HomeMy WebLinkAbout20200981 Ver 1_Corps signed PJD_20200730 1
PRELIMINARY JURISDICTIONAL DETERMINATION FORM
BACKGROUND INFORMATION
A. REPORT COMPLETION DATE FOR PRELIMINARY JURISDICTIONAL DETERMINATION (JD): July 22,
2016
B. NAME AND ADDRESS OF PERSON REQUESTING PRELIMINARY JD:
Soil and Environmental Consultants
Attn: Kevin Martin
8412 Falls of Neuse Rd., suite 104
Raleigh, NC 27615
C. DISTRICT OFFICE, FILE NAME, AND NUMBER: Wilmington, Dameron site/High Bar Creek, LLC/Friendship
Rd./Wake Forest/Wake County , SAW-2016-00650
D. PROJECT LOCATION(S) AND BACKGROUND INFORMATION: The project site is approximately 66 acres
bounded to the north by NC Hwy 98 bypass, and to the west and east by tributaries to Smith Creek. Please see the
attached aquatic resources inventory table and map for size and locations of jurisdictional features on site.
(USE THE ATTACHED TABLE TO DOCUMENT MULTIPLE WATERBODIES AT DIFFERENT SITES)
State: NC County/parish/borough: Wake City: Wake Forest
Center coordinates of site (lat/long in degree decimal format): Lat. 35.964260777016° N, Long. -78.5042731381472° W
Universal Transverse Mercator:
Name of nearest water body: Smith Creek
Identify (estimate) amount of waters in the review area:
Non-wetland waters: ~4,000 linear feet: varies width (ft) and/or acres.
Cowardin Class: Riverine
Stream Flow: Perennial
Wetlands: acres.
Cowardin Class:
Name of any water bodies on the site that have been identified as Section 10 waters:
Tidal:
Non-Tidal:
E. REVIEW PERFORMED FOR SITE EVALUATION (CHECK ALL THAT APPLIES):
Office (Desk) Determination. Date:
Field Determination. Date(s): May 17, 2016
1. The Corps of Engineers believes that there may be jurisdictional waters of the United States on the subject site, and the permit
applicant or other affected party who requested this preliminary JD is hereby advised of his or her option to request and o btain an
approved jurisdictional determination (JD) for that site. Nevertheless, the permit applicant or other person who requested t his
preliminary JD has declined to exercise the option to obtain an approved JD in this instance and at this time.
2. In any circumstance where a permit applicant obtains an individual permit, or a Nationwide General Permit (NWP) or other
general permit verification requiring “pre-construction notification” (PCN), or requests verification for a non-reporting NWP or
other general permit, and the permit applicant has not requested an approved JD for the activity, the permit applicant is hereby
made aware of the following: (1) the permit applicant has elected to seek a permit authorization based on a preliminary JD, which
does not make an official determination of jurisdictional waters; (2) that the applicant has the option to request an approved JD
before accepting the terms and conditions of the permit authorization, and that basing a permit authorization on an approved JD
could possibly result in less compensatory mitigation being required or different special conditions; (3) that the applicant has the
right to request an individual permit rather than accepting the terms and conditions of the NWP or other general permit
authorization; (4) that the applicant can accept a permit authorization and thereby agree to comply with all the terms and
conditions of that permit, including whatever mitigation requirements the Corps has determined to be necessary; (5) that
undertaking any activity in reliance upon the subject permit authorization without requesting an approved JD constitutes the
applicant’s acceptance of the use of the preliminary JD, but that either form of JD will be processed as soon as is practicab le;
(6) accepting a permit authorization (e.g., signing a proffered individual permit) or undertaking any activity in reliance on any
form of Corps permit authorization based on a preliminary JD constitutes agreement that all wetlands and other water bodies o n
the site affected in any way by that activity are jurisdictional waters of the United States, and precludes any challenge to such
jurisdiction in any administrative or judicial compliance or enforcement action, or in any administrative appeal or in any Fe deral
2
court; and (7) whether the applicant elects to use either an approved JD or a preliminary JD, that JD will be processed as soon as
is practicable. Further, an approved JD, a proffered individual permit (and all terms and conditions contained therein), or
individual permit denial can be administratively appealed pursuant to 33 C.F.R. Part 331, and that in any administrative appeal,
jurisdictional issues can be raised (see 33 C.F.R. 331.5(a)(2)). If, during that administrative appeal, it becomes necessary to make
an official determination whether CWA jurisdiction exists over a site, or to provide an official delineation of jurisdictional wat ers
on the site, the Corps will provide an approved JD to accomplish that result, as soon as is practicable.
