Loading...
HomeMy WebLinkAboutNCG030677_NOV Response_20200730Lawyer, Mike From: Michael Fidanza <michael.fidanza@setoolinc.com> Sent: Thursday, July 30, 2020 8:17 AM To: Lawyer, Mike Cc: Jeff Gerlock; Thomas Reaves; Eric Deaton; Eileen DePasqua; Hannah Patrick; Darlene Roberts; Justin Wallace; Jimmy Thompson; Eddie Callahan Subject: [External] Stormwater Permit# NCG030000 - Rectification - For Record Attachments: Stormwater Plan Of Action.pdf Mike, Please see my response to the notice of non-compliance attached to this email. I would like this to be added to our record, please. (SIGNED COPY ATTACHED) 105 Taylor St. Stormwater Permit NCG030000 I, Michael Fidanza of Southeastern Tool and Die, INC have received a copy of Notice of Violation/Compliance Inspection Report issued by the NCDENR office as of 20 July 2020 and am providing the explanation of violation below: Due to the inadequacy of maintaining compliance from 2018 to present, Southeastern Tool and Die, INC acknowledges the non-compliance reasoning. Between 2018 and 2019, there was a failure of previous staff/management personnel in the EHS department to maintain proper documentation of procedures needed to maintain compliance. I, Michael Fidanza am rectifying the non-compliance by taking the following steps in the available timeline below: 20 July 2020, Notice of Violation/Compliance received from Mike Lawyer from NCDENR due to previous staff in HR/EHS position not maintaining compliance. 28 July 2020, HR/EHS Manager Michael Fidanza (Michael.Fidanza@setoolinc.com) takes stormwater samples as instructed per procedure. 29 July 2020, custody of samples is handed over to Jeff Gerlock of Blue Ridge geological who will relinquish to Meritech Labs. (Cobtact: Lff.gerlock@gmail.com) (Contact: thomas.reaves@meritechlabs.com) 30 July 2020, HR/EHS Manager Michael Fidanza receives the manifest and detail for the use of personal record. From this date, it will be approximately two weeks to receive the results of the metal testing of storm water. 30 July 2020, pending stormwater plan and multiple schematics. These are in the works and will be ready prior to the end of August. Pending exact date. Michael Fidanza Southeastern Tool and Die, INC 105 Taylor St. Aberdeen NC 28315 Michael.Fidanza@setoolinc.com Respectfully, Michael Fidanza Human Resources and EHS Manager Michael.Fidanza@Setoolinc.com (910) 944-7677: Ext 109 r � P 105 Taylor St. Stormwater Permit NCG030000 I, Michael Fidanza of Southeastern Tool and Die, INC have received a copy of Notice of Violation/Compliance Inspection Report issued by the NCDENR office as of 20 July 2020 and am providing the explanation of violation below: Due to the inadequacy of maintaining compliance from 2018 to present, Southeastern Tool and Die, INC acknowledges the non-compliance reasoning. Between 2018`and 2019, there was a failure of previous staff/management personnel in the EHSdepartment to maintain proper documentation of procedures needed to maintain compliance.. 1, Michael Fidanza am rectifying the non-compliance by taking the following steps in the available timeline below: 20 July 2020, Notice of Violation/Compliance received from Mike Lawyer from NCDENR due to previous staff in HR/EHS position not maintaining compliance. 28 July 2020, HR/EHS Manager Michael Fidanza (Michael.Fidanza(@setoolinc.corn) takes stormwater samples as instructed per procedure. 29 July 2020, custody of samples is handed over to Jeff Gerlock of Blue Ridge geological who will relinquish to Meritech Labs. (Contact: ieff.gerlock f gmail.com) (Contact: thornas.reaves(�rneritechlabs.corn) 30 July 2020, HR/EHS Manager Michael Fidanza receives the manifest and detail for the use of personal record. From this date, it will be approximately two weeks to receive the results of the metal testing of storm water. 30 July 2020, pending stormwater plan and multiple schematics. These are in the works and will be ready prior to the end of August. Pending exact date. Michael Fidanza Southeastern Tool and Die, INC 105 Taylor St. Aberdeen NC 28315 Michael.Fidanza@setoolinc com �u��ltste�n NED( JUL 9-02020 DEMLR Fayetteville Regional Office 30 101� -D,0 2l