Loading...
HomeMy WebLinkAboutWQ0041848_Application (FTSE)_20200717R� �QIUMAvVt=. veers Surveyors Planne" July 14, 2020 Justin Henderson Environmental Senior Specialist Winston Salem Regional Office 450 W. Hanes Mill Road Winston Salem, NC 27105 Re: Fast Track Sanitary Sewer Application for Quarry Hills Phase 1 East Justin, Please fmd attached the completed application package for this project along with the fee check of $480. Please review and process for approval. Let me know if you have any questions. Sincerely, A Anthony D. Lester, PE PLS Vice President Evans Engineering, Inc. 4609 Dundas Drive Greensboro, NC 27407 Phone 336-854-8877 Fax 336-854-8876 License #C-0168 of water Resources State of North Carolina Department of Environmental Quality Division of Water Resources 15A NCAC 02T .0300 —FAST TRACK SEWER SYSTEM EXTENSION APPLICATION INSTRUCTIONS FOR FORM: FTA 0446 & SUPPORTING DOCUMENTATION This application is for sewer extensions involving gravity sewers, pump stations and force mains, or any combination that has been certified by a professional engineer and the applicant that the project meets the requirements of 15A NCAC 02T and the Division's Minimum Design Criteria and that plans, specifications and supporting documents have been prepared in accordance with, 15A NCAC 02T, 15A NCAC 02T .0300, Division policies and good engineering practices. While no upfront engineering design documents are required for submittal, in accordance with 15A NCAC 02T .0305(b), design documents must be prepared prior to submittal of a fast track permit application to the Division. This would include plans, design calculations, and project specifications referenced in 15A NCAC 02T .0305 and the applicable mimum design criteri nia. These documents shall be available upon request by the Division. Projects that are deemed permitted (do not require a permit from the Division) are explained in 15A NCAC 02T.0303. Projects not eligible for review via the fast track process (must be submitted for full technical review): ➢ Projects that require an environmental assessment in accordance with 15A NCAC 1C .0100; ➢ Projects that do not meet any part of the minimum design criteria (MDC) document; ➢ Projects that involve a variance from the requirements of 15A NCAC 2T; ➢ Pressure sewer systems utilizing septic tank -effluent pumps (STEPS) or simplex grinder pumps; ➢ STEP or simplex grinder pumps connecting to pressurized systems (e.g. force mains); ➢ Vacuum sewer systems. General —When submitting an application, please use the following instructions as a checklist in order to ensure all required items are submitted. Adherence to these instructions and checking the provided boxes will he produce a quicker review time, and reduce the amount of requested additional information. Failure to submit all required items will necessitate additional processing and review time, and may result in return of the application. Unless otherwise noted, the Applicant shall submit one original and one copy of the application and supporting documentation. A. One Original and One Copy of Application and Supporting Documents N Required unless otherwise noted . B. Cover Letter (Required for All Application Packages): ®, List all items included in the application package, as well as a brief description of the requested permitting action. ➢ Be specific as to the system type, number of homes served, flow allocation required, etc. ➢ If necessary for clarity, include attachments to the application form. C. Application Fee (All New and Major Modification Application Packages): ® Submit a check or money order in the amount of $480.00 dated within 90 days of application submittal. ➢ Payable to North Carolina Department of Environmental Quality (NCDEQ) D. Fast Track (Forme FTA 0446) Application (Required for All Application Packages): I81 Submit the completed and appropriately executed application. ➢ If necessary for clarity or due to space restrictions, attachments to the application may be made. N If the Applicant Type in Item I.2 is a corporation or company, provide documentation it is registered for business with the North