HomeMy WebLinkAboutSWA000071_SSW Fast Track Application (signed)_20200727DEMLR USE ONLY
Date Received
Fee Paid
Permit Number
SW Program(s): ❑ Coastaf SA HQW ❑ Coastal SA ORW ❑ Coastal FW-ORW ❑ Coastal Other
❑ Non -coastal HQW ❑ Non -coastal ORW ❑ Urbanizing Areas ❑ USMP
NC DEQ Division of Energy, Mineral and Land Resources
STATE STORMWATER FAST TRACK PROCESS:
"AUTHORIZATION TO CONSTRUCT" (ATC) PERMIT APPLICATION FORM
Link to Application Instructions
A. ELIGIBILITY FOR EAST -TRACT( PERMITTING
To be considered for a Fast Track ATC Permit, all of the items below must be checked. if any item cannot
be checked, then the project must apply under the Standard Permitting Process
® The project and all SCMs (including existing SCMs associated with the project) will meet all applicable
requirements of 15A NCAC 02H .1000 - .1062, including the Minimum Design Criteria (MDC), upon project
completion.
® The project is not proposing an alternative design.
® The project is not claiming an exemption from the MDC based on vested rights, a waiver or a Director's
Certification.
® The project is not out of compliance with an existing stormwater permit or any other environmental permit.
® The project is not applying for an offsite permit, an exemption, or a minor modification (as defined in 15A
NCAC 02H .1002(25)) to an existing state stormwater permit.
® The project application bears the signature and seal of a professional licensed pursuant to either Chapter 89A
or 89C of the NC General Statutes.
I understand that at project completion, an application with the as -built stormwater plans (as described in 15A
NCAC 02H .1044 must be submitted, and DEQ will review the as -built stormwater plans to confirm
compliance with the MDC. Approval of the as -built stormwater plans will be required before the Erosion and
Sedimentation Control Plan for the project may be closed out.
C] l understand that the Fast Track ATC Permit will expire five years after the date of issuance.
B. GENERAL INFORMATION
1 Project Name: Cash Solar LLC
2. Previous Project Name (if applicable):
3. Location of Project (street address): 4822 Hoke Ln
City:Red Oak County:Nash, _ Zip:27868
4. Directions to project (from nearest major intersection):
1450' west of the instersection of loop road and Red Oak Road.
5. Latitude:36a 01' 42.6404" N Longitude:-770 55' 23.5892" W of the main entrance to the project.
C. PERMIT INFORMATION
1. Specify whether project is (check one):
® New, no previous application
❑ New, replacing a previous Fast Track ATC Permit — provide previous permit number: SWA
By choosing this option, you are also requesting that DEQ rescind the previous Fast Track A TC Permit
upon issuance of the new Fast Track A TC Permit.
Stormwater Fast Track ATC Application Form Page 1 of 10 Feb. 10. 2018
❑ Major Modification, replacing an existing stormwater permit — provide existing permit number: SW
Status of construction? ❑ Not Started ❑ Partially Completed ❑ Completed
Major modifications must be submitted by the original pemtittee and are allowed only if the SW permit is
not expired. Minor modifications must use Standard Permitting Process. By choosing this option, you
are also requesting that DEQ rescind the previous SW Permit upon issuance of the new Fast
Track ATC Permit.
❑ Transfer of existing Fast Track ATC Permit — provide existing ATC permit number: SWA
2. Applicable state stormwater program(s) (check all that apply):
❑ Coastal SA HQW ® Urbanizing Areas (Phase 2)
❑ Coastal SA-ORW ❑ Non -Coastal HQW
Is any portion of the project within 575 feet
of SA-ORW waters? ❑ Yes ❑ No ❑ Non -Coastal ORW
❑ Coastal Freshwater ORW ❑ USMP
❑ Coastal — Other
3. Other Permits (as applicable; write NA" for those permit types that are not applicable):
Project Name
PermitlAppl
Issue Date
Other Information
No.
