Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
NCC203069_ESC Approval Submitted_20200729
ROY COOPER Governor NUCHAEL S. REGAN Secretary Brian Wrenn Acting Director NORTH CAROLINA Envtronmental Quality July 15, 2020 LETTER OF APPROVAL I-40 Drive -In, LLC Attention: William G Talley, Manager PO Box 872 Graham, NC 27253 RE: Project Name: Graham Drive In Project ID: ALAMA-2021-011 Total Acres: 19 County: Alamance River Basin: Cape Fear Project Location: Kronbergs Ct - Graham Submitted By: LEADS Group Date Received by LQS: July 14, 2020 Plan Type: Commercial — Express - New This office has received a soil erosion and sediment control plan for the project listed above which was submitted as required by the North Carolina Sedimentation Pollution Control Act (G.S. 113A-57 (4)). The Act requires that all persons disturbing an area of one or more acres of land must obtain approval of a soil erosion control plan prior to the commencement of the land -disturbing activity (G.S. 113A-54(d) (4)). The Act further states that this plan must be filed a minimum of 30 days prior to the activity and the approving authority must approve or disapprove the submitted plan within 30 days of receipt. Failure of the approving authority to approve or disapprove the submitted plan within the 30-day period will be deemed approval of the plan. Commencement or continuation of a land -disturbing activity under the jurisdiction of this Act prior to the approval of an erosion and sediment control plan is a violation of the Act. The approval of an erosion and sediment control plan is conditioned on the applicant's compliance with Federal and State water quality laws, regulations and rules. Please note additional information may be requested during the review of your ESC plan, and ESC plans are reviewed in the order received. North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Winston-Salem Regional Office 1 450 Hanes Mill Road, Suite 300 1 Winston-Salem, North Carolina 27105 �" 336-776-9800 Be advised the NC Construction General Permit (also known as "NCGO1") was renewed on April 1, 2019. The updated permit does not significantly change the measures that are required to be implemented on construction sites. However, there are some organizational and technical updates to the permit. Most notably, there is a new process in which construction sites will obtain official coverage under an NCGO1 permit through an electronic process, after the soil erosion and sediment control plan approval is issued. For assistance and guidance with the revised 2019 NCGO1 (Construction Stormwater General Permit NCGO10000) as adopted on April 1, 2019, please use the following link: https://deg.nc. gov/about/divisions/energy-mineral-land-resources/energy-mineral-land- permits/stormwater-permits/construction-sw If you have questions, please do not hesitate to contact our office at (336) 776-9800. Your cooperation in this matter is appreciated and we look forward to working with you on this proj ect. Sincerely, Scott Si Assistant Regional Engineer Land Quality Section Cc: LEADS Group 505 E. Davis St Burlington, NC 27215 Ids � y W PIZ r.., � ~ O Fact Sheet on the New NCGO1 Permit Apol 2019 The NC Construction General, Permit (also known as "NC6011 was renewed on April 1, 2019. The updated permit does not significantly ithange the measures that are required to be implemented on construction sites. However,. there are some organizational and technical updates to the permit as described below, Most notably, there is a new process in which construction sites will obtain official coverage under an NCGO1 permit through an electronic process. DEMLR worked with a broad team of stakeholders to make all of these updates. If you have questions, contact Annette Lucas at Annette.lucasjRncdenr.gov or (9.19) 707-3699. Organizational Updates Acronyms to Know The new permit: COC: Certificate of Coverage, proof of coverage under, an NCGO1 permit • Repeats state requirements for E&SC, Qi~MLR: NC Division of Energy, Mineral, and Land Resources Plans and organizes them with federal EASC; Erosion & Sedimentation Control construction activity requirements; a-NOI: Notice of Intent, application form for the NCG41 permit • is clearly organized by topic; and a=NI T: Notice of Termination, form for closing out the NCGO1 permit • Has less text and more tables. SWPPP: Stormwater Pollution Prevention Plan,, required by the NCGO1 Technical Updates The new permit: • Requires that the E&SC Plan meet SWPPP requirements (p. 2); • Provides a list of items that must be included in the SWPPP, such as the construction sequence, plans, calculations, etc; (p. 2-4)1-3 . Has updated language on bypasses and upsets, that is tailored to construction activities (p. 10) • Puts all timeframes for inspections The NCGO1 Process record -keeping and reporting in "calendar days" for clarity and The new NCGOZ applies to permits approved on orafter April 1, 2019. consistency (p,. 