Carolina Secretary of State. ❑ If the Applicant Type in Item 1.2 is a partnership or d/b/a, enclose a copy of the certificate fled with the Register of Deeds in the county of business. N The Project Name in Item H.1 shall be consistent with the project name on the flow acceptance letters, agreements, etc. N The Professional Engineer's Certification on Page 5 of the application shall be signed, sealed and dated by a North Carolina licensed Professional En ineer. N The Applicant's Certification on Page 5 of the application shall be signed in accordance with 15A NCAC 02T 00106(b). Per 15A NCAC 02T .0106(c), an alternate person may be designated as the signing official if a delegation letter is provided from a person who meets the criteria in 15A NCAC 02T .0106(b). INSTRUCTIONS FOR FORM: FTA 04-16 &SUPPORTING DOCUMENTATION Pagel of 3 E. Flow Tracking/Acceptance Form (Form: FTSE 0446) (If Applicable): ® Submit the completed and executed FTSE form from the owners of the downstream sewers and treatment facility. ➢ Multiple forms maybe required where the downstream sewer owner and wastewater treatment facility are different. ➢ The flow acceptance indicated in form FTSE must not expire prior to permit issuance and must be dated less than one year prior to the application date. ➢ Submittal of this application and form FTSE indicates that owner has adequate capacity and will not violate G.S. 143- 215.67(a). ➢ Intergovernmental agreements or other contracts will not be accepted in lieu of a project -specific FTSE. F. Site Maps (All Application Packages): ® Submit an 8.5-inch x 114nch color copy of a USGS Topographic Map of sufficient scale to identify the entire project area and closest surface waters. Location of the pxoject (gravity sewer, pump stations &force main) ➢ Downstream connection points and permit number (if known) for the receiving sewer ® Include a street level map (aerial) showing general project area so that Division staff can easily locate it in the field. G. Existing Permit (All Modification Packages): ❑ Submit the most recently issued existing permit. ❑ Provide a list of any items within the permit the Applicant would like the Division to address during the permit modification (i.e., permit description, flow allocation, treatment facility, etc.). H. Power Reliability Plan (R.equired if portable reliability option utilized for Pamp Station): ❑ Per 15A NCAC 02T .0305(h)(1), submit documentation of power reliability for pumping stations. ➢ This alternative is only available for average daily flows less than 15,000 gallons per day ➢ It shall be demonstrated to the Division that the portable source is owned or contracted by the applicant and is compatible ON with the station. The Division will accept a letter signed by the applicant (see 15A NCAC 02T .0106(b)) or proposed contractor, stating that "the portable power generation unit or portable, independently -powered pumping units, associated appurtenances and personnel are available for distribution and operation of this pump station." ➢ If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall be provided in the.case of a multiple station power outage. (Required at time of certification) I. Certificate of Public Convenience and Necessity (All Application Packages for Privately -Owned Public Utilities): ❑ Per 15A NCAC 02T .0115(a)(1) provide the Certificate of Public Convenience and Necessity from the North Carolina Utilities Commission demonstrating the Applicant is authorized to hold the utility franchise for the area to be served by the sewer extension, or ❑ Provide a letter from the North Carolina Utilities Commission's Water and Sewer Division Public Staff stating an application for a franchise has been received and that the service area is contiguous to an existing franchised area or that franchise approval is expected. J. Operational Agreements (Applications from HOA/POA and Developers for lots to be sold): ❑ .Home/Property Owners' Associations ❑ Per 15A NCAC 02T .0115(c), submit the properly executed Operational Agreement (FORM: HOA). ❑ Per 15A NCAC 02T .0115(c), submit a copy of the Articles of Incorporation, Declarations