HomeMy WebLinkAboutWQCS00055_NOV-2020-DV-0191 Response_20200720HE°City of Henderson
�$ �x Public Works Department
Post Office Box 1434.900 S. Beckford Drive
Henderson NC 27536-1434
Phone: (252) 431-6030 / Fax: (252) 431-0124
July 20, 2020
Mr. Scott Vinson, Regional Supervisor
Water Quality Regional Operations Section
Raleigh Regional Office
Division of Water Resources, NCDEQ
1628 Mail Service Center
Raleigh, NC 27699-1628
Re: Response to Notice of Violation & Intent to Issue Civil Penalty
Tracking No. — NOV-2020-DV-0191
Sanitary Sewer Overflows —January, February, March 2020
Henderson Collection System
Permit No. — WQCS00055
Dear Mr. Vinson:
NC Dept of Environmental Quality
JUL 2 8 2020
Raleigh Regional Office
I am writing in response to the above mentioned violation that we received on May 6, 2020. Cause and
actions taken for each incident are listed below.
Incident # 202000449, # 202000452
The overflows in these events were due to inflow and infiltration during extended periods of heavy
rainfall. Once the rain event ended, the overflows subsided. Following the overflow we cleaned debris
and placed lime in the area as needed. In the last year we have scoured the force mains from these
pump stations and had Charles Underwood work on the pumps with hopes of increasing the flow rates.
Unfortunately, we have not had any significant increases from this work. Moving forward, Henderson
City Council has approved a CIP project for an EQ tank at the Sandy Creek Pump Station for fiscal year
2020-2021. This project is contingent on council allocating the funds for the project. The EQ tank will
increase capacity at the pump station and help prevent spills.
Incident # 202000505, # 202000506, #202000507, # 202000509, #202000510, # 202000511
The overflows in these incidents were all due to inflow and infiltration during extended periods of heavy
rainfall. Once the rain event ended, the overflows subsided. Following the overflows, we cleaned and
placed lime as needed around the manholes. From January through June of this year, we have smoke
tested approximately 8,067 feet of sewer and inspected approximately 7,365 feet of sewer with use of
CCTV equipment. We have also cleaned approximately 55,025 feet of sewer with the use of a combo
truck, treated approximately 15,386 feet of sewer for roots and have made several repairs on sewer
mains and services. We know of several issues that are likely contributing to 1/1 that we have scheduled
to repair in the coming weeks. We are continuing to search and repair sources of 1/1.
Incident # 202000688
The overflow in this event was due to roots in the sewer main. We jetted approximately 200 feet of
sewer main with a combo truck to clear the blockage and stop the SSO. There was no debris on the
ground so we placed lime on the affected area. We check the flow in this area once a week and clean
the lines with when the flow is low. Duke's Root Control also treated this area for roots in 2019.
Incident # 202001046
The overflow in this event was due to debris such as rags and paper towels in the sewer main. We jetted
approximately 250 feet of sewer main with a combo truck to clear the blockage and stop the SSO. We
cleaned the debris and placed lime around the manhole. We used a nearby fire hydrant to run water
into the creek. This area is monitored weekly as it is a known problem for debris/rags.
Thank you very much for the opportunity to respond. We take our responsibility to maintain compliance
for our collection system very seriously. I trust that you find the City's actions for compliance are
satisfactory. Please feel free to contact our staff` or myself should you need any further information.
Sincerely,
Lee Owen
Assistant Public Works Director
Attachments: Work Order Detail — 2020 — CCTV Inspections
Work Order Detail — 2020 — Smoke Testing
Work Order Detail — 2020 — Sewer Jetting
Work Order Detail — 2020—Sewer Repairs
Duke's Root Control Invoice
CC; Edward Terrell Blackmon, City Manager
Andy Perkinson, Public Works Director
Joey Long, Distribution & Collection System Supervisor —Collection System ORC
Christy Lipscomb, KLRWP Director/ORC, HWRF ORC
Teddy Felts, Chief Plant Operator
File
DUKE'S
Root Control. Inc.
1020 Hiawatha Siva. West
Syracuse, NY 13204-1131
(800)447-6687 (315) 475.4203 (FAX)
ACCOUNTS PAYABLE
SOLD CITY OF HENDERSON
TO P.O. BOX 1434
HENDERSON, NC 27536
INVOICE
No. 17201
Auth By ANDY PERKINSON
Dept. SEWER VAh.NTEXANCE
JOb MUShM
Cut 4
Iareloe Mate custom" PO f
Ship Via
ltsod"t Cady
20-050'
K2268
4/30/2920 N/A
N/A
401
283.00
FEET
6' PIPE SEWER ROOT CONTROL
1.59
44 .
