Loading...
HomeMy WebLinkAboutNCS000584_2019 Site Audits Summary_20200720LEXINGeON Wxrex RFw CITY OF LEXINGTON FACILITIES SITE AUDITS 2019 FACILITY & AUDIT DATE FACILITY ADDRESS RESULT DEFICIENCIES LISTED RECOMMENDATIONS Provide proper cover & secondary containment measures for stored Improper fuel, chemical, & waste storage (lack of spill batteries, oil drums, fuel tanks & containers, lubricants, and other containment/proper cover) chemicals Site debris containment and removal deficiencies Move bulk waste/metal scrap from site Provide spill containment and drip pans immediately and clean up spills Numerous vehicle & equipment leaks and recent lubricant spills on per spill plan; store equipment awaiting & undergoing repair indoors with Garage 9/13 & 9/26/2019 507 Carolina Ave. Fail pavement- inadequate spill response & clean up efforts, uncovered & uncontained fluid leakage proper leak containment; replace obsolete and unused vehicles & equipment Site generated wastes & litter evident throughout the facility and along Add a 1-hour inspection and site clean up activity each week prior to staff perimeter leaving site for the week Floor drain septic tank system is not marked (& is not included in O&M Elevate septic tank system, inspect at least quarterly, identify this system plan) with signage for proper locating and safety, increase cleaning frequency The septic tank system has the potential for undetected overflows Add emergency monitoring & alarm equipment for overflow prevention Train garage staff to apply GH&PP measures. Garage staff to review & comply with City SPPP Plan (0&M Plan) Improper fuel, chemical, & waste storage (lack of spill Store chemicals, containers & fuel cans in proper containment/ safety containment/proper cover) cabinets Remove all fuel cans, lubricants, chemical containers and debris from municipal vehicles and work areas and store properly at the end of the Vehicle and equipment debris containment and removal deficiencies workday; discard wastes in contained and covered receptacles Improper location for equipment washing and cleaning; releases of Complete equipment/tool degreasing & washing at prescribed washing sediment & degreasing agents to pavement and drainage ways facilities where wastewater is collected and properly treated Batteries stored uncontained and without proper cover Provide stable containers under proper cover for stored batteries Provide labeled sealed containers for absorbents and store indoors at Absorbents left outside uncontained and without proper cover proper location for access per spill prevention plan Staff to inspect and clean out drainage systems weekly to ensure adequate Debris accumulation blocking storm drain drainage Emphasize use offacilities for cigarette disposal and add a 1-hour Cigarette butts and other debris accumulation and windblown trash inspection and site clean up activity each week prior to staff leaving site Utility Operations Center 9/13/2019 425 Carolina Ave. Fail around the site for the week Sediment released onto pavement Train staff to clean up soil & debris as soon as possible. Staff to review SPPP/O&M Plan and apply GH&PP measures Loose debris scattered around dumpsters Weekly inspection must include inspection and clean up of dumpster areas Windblown trash can & debris accumulation along parcel boundary Include property boundary in weekly inspection & clean up Condensation drain from ice maker discharges to concrete where flow is picking up debris Pipe condensation lines away from paved areas and into nearby drain Dumpster is missing drain plug Install new drain plug to contain dumpster leachate for disposal Several vehicle & equipment leaks and recent pavement stains- Provide spill containment and drip pans immediately and clean up spills inadequate spill response & clean up efforts, uncovered & uncontained per spill plan; store equipment awaiting repair indoors with proper leak fluid leakage containment; replace obsolete and unused vehicles & equipment Extend roof drains to lowest elevations of retaining wall for discharge to Gutter downspouts discharge at top of retaining wall above steep slope stable areas and prevent scour holes & erosion Regrade swales, apply ESC materials as needed & establish adequate Erosion of slopes along site perimeter and within drainage swales vegetation on denuded and eroding areas Landscaping crews to mow lawn at least 3 to 4 inches high to prevent Vacant area lacking vegetation scalping of vegetation; reseed lawn Store tanks & containers under adequate cover and in proper spill Improper chemical tank/drum/container & waste storage (lack of spill containment facilities; provide cover for dumpster & remove wastes from containment/proper cover) site promptly Site is being used as a dump/waste storage area; trash, debris and City staff/site manager to inspect site frequently and require all staff & lubricant containers litter the site with leakage evident on the soil contractors to remove waste materials and keep site clean Accumulated debris and waste materials at site are susceptible to being Add a 1-hour inspection and site clean up activity each week prior to Pole Yard 9/13/2019 330 Young Dr. Fail windblown and picked up by stormwater runoff through site workers leaving site for the week. Gravel lot lacks stone and includes exposed soil areas Place adequate stone for lot & travel paths and reseed & establish vegetation in other areas Ground cover and drainage system components are poorly maintained; Clean