEMENT (TYP.) PROP. PERMANENT EASEMENT (TYP.) AIRPORT ROAD (S.R. 1524) (NCDOT, 60' R/W PER M.B. 21, PG. 001)24" RCPINV. OUT: 573.33' PROP. 8" 11.5 SDR MDPE NATURAL GAS PIPELINE TO BE INSTALLED BY OPEN-TRENCH, MIN. 36" DEEP APPROX. EXTENT OF EX. 30' OVERHEAD UTILITY EASEMENT (TYP.) EX. JURISDICTIONAL WETLAND OEOEOEOEOEOEOEOETBTBR/WR/WR/WR/WPL PL PL PL PL PL PL PL PL PL PL PLGASGASGASGAS GASGASGASGAS57 8 57 7 57 6 577 579580581582578579580581FILE PATH:M:\Projects\Piedmont Natural Gas\2019019500CL - PNG Prospect Church (Airport) Road Replacement\CADD\Plan Set\Permitting\2019019500_C_SHT_STREAM WETLAND PERMITTING.dwg, LTRIPP, 7/28/2020 10:20:35 AM 1213 W. MOREHEAD STREETSUITE 300CHARLOTTE, NC 28208(t)704-334-5348WWW.WKDICKSON.COMNC LICENSE NO.F-0374WKD PROJ. NO.:DRAWING NUMBER:PROJ. DATE:PROJ. MGR.:DESIGN BY:DRAWN BY:PROJECT NAME: DRAWING TITLE: COPYRIGHT ©, W.K. DICKSON & CO., INC. ALL RIGHTS RESERVED. REPRODUCTION OR USE OF THE CONTENTS OF THIS DOCUMENT; ADDITIONS ORDELETIONS TO THIS DOCUMENT, IN WHOLE OR IN PART, WITHOUT WRITTEN CONSENT OF W.K. DICKSON & CO., INC., IS PROHIBITED. ONLY COPIESFROM THE ORIGINAL OF THIS DOCUMENT, MARKED WITH AN ORIGINAL SIGNATURE AND SEAL SHALL BE CONSIDERED TO BE VALID, TRUE COPIES.community infrastructure consultantsKnow what'sbelow.before you digCallWGBGLTGLTJULY 20208 OF 1520190195.00.CL20'40'SCALE: 1" = 20'0 10' STANLY COUNTY ALBEMARLE, NORTH CAROLINAAREA 7 IMPACT TABLEIMPACT TYPE &SITE #VALUEUNITPERMANENTSTREAM0LFPERMANENTWETLAND0ACTEMPORARYSTREAM; S321LFTEMPORARYWETLAND0ACPNG PROSPECT CHURCH (AIRPORT) ROAD REPLACEMENT PROJECT PIEDMONT NATURAL GAS AREA 7 IMPACT PLAN - 35.404106° N, 80.166622° WNOTE: SEE SHEET 1 FORKEY MAP & LEGENDPROP. 15' STREAM BUFFER15" CMP PROP. LIMIT OFDISTURBANCEPROP. TEMPORARYEASEMENT (TYP.)PROP. PERMANENTEASEMENT (TYP.)AIRPORT ROAD(S.R. 1524)(NCDOT, 60' R/WPER M.B. 21, PG. 001)FLOW INV. OUT: 575.70'PROP. 8" 11.5 SDR MDPE NATURALGAS PIPELINE TO BE INSTALLEDBY OPEN-TRENCH, MIN. 36" DEEPAPPROX. EXTENT OF EX.30' OVERHEAD UTILITYEASEMENT (TYP.)EX. JURISDICTIONAL STREAM -UT1 MOUNTAIN CREEKS3APPROX. LOCATION OF PROP.TEMPORARY PUMP-AROUND (TYP.)