HomeMy WebLinkAbout520002_Plan of Action_20200724Jul 24 2020 03:53PM Selby Land Concepts 2529646775
page 1
ro MC&AI �,uEy104 erld fif c JA W Act
Jul 24 2020 03:53PM Selby land Concepts 2529646775
page 2
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
Facility Number: . 3! z 2 County; A)Fs
Facility Name: %A L09 F/N1,S111A*-
Certified Operator Name: DVAIAL-0 %�1Le t. Operator #
Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the
lowest point on the top of the dam for lagoons without spillways; and from the current liquid level
in the lagoon to the bottom of the spillway for lagoons with spillways.
Lagoon Name/Identifier (ID):
Spillway (Yes or No):
Level (inches):
Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6
V010
3 '7
L_ 41
�
2. Check/all applicable items
V Liquid level is within the designed structural freeboard elevations of one or more structures. Five
and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within
acceptable ranges.
Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day
Plan of Action is attached. Agronomic balance is within acceptable range.
Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to
pumped and hauled is reflected in section III tables. Included within this plan is a list of the
proposed sites with related facility number(s), number acres and receiving crop information.
Contact and secure approval from the Division of Water Resources prior to transfer of
waste to a site not covered in the facility's certified animal waste management plan.
Operation will be partially or fully depopulated.
- attach a complete schedule with corresponding animal units and dates for depopulation
- if animals are to be moved to another permitted facility, provide facility number, lagoon
freeboard levels and herd population for the receiving facility
3. Earliest possible date to begin land application of waste: 7 .1W "%U
I hereby certify that I have reviewed the information listed above and included within the attached Plan
of Action, and to the best of my knowledge and ability, the information is accurate and correct.
- � n/ o _A41t5K_ Phone: e?rz
Facility Owner/Manager (print)
Date: 7 ,10 —,g-0
Facility Owner/Manager (signature)
PoA Cover Page 2/21/00
Jul 24 2020 03:53PM Selby Land Concepts 2529646775
page 3
PLAN OF ACTION (POA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1, Structure Name/Identifier (ID): 52-2 Lagoon #2
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker
b. designed 25 yr./24 hr. storm & structural freeboard
c. line b - line a (inches in red zone) =
d. top of dike surface area according to design
(area at below structural freeboard elevation)
e, line c/12 x line d x 7.48 gallons/ft3
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design
13.0 inches
l 9.51 inches
6.5 inches
125450 tt2
508282 gallons
—IS-01 days
g. volume of waste produced according to structural design 221390.4 fi3
h. current herd # 3000 certified herd # 9100
actual waste produced = current herd # x line g =
certified herd #
i. volume of wash water according to structural design
j. excess rainfall over evaporation according to design
k. (lines In + i +j) x 7.48 x 30 days/line f=
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 1 6/22/2020
m. ((lines e + k)/1000) x line I =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
PoA (30 Day) 2121/00
72986 ft3
ft3
102159.8 ft3
218348 gallons
0.99 Ibs/1000 gal.
719.4 lbs. PAN
Jul 24 2020 03:53PM Selby Land Concepts 2529646775 page 4
II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR.124
HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
1.
Structure ID: 52-2 Lagoon #2
line m =
719A Ito PAN
2.
Structure ID: 52-2 Lagoon #3
line m =
890.1 to PAN
3.
Structure ID:
line m =
lb PAN
4.
Structure ID:
line m =
lb PAN
5.
Structure ID:
line m =
lb PAN
6.
Structure ID:
line m =
Ito PAN
n.lineal +2+3+4+5+6= 1609.5lbPAN
III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN
PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS an oar PFRInn
O. tract #
p. field #
q. crop
r. acres
s. remaining IRR
2 PAN balance
(lb/sera)
LTOTAL PAN
BALANCE FOR
FIELD (Iba.)
uapplication window'
240
PIVOT
Soybeans
16.60
65.00
1079.0
411-9/15
240
Pull#7
Soybeans
4.32
120.00
518A
4/1-9/15
240
Pull #8
Soybeans
4.32
90.00
388.8
4/1-9/15
240
Pull #9
Soybeans
4.32
140.00
604.8
4/1-9/15
240
Pull #10
So beans
4.32
152.00
656.E
4/1-9/15
'State current crop ending application date or next crop application beginning date for available
receiving crops during 30 day draw down period.
v. Total PAN available for all fields (sum of column t) = 3247.0 111. PAN
IV. FACILITY'S PDA OVERALL PAN BALANCE
PoA (30 Day) 2/21/00
Jul 24 2020 03:53PM Selby Land Concepts 2529646775 page 5
w. Total PAN to be land applied (line n from section II) = 1609.5 lb. PAN
x. Crop's remaining PAN balance (line v from section III) = 3247.0 lb. PAN
y. Overall PAN balance (w - x) _ - 3$ lb. PAN
Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and
haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN
based on new information. If new fields are to be included as an option for lowering lagoon level, add these
fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to
another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the
Date: 4/25/17
Eve H. Honeycutt
Extension Agent
Agriculture, Livestock
Certified Technical Specialist
PoA (30 Day) 2/21100
Jul 24 2020 03:53PM Selby Land Concepts 2529646775
page 6
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Namelldentifier (ID): 52-2 Lagoon #3 - 1
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker 13.0
b. designed 25 yr.124 hr. storm & structural freeboard 19.5
c. line b - line a (inches in red zone) = 6.5
d. top of dike surface area according to design
(area at below structural freeboard elevation) 102545
a. line c/12 x line d x 7.48 gallons/f13 415478
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design 180
g. volume of waste produced according to structural design 221390.4
h. current herd # 900 certified herd # 4000
actual waste produced = current herd # x line g = 49813
certified herd #
i. volume of wash water according to structural design
J. excess rainfall over evaporation according to design 89782.7
k. (lines In + i +j) x 7.48 x 30 days/line f= 174004
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 6/2212020 1.51
m. ((lines e + k)/1000) x line I = 890.1
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
PoA (30 Day) 2/21/00