HomeMy WebLinkAboutSW6200704_Supplement-EZ Form_20200730SUPPLEMENT-EZ COVER PAGE
FORMS LOADED
PROJECT INFORIMATION
7 Project Name y _ Cypress Pointe
2 Project Area {aq_ .._ 50.88
3 Coastal Wetland Area ac p
4 Surface Water Area ac 0
5 Is this project High or Low Densi ? High
6 Does this project use an off -site SCM? No
COMPLIANCE WITH 02H.1004(4)
7
Width of v etated setbacks Provided feet
45
8
Will the vegetated setback remain vegetated?
Yes
9
Is BUA other that as listed in .1003 4 c-d out of the setback?
Yes
10
Is streambank stabilization proposed on this project?
No
NUMBER AND TYPE OF SCMs:
11
1 Infiltration S stem
0
12
Bioretention Cell
0
W 0
p
13
fWet Pond
14
Stormwater Wetland
15
Permeable Pavement
0
16
Sand Filter
0
17
Rainwater Harvesting RWH
0
18
Green Roof
0
19
Level Spreader -Filter Strip LS-F5
p
20
Disconnected Impervious Surface(Dig)
0
21
Treatment Swale
0
22
Dry Pond
2
23
StormFiiter
0
24
Silva Cell
0
25
Ba fter
0
26
Filterra
0
FORMS LOADED
DESIGNER CERTIFICATION
27
Name and Title:
Jeffrey A. Nobles, PE
Lany King & Associates, RLS, PA
1333 Morgaton Road, Suite 201
28
O anization:
29
Street address:
30
City, State, Zip:
Phone numbers :
Email:
Fayetteville, NC 28305
910-483-4300
jnoblesClkanda.com
31
32
Certification Statement:
I certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or
supervision; that the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete; and
that the engineering plans, specifications, operation and maintenance agreements and other supporting information are consistent
h the information provided here.
..tt�r�rrli
• f�
FeSS/
.p.0
SEAL =_
31459
,C.
v�;A NGINI E�`°� �•A.
Signat De ' ne
DRAINAGE AREAS
1 Is this a high density project? Yes
2 If so, number of drainage areas/SCMs 2
Is all/part of this project subject to previous rule
3 versions? No
FORMS LOADED
DRAINAGE AREA INFORMATION
Entire Site
1
2
4
Type of SCM
Dry Pond
DryPond
5
Total BUA in roject s ft
4799454 sf
158231 sf
321223 sf
6
New BUA on subdivided lots (subject to permitting)
s ft
New BUA outside of subdivided lots (subject to
Dermittinal (st)115454
364000 sf
124000 sf
240000 sf
7
sf
34231 sf
81223 sf
8
Offsite - total area (sq ft
sf
sf
sf
9
Offsite BUA s ft
sf
sf
sf
10
Breakdown of new BUA outside subdivided lots:
Parking (sq ft
Sidewalk ft
68250 sf
23250 sf
45000 sf
Roof (sq ft
295750 sf
100750 sf
195000 sf
Roadway s ft
115454 sf
34231 sf
81223 sf
- Future (sq ft
sf
sf
sf
Other, please specify in the comment box
below (sq ft
sf
sf
sf
11
New infiltrating permeable pavement on
subdivided lots (sq ft
sf
sf
sf
12
New infiltrating permeable pavement outside of
subdivided lots (sq ft
sf
sf
sf
13
Exisitng BUA that will remain (not subject to
ermitting) (sq ft
sf
sf
sf
14
Existin BUA that is a fready permitted (sq ft
sf
sf
sf
15
Existing BUA that will be removed ft
sf
sf
sf
16
Percent BUA
41%
42%
40%
17
Desi n storm inches
1 in
1 in
1 in
18
Design volume of SCM cu ft
40841 cf
13426 cf
27415 cf
19 lCalculation
method for design volume
Simple Method
Simple Method
ADDITIONAL INFORMATION
20
Please use this space to provide any additional information about the
drainage area(s]:
DRY POND
LE1 Drainage area number
2 Design volume of SCM
NERAL MDC FROM 02H .1050
Is the SCM sized to treat the SW from all surfaces at
3
build -out?
Yes
Yes
4
Is the SCM located away from contaminated soils?
Yes
Yes
5
What are the side slopes of the SCM (H:V)?
3:1
3:1
Does the SCM have retaining walls, gabion walls or
6
other engineered side slopes?
No
No
Are the inlets, outlets, and receiving stream protected
7
from erosion (10-year storm)?
Yes
Yes
Is there an overflow or bypass for inflow volume in
8
excess of the design volume?
Yes
Yes
What is the method for dewatering the SCM for
9
maintenance? Drawdown Orifice
If applicable, will the SCM be cleaned out after
Drawdown Orifice
10
construction? Yes
Yes
Does the maintenance access comply with General
11
MDC (8)?
Yes
Yes
Does the drainage easement comply with General
12
MDC (9)?
Yes
Yes
If the SCM is on a single family lot, does (will?) the
13
plat comply with General MDC (10)?
Is there an O&M Agreement that complies with
14
General MDC (11)?
Yes
Yes
Is there an O&M Plan that complies with General
15
MDC (12)?
Yes
Yes
16
Does the SCM follow the device specific MDC?
Yes
Yes
Was the SCM designed by an NC licensed
17
professional?
Yes
Yes
18
SHWTelevation (fmsl)
119
116
19
Elevation of the bottom of the dry pond (fmsl)
124
5 ft
121
5 ft
20
Distance from bottom to SHWT (feet)
Elevation of the temporary pool during the design
storm (feet)
Ponding depth of the design storm (feet?
Will the dry pond be uniformly graded to flow toward
the outlet?
Is a low flow channel being provided?
Are the inlet(s) and outlet located in a manner that
avoids short-circuiting?
Will berms or baffles be provided to increase the flow
path?
21
127 ft
124 ft
22
3 ft
3 ft
23
Yes
Yes
24
Yes
Yes
25
Yes
Yes
26
No
No
27
What method of pretreatment will be provided?
forebay
forebay
28
Diameter of drawdown orifice (in)
2 in
3 in
29
Drawdown time for the temporary pool (hours)
83.19
49.65
30
Does the pond minimize impacts to the receiving
channel from the 1-yr, 24-hr storm?
Yes
Yes
Yes
Yes
31
Is there a small permantent pool near the orifice to
prevent clogging?
the outlet be designed to prevent clogging?
32 lWill
Yes
Yes
33
Are the dam and embankment planted in non-
clumping turf grass?
Yes
Yes
34
Species of turf that will be used on the dam and
embankment
Bermuda
Bermuda
35
Will trees and shrubs be prevented from growing on
the dam and embankment?
Yes
Yes
I iONAL 1141.01iMA I IiNY
Please use this space to provide any additional
36 information about the infiltration system(s):
Dry Pond 1 6:54 PM 7/16/2020