July 29, 2020
Subject: Request for Additional Information
Stormwater Permit No. SW5200701
Bojangles at Spring Hope, NC
Nash County
Dear Mr. Varnell:
The Division of Energy, Mineral and Land Resources (DEMLR), received a Stormwater
Management Permit Application for the subject project on July 6, 2020. A review of that
information has determined that the application is not complete. The following information is
needed to continue the stormwater review:
1. Please complete Part II.2 of the SWU-101 application form specifying the type of project.
2. The project density in Part IV.8 of the SWU-101 application form does not match the
project density shown in the table under Part IV.10.
3. Please submit a Supplement EZ form for the project. The Supplement EZ form can be
found here: hgps:Hdeq.nc.gov/about/divisions/energy-mineral-land-resources/energy
mineral-land-permit-guidance/stormwater-bmp-manual.
4. 15A NCAC 02H .1042(2)(b)(ii) requires documentation from the NC Secretary of State
or other official documentation showing the titles and positions held by the person who
signed the application. Because the individual who signed the application is not listed on
the Secretary of State's website, further verification that this person is authorized to sign
the application is required. This could be either a signed letter from one of the individuals
listed by the Secretary of State confirming that this person is authorized or other official
documentation from the LLC.
5. The project does not meet the goals of the low density regulations, which are to spread
out built upon area and promote sheet flow over pervious areas. Although the project
density over the whole property is less than 24%, most of the pervious area is outside of
the project area. According to the deed restrictions and site plans, the actual BUA
percentage on the three subdivided lots will be approximately 75.1%, 76.2%, and 75%,
D E Qbi�� North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
512 North Salisbury Street 1 1612 Mail Service Center I Raleigh, North Carolina 27699-1612
vOryfN CRii(J!.iNn
Oea WolofE,Wm—talQuality 919.707.9200
with further BUA in the rights -of -way. Also, very little flow over pervious surfaces is
provided. The Division will consider the project high density.
6. Provide pdfs of all revisions, 2 hardcopies of revised plan sheets, and 1 hardcopy of other
documents. Pdfs must be uploaded using the form at:
https://edocs.deg.nc.gov/Forms/SW_Project Submittal
Please note that this request for additional information is in response to a preliminary review.
The requested information should be received by this Office prior to August 28, 2020, or
the application will be returned as incomplete. The return of a project will necessitate
resubmittal of all required items, including the application fee. Please reference the State
assigned project number SW5200701 on all correspondence.
If you need additional time to submit the information, please submit your request for a time
extension to the Division at the contact below. The request must indicate the date by which you
expect to submit the required information. The Division is allowed 90 days from the receipt of
a completed application to issue the permit.
The construction of any impervious surfaces, other than a construction entrance under an
approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject
to enforcement action pursuant to NCGS 143-215.6A.
If you have any questions concerning this matter please feel free to contact me at
Corey.Anen(&,ncdenr.gov or (919) 707-3649. Please note that due to the ongoing Covid-19
pandemic, I will be teleworking and will be most easily reached by email.
Sincerely,
Corey Anen, PE
Environmental Engineer
Stormwater Program
cc: Raleigh Regional Office