(SEE DETAILS ON SHEET 13 - 14) OE OE OE OE OE OE OE OE OE OE OE OE OE TBR/W R/W R/W R/W RR R/WRR R/WRR R/WRR R/WRR R/WGAS GAS GAS GAS GAS GAS GAS GAS GAS GV583582 581 580 580581 580579 579580582 581 582 FILE PATH:M:\Projects\Piedmont Natural Gas\2019019500CL - PNG Prospect Church (Airport) Road Replacement\CADD\Plan Set\Permitting\2019019500_C_SHT_STREAM WETLAND PERMITTING.dwg, LTRIPP, 7/28/2020 10:20:41 AM1213 W. MOREHEAD STREET SUITE 300 CHARLOTTE, NC 28208 (t)704-334-5348 WWW.WKDICKSON.COM NC LICENSE NO.F-0374 WKD PROJ. NO.: DRAWING NUMBER: PROJ. DATE: PROJ. MGR.: DESIGN BY: DRAWN BY:PROJECT NAME:DRAWING TITLE:COPYRIGHT ©, W.K. DICKSON & CO., INC. ALL RIGHTS RESERVED. REPRODUCTION OR USE OF THE CONTENTS OF THIS DOCUMENT; ADDITIONS ORDELETIONS TO THIS DOCUMENT, IN WHOLE OR IN PART, WITHOUT WRITTEN CONSENT OF W.K. DICKSON & CO., INC., IS PROHIBITED. ONLY COPIESFROM THE ORIGINAL OF THIS DOCUMENT, MARKED WITH AN ORIGINAL SIGNATURE AND SEAL SHALL BE CONSIDERED TO BE VALID, TRUE COPIES.community infrastructure consultants Know what'sbelow.before you digCall WGB GLT GLT JULY 2020 9 OF 15 20190195.00.CL 20'40' SCALE: 1" = 20' 0 10'STANLY COUNTYALBEMARLE, NORTH CAROLINAAREA 8 IMPACT TABLE IMPACT TYPE & SITE #VALUE UNIT PERMANENT STREAM 0 LF PERMANENT WETLAND; W1 0.018 AC TEMPORARY STREAM 0 LF TEMPORARY WETLAND; W2 0.018 AC PNG PROSPECT CHURCH (AIRPORT) ROADREPLACEMENT PROJECTPIEDMONT NATURAL GASAREA 8 IMPACT PLAN - 35.403692° N, 80.161622° WNOTE: SEE SHEET 1 FOR KEY MAP & LEGEND PROP. 15' WETLAND BUFFER PROP. LIMIT OF DISTURBANCE PROP. TEMPORARY EASEMENT (TYP.) PROP. PERMANENT EASEMENT (TYP.) AIRPORT ROAD (S.R. 1524)(NCDOT, 60' R/WPER M.B. 21, PG. 0 0 1 ) PROP. 8" 11.5 SDR MDPE NATURAL GAS PIPELINE TO BE INSTALLED BY OPEN-TRENCH, MIN. 36" DEEP APPROX. EXTENT OF EX. 30' OVERHEAD UTILITY EASEMENT (TYP.) EX. JURISDICTIONAL WETLAND W2 W1 OEOE OE OE OE OEOEOEOEOE OE FM TBTBTBBBBBBBB B BBTBTB TB R/W R/W R/W R/W R/W RR R/WRR R/WRR R/WRR R/WRR R/WRR R/WRR R/WRR R/WRR R/WFMFMFMFMPLPLPLRR R/WGAS GAS GAS GAS GAS GASGASGAS GAS GV GV 580 579579582582581580579 578 577 577577 578 579 580 581 582583 582 581 580 580581582583582 58 4 584 583 5 7 6 581 580 583 583582581580579578PRELIMINARY - NOT RELEASED FOR CONSTRUCTION, RECORDATION, CONVEYANCES, OR SALESFILE PATH:M:\Projects\Piedmont Natural Gas\2019019500CL - PNG Prospect Church (Airport) Road Replacement\CADD\Plan Set\Permitting\2019019500_C_SHT_STREAM WETLAND PERMITTING.dwg, LTRIPP, 7/28/2020 10:20:48 AM1213 W. MOREHEAD STREET SUITE 300 CHARLOTTE, NC 28208 (t)704-334-5348 WWW.WKDICKSON.COM NC LICENSE NO.F-0374 WKD PROJ. NO.: DRAWING NUMBER: PROJ. DATE: PROJ. MGR.: DESIGN BY: DRAWN BY:PROJECT NAME:DRAWING