LAMA Major
NIA
hL
Erosion &
Cash Solar. LLC
NASH-2020-
0'5-28-2020
Disturbed Area 39.9
Sedimentation Control
acre
010
NPDES Industrial
NIA
I NA
Stormwater
r
4041401 Permit
NIA
Proposed impacts
If/ac
4. Local jurisdiction for building permits: Nash County
Point of Contact: NIA Phone ##: 252 464-2440
D. CONTACT INFORMATION
1. Applicant/Financially Responsible Party (may be an Organization): Pine Gate Renewables, LLC
Signing Official Name & Title:Ben Catt Manager
Street Address:130 Roberts Street
City:Asheville State -,NC Zip:28801
Mailing Address (if dit%rent):
City: State: Zip:
Phone: (_) Fax:
Email:
2. If the Applicant is a Corporation or LLC (Address must match address on file with NC Dept of the Secretary of
State):
Name of Registered Agent: Registered Agent Solutions, Inc
Mailing Address:176 Mine take Court STE 100
City:Ralei h State:NC Zip:27615
Phone: (—� -- Fax: )
Email:
Stormwater Fast Track ATC Application Form Pare 2 of 10 Feb. 10, 2018
3. The Applicant is the (check all that apply):
❑ Property Owner
® Lessee (Attach a copy of the lease agreement & complete item 4.)
❑ Purchaser (Attach a copy of the pending sates agreement & complete Item 4.)
® Developer (Attach a copy of the development agreement & complete Item 4.)
4. If the Applicant is NOT the Property Owner (skip to Item 5 if the Applicant IS the Property Owner):
Property Owner Name/Organization: Donna Faulkner
Signing Official & Title:
Street Address:P.O. Box 147
City: Red Oak State:NC Zip:27868
Mailing Address (if applicable):
City: State: Zip:
Phone: Fax: ()
Email:
5. The licensed Design Professional that will be retained for the duration of the project, who may provide
information on the Applicant's behalf, and who will prepare and certify the as -built package:
Consulting Engineer/Landscape Architect:Gre Hoffman P.E_
Consulting Firm: Civil Design Concepts, P.A.
Mailing Address:168 Patton Avenue
City:Asheville State: NC Zip:28801
Phone: (828 ) 262-5388 Fax.
Email:ghoffman@cdcgo.com
6. [OPTIONAL) If you would like to designate another person to answer questions about the project:
Name & Title:
Organization: _
Mailing Address:
City: State: Zip:
Phone: L� Fax:
Email:
E. PROJECT INFORMATION
1. Specify the type of project (check one): ® Low Density ❑ High Density
2. Briefly summarize how the stormwater runoff will be treated/conveyed:
Storm rater Faai Track ATC Application Form Page 3 of 10 Feb. 10, 2018
The solar array is designed_ n acoordance with Part E-6 of the Stormwater Design Manual in all aspects
including avoiding compaction of s bsoil disconnecting runoff, avoiding concentration of stormwater
minimizing the use of herbicides and fertilizers mix of warm and cool season grasses and vertical clearance.
Sheet flow will be maintaned through the pro.iect. Duo to the low density of the pMiGct, structural treatment
measures are not yroposed.
3. Stormwater runoff from this project drains to the Tar -Pamlico River basin(s).
4. Receiving water information if more than 3 receiving waters, protfide additional information an an attached Sheet):
Receiving
Water 1
Receiving
Water 2
Receiving
Water 3
Receiving Stream Name
Pigbasket Creek
Stream Classification
QNSW
Stream Index Number
28-68-3-(2)
Stormwater Fast Track ATC Application Form Page 4 of 10 Feb. 10, 2018
5. Proiect area and density information:
Total Property Area
5,349,604
sf
Total Surface water Area
7 g_ 5 ,946 sf
Considered to include:
■ the normal pool of impounded structures;
• the area between the banks of streams and rivers; and
• the area below the Normal High Water (NHM line or Mean High Water (MHM line.
Total Coastal Wetlands Area
NIA sf
Considered to include_ coastal wetlands landward from the NHW (or MHW] line.
Total Project Area
4 592,658
sf
Excludes the surface water area and coastal wetland area identified above.
May or may not be the same as Property Area.
Built -Upon Area (BUA) associated with Existing Development
9,147 sf
"Existing development" means those projects that are built or those projects that have established a
vested right under North Carolina law as of the effective date of the slate stormwater program or
applicable local govemment ordinance to which the project Is subject.
