Loading...
HomeMy WebLinkAbout19990550 Ver 1_Complete File_19990527 DIVISION OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT 1. APPL'ICANT'S NAME: North Carolina Department of Transportation, Ferry Division -2. LOCATION OF PROJECT SITE: Off NC 12, in Hyde County on Ocracoke Island adjacent Hatteras Inlet. Photo Index - 1995: N/A, 1989: N/A, 1984: N/A; -State Plane Coordinates - X: 2,961,000 Y: 540,200 Green Island Quad. (upper right corner) 3. INVESTIGATION TYPE: CAMA 4. • INVESTIGATIVE PROCEDURE: Dates of Site Visit - 5/19/99 Was Applicant Present - No 5. PROCESSING PROCEDURE: Application Received - 5/14/99 Office - Washington 6 SITE DESCRIPTION: (A) Local Land Use Plan - Hyde County Land Classification From LUP - National Seashore (Highground)/Conservation (Water) (B) AEC(s) Involved: EW, PTA (C) Water Dependent: Yes (D) Intended Use: Private/Commecial (E) Wastewater Treatment: Septic with drainfields Planned - N/A (F) Type of Structures: Existing - paved loading loop, public restroom, three loading ramps and slips, office building. Planned - 2-3 pile dolphins. = (G) Estimated Annual Rate of Erosion: None - bulkheaded basin area. 7. HABITAT M-SCRIPTION: [AREA] ` DREDGED FILLED OTHER (A) Vegetated Wetlands (B) Non-Vegetated Wetlands (C) Other 18ft2 Dredged Basin Bottom 8 (D) Total Area Disturbed: 18ft2 (E) Primary Nursery Area: No (F) Water Classification. SA Open: Yes PROJECT SUNEVIARY: 'Applicant proposes to install 2-3 pile dolphin clusters for the purpose of mooring large auxiliary vessels. North Carolina Department of Transportation Ferry Division Hyde County Project Setting The project is located adjacent NC 12 on the north end of Ocracoke Island at the Hatteras- Ocracoke Ferry Terminal on Cape Hatteras National Seashore (CHNS) property in Hyde County, North Carolina. The North Carolina Department of Transportation (NCDOT) has an easement from the.CHNS for a ferry terminal in this location. NC 12 terminates into a loading loop bordered by Hatteras"Inlet on the north side, the ferry basin on the west side and a public bathroom facility on the east side. A sandy estuarine beach and dune boarder the basin on the north and south side. A diked spoil disposal area is also located on the southwest side of the basin. The dunes are vegetated with sea oats Uniola paniculata, and American beach grass Ammophila brevili ulata. Located onsite is a ±400'x ±400' ferry turning basin with metal sheet pile bulkhead on the north and east sides of the basin. There are three loading slips defined by existing dolphin clusters and loading ramps. Also located onsite a Ferry Division office building. Project Description The applicant proposes to install 2-3 pile dolphin clusters 2.0' waterward of the existing metal sheet pile bulkhead on the north side of the basin. The purpose of the dolphin clusters will be to secure auxiliary equipment such as a hydraulic dredge. The clusters will be washed down from a barge in the basin. Anticipated Impacts Environmental impacts from the installation of the clusters will be short term localized turbidity and additional congestion within the basin area. Steve Trowell - Washington Regional Office - 21 May 1999 } Form DCM-MP-1 APPLICATION (To he completed by all applicants) 1 APPLICANT a. Landowner., Name NCDOT - FERRY DIVISION Address PO BOX 57 City HATTERAS State NC Zip 27943 Day Phone (252)986-2136 Fax (252)986-2781 b. Authorized Agent: Name M. J. GRAY Address PO BOX 57 City HATTERAS State NC Zip: 27943 Day Phone (252 )986-2136 Fax (252)986-2781 .b. City, town, community or landmark NORTH END OF OCRACOKE ISLAND c. Street address or secondary road number NC12 d. Is proposed work within city limits or planning jurisdiction? Yes X No e. Name of body of water nearest project (e.g. river, creek, sound, bay) -pAMT T(o oOUN 3. DESCRIP'T'ION AND PLANNED USE OF PROPOSED PROJECT a. List all development activities you propose (e.g. building a home, motel, marina, bulkhead, pier, and excavation and/or filling activities. PLACE 2 PILE CLUSTERS OF 3 b. Is the proposed activity maintenance of an existing project, new work, or both? NEW c. Will the project be for public, private or commercial use? PUBLIC c. Project name (if any) NOTs_ Permit xQ1 be iuu-d in nalne of Lvsdoxaser(r), a.