13,925.00
FEET
B' PIPE SEWER ROOT CONTROL
1.59
22,144.75
936.00
FEET
10' PIPE SEWER ROOT CONTROL
1.76
1,647.36
242.00
FEET
12' PIP& SEWER ROOT CONTROL
1.92
464.64
Federal Tax Number: 75-3026801
NET INVOICE
24, 702.72
FREIGHT
0.00
TERMS: NET 30 DAYS
SALES TAX
0.00
INVOICES NOT PAID WITHIN 30 DAYS ARE SUBJECT TO A SERVICE
TOTAL
24, 702.112
CHARGE OF 3 11296 PER MONTH, WHICH IS AN ANNUAL RATE OF 18%
Work Order Detail NC Dept OfEnvironmentaI
Quality
1 uUuuu 100 zuzu - car i v Inspections - b" l.cg jana2 of . C
Owner Lee Owen
Status In Progress
Task Count 34
Progress 100.00%
Labor
$2,820;03
Equipment
$7,375.00
Material
$0.00
Other
$0.00
Total
$10,195.03
Task Information
Task ID
Activity
Asset
Priority
Status
Total Cost
T013086
TV Inspection
Sewer Main SM01840
None
Completed
345.00
T013088
TV Inspection
Sewer Main SM01879
None
Completed
345.00
T013119
TV Inspection
Sewer Main SM00528
None
Completed
374.00
T013126
TV Inspection
Sewer Main SM01639
None
Completed
115.59
T013127
TV Inspection
Sewer Main SM01534
None
Completed
113.85
TO13128
TV Inspection
Sewer Main SM01540
None
Completed
11559
T013130
TV Inspection
Sewer Main SM01533
None
Completed
17250
T013131
TV Inspection
Sewer Main SM00934
None
Completed
37400
TO13134
TV Inspection
Sewer Main SM02142
None
Completed
34500
T013135
TV Inspection
Sewer Main SM02042
None
Completed
34500
T013135
TV Inspection
Sewer Main SM01463
None
Completed
34500
TO13142
TV Inspection
Sewer Main SM01463
None
Completed
34500
T013144
TV Inspection
Sewer Main SM02043
None
Completed
138.00
6/30/2020
Generated by Cartegraph
Page 1
Work Order Detail
100000135 2020 - CCTV Inspections
Task Information
Task ID
Activity
Asset
Priority
Status
Total Cost
T013145
TV Inspection
Sewer Main SM02039
None
Completed
138.00
T013146
TV Inspection
Sewer Main SM02038
None
Completed
13&00
TO13147
TV Inspection
Sewer Main SM02035
None
Completed
138.00
T013148
TV Inspection
Sewer Main SM02041
None
Completed
138.00
T013149
TV Inspection
Sewer Main SM00528
None
Completed
345.00
T013151
TV Inspection
Sewer Main SM01763
None
Completed
345.00
T013153
TV Inspection
Sewer Main SM01504
None
Completed
345.00
T013156
TV Inspection
Sewer Main SM03311
None
Completed
345.00
T013157
TV Inspection
Sewer Main SM01561
None
Completed
345.00
TO13166
TV Inspection
Sewer Main SM00350
None
Completed
345.00
T013168
TV Inspection
Sewer Main SM00349
None
Completed
345.00
T013169
TV Inspection
Sewer Main SM01832
None
Completed
477.00
T013170
TV Inspection
Sewer Main SM01059
None
Completed
345.00
T013176
TV Inspection
Sewer Main SM01763
None
Completed
517.50
T013177
TV Inspection
Sewer Main SM01746
None
Completed
345.00
T013184
TV Inspection
Sewer Main SM00059
None
Completed
345.00
T013185
TV Inspection
Sewer Main SM01680
None
Completed
345.00
T013189
TV Inspection
Sewer Main SM00648
None
Completed
345.00
T013192
TV Inspection
Sewer Main SM01521
None
Completed
345.00
T013194
TV Inspection
Sewer Main SM01680
None
Completed
345.00
TO13196
'IV Inspection
Sewer Main SM00345
None
Completed
345.00
6/30/2020 Generated by Cartegraph Page 2
Work Order Detail
100000132
Owner
Lee Owen
Status
In Progress
Task Count
28
Progress
100.00%
Task Information
2020 - Smoke Testing
Labor $913.04
Equipment $700.00