and By-laws. ❑ Developers of lots to be sold ❑ Per 15A NCAC 02T .0115(b), submit the properly executed Operational Agreement (FORM: •DEV). For more information, visit the Division's collection systems website INSTRUCTIONS FOR FORM: FTA 04-16 &SUPPORTING DOCUMENTATION Page 2 of 3 THE COMPLETED APPLICATION PACKAGE INCLDING ALL SUPPORTING INFORMATION AND MATERIALS, SHOULD BE SENT TO THE APPROPRIATE REGIONAL OFFICE: REGIONAL OFFICE ADDRESS COUNTIES SERVED Asheville Regional Office 2090 US Highway 70 Avery, Buncombe, Burke, Caldwell, Cherokee, Water Quality Section Swannanoa, North Carolina 28778 Clay, Graham, Haywood, Henderson, Jackson, (828) 296-4500 Macon, Madison, McDowell, Mitchell, Polk, (828) 299-7043 Fax Rutherford, Swain, Transylvania, Yancey Fayetteville Regional Office 225 Green Street Suite 714 Anson, Bladen, Cumberland, Harnett, Hoke, Water Quality Section Fayetteville, North Carolina 28301-5094 Montgomery, Moore, Robeson, Richmond, (910) 433-3300 Sampson, Scotland (910) 486-0707 Fax Mooresville Regional Office 610 E. Center Avenue Alexander, Cabarrus, Catawba, Cleveland, Water Quality Section Mooresville, North Carolina 28115 Gaston, Iredell, Lincoln, Mecklenburg, Rowan, (704) 663-1699 Stanly, Union (704) 663-6040 Fax Raleigh Regional Office 1628 Mail Service Center Chatham, Durham, Edgecombe, Franklin, Water Quality Section Raleigh, North Carolina 27699A628 Granville, Halifax, Johnston, Lee, Nash, (919) 7914200 Northampton, Orange, Person, Vance, Wake, (919) 788-7159 Fax Warren, Wilson Washington Regional Office 943 Washington Square Mall Beaufort, Bertie, Camden, Chowan, Craven, Water Quality Section Washington, North Carolina 27889 Currituck, Dare, Gates, Greene, Hertford, Hyde, (252) 946-6481 Jones, Lenoir, Martin, Pamlico, Pasquotank, (252) 975-3716 Fax Perquimans, Pitt, Tyrrell, Washington, Wayne Wilmington Regional Office 127 Cardinal Drive Extension Brunswick, Carteret, Columbus, Duplin, New Water Quality Section Wilmington, North Carolina 28405 Hanover, Onslow, Pender (910) 796-7215 (910) 350-2004 Fax WinstonSalem Regional Office 450 W. Hanes Mill Road Alamance, Alleghany, Ashe, Caswell, Davidson, Water Quality Section Suite 300 Davie, Forsyth, Guilford, Rockingham, Randolph, Winston-Salem, North Carolina 27105 Stokes, Surry, Watauga, Wilkes, Yadkin (336) 776-9800 INSTRUCTIONS FOR FORM: FTA 04-16 &SUPPORTING DOCUMENTATION Page 3 of 3 of Water Resources State of North Carolina Department of Environmental Quality Division of Water Resources 15A NCAC 02T .0300 - FAST TRACK SEWER SYSTEM EXTENSION APPLICATION FTA 0446 & SUPPORTING DOCUMENTATION Application Number: (to be completed by DWR) All items must be completed or the application will be returned I. APPLICANT INFORMATION: 1. Applicant's name: Town of Swepsonville (company, municipality, HOA, utty, etc.) 2. Applicant type: ® Individual ❑ Corporation ❑ General Partnership ❑ Federal ❑ State/County ® Municipal 3. Signature authority's name: Brad Bullis per 15A NCAC 02T ,0106(b) Title: Town Administrator 4. Applicant's mailing address: 2747 Darrell Newton Drive City: Swepsonville State: NC Zip: 27253- 5. Applicant's contact information: Phone number: 336) 578-5644 Email Address: brad .bullis(a�swepsonvilletowno£net II. PROJECT INFORMATION: ❑.Privately -Owned Public Utility ❑ Other 1. Project name: Ouarry Hills Phase 1 East 2. Application/Project status: ® Proposed (New Permit) ❑ Existing Permit/Project If a modification, provide the existing permit number: WQ00 and issued date: If new construction but part of a master plan, provide the existing permit number: WQ00 3. County where project is located: Alamance 4. Approximate Coordinates (Decimal Degrees): Latitude: 36,034010' Longitude:-79.3533000 5. Parcel ID (if applicable): 152135 & 152131 (or Parcel ID to closest downstream sewer) III. CONSULTANT INFORMATION: 1. Professional Engineer: Anthony D. Lester License Number: 19773 Firm: Evans Engineering Inc• Mailing address: 4609 Dundas drive City: Greensboro State: NC Phone number: 336) 279-7450 Zip: 27407- Email Address: adl a evans eng com IV. WASTEWATER TREATMENT FACILITY (WWTF) INFORMATION: 1. Facility Name: South Burlington W WTF Permit Number: NC0023876 Owner Name: City, of Burlin on V. RECEIVING DOWNSTREAM SEWER INFORMATION (if different than WWTF): 1. Permit Numbers}: WQ Downstream (Receiving) Sewer Size: 8 inch stem Wide Collection System Permit Number(s�if applicable): WQCS00243 Owner Name(s): Town of Swepsonville FORM: FTA 04-16 Page 1 of 5 VI. 1 2. 