TITLE:COPYRIGHT ©, W.K. DICKSON & CO., INC. ALL RIGHTS RESERVED. REPRODUCTION OR USE OF THE CONTENTS OF THIS DOCUMENT; ADDITIONS ORDELETIONS TO THIS DOCUMENT, IN WHOLE OR IN PART, WITHOUT WRITTEN CONSENT OF W.K. DICKSON & CO., INC., IS PROHIBITED. ONLY COPIESFROM THE ORIGINAL OF THIS DOCUMENT, MARKED WITH AN ORIGINAL SIGNATURE AND SEAL SHALL BE CONSIDERED TO BE VALID, TRUE COPIES.community infrastructure consultants WGB GLT GLT JULY 2020 10 OF 15 20190195.00.CLSTANLY COUNTYALBEMARLE, NORTH CAROLINAAREA 9 IMPACT TABLE IMPACT TYPE & SITE #VALUE UNIT PERMANENT STREAM 0 LF PERMANENT WETLAND 0 AC TEMPORARY STREAM 0 LF TEMPORARY WETLAND 0 AC PNG PROSPECT CHURCH (AIRPORT) ROADREPLACEMENT PROJECTPIEDMONT NATURAL GASAREA 9 IMPACT PLAN - 35.403650° N, 80.161181° WPROP. 15' STREAM BUFFER PROP. LIMIT OF DISTURBANCE AIRPORT R O A D (S.R. 1524 ) (NCDOT , 60' R/W PER M.B. 2 1 , P G . 0 0 1 ) FL O W 30" DIP INV. IN: 577.20' PROP. 8" 11.5 SDR MDPE NATURAL GAS PIPELINE TO BE INSTALLED BY OPEN-TRENCH, MIN. 36" DEEP APPROX. EXTENT OF EX. 30' OVERHEAD UTILITY EASEMENT (TYP.) EX. JURISDICTIONAL STREAM - UT2 MOUNTAIN CREEK INV. OUT: 576.70' 1 8 " RCP18" RCP INV. OUT: 577.58'INV. OUT: 577.23'FLOWPROP. 8" 11.5 SDR MDPE NATURAL GAS PIPELINE WITH 12" API 5L PSL2 GRADE B (MIN.), 0.188" W.T. (MIN.) STEEL CASING TO BE INSTALLED BY DRY BORE WINSTON SALEMSOUTHBOUND RAILWAY(CSX, 300' R/W)Know what'sbelow.before you digCall 50'100' SCALE: 1" = 50' 0 25' NOTE: SEE SHEET 1 FOR KEY MAP & LEGEND PROP. TEMPORARY EASEMENT (TYP.) PROP. PERMANENT EASEMENT (TYP.) EX. NON-JURISDICTIONAL CHANNEL - REFER TO DATAFORM SCP1 OE OE OE OE OE OE OE OE FM FM FM FM FM FM FM FM FM FM R/WR/WTBTBTBTBTBTBTBTBTBTBTBTBTBTBBBBBBBBBBBBBBBBBBBBBBBBBR/W R/W PLPLPLPLPLPLPLPLPLPLPLPLGAS GAS GAS GAS GAS GAS GAS GAS 573 574 575 576 577 578 579 580 581 582 572 573 574575576 577 578579 580 581 582 5715705 7 2569570 PRELIMINARY - NOT RELEASED FOR CONSTRUCTION, RECORDATION, CONVEYANCES, OR SALESFILE PATH:M:\Projects\Piedmont Natural Gas\2019019500CL - PNG Prospect Church (Airport) Road Replacement\CADD\Plan Set\Permitting\2019019500_C_SHT_STREAM WETLAND PERMITTING.dwg, LTRIPP, 7/28/2020 10:20:55 AM1213 W. MOREHEAD STREET SUITE 300 CHARLOTTE, NC 28208 (t)704-334-5348 WWW.WKDICKSON.COM NC LICENSE NO.F-0374 WKD PROJ. NO.: DRAWING NUMBER: PROJ. DATE: PROJ. MGR.: DESIGN BY: DRAWN BY:PROJECT NAME:DRAWING TITLE:COPYRIGHT ©, W.K. DICKSON & CO., INC. ALL RIGHTS RESERVED. REPRODUCTION OR USE OF THE CONTENTS OF THIS DOCUMENT; ADDITIONS ORDELETIONS TO THIS DOCUMENT, IN WHOLE OR IN PART, WITHOUT WRITTEN CONSENT OF W.K. DICKSON & CO., INC., IS PROHIBITED. ONLY COPIESFROM THE ORIGINAL OF THIS DOCUMENT, MARKED WITH AN ORIGINAL SIGNATURE AND SEAL SHALL BE CONSIDERED TO BE VALID, TRUE COPIES.community infrastructure consultants Know what'sbelow.before you digCall WGB GLT GLT JULY 2020 11 OF 15 20190195.00.CL 20'40' SCALE: 1" = 20' 0 10'STANLY COUNTYALBEMARLE, NORTH CAROLINAAREA 10 IMPACT TABLE IMPACT TYPE & SITE #VALUE UNIT PERMANENT STREAM 0 LF PERMANENT WETLAND; W3 0.0138 AC TEMPORARY STREAM; S4 21 LF TEMPORARY WETLAND; W4 0.0141 AC PNG PROSPECT CHURCH (AIRPORT) ROADREPLACEMENT PROJECTPIEDMONT NATURAL GASAREA 10 IMPACT PLAN - 35.403256° N, 80.159586° WNOTE: SEE SHEET 1 FOR KEY MAP & LEGEND PROP. 15' WETLAND BUFFER30" RCPPROP. LIMIT OF DISTURBANCE PROP. TEMPORARY EASEMENT (TYP.) PROP. PERMANENT EASEMENT (TYP.) CARTER ACRES ROAD (S.R. 1524) (NCDOT, 60' R/W PER M.B. 21, PG. 001)FLOWINV. OUT: 570.05' PROP. 8" 11.5 SDR MDPE NATURAL GAS PIPELINE TO BE INSTALLED BY OPEN-TRENCH, MIN. 36" DEEP APPROX. EXTENT OF EX. 30' OVERHEAD UTILITY EASEMENT (TYP.) EX. JURISDICTIONAL STREAM - UT3 MOUNTAIN CREEK42" RCPINV. OUT: 571.06' EX. JURISDICTIONAL WETLAND DATA PLOT 10-1 DATA PLOT 10-2S4W4 W3 APPROX. LOCATION OF PROP. TEMPORARY PUMP-AROUND (TYP.) (SEE DETAILS ON SHEET 13 - 14) R/WR/WGAS GAS GAS GAS GAS GAS GAS GAS GASGASGASGASGASPL PL PL PL PL PL PL PL PL 58 4 585 586 587 588 589 589589 590 591 592 593 59 1 590 589 5 9 0 PRELIMINARY - NOT RELEASED FOR CONSTRUCTION, RECORDATION, CONVEYANCES, OR SALESFILE PATH:M:\Projects\Piedmont Natural Gas\2019019500CL - PNG Prospect Church (Airport) Road Replacement\CADD\Plan Set\Permitting\2019019500_C_SHT_STREAM WETLAND PERMITTING.dwg, LTRIPP, 7/28/2020 10:21:02 AM1213 W. MOREHEAD STREET SUITE 300 CHARLOTTE, NC 28208 (t)704-334-5348 WWW.WKDICKSON.COM NC LICENSE NO.F-0374 WKD PROJ. NO.: DRAWING NUMBER: PROJ. DATE: PROJ. MGR.: DESIGN BY: DRAWN BY:PROJECT NAME:DRAWING TITLE:COPYRIGHT ©, W.K. DICKSON & CO., INC. ALL RIGHTS RESERVED. REPRODUCTION OR USE OF THE CONTENTS OF THIS DOCUMENT; ADDITIONS ORDELETIONS TO THIS DOCUMENT, IN WHOLE OR IN PART, WITHOUT WRITTEN CONSENT OF W.K. DICKSON & CO., INC., IS PROHIBITED. ONLY COPIESFROM THE ORIGINAL OF THIS DOCUMENT, MARKED WITH AN ORIGINAL SIGNATURE AND