11-14);2 Permittees will no longer receive a copy of the NCGO1 permit in the mail • Changes the inspection frequency with their E&SC Plan approvals and be considered as covered under the (during business; hours) to at Feast permit. Federal rules require that DEMLR receive an NQI on each once per 7 calendar days and after construction project and issue each construction project its own COC. every storm > 1.0 inch (previously 03 inch);3 and Under the new NCGO1 process, construction sites will continue to • Excludes weekends, state and federal receive approval for E&SC Plans from either DEMLR or the delegated holidays from normal business hours local E&SC program just like before. After receiving E&SC Plan approval, unless construction_ activities take permittees will officially obtain coverage under the NCGO1 by place (p. 23). completing an e-NOI (available at dec1.nc.gov/NCG01). The e-NQI will only take about 20 minutes to fillout and submit on-line. This list is based on website guidance initially, there will be no charge associated with applying for an NCGO1 by the DEMLR Sediment Program. permit but can or around' June 1, 2019, DEMLR will begin charging a $100 2 The number of calendar days was annual general permit fee as required per §143-215,31). selected to be as equivalent as possible with the previous permit: DEMLR is working on creating a single application form that will allow an 3. The intent is to provide predictability applicant to simultaneously apply for an E&SC permit and an NCGO1 to the inspection schedule, COC, That effort is part of a larger Permit Transformation project at DEMLR. Q&A About the Now NCG01 Perm It Why do construction sites have to do this extra application step? DEMLR is required by the EPA to issue a specific COC to every construction site that disturbs one acre or more, DEMLR is working to create a form that combines the E&SC plan approval and a-NOI processes, but that will take more time. For now, DEMLR has created an efficient a-NOI process. If an E&SC Plan is approved before April 1, which permit applies? Projects with already approved MSC Plans will automatically follow the new NCGO1 permit, but will not need to fill out an a-NOI or pay an annual permit fee. However, the permittees should print the new permit and the two standard detail sheets and have them on site. Will DEMLR offer tools to help permittees comply with the new NCG01? Yes, DEMLR will provide two sample plan sheets at deg.nc.gov/NCG01 that can be placed into the E&SC plan set. The first covers the site stabilization and materials handling portions of the permit. The second sheet covers the inspection, record -keeping and reporting portions of the permit. How will the new a-NOI submittal and CAC process work? Permittees will apply for E&SC Plan approvals from either DEMLR or the delegated local E&SC program like before. The E&SC approval letter will instruct the permittee to visit deo,nc.gov/NCG01 to submit an e-NOI form to DEMLR. The permittee may begin the construction activity after submittal of the e-NOI, The permittee is required to print a copy of the permit and retain it on site. Initially, the COC will be issued for free but on or around June 1, 2019, a $100 annual general permit fee will be charged. Who is allowed to submit an e-N©I'form? Submittal must be by a responsible corporate officer that owns or operates the activity, such as a president, secretary, treasurer, or vice president or a manager that is authorized in accordance with IV.B.6 of the NCG01 permit. Additional signatory options are set forth in IV.B.6 of the permit. It is possible for consultant to prepare the e-NOI, save it as a draft, and email it to the responsible entity for signature & submittal, What happens to the COC when the construction activity is complete? When a project is complete, the permittees will contact DEMLR or the local delegated program to close out the E&SC Plan. After DEMLR or the local E&SC program inform the permittee of the project close out via inspection report, the permittee will visit deg.nc.gov/NCG41 to submit an e-NOT. Will there be a grace period for adherence to the new process? DEMLR does not have the authority to grant a grace period from a federally mandated permit. Permittees will be informed of the new process via web site, E&SC Plan approval letters and list servs, if a construction activity disturbs one acre or more (or is part of common plan of development that disturbs one acre or more) fails to submit an e-NOI after approval of its E&SC Plan, this is a violation of federal permitting requirements and the permittee could be subject to a penalty assessment. How does the new NCG01 affect the delegated local E&SC Programs? Local programs will continue to review and approve E&SC plans, However, they will no longer send copies of the NCG01 with E&SC Plan approvals. DEMLR will provide sample language to use in local E&SC Plan approvals to advise permittees that they must submit an e-NOI to DEMLR. Local programs are not required to check if permittees have submitted e- NOls to DEMLR. However, if they wish to do this voluntarily, there will be a tool available on DEMLR's web site for them to view a list of construction projects that have submitted e-NQIs, When local programs close out an E&SC Plan, the close-out Fetter will advise permittees that they must submit an e- NOT. DEMLR will provide sample language. Local programs may approve E&SC plans that meet state sediment laws and rules even if those plans are not compliant with all of the NCGO1 requirements. However, their permittees will. be required to add two plan sheets (which will be provided by DEMLR) to their E&SC Plans to ensure that they fully comply with the ground stabilization, materials handling, and inspection, record -keeping and reporting portion of the NCGO1 permit.