4. GENERAL REQUIREMENTS If the Applicant is a Privately -Owned Public Utility, has a Certificate of Public Convenience and Necessity been attached? ❑ Yes ❑No ®N/A If the Applicant is a Developer of lots to be sold, has a Developer's Operational Agreement (FORM: DEV) been attached? ❑ Yes ❑No ®N/A If the Applicant is a Home/Property Owners' Association, has_ an Operational Agreement (FORM: HOA) been attached? Origin of wastewater: (check all that apply): ® Residential Owned ❑ Residential Leased ❑ School / preschool / day care ❑ Food and drink facilities ❑ Businesses / offices / factories ❑ Yes ❑No ®N/A ❑ Retail (stores, centers, malls) ❑ Retail with food preparation/service ❑ Medical / dental / veterinary facilities ❑ Church ❑ Nursing Home 5. Nature of wastewater : 100 %Domestic/Commercial %Commercial ❑ Car Wash ❑ Hotel and/or Motels ❑ Swimming Pool /Clubhouse ❑ Swimming Pool/Filter Backwash ❑ Other (Explain in Attachment) Industrial (See 15A NCAC 02T ,0103(201) 4 Is there a Pretreatment Program in effect? ❑ Yes ❑ No 6. Has a flow reduction been approved under 15A NCAC 02T .0114(fl? ❑Yes ®No ➢ If Yes, provide a copy of flow reduction approval letter 7. Summarize wastewater generated by project: Establishment Type (see 02T.0114(fl) Daily Design Flow °�b No. of Units Flow Single Family Home (4 Bedrooms) 120 gal/Bedroom 40 195200 GPD gal/ GPD gal/ GPD gal/ GPD gal/ GPD gal/ GPD Total 1 %200 GPD a See 15A NCAC 02T .0114(b), (d), (e)(1) and (e)(2) for caveats to wastewater design flow rates (i.e., minimum flow per dwelling; proposed unknown non-residential development uses; public access facilities located near high public use areas; and residential property located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals as defined in G.S. 42A4). b Per 15A NCAC 02T .0114(c), design flow rates for establishments not identified [in table 15A NCAC 02T.0114] shall be determined using available flow data, water using fixtures, occupancy or operation patterns, and other measured data. 8. Wastewater generated by project: 19,200 GPD (per 15A NCAC 02T .0114) ➢ Do not include future flows or previously permitted allocations If permitted flow is zero, indicate why: ❑ Pump Station or Gravity Sewer where flow will be permitted in subsequent permits that connect to this line ❑ Flow has already been allocated in Permit Number: ❑ Rehabilitation or replacement of existing sewer with no new flow expected ❑ Other (Explain): FORM: FTA 04- 16 Page 2 of 5 VII. 7 VIII. GRAVITY SEWER DESIGN CRITERIA (If Applicable) - 02T .0305 & MDC (Gravity Sewers): Summarize gravity sewer to be permitted: Size (inches) Length (feet) Material 8" 1647 SDR35 8" 184 DIP ➢ Section II &III of the MDC for Permitting of Gravity Sewers contains information related to design criteria ➢ Section III contains information related to minimum slopes for gravity sewer(s) ➢ Oversizing lines to meet minimum slope requirement is not allowed and a violation of the MDC PUMP STATION DESIGN CRITERIA (If Applicable) — 02T .0305 &MDC (Pump Stations/Force Mains): COMPLETE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT 1. Pump station number or name: 2. Approximate Coordinates (Decimal Degrees): Latitude: Longitude: - ° 3. Design flow of the pump station: millions gallons per day (firm capacity) 4. Operational point(s) of the pump(s): gallons per minute at feet total dynamic head (TDH) 5. Summarize the force main to be permitted (for this Pump Station): Size (inches) Length (feet) Material 6. Power reliability in accordance with 15A NCAC 02T .0305(h)(1): Li Standby power source or pump with automatic activation and telemetry - 15A NCAC 02T .0305(h)(1)(B); ➢ Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day ➢ Must be permanent to facility Or if the pump station has