SEAL SHALL BE CONSIDERED TO BE VALID, TRUE COPIES.community infrastructure consultants Know what'sbelow.before you digCall WGB GLT GLT JULY 2020 12 OF 15 20190195.00.CL 40'80' SCALE: 1" = 40' 0 20'STANLY COUNTYALBEMARLE, NORTH CAROLINAAREA 11 IMPACT TABLE IMPACT TYPE & SITE #VALUE UNIT PERMANENT STREAM 0 LF PERMANENT WETLAND; W5 0.016 AC TEMPORARY STREAM 0 LF TEMPORARY WETLAND; W6 0.015 AC PNG PROSPECT CHURCH (AIRPORT) ROADREPLACEMENT PROJECTPIEDMONT NATURAL GASAREA 11 IMPACT PLAN - 35.403386° N, 80.162865° WNOTE: SEE SHEET 1 FOR KEY MAP & LEGEND PROP. 15' WETLAND BUFFER PROP. LIMIT OF DISTURBANCE PROP. TEMPORARY EASEMENT (TYP.) PROP. PERMANENT EASEMENT (TYP.) PROP. 8" 11.5 SDR MDPE NATURAL GAS PIPELINE TO BE INSTALLED BY OPEN-TRENCH, MIN. 36" DEEP APPROX. EXTENT OF EX. 30' OVERHEAD UTILITY EASEMENT (TYP.) EX. JURISDICTIONAL WETLAND DATA PLOT 11-1 DATA PLOT 11-2 W6 W5 PRELIMINARY - NOT RELEASED FOR CONSTRUCTION, RECORDATION, CONVEYANCES, OR SALESFILE PATH:M:\Projects\Piedmont Natural Gas\2019019500CL - PNG Prospect Church (Airport) Road Replacement\CADD\Plan Set\Permitting\2019019500_C_SHT_STREAM WETLAND PERMITTING.dwg, LTRIPP, 7/28/2020 10:21:03 AM1213 W. MOREHEAD STREET SUITE 300 CHARLOTTE, NC 28208 (t)704-334-5348 WWW.WKDICKSON.COM NC LICENSE NO.F-0374 WKD PROJ. NO.: DRAWING NUMBER: PROJ. DATE: PROJ. MGR.: DESIGN BY: DRAWN BY:PROJECT NAME:DRAWING TITLE:COPYRIGHT ©, W.K. DICKSON & CO., INC. ALL RIGHTS RESERVED. REPRODUCTION OR USE OF THE CONTENTS OF THIS DOCUMENT; ADDITIONS ORDELETIONS TO THIS DOCUMENT, IN WHOLE OR IN PART, WITHOUT WRITTEN CONSENT OF W.K. DICKSON & CO., INC., IS PROHIBITED. ONLY COPIESFROM THE ORIGINAL OF THIS DOCUMENT, MARKED WITH AN ORIGINAL SIGNATURE AND SEAL SHALL BE CONSIDERED TO BE VALID, TRUE COPIES.community infrastructure consultants Know what'sbelow.before you digCall WGB GLT GLT JULY 2020 13 OF 15 20190195.00.CLSTANLY COUNTYALBEMARLE, NORTH CAROLINAPNG PROSPECT CHURCH (AIRPORT) ROADREPLACEMENT PROJECTPIEDMONT NATURAL GASSTREAM CROSSING PUMP-AROUND DETAILSGASGASGASGASWATTLE (TYP.) SILT FENCE (TYP.) SILT FENCE OUTLET (TYP.)COFFER DAM (TYP.) FLOW FLOW SUCTION HOSE DISCHARGE HOSE DEWATERING DEVICE PROPOSED PIPELINE (TYP.) ENERGY DISSIPATION BYPASS PUMP. CONTRACTOR SHALL BE RESPONSIBLE FOR SELECTING PUMP ADEQUATE ENOUGH TO HANDLE THE BYPASS FLOW GENERATED BY THE DAMMING OF THE STREAM PUMP FLOATING INTAKE GENERAL NOTES: 1. CONTRACTOR SHALL ENSURE TO ANCHOR ALL PUMPS AND PIPES SECURELY. 