ditch and blocked pipe & reestablish vegetation for proper soil erosion is evident stabilization Place work supplies, tools, and other materials under roof to prevent contact with rainfall and runoff; power tools & equipment shall have Job materials, supplies, power tools, and personal items are distributed proper containment to prevent gas/oil spills; remove non -work related throughout the site uncovered and uncontained items from site Improper chemical drum/container and waste storage; deteriorating Dispose of deteriorating drums/containers and properly store drums and paint cans, drums and other fluid containers (lack of spill other containers under adequate cover and in proper spill containment containment/proper cover) facilities Remove all fuel cans, lubricants, chemical containers and debris from municipal vehicles, trailers and work areas and store properly at the end of the workday; discard wastes in contained and covered receptacles; empty Vehicle & equipment debris containment and removal deficiencies waste receptacles when full Provide spill containment and drip pans immediately and clean up spills Improper spill containment & clean up at site: a number of uncontained per spill plan; store equipment awaiting repair indoors with proper leak vehicle & equipment leaks evident and an engine stored outdoors in containment; remove obsoleted & unused equipment & engine; discharge container with (oil and grease) contaminated rainwater oil contaminated water to wastewater treatment Uncaged gas cylinder abandoned at edge of storage yard Dispose of cylinder or store under roof if refillable FACILITY & AUDIT DATE FACILITY ADDRESS RESULT DEFICIENCIES LISTED RECOMMENDATIONS Train staff to apply GH&PP measures. City staff to review & comply with City SPPP Plan (0&M Plan); add a 1-hour inspection and site clean up Wastes & litter evident throughout the facility and along perimeter activity each week prior to staff leaving site for the week Waste receptacles uncovered with rainwater infiltration evident; Provide adequate cover for all waste containers and repair or replace dumpster leaking at drain plug corner leaking dumpster Provide covered storage and containment barriers for soil, aggregates, Building Maintenance- Soil/aggregate stockpiles and landscaping materials migrating off site; mulch, compost and other bulk materials which prevents contact with Street -Public Grounds Material 520 S. Talbert Blvd. Fail storage areas lacking cover and containment wind and precipitation Store work supplies, tools, and other materials under roof to prevent Storage Facility contact with rainfall and runoff; power tools & equipment shall have 8/9/2019 Equipment, tools and supplies are stored uncovered proper containment to prevent gas/oil spills Eliminate stormwater intrusion and provide improved containment at salt storage building: seal apron/curb connection with wall & add door or Salt erosion and migration evident at salt storage facility drape at building entrance Salt building loading area is piped directly to stream; precipitation and runoff contacting any spilled salt can flow to and contaminate nearby Address salt migration and spill clean up in SPPP (O&M Plan) and train staff stream to properly clean up spilled and migrating salt Excessive herbicide application and erosion evident around open Cease herbicide applications around storm drainage structures, on slopes throated yard inlet, along slopes and access drive and drainage ways and in drainage ways; stabilize eroded and denuded areas and reestablish where vegetation has been eliminated vegetation; herbicide use must comply with site SPPP (O&M Plan) Repair damaged and missing drain pipes or modify roof drain discharges Damaged guttering & downspouts at salt shed appropriately to prevent erosion and sedimentation Remove pipe from ditch and properly store materials and supplies away Pipe materials stored in ditch centerline are blocking drain pipe; erosion from drainage ways; repair roof drainage deficiency; staff shall complete occurring at building corner from roof runoff is threatening building regular inspections and maintenance of site drainage system components foundation per SPPP (O&M Plan) Scrap, waste and debris piled up and stored at facility impede site Properly store materials for later use under cover; remove waste materials maintenance activities and debris from site Store chemical containers & fuel cans in proper containment/ safety cabinets; seal & label reusable containers/drums and store under roof with Improper fuel, coolant, chemical, & waste storage (lack of spill proper containment; remove & discard empty/unused containers and containment/proper cover) drums Store equipment with tanks under cover and inspect for leaks regularly; Equipment with chemical/spray tanks stored outdoors have potential for drain tank contents to proper disposal prior to parking and storing tank & line deterioration from UV exposure & leakage equipment Wastes & litter evident throughout the facility, waste material Train staff to apply GH&PP measures. City staff to review & comply with accumulation at the equipment wash pad and near storm drain inlets, City SPPP Plan (O&M Plan); add a 1-hour inspection and site clean up windblown litter along the fence and debris at the site perimeter near activity each week prior to staff leaving site for the week; inspect all storm the stream inlets, all grates & drainage ways and stream bank below yard each week Uncaged gas cylinder discarded