This preliminary JD finds that there “may be” waters of the United States on the subject project site, and identifies all aquatic
features on the site that could be affected by the proposed activity, based on the following information:
SUPPORTING DATA. Data reviewed for preli minary JD (check all that apply - checked items should be included in case
file and, where checked and requested, appropriately reference sources below):
Maps, plans, plots or plat submitted by or on behalf of the applicant/consultant: Soil and Environmental Consultants.
Data sheets prepared/submitted by or on behalf of the applicant/consultant.
Office concurs with data sheets/delineation report.
Office does not concur with data sheets/delineation report.
Data sheets prepared by the Corps: .
Corps navigable waters’ study: .
U.S. Geological Survey Hydrologic Atlas: .
USGS NHD data.
USGS 8 and 12 digit HUC maps.
U.S. Geological Survey map(s). Cite scale & quad name: Rolesville/Wake Forest.
USDA Natural Resources Conservation Service Soil Survey. Citation: Wake County (1970).
National wetlands inventory map(s). Cite name: .
State/Local wetland inventory map(s): .
FEMA/FIRM maps: .
100-year Floodplain Elevation is: (National Geodetic Vertical Datum of 1929)
Photographs: Aerial (Name & Date): .
or Other (Name & Date): .
Previous determination(s). File no. and date of response letter: .
Other information (please specify): .
IMPORTANT NOTE: The information recorded on this form has not necessarily been verified by the Corps and should
not be relied upon for later jurisdictional determinations.
_________________________ __________________________
Signature and date of Signature and date of
Regulatory Project Manager person requesting preliminary JD
(REQUIRED) (REQUIRED, unless obtaining the signature is
Impracticable)
Aquatic Resources Inventory Table
Site
number Latitude Longitude Cowardin
Class
Estimated amount of
aquatic resource in
review area
Class of aquatic
resource
Stream A
(Dunn
Creek)
35.9629 -78.5065 Riverine ~3,000 linear feet non-section 10 – non-
wetland
Stream B 35.9633 -78.5027 Riverine ~1,900 linear feet non-section 10 – non-
wetland
NOTIFICATION OF ADMINISTRATIVE APPEAL OPTIONS AND PROCESS AND
REQUEST FOR APPEAL
Applicant: Soil and Environmental Consultants
Attn: Kevin Martin
File Number: SAW-2016-00650 Date: July 22, 2016
Attached is: See Section below
INITIAL PROFFERED PERMIT (Standard Permit or Letter of permission) A
PROFFERED PERMIT (Standard Permit or Letter of permission) B
PERMIT DENIAL C
APPROVED JURISDICTIONAL DETERMINATION D
PRELIMINARY JURISDICTIONAL DETERMINATION E
SECTION I - The following identifies your rights and options regarding an administrative appeal of the above decision.
Additional information may be found at http://www.usace.army.mil/inet/functions/cw/cecwo/reg or
Corps regulations at 33 CFR Part 331.
A: INITIAL PROFFERED PERMIT: You may accept or object to the permit.
ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final
authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your
signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all
rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the
permit.
OBJECT: If you object to the permit (Standard or LOP) because of certain terms and conditions therein, you may request
that the permit be modified accordingly. You must complete Section II of this form and return the form to the district
engineer. Your objections must be received by the district engineer within 60 days of the date of this notice, or you will
forfeit your right to appeal the permit in the future. Upon receipt of your letter, the district engineer will evaluate your
objections and may: (a) modify the permit to address all of your concerns, (b) modify the permit to address some of your
objections, or (c) not modify the permit having determined that the permit should be issued as previously written. After
evaluating your objections, the district engineer will send you a proffered permit for your reconsideration, as indicated in
Section B below.