-21or project name. J Y, ?. LOCATION OF PROPOSED PROJECT d. Give a brief description of purpose, use, methods of construction and daily operations of proposed project. If more space is needed, please attach additional pages. WASH 2 CLUSTERS OF THREE PILES FOR THE PURPOSE OF SECURING AUXILIARY EQUIPMENT EX-CORPS OF ENGINEER DREDGE. a. County HYDE Form DCAl-NfP-1 4. LAND AND WATER CHARACTERISTICS a. Size of entire tract b. - Size of individual lot(s) N/A c.. Approximate elevation of tract above MHW or N "rL +5 d. Soil type(s) and texture(s) of tract SAND e. Vegetation on tract SPARSE f. Man-made features now on tract FERRY TERMINAL BUILDING AND RESTROOMS g. What . is the CAMA Land Use Plan land classif catign of the site? (Consult the local land use pLv:.) Conservation Transitional Developed Community _ Rural Other h. How is the tract zoned by local government? NO i.- Is the proposed project consistent with the applicable zoning? X Yes No (Attach Zoning ronTLL=rr certificate, icppE=blr) j. Has a professional archaeological assessment been done for the tract? Yes No If yes, by whom? UNKNOWN k. Is the project located in , a National Registered Historic District or does it involve a National Register listed or eligible property? Yes X No ' 1. Are there wetlands on the site? Yes X No Coastal (marsh) Other If yes, has a delineation been conducted? (A=ch doc-. rra_-=on, if atiriL:bk) m. Describe existing wastewater treatment facilities. N/A n. Describe location and type of discharges to waters of the state. (For example, surface runoff, sanitary wastewater, industrial/commercial eN?A nt, "wash down" and residential discharges.) o. Describe existing drinking water supply source. N/A S. ADDITIONAL INFORMATION In addition to the completed application form, the following items must be submitted: A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties. If the applicant is not claiming to be the owner of said property, then forward a copy of the deed or other instrument under which the owner claims title, plus written permission from the owner to carry out the project. ° An accurate, dsted work plat (including plan view and cross-sectional drawings) drawn to scale in black ink on an 8 1P_" by 11" white paper. (Refer to Coastal Resources Commission Rule 7J.0203 for a detailed description.) Please note that original drawings are preferred and only high quality copies will be accepted. Blue-line prints or other larger plats are acceptable only if an adequate number of quality copies are provided by applicant. (Contact the U.S. Army Corps of Engineers regarding that agency's use of larger drawings.) A site or location map is a part of plat requirements and it must be sufficiently detailed to guide agency personnel unfamiliar with the area to the s Form DCM-MP-1 site. Include highway or secondary road (SR) numbers; landmarks, and the like. A Stormwater Certification, if one is necessary A list.of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received .a copy of the application and plats by certified m8il. Such landowners must be advised that they have ?O days in which to submit comments on the pfposed project to the Division of Coastal Management.. Upon signing this form, the applicant further certifies that such notice has been provided. Name CAPE ATTFRAS NATIONAL SEASHORE Address RT 1, BOX 675, MANTEO, NC 27954 Phone (252) 473-2111 Name Address Phone Name Address Phone 0 A list of prevjous state or federal permits issued for work on the proje t. tract. Include permit numbers, permute(, and issuing dates. 224=87,., NCDOT FERRY DIVISION 12-29-97 c° A cheek for $250 made payable to the Department of Environment, Health, and Natural Resources (DEHNR) to cover the costs of processing the application. 