on the ground with debris; deteriorating propane tank store outdoors Dispose of cylinders or store caged & under roof for proper safety Store equipment under roof when not in use; clean/degrease regularly and Roadway crack sealant melters/applicators are parked in yard check lines & valves at least once per year Provide spill containment and drip pans immediately and clean up spills Numerous vehicle & equipment leaks throughout the site- inadequate per spill plan; store equipment awaiting repair indoors with proper leak spill response & clean up efforts, uncovered & uncontained fluid leakage containment; replace obsolete and unused vehicles & equipment Tip all solid & liquid wastes from recycling & waste collection equipment at landfill by the end of the workday; remove all fuel cans, lubricants, chemical containers and debris from municipal vehicles and work areas and store properly at the end of the workday; discard wastes in contained and covered receptacles; staff shall keep lids on receptacles closed and Street -Sanitation- Public Grounds Facilities 7/31/19 310 E. 3rd Ave. Fail Vehicle & equipment debris containment and removal deficiencies empty them when full Repair or replace dumpsters and damaged receptacles to provide cover & Waste receptacles and dumpsters in use at site are deteriorating, lack containment of waste materials (prevent trash from contacting wind and covers and are missing drain plugs precipitation) Scrap, debris, deteriorating sand bags, equipment parts, etc... piled up and stored at facility may contribute sediment & other materials to Properly store materials for later use under cover; remove waste materials runoff and impede site maintenance activities and debris from site At minimum, install lids that seal inlets when wash area is not in use; train staff for proper operation to prevent stormwater infiltration; City should Oil/water separator at equipment wash pad is uncovered and exposed to consider (1) installing a wash pad canopy that prevents precipitation from precipitation; grates allow precipitation to fill tank for possible overflows infiltrating and (2) isolating separator effluent for discharge to sanitary to downstream storm drainage system and stream sewer (eliminate the potential for overflows) Include waste disposal and equipment wash out strategies in SPPP and Street sweeping solids and washout materials have the potential to implement promptly for street sweeping equipment operation & contaminate site stormwater and runoff with heavy metals maintenance Herbicide application within drainage ways evident; excessive herbicide Cease herbicide applications around storm drainage structures, on slopes application has eliminated vegetative cover in some areas; extensive and in drainage ways; stabilize eroded and denuded areas and reestablish spraying occurring well beyond normal limits vegetation; herbicide use must comply with site SPPP (0&M Plan) Dumpster is missing drain plug; dumpster pad is located within ten feet Replace missing drain plug and relocate dumpster for improved of a storm drain inlet containment Provide erosion control materials appropriate for slope & reseed or stone Water Treatment Plants #1 & #2 7/12/19 2979 Greensboro St. Ext. Pass Some areas of recent construction are eroded and lacking vegetation as required Undersized VC storm drain obstructed by build up Replace drain pipe with 12" minimum diameter RCP or smooth wall plastic pipe Chemical storage containment facility may need additional Improve effectiveness of chemical containment facility by installing shutoff improvements for spill containment valves on downstream side of drain lines Fuel tank is uncovered and exposed to precipitation Provide canopy for fuel tank or move to existing enclosure Waste bins and receptacles lacking covers Repair waste receptacles or replace with properly covered containers FACILITY & AUDIT DATE FACILITY ADDRESS RESULT DEFICIENCIES LISTED RECOMMENDATIONS Waste materials and chemical containers from lab in exposed open waste Either move waste receptacles indoors or provide trash bins that are containers properly covered and include adequate containment Store chemical containers under roof in proper containment/safety cabinets; seal & label reusable containers/drums and store under roof with Improper fuel can, chemical & waste storage (lack of spill proper containment; remove & discard empty/unused containers, containment/proper cover) batteries, and damaged drums Remove all fuel cans, lubricants, chemical containers and debris from municipal vehicles, equipment and work areas and store properly at the end of the workday; discard wastes in contained and covered receptacles; Vehicle & equipment debris containment and removal deficiencies empty waste receptacles when full Scrap, waste pallets, discarded chemical storage tanks, and debris piled up and stored at facility impede site maintenance activities and Properly store materials for later use under cover; remove waste materials contribute to stormwater degradation and debris from site for appropriate disposal Storage silo at First Stage Lift Station lacks secondary containment Provide containment bay Staff must immediately remove waste materials and deposit them in Site generated wastes and raw waste contaminated materials litter covered containers with proper containment for temporary storage prior WWTP 7/12/19 500 Glendale Rd. Fail various locations at the site to disposal Concrete slab at mobile (waste hauler) dump station