an average daily flow less than 15,000 gallons per day: ❑ Portable power source with manual activation, quick -connection receptacle and telemetry - 15A NCAC 02T .0305(h)(l)(C) or ❑ Portable pumping unit with plugged emergency pump connection and telemetry - 15A NCAC 02T .0305(h)(1)(C): ➢ It shall be demonstrated to the Division that the portable source is owned or contracted by the applicant (draft agreement) and is compatible with the station. ➢ If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall be provided in the case of a multiple station power outage. FORM: FTA 04-16 Page 3 of 5 IX, SETBACKS &SEPARATIONS — (02B .0200 & 15A NCAC 02T .0305(f))9 Does the project comply with all separations found in 15A NCAC 02T .0305(f) &(g) ➢ 15A NCAC 02T.0305(fl contains minimum separations that shall be provided for sewer systems: ® Yes ❑ No Setback Parameter* Separation Reuired Storm sewers and other utilities not listed below vertical 24 inches Water mains vertical -water over sewer including in benched trenches 18 inches Water mains horizontal 10 feet Reclaimed water lines vertical - reclaimed over sewer 18 inches Reclaimed water lines horizontal - reclaimed over sewer 2 feet "Any private or public water supply source, including any wells, WSJ waters of Class I or Class II impounded reservoirs used as a source of drWdng water 100 feet **Waters classified WS (except WS-I or WS-V), B, SA, ORW, HQW, or SB from normal high water or tide elevation and wetlands see item IX.2 50 feet **Any other stream, lake, impoundment, or ground water lowering and surface drainage ditches 10 feet Any building foundation 5 feet Any basement 10 feet Top slope of embankment or cuts of 2 feet or more vertical height 10 feet Drainage systems and interceptor drains 5 feet Any swimming pools 10 feet Final earth grade vertical 36 inches ➢ 15A NCAC 02T.0305(e) contains alternatives where separations in 02T.0305(fl cannot be achieved. ➢ **Stream classifications can be identified using the Division's NC Surface Water Classifications weul2ne ➢ If noncompliance with 02T.0305( or (g), see Section X of this application 2. Does the project comply with separation requirements for wetlands? (SO feet of separation) ®Yes ❑ No ❑ N/A ➢ See the Division's draft separation requirements for situations where separation cannot be meet ➢ No variance is required if the alternative design criteria specified is utilized in design and construction ➢ As built documents should reference the location of areas effected 3. Does the project comply with setbacks found in the river basin'rules per 15A NCAC 02B .0200? ®Yes ❑ No � N/A ➢ This would include Trout Buffered Streams per 15A NCAC 2B.0202 4. Does the project require coverage/authorization under a 404 Nationwide or individual permits Qr 401 Water Quality Certifications? ➢ Information can be obtained from the 401 &Buffer Perm ittine Branch 5. Does project comply with 15A NCAC 02T.0105(c)(6) (additional permits/certifications)? Per 15A NCAC 02T.0105(c)(6), directly related environmental permits or certification applications are being prepared, have been applied for, or have been obtained. Issuance of this permit is contingent on issuance of dependent permits (erosion and sedimentation control plans, stormwater management plans, etc.). 6. Does this project include any sewer collection lines that are deemed "high -priority?" Per 15A NCAC 02T.0402. "high -priority sewer" means "any aerial sewer, sewer contacting surface waters, siphon, or sewer positioned parallel to sheambanks that is subject to erosion that undermines or deteriorates the sewer. ❑ Yes ®No ❑ N/A ➢ If yes, include an attachment with details for each line, including type (aerial line, size, material, and location). High priority lines shall be inspected by the permittee or its representative at least once eveiysix-months and iuspections documented per 15A NCAC 02T.0403(a)(5) or the permitee's individual System -Wide Collection permit. FORM: FTA 0446 Page 4 of 5 X. CERTIFICATIONS: 1. Does the submitted system comply with 15A NCAC 021, the Minimum Design Criteria for the Permitting of Pump Stations and Force Mains (latest version), and the Gravity Sewer Minimum Design Criteria (latest version) as applicable? ® Yes ❑ No If No, complete and submit the Variance/Altetnative Design Request application (VADC 10-14) and supporting documents for review. Approval of the request is required prior to submittal of the Fast Track Application and supportine documents. 