Material $106.86
Other $0.00
Total $1,719.90
T012995
Smoke Testing
Sewer Main SM02409
None
Completed
82.50
T012997
Smoke Testing
Sewer Main SM01873
None
Completed
82.50
T012998
Smoke Testing
Sewer Main SM02665
None
Completed
54.45
T012999
Smoke Testing
Sewer Main SM01808
None
Completed
55.29
T013000
Smoke Testing
Sewer Main SM02663
None
Completed
55.29
T013001
Smoke Testing
Sewer Main SM02142
None
Completed
64.00
T013002
Smoke Testing
Sewer Main SM02141
None
Completed
64.00
T013003
Smoke Testing
Sewer Main SM00439
None
Completed
41.25
T013004
Smoke Testing
Sewer Main SM01559
None
Completed
4125
T013005
Smoke Testing
Sewer Main SM01556
None
Completed
41.25
T013006
Smoke Testing
Sewer Main SM01557
None
Completed
41.25
T013007
Smoke Testing
Sewer Main SM01558
None
Completed
4125
T013008
Smoke Testing
Sewer Main SM01653
None
Completed
41.25
613412U2u
Generated by Cartegraph
Page 1
Work Order Detail
100000132 2020 - Smoke Testing
Task Information
Task ID
Activity
Asset
Priority
Status
Total Cost
T013009
Smoke Testing
Sewer Main SM01745
None
Completed
36.30
T013010
Smoke Testing
Sewer Main SM01763
None
Completed
36.30
T013011
Smoke Testing
Sewer Main SM01746
None
Completed
37.12
T013012
Smoke Testing
Sewer Main SM01764
None
Completed
37.12
T013013
Smoke Testing
Sewer Main SM01767
None
Completed
36.30
T013014
Smoke Testing
Sewer Main SM01766
None
Completed
36.30
T013015
Smoke Testing
Sewer Main SM01761
None
Completed
36.30
T013016
Smoke Testing
Sewer Main SM01762
None
Completed
37.12
T013017
Smoke Testing
Sewer Main SM01765
None
Completed
37.12
T013018
Smoke Testing
Sewer Main SM01812
None
Completed
55.29
T013019
Smoke Testing
Sewer Main SM01815
None
Completed
55.29
T013020
Smoke Testing
Sewer Main SM01817
None
Completed
54.45
T013041
Smoke Testing
Sewer Main SM01559
None
Completed
11812
T013042
Smoke Testing
Sewer Main SM01556
None
Completed
200.62
T013150
Smoke Testing
Sewer Main SM01763
None
Completed
200.62
6/3012020 Generated by Cartegraph Page 2
NC Dept aFEnVlrbnmental Quality
Work Order Detail JUL 2
8 2020
100000133
Owner
Lee Owen
Status
In Progress
Task Count
141
Progress
100.00%
"ask Information
2020 - Sewer Jetting
Labor $10,130.24
Equipment $16,350 00
Material $614.01
Other $0.00
Total $27,094.25
T010144
JettinglRodding
Sewer Lateral 62
None
Completed
29625
T010159
JettinglRodding
Sewer Lateral 60
None
Completed
272.50
T010164
JettinglRodding
Sewer Main SM00629
None
Completed
499.75
T010772
JettinglRodding
Sewer Main SM03348
None
Completed
556.50
TO11324
JettinglRodding
Non -Asset
None
Completed
197.50
T012976
JettinglRodding
Sewer Main SM00842
None
Completed
391.00
T013023
JettinglRodding
Sewer Main SM00210
None
Completed
12250
T013024
JettinglRodding
Sewer Main SM01121
None
Completed
12250
T013025
JettinglRodding
Sewer Main SM00210
None
Completed
137.00
T013026
JettinglRodding
Sewer Main SM02199
None
Completed
6850
T013027
JettinglRodding
Sewer Main SM02198
None
Completed
68.50
T013028
JettinglRodding
Sewer Main SM00343
None
Completed
68.50
T013029
JellinglRodding
Sewer Main SM00342
None
Completed
6850
61burzL)20
Uenerated by Cartegraph
Page 1
Work Order Detail
100000133 2020 - Sewer Jetting
Task Information
Task ID
Activity
Asset
Priority
Status
.