is cracked and may be permitting groundwater infiltration Repair/replace concrete Dumpster at First Stage LS leaks excessively Replace dumpster Clean up site; provide dumpster with a lid and adequate dimensions to Dumpster at Screening Facility does not adequately catch and contain properly catch and contain screened materials; provide additional materials removed from waste stream; debris and ponding liquids containment for dumpster pad; plant staff to clean pad as necessary to evident around dumpster prevent stormwater contamination Herbicide application within drainage ways evident; excessive herbicide Cease herbicide applications around storm drainage structures, on slopes application has eliminated vegetative cover in some areas; extensive and in drainage ways; stabilize eroded and denuded areas and reestablish spraying occurring well beyond normal limits vegetation; herbicide use must comply with site SPPP (0&M Plan) Multiple unused tanks and containers filled with rain water creating Pump/discharge rainwater from tanks and containers to treatment; store excellent mosquito habitat loose containers under roof or discard Staff to conduct regular inspections of roof drains, downspouts, and site storm drainage system; clean roadway gutter and remove wastes to Roadway gutters contain excess sediment and debris; storm inlets contained trash receptacle; stabilize outfall banks and discharge point with impeded by accumulated sediment; outfall slopes and discharge locations geofabric and large riprap; clear grates and inlets; complete other storm eroding drainage system maintenance as necessary Provide proper cover & secondary containment measures or ue tanks, cleaners, pesticides/herbicides & other chemicals; maintain covered storage areas an adequate distance from storm drainage inlets and Improper chemical & fuel storage (storage of unsealed containers, drainage ways to prevent spills from reaching storm drainage system; staff improper cover & lack of spill containment) ; storage in the immediate to return chemicals to storage areas immediately after each use; discard vicinity of storm drain inlet; chemical storage near building doorway old chemicals & empty containers Repair reuse tank before reactivating system and stabilize slope where Reclaimed water reuse tank is leaking erosion has occurred Provide appropriate drainage improvements to replace failed storm drain; provide energy dissipater at pipe outlet to prevent scouring --Consult with The 4" corrugated drainage pipe downslope of the outdoor common area City Engineer to establish an adequate design for this location; staff to at the municipal building has failed and scouring is evident at pipe inspect and clean areas in the vicinity of storm drain inlets prior to each discharge; trash & debris evident at the 4" pipe discharge storm event, at minimum Install the appropriate measures to capture, treat and discharge wash Drainage from equipment wash pad is causing downstream erosion and waters --Consult with City Engineer to determine the best design to address gullying wash pad discharges 4" corrugated pipe conveying runoff downstream of wash pad is collecting sediment, is improperly buried to prevent collapse, and is Upgrade the drainage system in this area to address concentrated runoff Lexington Golf Course & WW Reuse Facility 10/3Fa19 200 Count Club Blvd. Country Fail inadequate to covey the runoff discharged to the drainage ditch; severe erosion occurring at 4" outfall near fence volumes and excessive velocities --Consult with City Engineer to determine the best design for this location and stabilize eroded areas Scouring evident at building downspout discharge g g p g Installs lash block, or connect downspout to piped drainage system p p P P g y Install and maintain appropriate quality filter sacks at stormwater inlets subject to accumulating sediment and debris; wash equipment at designated wash pad for proper wash water treatment; staff to inspect all Golf carts apparently being washed on or near storm drain inlets; grass storm inlets, all grates & drainage ways each week and to remove grass & and debris accumulating in catch basins debris from structures to prevent back ups Remove golf clubs and clean structure; staff to inspect all storm inlets, all Golf clubs located in bottom of storm drainage structure with grates & drainage ways regularly and remove grass & debris from accumulation of trash and debris structures to prevent back ups Store any uncovered trash cans under roof; staff to keep Dumpster with debris trapped by lid and door open; trash receptacles dumpster/receptacle lids and doors closed to prevent precipitation from without lids located outdoors contacting trash Train staff to apply GH&PP measures to prevent discharges of materials to storm drainage system. City staff to review & comply with City SPPP Plan (O&M Plan); add a 1-hour inspection and site clean up activity each week Trash accumulation visible around dumpster prior to staff leaving site for the week Staff to check vehicles & equipment for leaks before use; provide spill containment and drip pans immediately and clean up spills per spill plan; Numerous vehicle & equipment leaks and recent lubricant spills; store leaking equipment awaiting & undergoing repair indoors with proper inadequate spill response & clean up efforts; uncovered & uncontained leak containment away from storm drains; replace obsolete and unused fluid leakage for equipment parked outdoors vehicles & equipment