2. CONTRACTOR SHALL UTILIZE NCDEQ EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL AND NCDOT BEST MANAGEMENT PRACTICES FOR CONSTRUCTION AND MAINTENANCE OF STREAM CROSSING. 3. CONTRACTOR SHALL PERFORM CROSSING WHEN PRECIPITATION HAS NOT OCCURRED IN THE PAST 48 HOURS AND WHEN PRECIPITATION IS NOT FORECASTED WITHIN STREAM CROSSING CONSTRUCTION WINDOW. 4. ALL DISTURBED STREAM BANKS SHALL BE STABILIZED WITH COIR FIBER EROSION CONTROL MATTING (OR APPROVED EQUIVALENT). DO NOT INSTALL EROSION CONTROL MATTING WITHIN THE TYPICAL HIGH WATER FLOW LINE OF THE STREAM. CONSTRUCTION SEQUENCE 1. SET UP BYPASS PUMP AND TEMPORARY PIPING. PLACE OUTLET OF TEMPORARY PIPE TO MINIMIZE EROSION AT DISCHARGE SITE OR PROVIDE TEMPORARY ENERGY DISSIPATION MEASURES. FIRMLY ANCHOR PUMP AND PIPING. 2. CONSTRUCT OUTLET PROTECTION IF NEEDED. 3. CONSTRUCT SAND BAG COFFER DAM UPSTREAM OF WORK AREA TO IMPOUND WATER FOR BYPASS PUMP INTAKE. USE A FLOATING INTAKE FOR PUMPS WHERE POSSIBLE. 4. CONSTRUCT AN SAND BAG COFFER DAM DOWNSTREAM TO ISOLATE WORK AREA. 5. CHECK OPERATION OF PUMP AND PIPING SYSTEM 6. EXCAVATE AND SAVE THE EXISTING STREAM SURFACE COBBLE FOR USE IN FINAL STABILIZATION. IF NO STREAM COBBLE IS PRESENT, EXCAVATE AS TYPICAL AND REFER TO NOTE 8A FOR CHANNEL FLOW LINE STABILIZATION. 7. INSTALL PROPOSED PIPELINE AS SHOWN ON PLANS. 8. BACKFILL TRENCH WITH NATIVE SOIL AND COMPACT TO PNG SPECIFICATIONS. UPON BACKFILLING OF TRENCH, REPLACE EXCAVATED STREAM COBBLE TO RESTORE STREAM FLOW LINE TO ITS ORIGINAL CONDITION AND PROVIDE SURFACE STABILIZATION. 9. STABILIZE ALL OTHER DISTURBED AREAS AS DETAILED IN GENERAL NOTE 4 ON THIS SHEET, AND IN THE CHANNEL CROSSING POST-CONSTRUCTION STABILIZATION DETAIL ON THIS SHEET. CONTRACTOR SHALL ADHERE TO ALL 401/404 PERMIT GUIDELINES FOR RE-ESTABLISHING VEGETATION WITHIN STREAM BANKS. 10. UPON COMPLETION OF CONSTRUCTION, REMOVE SAND BAG COFFER DAM, BYPASS PUMP, AND TEMPORARY PIPE. MAINTENANCE 1. ROUTINELY INSPECT BYPASS PUMP AND TEMPORARY PIPING TO ENSURE PROPER OPERATION. 2. INSPECT SAND BAG COFFER DAM FOR LEAKS AND REPAIR ANY DAMAGE. 3. INSPECT DISCHARGE POINT FOR EROSION. 