Entity Requesting Allocation: Rockingham County
Project Name for which flow is being requested: Sanitary Sewer Impr. for Corporate Park
More than one FTSE may be required for a single project if the owner of the WWTP is not responsible for all pump
stations along the route of the proposed wastewater flow.
I. Complete this section only if you are the owner of the wastewater treatment plant.
a. WWTP Facility Name: Town of Mayo
b. WWTP Facility Permit #: NC0021873
1. =
c. WWTP facility's permitted flow
d. Estimated obligated flow not yet tributary to the WWTP
e. WWTP facility's actual avg. flow
f. Total flow for this specific request
g. Total actual and obligated flows to the facility
h. Percent of permitted flow used
All flows are in MGD
4.500
0.000
1.322
0.000
1.332
29.60%
II. Complete this section for each pump station you are responsible for along the route of this proposed
wastewater flow.
List pump stations located between the project connection point and the WWTP:
(A)
(B)
(C)
(D)=(B+C)
(E)=(A-D)
Design
Obligated,
Pump
Pump
Average
Approx.
Not Yet
Total Current
Station
Station
Firm
Daily Flow**
Current
Tributary
Flow Plus
(Name or
Permit
Capacity, *
(Firm / pf),
Avg. Daily
Daily Flow,
Obligated
Available
Number)
No.
MGD
MGD
Flow, MGD
MGD
Flow
Capacity***
Red
0.432
0.1728
0.005
0
0.005
0.1678
Gold Hill 0.720 0.2880 0.009 0 0.009 0.2790
Hogan's 1.152 0.4608 0.021 0 0.021 0.4398
* The Firm Capacity (design flow) of any pump station is defined as the maximum pumped flow
that can be achieved with the largest pump taken out of service.
** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor
(pf) not less than 2.5, per Section 2.02(A)(4)(c) of the Minimum Design Criteria.
*** A Planning Assessment Addendum shall be attached for each pump station located
between the project connection point and the WWTP where the Available Capacity is < 0.
Downstream Facility Name (Sewer): Town of Madison
Downstream Permit Number: WQCS00144
Page 1 of 6
FTSE 10-18
III. Certification Statement:
I Ronnie Tate, Dir. of Engr. & PU certify to the best of my knowledge that the addition of
the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving
wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity
related sanitary sewer overflows or overburden any downstream pump station en route to the receiving
treatment plant under normal circumstances, given the implementation of the planned improvements
identified in the planning assessment where applicable. This analysis has been performed in accordance
with local established policies and procedures using the best available data. This certification applies to
those items listed above in Sections I and II plus all attached planning assessment addendums for which I
am the responsible party. Signature of this form certifies that the receiving collection system or treatment
works has adequate capacity to transport and treat the proposed new wastewater.
Signing OJ7cial Signature Date
Director of Engineering & Public Utilities
Title of Signing Official
Page 2 of 6
F1 Sh 10-18