Loading...
HomeMy WebLinkAbout20181195 Ver 1_Compliance Comments_20200731 Wetland Inspection Report Project Num: 20181195 Version: 2 Status: Completed Project Name: NCDOT-Replace Bridge 410 on SR 1844 Project Type: Replace bridge with bridge County: Davidson Region: Winston-Salem Location: NCDOT-Replace Bridge 410 on SR 1844 Latitude: +35° 50' 31" Longitude: -80° 13'20" SW Plan Location: Site Owner Name: NC DOT Division 9 Inspection Date: 7/29/2020 Reason for Inspection: Routine Inspection Type: Site Inspection(DOT) Inspection Contact Person: Title: Phone: On-Site Representative(s): Primary Inspector: Dave Wanucha Phone: 336-776-9703 Secondary Inspector(s): Facility Compliance Status: Compliant ❑ Not Compliant Program Areas: 401 (includes isolated/non-404) Question Areas: II Permit(401 WQC) Inspection Summary: page 1 Site Number: 20181195 Owner: Tippett,Lyndo Inspection Date: 7/29/2020 Inspection Type: Site Inspection(DOT) Reason for Visit: Routine Permit(401 WOC) Yes No NA NE Does the impact(s)match what was approved in the 401 WQC or non 404 permit? • ❑ ❑ El Are the culverts and/or filled areas installed properly? • ❑ ❑ ❑ Is the site compliant with additional conditions of the 401 WQC or non 404 permit? • El ❑ El Comment: This bridge replacement was recently completed. EC measures at SDOs remain in place and are functioning. Impact sites were built per the plans. page 2