Loading...
HomeMy WebLinkAbout20200622 Ver 1_Project 15-0034 Coastal Storm Damage Reduction plan_20200731Pat McCrory, Governor August 14, 2014 Mr. Eric Gasch Department of the Army Wilmington District Corps of Engineers 69 Darlington Avenue Wilmington, North Carolina 28403-1343 Bill Daughtridge, Jr., Secretary Ile: SCH File # 1.5-E-0000-0034; FONSI; Proposal is for the refinement in utilization of borrow areas located offshore of 'Topsail Island for the Coastal Storm Damage Reduction plan for Surf City and North Topsail Beaches. Dear Mr. Gasch: The above referenced environmental impact information has been submitted to the State Clearinghouse under the provisions of the National Environmental Policy Act. According to G.S. 113A-10, when a state agency is required to prepare an environmental document under the provisions of federal law, the environmental document meets the provisions of the State Environmental Policy Act. Attached to this letter for your consideration are the comments made by agencies in the course of this review. If any fin-ther environmental review documents are prepared for this project, they should be forwarded to this office for intergovernmental review. Should you have any questions, please do not hesitate to call. Sincerely, Cryst Best State Environmental Review Clearinghouse Attachments cc: Region Region P Mailing Address: Telephone: (919)807-2425 Location Address: 1301 Mail Service Center Fax (919)733-9571 116 West Jones Street Raleigh, NC 27699-1301 State Courier #51-01-00 Raleigh, North Carolina e-mail state. clearinghouse@doa.nc.gov An Equal Opportunity/Affirmative Action Employer r igA ZZ NCDENR North Carolina Department of Environment and Natural Resources Pat McCrory Governor John E. Skvarla, III Secretary MEMORANDUM TO: Crystal Best State Clearinghouse FROM: Lyn Hardison Division of Environ ental Assistance and Customer Service Permit Assistance & Project Review Coordinator RE: 15-0034 Finding of No Significant Impact Proposal is for the refinement in utilization of borrow areas located offshore of Topsail Island for the Coastal Storm Damage Reduction plan for Surf City and North Topsail Beaches Fender Onslow Counties Date: August 14, 2014 The Department of Environment and Natural Resources has reviewed the proposal for the referenced project. The comments are attached for the applicant's consideration. The Department appreciates the cooperative efforts and open communication the applicant has with our agencies and we encourage these efforts to continue as they move forward with the project. Thank you for the opportunity to respond. Attachment 1639 Mail Service Center, Raleigh, Noiih Carolina 27699.1639 Crtstomer Servico Toll Free 1-877-623.67481% Internet: w1,v.w.ncdenrcg0v An EQ.X'il Cppoduniiyi Af4;cnavve Acke , Empr:.oyor. Made in part by recycled paper State of Korth Carolina Department of Environment and Natural Resources INTERGOVERNMENTAL REVIEW - PROJECT COMMENTS Reviewing Office: WIRO Project Nurrlbert5-0034Due date: 8/8/2014 Oot.tntyPender After review of this project it has been detennined that the ENR pemtii(s) and/or approvals indicated nlay need to be obtained in order for this project to comply With North Carolina Law, Questions regarding these permits should be addressed to the Regional Off -ice indicated on the reverse of the farm. Alt applications, information and guidelines relative to these plans and permits are available from the same Regional Office. Norn€al Process Time PERMITS SPECIAL APPLICATION PROCEDURES or REQUIREMENTS (statutory time limit) Permit to construct & operate Wastewater treatment facilities. & sewer systems not discharging Application 90 days before begin construction or award ofconstruction 30 days sewer system extensions contracts. On -site inspection. Past -application technical conference usual_ (90 days) into state surface waters. NPDES into surface water