T013030
JettinglRodding
Sewer Main SM02237
None
Completed
137.00
T013031
JettinglRodding
Sewer Main SM02642
None
Completed
137.00
TO13032
JettinglRodding
Sewer Main SM00529
None
Completed
68.50
T013033
JettinglRodding
Sewer Main SM00528
None
Completed
6&50
T013034
JettinglRodding
Sewer Main SM00528
None
Completed
68.60
T013036
JettinglRodding
Sewer Main SM00529
None
Completed
68.50
TO13036
JettinglRodding
Sewer Main SM01121
None
Completed
137.00
T013037
JettinglRodding
Sewer Main SM00934
None
Completed
45.19
T013038
JettinglRodding
Sewer Main SM03530
None
Completed
45.19
T013039
JettinglRodding
Sewer Main SM03529
None
Completed
46.58
T013040
JettinglRodding
Sewer Main SM02142
None
Completed
137.00
T013043
JettinglRodding
Sewer Main SM01879
None
Completed
275.00
T013044
JettinglRodding
Sewer Main SM02237
None
Completed
251.00
T013045
JettinglRodding
Sewer Main SM01024
None
Completed
61.25
T013046
JettinglRodding
Sewer Main SM01023
None
Completed
61.25
T013047
JettinglRodding
Sewer Main SM01840
None
Completed
253.00
T013048
JettinglRodding
Sewer Main SM02673
None
Completed
255.00
TO13049
JettinglRodding
Sewer Main SM01463
None
Completed
183.75
T013050
JettinglRodding
Sewer Main SM01464
None
Completed
183.75
T013051
JettinglRodding
Sewer Main SM01463
None
Completed
683.00
T013052
JettinglRodding
Sewer Main SM01858
None
Completed
253.00
0/30/2020 Generated by Cartegraph Page 2
Work Order Detail
100000133 2020 - Sewer Jetting
InformationTask
Task ID
Activity
Asset
Priority
Status
Total
T013053
JettinglRodding
Sewer Main SM01159
None
Completed
251.00
T013054
JettinglRodding
Sewer Main SM01463
None
Completed
122.50
T013055
JettingfRodding
Sewer Main SM02236
None
Completed
255.00
T013056
Jetting/Rodding
Sewer Main SM02238
None
Completed
25500
T013057
JettingfRodding
Sewer Main SM03350
None
Completed
9800
T013058
JeltinglRodding
Sewer Main SM03348
None
Completed
98.D0
TO13059
JettingfRodding
Sewer Main SM03349
None
Completed
122.50
T013060
Jetting/Rodding
Sewer Main SM03352
None
Completed
98.D0
T013061
JettingfRodding
Sewer Main SM03353
None
Completed
9800
T013062
JeltinglRodding
Sewer Main SM01488
None
Completed
255.00
T013063
JettinglRodding
Sewer Main SM01497
None
Completed
251.00
T013064
JettinglRodding
Sewer Main SM00502
None
Completed
251.00
T013065
JettinglRodding
Sewer Main SM01139
None
Completed
122.50
T013066
JettingfRodding
Sewer Main SM01136
None
Completed
122.50
T013067
JettinglRodding
Sewer Main SM01140
None
Completed
122.50
T013068
JettinglRodding
Sewer Main SM01133
None
Completed
122.50
T013069
JettinglRodding
Sewer Main SM01139
None
Completed
139.65
T013070
JettinglRodding
Sewer Main SM01136
None
Completed
140.87
T013071
Jetting/Rodding
Sewer Main SM01140
None
Completed
139.65
T013072
JettingfRodding
Sewer Main SMD1133
None
Completed
139.65
T013073
JeltinglRodding
Sewer Main SM03714
None
Completed
139.65
613W2020 Generated by Cartegraph page 3
Work Order Detail
100000133 2020 - Sewer Jetting
Task Information
Task ID
Activity
Asset
Priority
Status
Total Cost
T013074
JettinglRodding
Sewer Main SM01135
None
Completed
140.87
T013075
Jetting/Redding
Sewer Main SM01159
None
Completed
139.65
T013076
JettinglRodding
Sewer Main SM00262
None
Completed
196.00
TO13077
JettinglRodding
Sewer Main SM00758
None
Completed
196.00
T013078
JettinglRodding
Sewer Main SM00259
None
Completed
196.00
T013079
JettinglRodding
Sewer Main SM00033
None
Completed
196.00
T013080
JettinglRodding
Sewer Main SM00034
None
Completed
19600
T013081
JettinglRodding
Sewer Main SM00033
None
Completed
