HomeMy WebLinkAbout19991259 Ver 1_Complete File_19991116State of North Carolina
Department of Environment
M» •- and Natural Resources
Division of Water Quality
James B. Hunt, Jr., Governor
Bill Holman, Secretary
Kerr T. Stevens, Director
1 •
NCDENR
NORTH CAROLINA DEPARTMENT OF
ENVIRONMENT AND NATURAL RESOURCES
November 23, 1999
Gates County
DWQ Project # 991259
APPROVAL of 401 Water Quality Certification
Lindsey Riddick
North Carolina Department of Transportation
P.O. Box 850
Edenton, NC, 27932
Dear Mr. Riddick:
You have our approval, in accordance with the attached conditions and those listed below, to replace Bridge No. 40 over
Buckhom Creek in Gates County, as you described in your application received by the Division of Water Quality on November
16, 1999. After reviewing your application, we have decided that this fill is covered by General Water Quality Certification
Number 3100. This certification allows you to use General Permit Number 198200031 when the Corps of Engineers issues it. In
addition, you should get any other federal, state or local permits before you go ahead with your project including (but not limited
to) Sediment and Erosion Control, Coastal Stormwater, Non-Discharge and Water Supply Water shed regulations. This approval
will expire when the accompanying 404 or CAMA permit expires unless otherwise specified in the General Certification.
This approval is only valid for the purpose and design that you described in your application. If you change your project,
you must notify us and you may be required to send us a new application.. If the property is sold, the new owner must be given a
copy of this Certification and approval letter and is thereby responsible for complying with all conditions. If total wetland fills
for this project (now or in the future) exceed one acre, compensatory mitigation may be required as described in 15A NCAC 2H
.0506 (h) (6) and (7). For this approval to be valid, you must follow the conditions listed in the attached certification.
If you do not accept any of the conditions of this certification, you may ask for an adjudicatory hearing. You must act
within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition, which conforms to Chapter
150B of the North Carolina General Statutes to the Office of Administrative Hearings, P.O. Box 27447, Raleigh, N.C. 27611-
7447. This certification and its conditions are final and binding unless you ask for a hearing.
This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have
any questions, please telephone John Dorney at 919-733-9646.
Sincerely,
11?•-t?
rr T Stevens
Attachment
cc: Cotes of Engineers Washington Regulatory Field Office
Washington DWQ Regional Office
File Copy
Central Files
991259/cib
Division of Water Quality - Non-Discharge Branch
1621 May Service Center, Raleigh, NC 27699-1621 Telephone 919-733-1786 FAX # 733-9959
An Equ l Opportunity Affirmative Action Employer - 50% recycled/10% post consumer paper
http://h2o.enr.state.nc.us/wetlandc.htmi
41 w
IA 1'IVf T
RECEIVED
100 ?}1 0 5T?
y d rr AO
STATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
JAMES B. HUNT JR. DAVID McCOY
GOVENOR SECRETARY
November 10, 1999
. . SUBJECT: Gates County, Replace Bridge No. 40 over Buckhom Creek on SR 1200
Mr. Michael F. Bell, P. W. S. `
NCDOT Coordinator
U:S. Army Corps of Engineers
Regulatory Field Office
P. O. Box 1000
Washington, North Carolina 27889-1000
Dear Mr. Bell:
The North Carolina Department of Transportation proposes to replace the existing bridge over
Buckhom Creek. Bridge No. 40 will be replaced with two 112.0 inch x 75.0 inch corrugated
aluminum pipe arches. Each pipe will be 60.0 feet in length. Additionally, a small amount of
rip-rap will be placed at each pipe end for stabilization.
