Loading...
HomeMy WebLinkAbout520002_Plan of Action_20200724Jul 24 2020 03:53PM Selby Land Concepts 2529646775 page 1 ro MC&AI �,uEy104 erld fif c JA W Act Jul 24 2020 03:53PM Selby land Concepts 2529646775 page 2 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: . 3! z 2 County; A)Fs Facility Name: %A L09 F/N1,S111A*- Certified Operator Name: DVAIAL-0 %�1Le t. Operator # Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Lagoon Name/Identifier (ID): Spillway (Yes or No): Level (inches): Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 V010 3 '7 L_ 41 � 2. Check/all applicable items V Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility number(s), number acres and receiving crop information. Contact and secure approval from the Division of Water Resources prior to transfer of waste to a site not covered in the facility's certified animal waste management plan. Operation will be partially or fully depopulated. - attach a complete schedule with corresponding animal units and dates for depopulation - if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: 7 .1W "%U I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. - � n/ o _A41t5K_ Phone: e?rz Facility Owner/Manager (print) Date: 7 ,10 —,g-0 Facility Owner/Manager (signature) PoA Cover Page 2/21/00 Jul 24 2020 03:53PM Selby Land Concepts 2529646775 page 3 PLAN OF ACTION (POA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1, Structure Name/Identifier (ID): 52-2 Lagoon #2 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr./24 hr. storm & structural freeboard c. line b - line a (inches in red zone) = d. top of dike surface area according to design (area at below structural freeboard elevation) e, line c/12 x line d x 7.48 gallons/ft3 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 13.0 inches l 9.51 inches 6.5 inches 125450 tt2 508282 gallons —IS-01 days g. volume of waste produced according to structural design 221390.4 fi3 h. current herd # 3000 certified herd # 9100 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines In + i +j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 1 6/22/2020 m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) PoA (30 Day) 2121/00 72986 ft3 ft3 102159.8 ft3 218348 gallons 0.99 Ibs/1000 gal. 719.4 lbs. PAN Jul 24 2020 03:53PM Selby Land Concepts 2529646775 page 4 II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR.124 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: 52-2 Lagoon #2 line m = 719A Ito PAN 2. Structure ID: 52-2 Lagoon #3 line m = 890.1 to PAN 3. Structure ID: line m = lb PAN 4. Structure ID: line m = lb PAN 5. Structure ID: line m = lb PAN 6. Structure ID: line m = Ito PAN n.lineal +2+3+4+5+6= 1609.5lbPAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS an oar PFRInn O. tract # p. field # q. crop r. acres s. remaining IRR 2 PAN balance (lb/sera) LTOTAL PAN BALANCE FOR FIELD (Iba.) uapplication window' 240 PIVOT Soybeans 16.60 65.00 1079.0 411-9/15 240 Pull#7 Soybeans 4.32 120.00 518A 4/1-9/15 240 Pull #8 Soybeans 4.32 90.00 388.8 4/1-9/15 240 Pull #9 Soybeans 4.32 140.00 604.8 4/1-9/15 240 Pull #10 So beans 4.32 152.00 656.E 4/1-9/15 'State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = 3247.0 111. PAN IV. FACILITY'S PDA OVERALL PAN BALANCE PoA (30 Day) 2/21/00 Jul 24 2020 03:53PM Selby Land Concepts 2529646775 page 5 w. Total PAN to be land applied (line n from section II) = 1609.5 lb. PAN x. Crop's remaining PAN balance (line v from section III) = 3247.0 lb. PAN y. Overall PAN balance (w - x) _ - 3$ lb. PAN Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the Date: 4/25/17 Eve H. Honeycutt Extension Agent Agriculture, Livestock Certified Technical Specialist PoA (30 Day) 2/21100 Jul 24 2020 03:53PM Selby Land Concepts 2529646775 page 6 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Namelldentifier (ID): 52-2 Lagoon #3 - 1 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker 13.0 b. designed 25 yr.124 hr. storm & structural freeboard 19.5 c. line b - line a (inches in red zone) = 6.5 d. top of dike surface area according to design (area at below structural freeboard elevation) 102545 a. line c/12 x line d x 7.48 gallons/f13 415478 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 g. volume of waste produced according to structural design 221390.4 h. current herd # 900 certified herd # 4000 actual waste produced = current herd # x line g = 49813 certified herd # i. volume of wash water according to structural design J. excess rainfall over evaporation according to design 89782.7 k. (lines In + i +j) x 7.48 x 30 days/line f= 174004 4. Total PAN to be land applied during draw down period I. current waste analysis dated 6/2212020 1.51 m. ((lines e + k)/1000) x line I = 890.1 REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) PoA (30 Day) 2/21/00