HomeMy WebLinkAboutNCS000040_Report_20200727CH RUOT n T
PIPE and FOUNDRY COMPANY
P.O. Box 35430 ® Telephone 704/332-2647
CHARLOTTE, NORTH CAROLINA 28235
Foundry Fax No. 332-4581
July 27, 2020
James Moore
NCDEQ - Mooresville Regional Office
610 East Center Avenue, Suite 301
Mooresville, NC 28115
704.235.2138
james.moore@ncdeiir.gov
ncdenr.gov
RE: Charlotte Pipe and Foundry Company - Cast Iron Division
Stormwater Permit: NCS000040
SW TSS Abatement & Maintenance Quarterly Report (Apr - Jun 2020)
Dear James,
In addition to other Best Management Practices (BMPs), Charlotte Pipe continues to maintain
the following BMPs specifically for TSS Abatement:
• Continuous sweeping of outside areas around the facility;
• Operation and collection of dust with 20+ baghouses equipped with covered collection
boxes;
• Operation of water spray on charging system and in scrap yard;
• Pumping stormwater sumps from charging area and scrap yard to WWTP for treatment;
• Placement of catch pans under hopper bottoms of feldspar delivery truck during raw
material unloading; and
• Maintaining & replacement of drain/sock inserts in specified drains/culverts around
the facility.
Please find attached the Filter Insert Maintenance Schedule for CY2020 YTD.
The most recent analytical sampling was conducted March 2020 (Jan - Jun 2.020). Follow-up
sampling will be conducted July - Dec 2020.
Please contact Jenny Pappalardo at (704) 348-5513 if you have any questions or need any
additional information.
Sincerely,
+"'� L?C'ep '�"
Jenny L. Pappalardo
Charlotte Pipe and Foundry Co.
Environmental Compliance
ID# Location
SWl Corner of Office Building
SW2 Behind Slag Pile
SW3 Water Treatment
Stormwater Insert Schedule
Change
Schedule Mar-20 Apr-20 MaV-20 Jun-20
1/yr x
1/grtr x
1/6m x
SW4 Corner of Substation & Rolo Laempe 1/6m x
SW5 Corner of Substation & Rolo Electr Rm 1/6m x
SW6 Oil House 1/6m x
SW7 NPF Baghouse 1/grtr x
SW8 Sand Lab 1/grtr x
SW9 Oil House Hill 1/6m x
Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20
SW10
Middle Oil House Hill
1/6m x
SW11
Gas Pump
1/6m x
SW12
HWS Baghouse
1/grtr x
SW13
Alley @ HWS & Bath House
1/grtr x x
SW14
Alley @ Kitchen
1/grtr x x
SW15
Alley @ Cope & Drag
1/mo x x x x x
SW16
Alley @ Pattern Shop
1/mo x x x x x
SW17
Top Hill
1/yr
SW18
E-Coat
1/yr x
SW19
Behind Pipe
1/yr
n, Next Scheduled Change