Enclosed please find a project site map, a drawing of the proposed work, and a pre-construction
notification form. This project will impact approximately 70.0 linear feet of jurisdictional
surface waters. Please be advised that there wilt'be no work within the channel of Buckhorn
Creek other than what is specifically shown on the attached drawings. This project will not
impact jurisdictional wetlands. Buckhorn Creek is a bank to bank stream at the project site.
c , A .r
Mr. Mike Bell
November 10, 1999
Page Two
It is anticipated that construction of this project will be authorized under a Department of the
Army Nationwide Permit No. 14. By copy of this letter, we are also requesting a 401 General
Water Quality Certification # 3103 (for NWP 14) from the NC Division of Water Quality. The
Department's is preparing to pave SR 1200 and would like to replace bridge #40 before
initializing the resurfacing. Therefore, your help in expediting the review process will be greatly
appreciated. Thank you for your help with this important matter. If you have any questions or
need any additional information, please contact me at 252-482-7977.
Sincerely,
D. R. Conner, P. E.
Division Engineer - Division One
,r- , /2, ? 'a /
T. Linds ddick, Jr.
Division Environmental Officer
Attachment
cc: Mr. John Dorney, NCDWQ, w/atta.
Mr. David Cox, NCWRC, w/atta.
Ms. Sara Winslow, NCDMF, w/atta.
Mr. Tom Mcartney, USFWS, w/atta.
Mr. Keith Harrison, NCDOT
Mr. R. E. Capehart, PE, NCDOT
r
r
r
N A N 5 E M O N D n
O^
_ R.d Grw•
?' ?' 170• '342 '
Hill td ? 145
D b 0
u Itl? ? .. 7 n ..
14-'
d , 114_0 r \ 1 114R ' • ``, D
LJC U10, IS?7 L? t t r'
j to
?? ?x ?"
Don BratrMom C`
]7
i4 R.ynddwl7 y ° Mai.llon ? .t,
1203
S
703 BLACH
100 I .e L' 106- 1.
V, 14 IJQ4
11.4
.: uat Ito. ' 13 -: /
r , 1i11.v '/ 1.3 will.y- 17,_1
ToPsY
17St 1' 13.43.7 } Ga 3?/
45 J
15 f 22,
pocos N I ?05
ld ' 1717 1344
WHlTEOAK .,? 112 ?• L
3>m .?
S.- >N \l?
29 J41
e Soy
?° .e `1 ,too buekland
J
,L lu ? •,gr0^`h 9 `? c
.L. . / 1.0 ?L
IJ LM 10
?
Ir+ Z Roduco .31! LIU W
?,11141 31 2•? 1,r \ e ?r ?o lls 11K
n T it 70 ' y Eala.
I
1 whit. Oak .7 8
p
4O Corn« Migh '1 I v 1 t ?, SR \ '' - Lill ! a1
I , 57 El.anon 1 t i
1
to Crowoodt air. M
LUI 1111( 1.7
ttll 1.7 a I. - 16
swm
n 1110 J
9 II1. H =
i - 171 .o Eur• 7V ^ ?? 3 C, e4. '194
63 t 7.
j 7
.o , oq •?? _1! ^ .. '
111) 1.7 ndl
Cute GATESVILLE Drc
'AS
L? III.
1} tc
12 111. ??' 1?
M?0 Mr4 \\\ \\119 2?\ ?° ? 1 / ?? p
?• 4 ? 117 ' ' ? ?~
?? , ? \ H I 1100 \? ??
cyow???,? .n 1 C Z
y
H E R T f O \ ?' R q?..
AT cs
N SR IZnC)
41
t
PRO P05,60
X0LFeq,
I
SR?aec i i
SQL( p?
10 1-00 as
eo_e
?J
i ?