B: PROFFERED PERMIT: You may accept or appeal the permit
ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final
authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your
signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all
rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the
permit.
APPEAL: If you choose to decline the proffered permit (Standard or LOP) because of certain terms and conditions therein,
you may appeal the declined permit under the Corps of Engineers Administrative Appeal Process by completing Section II of
this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days
of the date of this notice.
C: PERMIT DENIAL: You may appeal the denial of a permit under the Corps of Engineers Administrative Appeal Process by
completing Section II of this form and sending the form to the division engineer. This form must be received by the division
engineer within 60 days of the date of this notice.
D: APPROVED JURISDICTIONAL DETERMINATION: You may accept or appeal the approved JD or provide new
information.
ACCEPT: You do not need to notify the Corps to accept an approved JD. Failure to notify the Corps within 60 days of the
date of this notice, means that you accept the approved JD in its entirety, and waive all rights to appeal the approved JD.
APPEAL: If you disagree with the approved JD, you may appeal the approved JD under the Corps of Engineers
Administrative Appeal Process by completing Section II of this form and sending the form to the district engineer. This form
must be received by the division engineer within 60 days of the date of this notice.
E: PRELIMINARY JURISDICTIONAL DETERMINATION: You do not need to respond to the Corps regarding the
preliminary JD. The Preliminary JD is not appealable. If you wish, you may request an approved JD (which may be appealed),
by contacting the Corps district for further instruction. Also you may provide new information for further consideration by the
Corps to reevaluate the JD.
SECTION II - REQUEST FOR APPEAL or OBJECTIONS TO AN INITIAL PROFFERED PERMIT
REASONS FOR APPEAL OR OBJECTIONS: (Describe your reasons for appealing the decision or your objections to an initial
proffered permit in clear concise statements. You may attach additional information to this form to clarify where your reasons or
objections are addressed in the administrative record.)
ADDITIONAL INFORMATION: The appeal is limited to a review of the administrative record, the Corps memorandum for the
record of the appeal conference or meeting, and any supplemental information that the review officer has determined is needed to
clarify the administrative record. Neither the appellant nor the Corps may add new information or analyses to the record.
However, you may provide additional information to clarify the location of information that is already in the administrative
record.
POINT OF CONTACT FOR QUESTIONS OR INFORMATION:
If you have questions regarding this decision and/or the
appeal process you may contact:
District Engineer, Wilmington Regulatory Division,
Raleigh Regulatory Field Office
Attn: James Lastinger, Regulatory Specialist
3331 Heritage Trade Dr., suite 105
Wake Forest, NC 27587
919-554-4884 ext 32
If you only have questions regarding the appeal process you may
also contact:
Mr. Jason Steele, Administrative Appeal Review Officer
CESAD-PDO
U.S. Army Corps of Engineers, South Atlantic Division
60 Forsyth Street, Room 10M15
Atlanta, Georgia 30303-8801
Phone: (404) 562-5137
RIGHT OF ENTRY: Your signature below grants the right of entry to Corps of Engineers personnel, and any government
consultants, to conduct investigations of the project site during the course of the appeal process. You will be provided a 15 day
notice of any site investigation, and will have the opportunity to participate in all site investigations.
________________________________________
Signature of appellant or agent.
Date: Telephone number:
For appeals on Initial Proffered Permits send this form to:
District Engineer, Wilmington Regulatory Division, Attn: , 69 Darlington Avenue, Wilmington, North Carolina
28403
For Permit denials, Proffered Permits and approved Jurisdictional Determinations send this form to:
Division Engineer, Commander, U.S. Army Engineer Division, South Atlantic, Attn: Mr. Jason Steele, Administrative
Appeal Officer, CESAD-PDO, 60 Forsyth Street, Room 10M15, Atlanta, Georgia 30303-8801
Phone: (404) 562-5137
MAP TITLE
N
"YN e Ct V-/-- A
0 205 410 820 Feet
1 inch = 400 feet
Disclaimer
ili makes every effort to produce and publish
the most current and accurate mbermation possible.
However, the maps are produced for information proposes,
and are NOT surveys. No warranties, expressed or implied
,are provided for the data therein, its use,or its interpretation.