0 A signed AEC hazard notice for proje,^ts in oceanfront and inlet areas. d A statement of compliance . with the N.C. Environmental Policy Act; (N.C.G.S. 113A - 1 to 10) If the project involves the expenditure of public funds or use of public lands, attach a statement documenting compliance with the Norton Carolina Environmental Policv Act. 6. CERTIFICATION AND PERMISSION TO ENTER ON LAND I understand that any permit issued in response to this application will allow only the development described in the application. The project will be subject to conditions and restrictions contained to the permit. I certify that to the best of my knowledge, the proposed activity complies with the State of North Carolina's approved Coastal Management Program and will be conducted in a manner consistent with such program. I certify that I am authorized to grant, and do in fact, grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of the projert. I further certify that the information provided in this application is truthful to the hest of my L-towledge. "ibis is the / Z day of M,* 19?? Print Name Iv/O rwr -J, trrq Signature L--i-xn_r or Authorized AEcnt Ple: se indicate attachments pertaining to your proposed project. DCM MP-2 Excavation and Fill Information DCM MP-3 Upland Development DCM MP-4 Structures Information DCM MP-5 Bridges and Culverts DCM NIP-6 Marina Development NOTE: Please sign and date each arrachmew in the soave provided x the borrom of each form. Form DCNI-MP4 STRUCTURES (Construction within Puhlic Trust Areas) 4 1 Attach this form to Joint Application for CAMA Major e. Mooring buoys /V 1 Permit, Form DCM-MP-1. Be sure to complete all (1) _ Commercial ^Community _ Private, other sections of the Joint Application which relate to (2) Number this proposed project. (3) Description of buoy (Color, inscription, size, anchor, etc.) a. Dock (§) ahdlor Pier(s) 1(11A (1) _ Commercial -Community _ Private ?(2) Number (3) Length (4) Width of water body (4) Width (5) Distance buoy(s) to be placed beyond (5) Finger Piers Yes No shoreline (i) Number (ii) Length f. Mooring structure (boatlift, mooring pilings, etc.) (iii) Width (1) _ Commercial Community _ Private (6) Platform(s) Yes No (2) Number ? ?- 3 P1 ZlIz IS (i) Number (3) Length S l? (ii) ,Length (4) Width 3 `y (iii). Width (7); Number of slips proposed g. Other (Give complete description) ($) -Proximity of structure to adjacent riparian property lines (9) Width of water body 100Y 0 (10) Water depth at waterward end of pier at MLW or NWL " -7 b. Boathouse' (including covered lifts) /(//A (1) Commercial Private (2) Length ,V c P4 % Fe i"Y V ('tit S ! v x1 (3) Width Applicant o roo ect Name c. Groin (e.g. wood, sheetpile, etc.) 1A Signatu e (1) Number (2) Length (s) hate d. Breakwater (e.g wood, sheetpile, etc.) 41114 (1) Length (2) Average distance from MHW, NWL or wetlands (3) Maximum distance beyond MHW, NWL or wetlands 12 35°10' Vtc-1/.JI'T-t MAP 0 0 ° 0 o GD 00 o 76-1 O 00 co O •G L\ a 0 O =EXISTI/JC4 CUJSTER • =NEW GL IJSTE'IR - -=NEIN 'SWGLE PILE. rN:.C:.:DePT, OF TR IJSPORTATIOrl i FERRY DIVISIOM N? Nw IZ PILE CLUSTER INsTAL?4T?o?1 r -? OCRACOK E, N.C.- - -HYDE Co, . scq ?e Co QT E AP R i 1 5 199 <T I of Z NOTES: 1. ILE CLUSTERS CONSIST OF q_R?EATED 5 OR 7 12" PRESSURE PILES, 50' IN LGTH. 2. PILE DESIGNATION: 2.5 PCF CCA-C, SALT WATER MARINE EXPOSURE (AWPA C3 STDS) 12' 50' TYP. PILE CLUSTER (NTS) N.C. DEPT. OF TRANSPORTATION FERRY DIVISION PILE CLUSTER INSTALLATION OCRACOKE, N.C.---HYDE CO. SCALE: NONE SHEET DATE: ,r} ?R I L j, 1 999 2 OF 2 EHT Or ry F UNITED STATES O, 's DEPARTMENT OF THE INTERIOR NATIONAL PARK SERVICE ?.a OUTER BANKS GROUP C R Y ape Hatteras National Seashore Cape Lookout National Seashore TO: IN REPL REFE Fort Raleigh National Historic Site Wright Brothers National Memorial L46 (CAHA ) Route 1, Box 675, Manteo, North Carolina 27954-2708 April 13, 1999 Mr. Morris Gray Hatteras Inlet Ferry Operations P.O.-Box 57 Hatteras, North Carolina 27943 Dear Mr. Gray: P You have permission from the National Park Service, Cape Hatteras National Seashore,to install two pile clusters of three _pressure treated piles each at the requested location adjacent to the bulkhead in the Ocracoke.Ferry Terminal basin. ;Installation of the pile clusters must be completed from.the ,'basin. No disturbance or work is permitted on or from National Park Service property. If you have any questions, please contact Mr. Warren Wrenn at 473-2111 extension 149. Sincerely, Robert W. Reyno ds Superintendent Outer Ba-riks Group ..Cc: Warren Wrenn