and/or permit to discharge argeconstruct Application 180 days before begin activity. On -site inspection. Pre- application conference usual. Additionally, obtain permit to construct 90-120 days to operate and wastewater facilities wastewater treatment facility -granted after NPDES. Reply time, 30 days aftet (N/A) discharging into state surface Waters. receipt of plans or issue of NPDES permit -whichever is later. El Water Use Permit Pre -application technical conference usually necessary ( days (N/A) Well Construction Permit Complete application must be received and permit issued prior to the 7 days installation of a well. (15 days) Application copy must be served on each adjacent riparian property owner. Dredge and Fill Permit On -site inspection. Pre -application conference usual. Filling may require 55 days Easement to Fill from N.C. Department of Administration and (90 days) t~edetal Dredge and Fill Permit. Permit to construct & operate Air Pollution Abatement Application must be submitted and permit received prior to construction and operation of the source. 11'a permit is required in an ❑ facilities and/or Emission Sources as per 15 A NCAC area without local zoning, then there are additional requirements and 90 days (2Q.0100 thru 2Q ©300) ti€nelincs (2Q.0113). El Permit to construct & operate Transportation Facility as 2QA601) Application must be submitted at least 90 days prior to construction or 90 days per 15 A NCAC (2D.0800, modification ofthe source. Any open burning associated with subject proposal must be in compliance with 15 A NCAC 2D.1900 Demolition or renovations ors€ructures containingasbestos ❑material must be in compliance with 15 A NCAC 20.1110 N/A 60 days (a) (1) which requires notification and removal prior to (90 days) demolition. Contact Asbestos Control Group 919-707-5950_ Complex Source Pennit required under 15 A NCAC 2D.0800 The Sedimentation Pollution Control Act of 1973 must be property addressed for any land disturbing activity. An erosion & sedimentation O control plan will be required ifone or more acres to be disturbed. Plan Cited with proper Regional Office (Land Quality Section) At least 30 20 days days before beginning activity. A fee of$65 for the first acre or any part of an acre. An express review option isavailable with additional (30 days) fees - Sedimentation and erosion control must be addressed in accordance With NCDQT's approved program. Particulat attention shotild be given (30 days) to design and installation of appropriate perimeter sediment trapping devices as well as stable stormwater conveyances and outlets. On -site inspection usual. Surety bond tiled with ENR Bond amount varies ElMining Permit with type mine and number of acres of affected land. Any arc mined greater 30 days than one acre must he permitted. The appropriate bond must be received (fit) days) before the permit can be issued. On -site inspection by N.C. Division Forest Resources if permit exceeds 4 1 day North Carolina Burning permit days (N/A) Special Ground Clearance Burning Permit - 22 On -site inspection by N.C. Division Forest Resources required "if more than five acres of ground clearing activities are involved. Inspections should he 1 day counties in coastal N_C_ with organic soils requested at least ten days before actual bum is planned." (N/A) ElOil Refining Facilities N/A 90I lA)20 days If pen -nit required, application 60 days before begin construction. Applicant must hire N.C. qualified engineer to! prepare plans, inspect construction_ certify construction is according to ENR approved plans. May also require Dam Safety Permit pennit under mosquito control program. And a 404 pennit from Corps of 30 days Engineers- An inspection of site is necessary to verify Hazard Classification_ (60 days) A minimum fee of $200.00 must accompany the application. An additional processing fee based on a percentage or