?o
I , ?,,?ss ¢ 2?? -RAP
'7 /
3 E w rrJF 10+50.1
aaxnr.??l ?b
i
CL,A33 XrP - RRf
4 1
3/25/96
DEM ID: CORPS ACTION ID:
NATIONWIDE PERMIT REQUESTED (PROVIDE NATIONWIDE PERMIT #): NW 14
PRE-CONSTRUCTION NOTIFICATION APPLICATION
FOR NATIONWIDE PERMITS THAT REQUIRE:
1) NOTIFICATION TO THE CORPS OF ENGINEERS J
2) APPLICATION FOR SECTION 401 CERTIFICATION ![
3) COORDINATION WITH THE NC DIVISION OF COASTAL MANAG?INT " r
SEND THE ORIGINAL AND (1) COPY OF THIS COMPLETED FORM TO THE APPROPRIAT9
FIELD OFFICE OF THE CORPS OF ENGINEERS (SEE AGENCY ADDRESSES SHEE`f).
SEVEN (7) COPIES SHOULD BE SENT TO THE N.C. DIVISION OF ENVIRONMENTAL
MANAGEMENT (SEE AGENCY ADDRESSES SHEET). PLEASE PRINT.
1. OWNERS NAME: NCDOT
2. MAILING ADDRESS: P 0 Box 850
SUBDIVISION NAME:
CITY: Edenton STATE: NC ZIP CODE: 27932
PROJECT LOCATION ADDRESS, INCLUDING SUBDIVISION NAME (IF DIFFERENT FROM
MAILING ADDRESS ABOVE): Bridge 40 on SR 1200
3. TELEPHONE NUMBER (HOME):
(WORK): 252-482-7977
4. IF APPLICABLE: AGENT'S NAME OR ..RESPONSIBLE CORPORATE OFFICIAL,
ADDRESS, PHONE NUMBER: Don R Conner P E -
Division Engineer-Division One
5. LOCATION OF WORK (PROVIDE A MAP, PREFERABLY A COPY OF USGS
TOPOGRAPHIC MAP OR AERIAL PHOTOGRAPHY WITH SCALE):
COUNTY: Gates NEAREST TOWN OR CITY: Gatesville
1
I . 1
10a. NUMBER OF ACRES OF WETLANDS IMPACTED BY THE PROPOSED PROJECT BY:
FILLING:
FLOODING:
DRAINAGE:
EXCAVATION:
OTHER:
TOTAL ACRES TO BE IMPACTED: 0.0
10b. (1) STREAM CHANNEL TO BE IMPACTED BY THE PROPOSED PROJECT (IF
RELOCATED, PROVIDE DISTANCE BOTH BEFORE AND AFTER RELOCATION):
LENGTH BEFORE: N/A FT AFTER: N/A FT
WIDTH BEFORE (based on normal high water contours): N/A FT
WIDTH AFTER: N/A
AVERAGE DEPTH BEFORE: N/A FT AFTER: N/A FT
(2) STREAM CHANNEL IMPACTS WILL RESULT FROM: (CHECK ALL THAT APPLY)
OPEN CHANNEL RELOCATION: PLACEMENT OF PIPE IN CHANNEL: X
CHANNEL EXCAVATION: CONSTRUCTION OF A DAM/FLOODING:
OTHER:
11. IF CONSTRUCTION OF A POND IS PROPOSED, WHAT IS THE SIZE OF THE
WATERSHED DRAINING TO THE POND? N/A
WHAT IS THE EXPECTED POND SURFACE AREA? N/A
12. DESCRIPTION OF PROPOSED WORK INCLUDING DISCUSSION OF TYPE OF
MECHANICAL EQUIPMENT TO BE USED (ATTACH PLANS: 8 1/2" X 11" DRAWINGS
ONLY) :
Replacement of Bridge 40 with two Corrugated Aluminum Arch
13. PURPOSE OF PROPOSED WORK: Reiplace a substandard structure
3
. i
14. STATE REASONS WHY IT IS BELIEVED THAT THIS ACTIVITY MUST BE CARRIED
OUT IN WETLANDS. (INCLUDE ANY MEASURES TAKEN TO MINIMIZE WETLAND
IMPACTS): Structure is being replaced in place
17. DOES THE PROJECT INVOLVE AN EXPENDITURE OF PUBLIC FUNDS OR THE USE
OF PUBLIC (STATE) LAND?
