Loading...
HomeMy WebLinkAbout20200969 Ver 1_Riparian Buffer Authorization Request_20200728Action History (UTC-05:00) Eastern Time (US & Canada) Subrrit by Anonymous User 7/28/2020 12:25:37 PM (Start) Approve by Carpenter, Kristi 7/29/2020 1:12:34 PM (DOT - Initial Review) • The task was assigned to Carpenter, Kristi 7/28/2020 12:27 PM Buffer Authorization Application Form 15ANCAC 02B .0233 (8)(b), .0243 (8)(b), .0250 (11)(b), .0259 (8)(b), .0267 (11)(c), .0607 (e)(2) Buffer Authorization Online Fo Update 10/23/2018 Original Submittal 7/28/2020 A. Owner/Applicant Information General Information Primary Contact Email:* jbjohnson@ncdot.gov Rease list the contact person's en -ail for questions or payrrent on this project if needed. Who is submitting the application?* r Owner W Applicant other than Owner r Agent Is there an agent working on this application r Yes but not submitting it? r No 1. Property Owner Information: la. Name on Recorded Deed:* David Madures 1b. Responsible Party: David Madures (for Corporations) 1c. Mailing Address:* Street Address 581 Hwy 13 Bypass Address Line 2 aty Snow Hill Fbstal / Zip Code 28580 1d. Telephone:* 252 439 2821 State / Province / Pbegion NC Country US le. Email Address:* jbjohnson@ncdot.gov 2. Applicant's Information (if different from owner): 2a. Name: NCDOT 2b. Company Affiliation: 2c. Mailing Address: Street Address 1037 WH Smith Boulevard Address Line 2 aty Greenville Fbstal / Zip Code 27834 2d. Telephone: 252 439 2821 2e. Email Address: jbjohnson@ncdot.gov State / Province / Fbgion NC Country US B. Project Information and Prior Project History 1. Project Information `A ........................................................................................................................................................................................................................................................................................................................................................................................................ ...... la. Name of Project:* US 13 Snow Hill project R-5812 (Subdivision, facility, or establishrrent narre) 1b. Is this a publicly -funded transportation project?* r Yes r No 1c. TIP# R-5812 1d. Subdivision Name: le. Nearest Snow Hill Municipality: 1f. Property Size: 0.00 acres 1g. County (or Counties) where the project is located:* Greene 1h. Property ID# Date of Purchase Tax RN or Parcel id 1 i. Deed Information Type of Book Book# Page# Deed Map 1j. Attach a copy of the recorded map that indicates when the lot was last platted. nick the upload button or drag and drop files here to attach docurrent RDF only 1k. How would you like to provide the Latitude and Longitude information?* f Address Lookup r Manually Latitude * 35.45856 Longitude* 77.67545 11. Is the project located in any of North Carolina's twenty coastal counties?* r Yes r No 2. Surface Waters 2a. Name of the nearest body of water to proposed project:* Contentnea creek 2b. Water Quality Classification of nearest receiving water:* C,SW, NSW A 2c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property:* 0 (linear feet only) 3. Project Description: 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: Project will restore eroded banks from an adjacent NCDOT construction project. 2 Excavators, 4 Dump trucks, will place rip rap on the eroded banks. An impervious dike will be used to pump water around the project so that it can be done in the dry. 3b. Attach an 8'/2 x 11 excerpt from the most recent version of the USGS topographic map indicating the location of the site. gick the upload button or drag and drop files here to attach docurrent ACME Mapper 2.2 - 23.4 km N)M of Kinston NC.pdf 285.9KB FDF only 3c. Attach an 81/. x 11 excerpt from the most recent version of the published County NRCS Soil Survey Map depicting the project site. aick the upload button or drag and drop files here to attach docurrent Snow Hill Soil map.pdf 99.6KB FDF only 4. Proposed Activity Provide a detailed description of the proposed activity including its purpose and include the type of equipment to be used: Project will restore eroded banks from an adjacent NCDOT construction project. Total of 65' of linear shoreline impact. Attach a site plan as applicable to the project: gick the upload button or drag and drop files here to attach docurnent Snow Hill R-5812 plan view and cross section.pdf 21.6KB FDF only 5. Jurisdictional Determinations 5a. Have jurisdictional wetlands or stream determinations by the Corps or State been requested or obtained for this property/project (including all prior phases) in the past?* 4 Yes O No 6. Project History 6a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past?* r Yes r No 7. Future Project Plans 7a. Is this project a phased project?* O Yes a No C. Proposed Impacts Inventory Buffer Impacts Project is in which protected Basin?* F Neuse River Basin (15A NCAC 02B.0233) r Catawba River Basin (15A NCAC 02B.0243) r Randleman Lake Watershed (15A NCAC 02B.0250) f Tar -Pamlico River Basin (15A NCAC 026.0259) r Jordan Lake Watershed (15A NCAC 02B.0267) r Goose Creek Watershed (15A NCAC 02B.0606 & 15A NCAC 026.0607) Individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. Site# - Reason Stream Name Buffer Impact* Impact Type * Zone 111 Zone 2 Ivbp label (e.g. Road Temporary Allowable 0.00 0.00 Grossing 1) (T) Square Square Perm orTenp Feet Feet Total Zone 1 Impacts: 0.00 Total Zone 2 Impacts: 0.00 Total Buffer Impacts: 0.00 Comments: No Buffer impacts. D. Impact Justification and Mitigation 1. Avoidance and Minimization la. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project.* Only Armoring the shoreline that was disturbed and not going above the top of bank. Total of 65' of linear shoreline impact. 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques.* Only Armoring the shoreline that was disturbed and not going above the top of bank. Total of 65' of linear shoreline impact. E. Diffuse Flow Plan .......................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................... la. What type of SCM are you providing?* r- Level Spreader r- Vegetated Conveyance (lower SHWT) r- Wetland Swale (higher SHWT) W Proposed project will not create concentrated stormwater flow through the buffer r- Other SCM that removed minimum of 30% nitrogen 1c. Diffuse Flow Documentation* aick the upload button or drag and drop files here to attach document Snow Hill R-5812 plan view and cross section.pdf 21.6KB FDF only F. Supplementary Information Environmental Documentation la. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land? f• Yes f No 1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina) Environmental Policy Act (NEPAISEPA)? r 1c. If you answered "yes" to the above, has the document been finalized bythe State Clearing House? r v 1d. Attach a copyof the NEPAor SEPAfinal approval letter. dick the upload button or drag and drop files here to attach docurrent FUF only Violations 2a. Is the site in violation of DWR Wetland Rules (15A NCAC 02H .0500), Isolated Wetland Rules (15A NCAC 02H .1300), DWR Surface Water or Wetland Standards, or Riparian Buffer Rules (15A NCAC 02B .0200)? r c 2b. Is this an after -the -fact buffer authorization application? C' .11 G. Additional Information A ............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................. Please upload any additional information you would like the Division to consider during application review. Additional Attachments: Click the upload button or drag and drop files here to attach document FDF only Additional Comments: H. Sign and Submit By digitally signing below, I certify that: o I have given true, accurate, and complete information on this form; o I agree that submission of this form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act) • I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); o I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND o I intend to electronically sign and submit the application form." Print Name:* Jay B Johnson Signature Submission Date: (Auto populated field) Initial Review Is this accepted into the review process?* Is this project a public transportation project?* ID#* Version:* Select Reviewer: Select Reviewing Office* Has payment been received?* r Yes r No r Yes r No 20200969 1 Garcy Ward:eads\gpward Washington Regional Office - (252) 946-6481 r No Payment Needed f Fee Received r Need Fee - send electronic notification