the total project cost Will be required .it ie 16, 2014 upon completion_ Project Number: 15-0034Due Date: 8/8/2014 Normal Process Time (statutory time limit) PERMIT'S SPECIAL APPLICATION PROCEDURES or REQUIREMENTS File surety bond of $5,000 with ENR running to State ofNC conditional that any vxil 10 days Permit to drill exploratory oil or gas well opened by dill operator shall, upon abandonment, be plugged according to ENR rules N/A Geophysical Exploration Permit and regulations. ❑ Application Cued with ENR at least 10 days prior to issue or permit. Application by 10 days letter. No standard application roan, NIA ❑ Skate Lakes ClnstnlCtian Permit Application fee based on structure size is charged. Must include descriptions & 15-20 days drawings of structure & proof of ownership of riparionproperty. NIA ❑ 401 Water Quality Certification N/A^ 60 days (130 days) ❑ CAMA Permit for MAJOR development $250.00 fee must accompany application 55 days (150 days) ❑ CAMA Pearnt for MINOR development $50 00 fee must accompany application 22 days (25 days) Several geodetic monuments are located in or near the project area. if any monument needs to he moved or destroyed, please notify: ❑ N.C. Geodetic Survey, Box 27697 Raleigh, NC 27611 ❑ Abandonment of any wells, if requited must be in accordance with Title 15A. Subchapter 2C.0I00. ❑ Notification of the proper regional office is requested if "orphan" underground storage tanks (USTS) are discovered during any excavation operation. ❑ Compliance with 15A NCAC 2H 1000 (Coastal Storrnwater Rules) is required_ 45 days (WA) ❑ Tar Pamlico or Neuse Riparian Buffer Rules required. Plans and specifications for the construction, expansion, or alteration of a public;vater system most be approved by the division of Water QResources/Public Water Supply Section prior to the award of a contract or the initiation of construction as per 15A NCAC t 8C .0300 et. seq. Plans and 30 days specifications should be submitted to 1634 Mail Service Centet, Raleigh, North Carolina 27699-1634. All public water supply systems must comply with state and federal drinking water monitoring requirements. For more information, contact the Public Water Supply Section, (919) 707-9100. if existing water lines dill be relocated during the construction, plans for the seater line relocation trust be submitted to the Division of Water © Resources/Public Water Supply Section at 1634 Mail Service Center, Raleigh, North Carolina 27699-1634. For more information, contact the Public 30 days Water Supply Section, (919) 707-9100. Other comments [attach additional vases as necessary, being certain to cite comment authoritO Division Initials No Comments Date Comment Review 17AQ n/a El DWR-WQROS JHG ® _ 8/5/14 (Aquifer & Surface) DWR-PWS n/a ❑ { / DEMLR (1_Q & SW) DES Off -source activities are not jurisdictional under NCSPCA or Coastal 8/8/14 Stormwater rules. Land disturbances landward of the first litre of vegetation are jurisdictional. DWM -UST n/a ❑ _ REGIONAL, OFFICES Questions regarding these permits should be addressed to the Regional Office marled below, ❑Asheville Regional Office []Mooresville Regional Office ®Wiltnington Regional Office 2090 US Highway 70 610 East Center Avenue, Suite 301 127 Cardinal Drive Extension Swannanoa, NC 28778 Mooresville, NC 28115 Wilmington, NC 28405 (828) 296-4500 (704) 663-1699 (910) 796-7215 ❑Fayetteville Regional Office 225 North Green Street, Suite 714 Fayetteville, NC 28301-5043 (910)433-3300 []Raleigh Regional Office 3800 Barrett Drive, Suite 101 Raleigh, NC 27609 (919) 791-4200 ❑Washington Regional, Office 943 Washington Square Mail Washington, NC 27889 ❑Winston-5alem Regional Office 585 Waughtown Street Winston-Salem, NC 27107 (336)771-5000 June 16,2014 NORTH CAROL NA STATE CLEARINGHOUSE DEPARTMENT OF ADMINISTRATIONT INTERGOVERNMENTAL REVIEW COUNTY: PENDER ONSLOW X05:IRRIGATION/DRAINAGE/FLOOD CONTROL