HomeMy WebLinkAbout2020-0731_IAP_EffectivenessReport_CoverLetter526 South Church Street
DUKE
4n
Charlotte, NC 28202
Mailing Address:
ENERGY.
PO Box 1006
Mail Code EC13K
Charlotte, NC 28201-1006
9Rn .37.3 66.M
July 31, 2020
* Submitted electronically via email. *
North Carolina Department of Environmental Quality
Division of Water Resources
Solid Waste Section
2090 US-70
Swannanoa, NC 28778
Attn: Mr. Ted Campbell
Subject: Asheville Steam Electric Plant Interim Action Plan 2020 Effectiveness Monitoring Report
Dear Mr. Campbell:
Duke Energy Progress, LLC. (Duke Energy) submits herein the Interim Action Plan 2020
Effectiveness Monitoring Report which covers the period of June 2019 through June 2020 for
the extraction well system at the Asheville Steam Electric Plant. This report was generated by
SynTerra on behalf of Duke Energy Progress, LLC.
Per the Department of Environmental Quality (DEQ) email from Mr. Steve Lanter to Mr. John
Toepfer dated April 22, 2020, the due date for this report and all subsequent reports was
deferred from April 30 to July 31 annually. If you have any questions on the enclosed
information, please contact me at Bryson.Allison@duke-energy.com or (706) 910-9638.
Respectfully submitted,
Digitally signed by L. Bryson S.
L. Bryson S. Allison Allison
Date: 2020.07.31 16:39:45-04'00'
L. Bryson S. Allison, P.E.
Engineer
Environmental Services
Attachment: Interim Action Plan 2020 Effectiveness Monitoring Report, Asheville Steam
Electric Plant