Loading...
HomeMy WebLinkAboutNCS000040_Report_20200727CH RUOT n T PIPE and FOUNDRY COMPANY P.O. Box 35430 ® Telephone 704/332-2647 CHARLOTTE, NORTH CAROLINA 28235 Foundry Fax No. 332-4581 July 27, 2020 James Moore NCDEQ - Mooresville Regional Office 610 East Center Avenue, Suite 301 Mooresville, NC 28115 704.235.2138 james.moore@ncdeiir.gov ncdenr.gov RE: Charlotte Pipe and Foundry Company - Cast Iron Division Stormwater Permit: NCS000040 SW TSS Abatement & Maintenance Quarterly Report (Apr - Jun 2020) Dear James, In addition to other Best Management Practices (BMPs), Charlotte Pipe continues to maintain the following BMPs specifically for TSS Abatement: • Continuous sweeping of outside areas around the facility; • Operation and collection of dust with 20+ baghouses equipped with covered collection boxes; • Operation of water spray on charging system and in scrap yard; • Pumping stormwater sumps from charging area and scrap yard to WWTP for treatment; • Placement of catch pans under hopper bottoms of feldspar delivery truck during raw material unloading; and • Maintaining & replacement of drain/sock inserts in specified drains/culverts around the facility. Please find attached the Filter Insert Maintenance Schedule for CY2020 YTD. The most recent analytical sampling was conducted March 2020 (Jan - Jun 2.020). Follow-up sampling will be conducted July - Dec 2020. Please contact Jenny Pappalardo at (704) 348-5513 if you have any questions or need any additional information. Sincerely, +"'� L?C'ep '�" Jenny L. Pappalardo Charlotte Pipe and Foundry Co. Environmental Compliance ID# Location SWl Corner of Office Building SW2 Behind Slag Pile SW3 Water Treatment Stormwater Insert Schedule Change Schedule Mar-20 Apr-20 MaV-20 Jun-20 1/yr x 1/grtr x 1/6m x SW4 Corner of Substation & Rolo Laempe 1/6m x SW5 Corner of Substation & Rolo Electr Rm 1/6m x SW6 Oil House 1/6m x SW7 NPF Baghouse 1/grtr x SW8 Sand Lab 1/grtr x SW9 Oil House Hill 1/6m x Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 SW10 Middle Oil House Hill 1/6m x SW11 Gas Pump 1/6m x SW12 HWS Baghouse 1/grtr x SW13 Alley @ HWS & Bath House 1/grtr x x SW14 Alley @ Kitchen 1/grtr x x SW15 Alley @ Cope & Drag 1/mo x x x x x SW16 Alley @ Pattern Shop 1/mo x x x x x SW17 Top Hill 1/yr SW18 E-Coat 1/yr x SW19 Behind Pipe 1/yr n, Next Scheduled Change