MS CAROLYN PENNY CLEARINGHOUSE COORDINATOR CC&PS - DIV OF EMERGENCY MANAGEMENT FLOODPLAIN MANAGEMENT PROGRAM MSC ## 4 719 RALEIGH NC REVIEW DISTRIBUTION CAPE FEAR COG CC&PS - DIV OF EMERGENCY MANAGEMENT DENR - COASTAL MGT DENR LEGISLATIVE AFFAIRS DEPT OF AGRICULTURE DEPT OF CULTURAL RESOURCES DEPT OF TRANSPORTATION EASTERN CAROLINA COUNCIL PROJECT INFORMATION APPLICANT: Department of the Army TYPE: National Environmental Policy Act Finding of No Significant Impact STATE NUMBER: 15-E-0000-0034 DATE RECEIVED: 07/21/2014 AGENCY RESPONSE: 08/08/2014 REVIEW CLOSED: 08/13/2014 DESC: Proposal is for the refinement in utilization of borrow areas located offshore of Topsail Island for the Coastal Storm Damage Reduction plan for Surf City and North Topsail Beaches. - View documents at: http://www.saw.usace.a.rmy.mil/Missions/Coasta!StormI)amageReduction/Sur±CityandNTo psailBeach.aspx CROSS-REFERENCE NUMBER: 10-E-0000-0249 II-E--0000-0098 14-E-0000-0029 The attached project has been submitted to the N. C. State Clearinghouse for intergovernmental review. Please review and submit your response by the above indicated date to 1301 Mail Service Center, Raleigh NC 27699-1301. If additional review time is needed, please contact this office at (919)807-2425. _ COMMENT COMM NTS ATTACHED AS A RESULT OF THIS REVIEW TH�,p}F,'OLLOWING IS SUBMITTED: NO F SIGNED BY: t DATE: d` NORTH CAROLINA STATE CLEARINGHOUSE DEPARTMENT OF ADMINISTRATION INTERGOVERNMENTAL REVIEW COUNTY: PENDER ONSLOW H05: IRRIGATION/ DRAINAGE /FLOOD CONTROL MS CARRIE ATKINSON CLEARINGHOUSE COORDINATOR DEPT OF TRANSPORTATION STATEWIDE PLANNING - MSC #1554 RALEIGH NC REVIEW DISTRIBUTION CAPE FEAR COG CC&PS - DIV OF EMERGENCY MANAGEMENT DENR COASTAL MGT DENR LEGISLATIVE AFFAIRS DEPT OF AGRICULTURE DEPT OF CULTURAL RESOURCES DEPT OF TRANSPORTATION EASTERN CAROLINA COUNCIL PROJECT INFORMATION APPLICANT: Department of the Army TYPE: National Environmental Policy Act Finding of No Significant Impact STATE NUMBER: 15-E-0000--0034 FATE RECEIVED: 07/21/2014 AGENCY RESPONSE: 08/06/2014 REVIEW CLOSED: 08/13/2014 DESC: Proposal is for the refinement in utilization of borrow areas located offshore of Topsail Island for the Coastal Storm Damage Reduction plan for Surf City and North Topsail Beaches. - View documents at: http://www.saw.usace.army.mil/Missions/CoastalStormDamageReduction/SurfCityan.dNTO psailSeach.aspx CROSS-REFERENCE NUMBER: 10-E-0000--0249 11-E-0000--0098 14-E-0000-0029 The attached project has been submitted to the N. C. State Clearinghouse for intergovernmental review. Please review and submit your response by the above indicated date to 1301 Mail Service Center, Raleigh NC 27699-1301. If additional review time is needed, please contact this office at (919)807-;425. AS A RESULT OF THIS REVIEW THE FOLLOWING IS SUBMITTED: ❑ NO COMMENT COMMENTS ATTACHED SIGNED BY: DATEIF a �1 ..A ay..� STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION PAT MCCRORY ANTHONY J. TxrA GO V F RNIOR SECRETARY July 25, 2014 State Number: 15-E-0000-0034 Project Title: Department of the Army After reviewing your application it has been determined that the Coastal Storm Damage Reduction Plan for Surf City and. North Topsail Beaches is located near a facility that is scheduled for improvements. State TIP Project B-4929 proposes to improve the existing facility. To avoid any potential conflicts, please coordinate with Michele James, who is the Project Development Engineer in Project Development and Environmental Analysis. Michele James can be reached by phone at (919) 707-6027 or by email mjamesAncdot.gov. Thank You, Nastasha Earle Transportation Planning Branch Southeast Unit MAILING ADDRESS: TELEPHONE 919.707-0931 LOCATION: NC DEPARTMENT OF TRANSPORTATION FAX: 919-733-9794 1 S. WILMMTONSTREET DOH DISTRICT1 Wa BSITE: 1NWW.IJON.flOT.STATE.NC.US RALEIGH NC 27699 1554 MAIL SERVICE CENTER RALE€GH NC 27699-1554