HomeMy WebLinkAboutNCC201440_Modification Review_20200729Action History (UTC-05:00) Eastern Time (US & Canada)
Submit by Anonymous User 7/28/2020 6:06:35 PM (ADD TO FILE Submittal)
Approve by Georgoulias, Bethany 7/29/2020 9:29:30 AM (Construction COC ADD TO FILE Review- NCC201440)
• The task was assigned to Georgoulias, Bethany. The due date is: July 31, 2020 5:00 PM
7/28/2020 6:06 PM
Y. ,
NORTH CAPOLINA
EnYlrenmemf& Qualay
Certificate of NCC201440
Coverage (COC) Enter the Certificate of Coverage Ninber (Use capital letters)
No.*
Information associated with this permit
Project Name
Chatham Park Section 5.1 - Subdivision West Phase 1
Address
Vine Parkway, Pittsboro, NC 27312, Pittsboro, NC
County
Chatham
Latitude
35.7280
Longitude
-79.1590
Permittee Listed
Chatham Park Investors LLC
Legally Responsible
Tim Smith
Individual
NC Reference No.
NCG01-2020-1440
E&SC Plan ID
2019-04807
Original NOI
24161
Tracking No.*
Date COC Issued*
04/14/2020
Prior Rescission
This field will populate only if CCChas already been rescinded.
Date
Modification Information:
Reason for r Closed -Out Lots/Outparcels in E&SC Plan
Modification * r Additional Lots/Outparcels Approved - E&SC Revised
F Other Revision(s) to E&SC Plan
r Legally Responsible Individual Has Changed
r Multiple Reasons (List)
Addional Nbre information if necessary
Explanation Modified to include Lot Erosion Control/Detailed Lot Grading
You must upload supporting documentation below. Do not upload E&SC Plans unless specific plan
sheets are the only documentation with approval for revised acres of disturbance, etc. (only upload applicable
sheets). For changes to the legally responsible individual, you must upload this form.
Supporting Upload Supporting Documentation (%vised ESCApproval, (lose -Out Doc, etc.)
Documentation Letter of Approval.pdf 288.02KB
Mast be FDFfon-rat
North Carolina General Statute 143-215.66 (1) provides that:
Anyperson who knowinglymakes anyfalse statement, representation, or certification in anyapplication, record, report, plan, or other
documentfiled or required to be maintained under this Article or a rule implementing this Article; or who knowinglymakes a false statement
of a material fact in a rulemaking proceeding or contested case underthis Article; orwho falsifies, tampers with, or knowinglyrenders
inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the
Commission implementing this Article shall be guiltyofa Class 2 misdemeanor which mayinclude a fine notto exceed ten thousand
dollars ($10,000).
rJ I hereby request modification to coverage under the NPDES Stormwater Permit
for the subject project site. I am familiar with the information contained in this
request and to the best of my knowledge and belief such information is true,
complete and accurate.
Specify if you are:* r The Legally Responsible Individual
r Authorized Responsible Person*
*This form must be signed by a responsible corporate officer that owns or operates the construction activity, such as a
president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B,
Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B,
Item (6) of that permit.
Signature
Type Name* Robin Rose
Title * Authorized Agent
Organization* Chatham Park Investors LLC
Date * 07/28/2020
Email Address* robin@prestondev.com
Errail for confirmation
Telephone Number* 919-481-3000 x 5
Contact nun ber if we need to reach you
Note: Original permittee and site contact are copied on modification correspondence.
Additional Email aalbini@uvithersravenel.com
(Optional) Additional email for confirmation
Original Permittee robin@prestondev.com
Email
Original Site Contact robin@prestondev.com
Email
Review Date 07/29/2020
Rescinded Since
Submitted?
Request Date 20200728
Formatted
Review Date 20200729
Formatted