Loading...
HomeMy WebLinkAbout2020-0731_IAP_EffectivenessReport_CoverLetter526 South Church Street DUKE 4n Charlotte, NC 28202 Mailing Address: ENERGY. PO Box 1006 Mail Code EC13K Charlotte, NC 28201-1006 9Rn .37.3 66.M July 31, 2020 * Submitted electronically via email. * North Carolina Department of Environmental Quality Division of Water Resources Solid Waste Section 2090 US-70 Swannanoa, NC 28778 Attn: Mr. Ted Campbell Subject: Asheville Steam Electric Plant Interim Action Plan 2020 Effectiveness Monitoring Report Dear Mr. Campbell: Duke Energy Progress, LLC. (Duke Energy) submits herein the Interim Action Plan 2020 Effectiveness Monitoring Report which covers the period of June 2019 through June 2020 for the extraction well system at the Asheville Steam Electric Plant. This report was generated by SynTerra on behalf of Duke Energy Progress, LLC. Per the Department of Environmental Quality (DEQ) email from Mr. Steve Lanter to Mr. John Toepfer dated April 22, 2020, the due date for this report and all subsequent reports was deferred from April 30 to July 31 annually. If you have any questions on the enclosed information, please contact me at Bryson.Allison@duke-energy.com or (706) 910-9638. Respectfully submitted, Digitally signed by L. Bryson S. L. Bryson S. Allison Allison Date: 2020.07.31 16:39:45-04'00' L. Bryson S. Allison, P.E. Engineer Environmental Services Attachment: Interim Action Plan 2020 Effectiveness Monitoring Report, Asheville Steam Electric Plant