4. ENSURE FLOW IS ADEQUATELY DIVERTED THROUGH PIPE. PRELIMINARY - NOT RELEASED FOR CONSTRUCTION, RECORDATION, CONVEYANCES, OR SALESFILE PATH:M:\Projects\Piedmont Natural Gas\2019019500CL - PNG Prospect Church (Airport) Road Replacement\CADD\Plan Set\Permitting\2019019500_C_SHT_STREAM WETLAND PERMITTING.dwg, LTRIPP, 7/28/2020 10:21:04 AM1213 W. MOREHEAD STREET SUITE 300 CHARLOTTE, NC 28208 (t)704-334-5348 WWW.WKDICKSON.COM NC LICENSE NO.F-0374 WKD PROJ. NO.: DRAWING NUMBER: PROJ. DATE: PROJ. MGR.: DESIGN BY: DRAWN BY:PROJECT NAME:DRAWING TITLE:COPYRIGHT ©, W.K. DICKSON & CO., INC. ALL RIGHTS RESERVED. REPRODUCTION OR USE OF THE CONTENTS OF THIS DOCUMENT; ADDITIONS ORDELETIONS TO THIS DOCUMENT, IN WHOLE OR IN PART, WITHOUT WRITTEN CONSENT OF W.K. DICKSON & CO., INC., IS PROHIBITED. ONLY COPIESFROM THE ORIGINAL OF THIS DOCUMENT, MARKED WITH AN ORIGINAL SIGNATURE AND SEAL SHALL BE CONSIDERED TO BE VALID, TRUE COPIES.community infrastructure consultants Know what'sbelow.before you digCall WGB GLT GLT JULY 2020 14 OF 15 20190195.00.CLSTANLY COUNTYALBEMARLE, NORTH CAROLINAPNG PROSPECT CHURCH (AIRPORT) ROADREPLACEMENT PROJECTPIEDMONT NATURAL GASSTREAM CROSSING PUMP-AROUND DETAILSCOFFER DAM DETAIL CONSTRUCTION SPECIFICATION 1. REMOVE BRANCHES AND LARGE ROCKS FROM AREA WHERE THE SAND BAGS WILL BE PLACED. 2. LAY OUT THE IMPERVIOUS POLY-FABRIC LINER WITH THE CENTER OF THE LINER LOCATED OVER THE CENTER OF THE SAND BAG DIKE. 3. PLACE THE PLASTIC WRAPPED SANDBAGS TO THE DESIRED HEIGHT. THE DIKES SHALL HAVE A WIDTH SUITABLE TO SUPPORT THE HEIGHT. EACH ROW SHALL BE OFFSET SO THE JOINTS ARE STAGGERED. PACK SANDBAGS TIGHTLY TOGETHER. 4. WRAP IMPERVIOUS POLY-FABRIC LINER AROUND SANDBAG DIKE AND SECURE WITH FINAL LAYER OF SANDBAGS. MAINTENANCE 1. PERIODICALLY INSPECT SANDBAG DIKE FOR DAMAGE AND LEAKS. 2. REMOVE IMPOUNDED TRASH AND SEDIMENT AS NEEDED. COIR FIBER MATTING (400 G/M²) 9"-12" DIAMETER COIR FIBER ROLL EX.STREAM BANK STREAM CROSSING POST-CONSTRUCTION STABILIZATION STABILIZE CHANNEL FLOW LINE WITH ORIGINAL STREAM COBBLE KEY IN MATTING PER MANUFACTURERS INSTRUCTIONS PRELIMINARY - NOT RELEASED FOR CONSTRUCTION, RECORDATION, CONVEYANCES, OR SALESFILE PATH:M:\Projects\Piedmont Natural Gas\2019019500CL - PNG Prospect Church (Airport) Road Replacement\CADD\Plan Set\Permitting\2019019500_C_SHT_STREAM WETLAND PERMITTING.dwg, LTRIPP, 7/28/2020 10:21:05 AM1213 W. MOREHEAD STREET SUITE 300 CHARLOTTE, NC 28208 (t)704-334-5348 WWW.WKDICKSON.COM NC LICENSE NO.F-0374 WKD PROJ. NO.: DRAWING NUMBER: PROJ. DATE: PROJ. MGR.: DESIGN BY: DRAWN BY:PROJECT NAME:DRAWING TITLE:COPYRIGHT ©, W.K. DICKSON & CO., INC. ALL RIGHTS