2. Professional Engineer's Certifications I, Anthony D. Lester attest that this application for (Professional Engineer's name from Application Item Ell .l.) has been reviewed by .me and is accurate, complete and consistent with the information supplied in the plans, specifications, engineering calculations, and all other supporting documentation to the best of my knowledge. I further attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer Minimum Design Criteria for Gravity Sewers (latest version), and the Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains (latest version). Although other professionals may have developed certain portions of this submittal package, inclusion of these materials under my signature and seal signifies that I have reviewed this material and have judged it to be consistent with the proposed design. NOTE — In accordance with General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000, as well as civil penalties up to $25,000 per violation. North Carolina Professional Engineer's seal, signature, and date: 3. Applicants Certification per 15A NCAC 02T .4106(b): I, �����' � L��a���S j �6�wW a4�Y�►01t (Signature Authbrity's name &title from Application Item I.3.) 9 77:5 vZ Nc N� .,� E that this application. for has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting documentation and attachments are not included, this application package is subject to being returned as incomplete. I understand that any discharge of wastewater from this non - discharge system to surface waters or the land will result in an immediate enforcement action that may include civil penalties, injunctive relief, and/or criminal prosecution. I will make no claim against the Division of Water Resources should a condition of this permit be violated. I also understand that if all required parts of this application package are not completed and that if all required supporting information and attachments are not included, this application package will be returned to me as incomplete. NOTE — In accordance with General Statutes 143-215.6A and 143-215.0, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000 as well as civil penalties up to $25,000 per violation. FORM: FTA 04-16 Page 5 of 5 s 3�15 y AMR, ,,, LEI s2 x.d�:''^'• 'ter" ,. ,... State of North Carolina Department of Environmental Quality Division of Water Resources Flow Tracking for Sewer Extension Applications (FTSE 104 8) Entity Requesting Allocation: Town of Swepsonville Project Name for which flow is being requested: Quarry Hills Phase 1 East More than one FTSE may be required for a single project if the owner of the WWTP is not responsible for all pump stations along the route of the proposed wastewater flow. I. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: Allocation to South Burlington WWTP b. WWTP Facility Permit #: NC0023876 All flows are in MGD c. WWTP facility's permitted flow 0.8000 d. Estimated obligated flow not yet tributary to the WWTP 0.0000 e. WWTP facility's actual avg. flow 0.2095 £ Total flow for this specific request 0.0192 g. Total actual and obligated flows to the facility 0.2287 h. Percent of permitted flow used 29% II. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP: Pump Pump Station Station (Name or Permit Number) No. Hills Design Obligated, Average Approx. Not Yet Total Current Firm Daily Flow** Current Tributary Flow Plus Capacity, * (Fh7n / pf), Avg. Daily Daily Flow, Obligated Available MGD MGD Flow, MGD MGD Flow Capacity*** 0.4392 0.1757 0.0399 0.0192 0.0591 0.1166 0.4680 0.1872 0.2095 0.0192 0.2287 40415 * The Firm Capacity (design flow) of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. *Y Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pf) not less than 2.5, per Section 2.02(A)(4)(c) of the Minimum Design