YES [X] NO [] (IF NO, GO TO 18)
a. IF YES, DOES THE PROJECT REQUIRE PREPARATION OF AN
ENVIRONMENTAL DOCUMENT PURSUANT TO THE REQUIREMENTS OF THE NORTH
CAROLINA ENVIRONMENTAL POLICY ACT?
YES [ ] NO [X]
b. IF YES, HAS THE DOCUMENT BEEN REVIEWED THROUGH THE NORTH
CAROLINA DEPARTMENT OF ADMINISTRATION STATE CLEARINGHOUSE?
YES [ ] NO [ ]
IF ANSWER TO 17b IS YES, THEN SUBMIT APPROPRIATE DOCUMENTATION FROM THE
STATE CLEARINGHOUSE TO DIVISION OF ENVIRONMENTAL MANAGEMENT REGARDING
COMPLIANCE WITH THE NORTH CAROLINA ENVIRONMENTAL POLICY ACT.
QUESTIONS REGARDING THE STATE CLEARINGHOUSE REVIEW PROCESS SHOULD BE
DIRECTED TO MS. CHRYS BAGGETT, DIRECTOR STATE CLEARINGHOUSE, NORTH
CAROLINA DEPARTMENT OF ADMINISTRATION, 116 WEST JONES STREET, RALEIGH,
NORTH CAROLINA 27603-8003, TELEPHONE (919) 733-6369.
4
18. THE FOLLOWING ITEMS SHOULD BE INCLUDED WITH THIS APPLICATION IF
PROPOSED ACTIVITY INVOLVES THE DISCHARGE OF EXCAVATED OR FILL MATERIAL
INTO WETLANDS:
a. WETLAND DELINEATION MAP SHOWING ALL WETLANDS, STREAMS, LAKES
AND PONDS ON THE PROPERTY (FOR NATIONWIDE PERMIT NUMBERS 14, 18, 21,
26, 29, AND 38). ALL STREAMS (INTERMITTENT AND PERMANENT) ON THE
PROPERTY MUST BE SHOWN ON THE MAP. MAP SCALES SHOULD BE 1 INCH EQUALS
50 FEET OR 1 INCH EQUALS 100 FEET OR THEIR EQUIVALENT.
b. IF AVAILABLE, REPRESENTATIVE PHOTOGRAPH OF WETLANDS TO BE
IMPACTED BY PROJECT.
C. IF DELINEATION WAS PERFORMED BY A CONSULTANT, INCLUDE ALL DATA
SHEETS RELEVANT TO THE PLACEMENT OF THE DELINEATION LINE.
d. ATTACH A COPY OF THE STORMWATER MANAGEMENT PLAN IF REQUIRED.
e. WHAT IS LAND USE OF SURROUNDING PROPERTY? Rural
f. IF APPLICABLE, WHAT IS PROPOSED METHOD OF SEWAGE DISPOSAL?
g. SIGNED AND DATED AGENT AUTHORIZATION LETTER, IF APPLICABLE.
NOTE: WETLANDS OR WATERS OF THE U.S. MAY NOT BE IMPACTED PRIOR TO:
1) ISSUANCE OF A SECTION 404 CORPS OF ENGINEERS PERMIT,
2) EITHER THE ISSUANCE OR WAIVER OF A 401 DIVISION OF
ENVIRONMENTAL MANAGEMENT (WATER QUALITY) CERTIFICATION, AND
3) (IN THE TWENTY COASTAL COUNTIES ONLY), A LETTER FROM THE
NORTH CAROLINA DIVISION OF COASTAL MANAGEMENT STATING THE PROPOSED
ACTIVITY IS CONSISTENT WITH THE NORTH CAROLINA COASTAL MANAGEMENT
PROGRAM.
OWNER'S/AGENT'S SIGNATURE
? / ? 9
DATE
(AGENT'S SIGNATURE VALID ONLY
IF AUTHORIZATION LETTER FROM
THE OWNER IS PROVIDED (18g.))
5