122.50
T013082
JettinglRodding
Sewer Main SM00034
None
Completed
122.50
T013083
JettinglRodding
Sewer Main SM02193
None
Completed
122.50
T013084
JettinglRodding
Sewer Main SM02172
None
Completed
122.50
T013085
JettinglRodding
Sewer Main SM02814
None
Completed
122.50
T013087
JettinglRodding
Sewer Main SM00528
None
Completed
162.91
T013089
JettinglRodding
Sewer Main SM01035
None
Completed
162.91
T013090
JettinglRodding
Sewer Main SM02407
None
Completed
122.50
T013091
JettinglRodding
Sewer Main SM02408
None
Completed
122.50
T013092
JettinglRodding
Sewer Main SM01030
None
Completed
162.91
T013093
JettinglRodding
Sewer Main SM01033
None
Completed
164.15
T013094
JettinglRodding
Sewer Main SM01034
None
Completed
164.15
T013095
JettinglRodding
Sewer Main SM01494
None
Completed
162.91
T013096
JettinglRodding
Sewer Main SM01871
None
Completed
109.01
6/30/2020 Generated by Cartegraph Page 4
Work Order Detail
100000133 2020 - Sewer Jetting
Task
Information ji-A
Task ID
Activity
Asset
Priority
Status
Total Cost
T013097
JettinglRodding
Sewer Main SM01873
None
Completed
109.01
T013098
JettinglRodding
Sewer Main SM01872
None
Completed
10780
T013099
JettinglRodding
Sewer Main SM01870
None
Completed
109.01
T013100
JettinglRodding
Sewer Main SM01493
None
Completed
109.01
T013101
JettinglRodding
Sewer Main SM01578
None
Completed
109.01
T013102
JettinglRodding
Sewer Main SM01575
None
Completed
10901
T013103
JettinglRodding
Sewer Main SM01494
None
Completed
109.01
T013104
JettinglRodding
Sewer Main SM01020
None
Completed
10901
TO13105
JettinglRodding
Sewer Main SM00934
None
Completed
260.00
T013106
JettinglRodding
Sewer Main SM03530
None
Completed
260.00
T013107
Jetting/Rodding
Sewer Main SM03529
None
Completed
27500
T013108
JettinglRodding
Sewer Main SM01745
None
Completed
122.50
T013109
JettinglRodding
Sewer Main SM01763
None
Completed
122.50
T013110
JettinglRodding
Sewer Main SM01746
None
Completed
252.50
T013111
JettinglRodding
Sewer Main SM01767
None
Completed
252.50
T013112
Jetting/Rodding
Sewer Main SM01766
None
Completed
252.50
T013113
JettinglRodding
Sewer Main SM01762
None
Completed
25250
T013114
JettinglRodding
Sewer Main SM00455
None
Completed
17415
T013115
JettinglRodding
Sewer Main SM02672
None
Completed
172.91
TO13116
Jetting/Rodding
Sewer Main SM00457
None
Completed
172.91
T013117
JettinglRodding
Sewer Main SM01869
None
Completed
190.75
6/30/2020 Generated by Cartegraph Page 5
Work Order Detail
100000133 2020 - Sewer Jetting
Information.Task
Aim
Task ID
Activity
Asset
Priority
Status
Total Cost
T013118
JettinglRodding
Sewer Main SM01868
None
Completed
190.75
T013120
Jetting/Rodding
Sewer Main SM01537
None
Completed
12450
T013121
Jetting/Rodding
Sewer Main SM01536
None
Completed
12450
T013123
JettinglRodding
Sewer Main SM01539
None
Completed
12717
T013124
JettinglRodding
Sewer Main SM01634
None
Completed
12717
T013125
JettinglRodding
Sewer Main SM01540
None
Completed
12717
T013129
JettinglRodding
Sewer Main SM01533
None
Completed
12850
T013133
JettinglRodding
Sewer Main SM02042
None
Completed
126.50
T013137
JettinglRodding
Sewer Main SM02043
None
Completed
101.20
T013138
JettinglRodding
Sewer Main SM02039
None
Completed
101.20
T013139
JettinglRodding
Sewer Main SM02038
None
Completed
101.20
T013140
JettinglRodding
Sewer Main SM02041
None
Completed
101.20
T013141
JettinglRodding
Sewer Main SM02035
None
Completed
101.20
T013152
JettinglRodding
Sewer Main SM00331
None
Completed
261.00
T013154
JettinglRodding
Sewer Main SM01504
None
Completed
249.00
T013155
JettinglRodding