Criteria. *x* A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is < 0. Downstream Facility Name (Sewer): South Burlington WWTP Downstream Permit Number: NC0023876 Page 1 of 6 FTSE 10-18 III. Certification Statement: I Brad Bullis certify to the best of my knowledge that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II plus all attached planning assessment addendums for which I am the responsible party. Signature of this form certifies that the receiving collection system or treatment works has adequate capacity to transport and treat the proposed new wastewater. Official Signature Title of Signing Official Date Page 2 of 6 F'I'SI 10-18 PLANNING ASSESSMENT ADDENDUM (PAA) Submit a planning assessment addendum for each pump station listed in Section II where Available Capacity is < 0. Pump Station (Name or Number): Given that: a. The proportion and amount of Obligated, Not Yet Tributary Daily Flow (C) accounts for 46.3 % and 0.0192 MGD of the Available Capacity (E) in Pump Station Virginia Mills ; and that b. The rate of activation of this obligated, not yet tributary capacity is currently approximately 0.0192 MGD per year; and that c. A funded Capital Project that will provide the required planned capacity, namely Virginia Mills Pump Station Replacement is in design or under construction with planned completion in July 2021 ; and/or d. The following applies: The Swepsonville Town Council commissioned a sewer study to identify issues within the sewer collection and pumping system. Based on the study results, the Council approved a three phased action plan to reduce sewer treatment costs as well as regain system capacity lost to inflow and infiltration. The three phased action plan included: 1) Point repairs to address sources of inflow and infiltration identified during widespread smoke testing; 2) Replace the existing Virginia Mills Pump Station with a new L0 MGD Firm Capacity station; 3) Sewer line and manhole rehabilitation of sewer outfalls upstream of Virginia Mills Pump Station. As of the date of this permit request, the current status of action plan items is as follows: Action Plan Item 1 - Complete; Action Plan Item 2 - Bids have been received and contracts are currently being executed; Action Plan Item 3 - The Town has received a Letter of Intent to Fund the Virigina Mills Outfall & Hillside Outfall Sanitary Sewer Rehabilitation Proiect (CS370839-01). Therefore: Given reasonably expected conons and planning information, there is sufficient justification to allow this flow to be permitted, without a significant likelihood of over -allocating capacity in the system infrastructure. I understand that this does not relieve the collection system owner from complying with G.S. 143- 215.67(a) which prohibits the introduction of any waste in excess of the capacity of the waste disposal system. Sign Page 3 of 6 FTSIi 10-18 State of North Carolina Department of Environment and Natural Resources Iaivision of Water Resources fatvisaan a tnt�te' Resc�ti�a�es Flow TraeldugfAcceptance for Sewer Extension Permit Applications (PTn 10=11) Entity Requesting Allocation City of Burlington Project Name for which #low is being requested; quarry Mllls Phase 9a�t More than one .FI'SE may be requiW for a single protect if the owner of the WWTPis not responsible for all p:cmp stattons along the route of the proposes! wastewaterflow, 1. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: South Burlington WWTP b. WWTP Facility Permit #; NC0023876 Al! flaws nrre !n MGD e. WWTP facility's permitted flow 12.00 d. Estimated obligated flow not yet tributary to the WWTP 14777679 e. WWTP facility's actual avg. flow 8.752000 f. Total flow for this specific request (090102) Swepsonville Allocation g. Total actual and obligated flows to the facility M529679 h. Percent of permitted flow used7.75°�0 TT , Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow, List pump stations located between the prajeot connection point and the WWTP Design Obligated Average Rally Approx, Nat Yet Total Current Pump Station Firm Flow** Current Avg, Tributary Flow Plus (Name or Capacity, * (Firm/po, Daily