RESERVED. REPRODUCTION OR USE OF THE CONTENTS OF THIS DOCUMENT; ADDITIONS ORDELETIONS TO THIS DOCUMENT, IN WHOLE OR IN PART, WITHOUT WRITTEN CONSENT OF W.K. DICKSON & CO., INC., IS PROHIBITED. ONLY COPIESFROM THE ORIGINAL OF THIS DOCUMENT, MARKED WITH AN ORIGINAL SIGNATURE AND SEAL SHALL BE CONSIDERED TO BE VALID, TRUE COPIES.community infrastructure consultants Know what'sbelow.before you digCall WGB GLT GLT JULY 2020 15 OF 15 20190195.00.CLSTANLY COUNTYALBEMARLE, NORTH CAROLINAPNG PROSPECT CHURCH (AIRPORT) ROADREPLACEMENT PROJECTPIEDMONT NATURAL GASSTREAM CROSSING PUMP-AROUND DETAILSRIPARIAN SEEDING NOTES THE RIPARIAN SEED MIX SHOULD BE USED IN LIEU OF A TYPICAL PERMANENT SEEDING MIXTURE FOR STABILIZING DISTURBANCES WITHIN ENVIRONMENTALLY SENSITIVE AREAS SUCH AS STREAM BANKS, WETLANDS, AND ALL AREAS WITHIN 15' OF A STREAM BANK OR WETLAND EDGE. RIPARIAN SEEDING RECOMMENDATIONS FOR ALL SEASONS SEEDING MIXTURE ERNST CONSERVATION SEEDS RIPARIAN BUFFER MIX - ERNMX-178 PRE-MIXED SEED 22.1% PANICUM CLANDESTINUM, TIOGA (DEERTONGUE, TIOGA) 20.0% ELYMUS VIRGINICUS, 'MADISON' (VIRGINIA WILDRYE, ‘MADISON’) 18.0% ANDROPOGON GERARDII, 'NIAGARA' (BIG BLUESTEM, ‘NIAGARA’) 18.0% SORGHASTRUM NUTANS, PA ECOTYPE (INDIANGRASS, PA ECOTYPE) 10.0% PANICUM VIRGATUM, 'SHAWNEE' (SWITCHGRASS, ‘SHAWNEE’) 3.0% RUDBECKIA HIRTA, COASTAL PLAIN NC ECOTYPE (BLACKEYED SUSAN, COASTAL PLAIN NC ECOTYPE) 2.0% ASCLEPIAS INCARNATA, PA ECOTYPE (SWAMP MILKWEED, PA ECOTYPE) 2.0% VERBENA HASTATA, PA ECOTYPE (BLUE VERVAIN, PA ECOTYPE) 1.0% EUPATORIUM PERFOLIATUM, PA ECOTYPE (BONESET, PA ECOTYPE) 1.0% HELENIUM AUTUMNALE, PA ECOTYPE (COMMON SNEEZEWEED, PA ECOTYPE) 0.7% ASTER NOVAE-ANGLIAE, PA ECOTYPE (NEW ENGLAND ASTER, PA ECOTYPE) 0.7% ASTER UMBELLATUS, PA ECOTYPE (FLAT TOPPED WHITE ASTER, PA ECOTYPE) 0.7% ZIZIA AUREA, PA ECOTYPE (GOLDEN ALEXANDERS, PA ECOTYPE) 0.5% MONARDA FISTULOSA, FORT INDIANTOWN GAP-PA ECOTYPE (WILD BERGAMOT, FORT INDIANTOWN GAP-PA ECOTYPE) 0.3% SOLIDAGO RUGOSA, PA ECOTYPE (WRINKLELEAF GOLDENROD, PA ECOTYPE) SEEDING RATE: 20 LB/ACRE OF SEED MIX PLUS AN ADDITIONAL 10 LB/ACRE OF (DRY SITES - GRAIN OATS, JAN 1 - AUG 1; OR GRAIN RYE, AUG 1 - JAN 1; MOIST SITES - GRAIN RYE YEAR-ROUND) SEEDING DATES: MOUNTAINS - YEAR-ROUND PIEDMONT - YEAR-ROUND COASTAL PLAIN - YEAR-ROUND MAINTENANCE RE-FERTILIZE IF GROWTH IS NOT FULLY ADEQUATE. RESEED, RE-FERTILIZE AND MULCH IMMEDIATELY FOLLOWING EROSION OR OTHER DAMAGE.