Sewer Main SM03311
None
Completed
248.00
T013158
JettinglRodding
Sewer Main SM01551
None
Completed
249.00
T013159
JettinglRodding
Sewer Main SM03732
None
Completed
249.00
T013160
JettinglRodding
Sewer Main SM01832
None
Completed
377.50
T013161
JettinglRodding
Sewer Main SM01059
None
Completed
253.00
T013162
Jelling/Radding
Sewer Main SM03112
None
Completed
249.00
6/30/2020 Generated by Cartegraph Page 6
Work Order Detail
100000133 2020 - Sewer Jetting
InformationTask
Task ID
Activity
Asset
Priority
Status
Total Cost
T013163
JettinglRodding
Sewer Main SM00348
None
Completed
189.75
TO13164
JettinglRodding
Sewer Main SM00347
None
Completed
189.75
T013165
JettinglRodding
Sewer Main SM00350
None
Completed
520.00
T013167
Jetting/Radding
Sewer Main SM00349
None
Completed
263.00
T013171
JettinglRodding
Sewer Main SM01767
None
Completed
251.00
T013172
JettinglRodding
Sewer Main SM01766
None
Completed
375.50
T013173
JettinglRodding
Sewer Main SM01762
None
Completed
251.00
TO13174
JettinglRodding
Sewer Main SM01746
None
Completed
24900
T013175
JettinglRodding
Sewer Main SM01763
None
Completed
38550
T013178
JettinglRodding
Sewer Main SM01746
None
Completed
37350
T013179
JettinglRodding
Sewer Main SM00360
None
Completed
126.50
T013180
JettinglRodding
Sewer Main SM00257
None
Completed
275.00
T013181
JettinglRodding
Sewer Main SM01521
None
Completed
253.00
T013182
Jetting/Rodding
Sewer Main SM00049
None
Completed
24900
T013183
JettinglRodding
Sewer Main SM00059
None
Completed
25300
T013186
JettinglRodding
Sewer Main SM01680
None
Completed
514.00
T013187
JettinglRodding
Sewer Main SM00103
None
Completed
284.00
T013188
JettinglRodding
Sewer Main SM00648
None
Completed
249.00
T013191
JettinglRodding
Sewer Main SM01521
None
Completed
25100
T013193
JettinglRodding
Sewer Main SM01680
None
Completed
51600
T013195
JettinglRodding
Sewer Main SM00345
None
Completed
385.50
6/30/2020 Generated by Cartegraph Page 7
Work Order Detail
100000133 2020 - Sewer Jetting
Task Information A
Task ID Activity Asset Priority Status Total Cost
T013197 Jetting/Rodding Sewer Main SM00345 None Completed 251.00
T013198 Jetting/Rodding Sewer Main SM00345 None Compleled 251.00
6/30/2020 Generated by Cartegraph Page 8
�C' Dept of Environmental Qualify
Work Order Detail
100000131
Owner Lee Owen
Status In Progress
Task Count 17
Progress 100.00%
2020 - Sewer Repairs
JUL 2 3 2020
Labor $2,177.65
Equipment
$3,092.50
Material
$1,386.20
Other
$568.00
Total $7,224.35
InformationTask
Task ID
Activity
Asset
Priority
Status
Total Cost
T009991
Repair
Sewer Manhole MH00744
None
Completed
3047.00
T010163
Repair
Non -Asset
None
Completed
199.08
T010899
Repair
Non -Asset
None
Completed
1972.44
T011524
Repair
Non -Asset
None
Completed
72598
T012983
Repair
Non -Asset
None
Completed
9845
T012984
Repair
Non -Asset
None
Completed
98.45
T012985
Repair
Non -Asset
None
Completed
9845
T012986
Repair
Non -Asset
None
Completed
9845
T012987
Repair
Non -Asset
None
Completed
9845
T012988
Repair
Non -Asset
None
Completed
9845
T012989
Repair
Non -Asset
None
Completed
98.45
T012990
Repair
Non -Asset
None
Completed
98.45
T012991
Repair
Non -Asset
None
Completed
98.45
6)30/2020
Generated by Cartegraph
Page 1
Work Order Detail
100000131 2020 - Sewer Repairs
Task InforStion
Task ID
Activity
Asset
Priority
Status
Total Cost
T012992
Repair
Non -Asset
None
Completed
98.45
T012993
Repair
Non -Asset
None
Completed
98.45
T012994
Repair
Non -Asset
None
Completed
98.45
T012995
Repair
Non -Asset
None
Completed
98.45
6/30/2020 Generated by Cartegraph Wage 2