Flow, Daily Flow, Obligated Available Number) GPD GPD GPD GPD Flow Capacity*** NONE * The Firm Capacity of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. *A Design Average Daily Flow is the firm capacity of the pumpsfation divided by a peaking factor (pf) not less than 2.5. *** A Planning Assessment Addendum shall be attached for each pump station Located between the project connection point and the WWTP where the Available Capacity S 01 Downstream Faoility Name (Sewer) ; IJIA Downstream Permit Number; NIA FTS6 10-18 III, Certification Statement; I, Wt Todd Lambert,1'.fi, certify to the best of my knowledge that the addition of the vo 'me a �vastewmr to a permitted in this proj Lect has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project Is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station on mute to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning asssessment where applicable, This analysis has been performed in accordance with local established policies and procedures using the hest available data. This certification applies to those items listed above in Sections I and U plus all attached planning assessment addendums for which I am the responsible party. Signature of this form certifies that the receiving collection system or treatment works has adequate capacity to transport and treat the proposed new wastewater, Data 2 of 6 FTSE 10-16 e s! e e ,�y QUARRY HILLS PHASE 1 EAST SCALE: 1 "=1,000' QUARRY HILLS PHASE 1 EAST SCALE: 1 "=1,000' VI. GENERAL REQUIREMENTS 1. If the Applicant is a Privately -Owned Public Utility, has a Certificate of Public Convenience and Necessity been attached? [:]Yes [:]No ®N/A 2. If the Applicant is a Developer of lots to be sold, has a Developer's Operational Agreement (FORM: DEV) been attached? ❑ Yes ❑No ®N/A 3. If the Applicant is a Home/Propegy Owners' Association, has an Operational Agreement (FORM: HOA) been attached? ❑ Yes ❑No ®N/A 4. Origin of wastewater: (check all that apply): ® Residential Owned ❑ Retail (stores, centers, malls) ❑ Car Wash ❑ Residential Leased ❑ Retail with food preparation/service ❑ Hotel and/or Motels ❑ School / preschool / day care ❑ Medical / dental / veterinary facilities ❑ Swimming Pool /Clubhouse ❑ Food and drink facilities ❑ Church ❑ Swimming Pool/Filter Backwash ❑ Businesses / offices / factories ❑ Nursing Home ❑ Other (Explain in Attachment) 5. Nature of wastewater: 100 % Domestic/Commercial % Commercial % Industrial (See 15A NCAC 02T .0103(20)) 4,Is there a Pretreatment Program in effect? ❑ Yes ❑ No 6. Hasa flow reduction been approved under 15A NCAC 02T .0114(fl? [—]Yes ®No ➢ If yes, provide a copy of flow reduction approval letter 7. Summarize wastewater generated by project: Establishment Type (see 02T.0114(f)) Daily Design Flow 0 No. of Units Flow Single Family Home (4 Bedrooms) 120 gal/Bedroom 40 19,200 GPD gal/ GPD gal/ GPD gal/ GPD gal/ GPD gal/ GPD Total 19,200 GPD a See 15A NCAC 02T .0114(b),d), (e)(1) and (e)(2) for caveats to wastewater design flow rates (i.e., minimum flow per dwelling; proposed unknown non-residential development uses; public access facilities located near high public use areas; and residential property located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals as defined in G.S. 42A-4). b Per 15A NCAC 02T .0114(c), design flow rates for establishments not identified [in table 15A NCAC 02T.01141 shall be determined using available flow data, water using fixtures, occupancy or operation patterns, and other measured data. 8. Wastewater generated by project: 0 GPD (per 15A NCAC 02T .0114) ➢ Do not include future flows or previously permitted allocations If permitted flow is zero, indicate why: ❑ Pump Station or Gravity Sewer where flow will be permitted in subsequent permits that connect to this line ❑ Flow has already been allocated in Permit Number: ❑ Rehabilitation or replacement of existing sewer with no new flow expected ® Other (Explain): This permit shall be a "Construction Only" Permit. Once the Town of Swepsonville increases their capacity at the Virgina Milla Pump Station, additional flow will be permitted. FORM: FTA 04-16 Page 2 of 5