Proposed New BUA
85,378 sf
Includes proposed new BUA that is not associated with existing development.
BUA"is defined in N.C.G.S. f43-214.M2). It includes, but is not limited to: buildings, roads, parking
areas, sidewalks, and some gravel areas. The design volume of SCMs must take into account the runoff
from build out from dil surfaces draining to the SCM in accordance with 15A NCAC 02H .1050(1),
Project Density
w1 Existing Development: Project Density = [New BUAy(fotal Project Area —Existing BUA] x 100 or
1 86 %
w10 Existing Development. Project Density = (New BUA]Mtal Project Area] x 100
6. Anticipated construction start date 07/2020
7. Is the project located within 5 miles of a public airport? ® No ❑ Yes
/f Yes,'see S.L. 2012-200, Part Vt. hgp:l/www.ncleg.nettSessionsl20111Bills/Senate/PDF/S229y6.adf and
DEQ Stormwater Design Manual Chapter E-4 Airports.
8. For projects in Union County -. Contact DEMLR Central Dice Stormwater staff at 919-707-9200 to determine
if the project is located within a Threatened & Endangered Species watershed that may be subject to more
stringent stormwater requirements per 15A /IICAC 02B .0600.
Stormwater Fast Track ATC Application Form Page 5 of 10 Feb. 10, 2018
F. SUBMITTAL REQUIREMENTS
Submit the application package to the appropriate DEMLR Regional Office (Coastal, SA Waters) or DEMLR
Central Office (Urbanizing Areas Ph 2, USMP, Non -Coastal HQWIORW). Only application packages that include
all required items listed below will be accepted and reviewed.
Initial each item below to indicate that the required information is provided in the application package:
Initials
�If 1. Two original signed hard copies and one electronic copy of this State Stormwater Fast Track
Process "Authorization to Construct" (ATC) Permit Application Form.
6f k _ 2. Permit application processing fee of $505 payable to NCDEQ.
aH — 3. Two hard copies and one electronic copy of a USGS map identifying the project location
and GPS coordinates for the project, If the receiving water is Class SA or the receiving water
drains to Class SA waters within % mile of the project boundary, include the '/ mite radius
on the map. If the project is within 575 feet of Class SA-ORW waters, include the 575-foot
radius on the map.
4. Two original signed hard copies and one electronic copy of a site plan depicting the boundary
of the project or project phase currently being permitted, including the locations of SCMs,
streams, wetlands, and buffers.
-l_ 5. Two hard copies and one electronic copy of a construction sequence that discusses how any
future development on the project may be phased.
6. A copy of the most current property deed. Deed book: 2199 Page No: 16-19
GIN _ 7. [IF APPLICABLE] When the applicant is a corporation or a limited liability corporation (LLC): Provide
two hard copies and one electronic copy of documentation from the NC'Secretary of State, or other
official documentation, which supports the titles and positions held by the persons listed
in Section C.2 per 15A NCAC 2H. 1043(3)(b). The corporation or LLC must be listed as an active
corporation in good standing with the NC Department of the Secretary of State; otherwise, the
application will be returned. httns://www.sosnc.gov/search/index/co!R
8. [IF APPLICABLE] When the applicant is a Partnership or other person engaging in business under
an assumed name, attach a copy of the Certificate of Assumed Name.
c �{ 9. [IF APPLICABLE] When the applicant is not the property owner: Provide two hard copies and one
electronic copy of lease agreements, affidavits, pending sales agreement, development agreement,
or other documents showing that the applicant has obtained legal rights to submit a stormwater
permit application within the proposed project area.
10. [IF APPLICABLE] If modifying an existing permit for completed or partially completed projects, a copy
of the designer's certification.
Stormwater Fast Track ATC Application Form Page 6 of 10 Feb. 10, 201 S
G. CERTIFICATION OF APPLICANTI FINANCIALLY RESPONSIBLE PARTY
The Applicant, who is also the Financially Responsible Party, identified in Section D of this form must sign and have
notarized the following guaranty:
I, (print or type name of Applicant/Financially Responsible Party) Pine Gate Renewables. LLC ,
certify that the information included on this permit application form is, to the best of my knowledge, correct and
that:
1. the design has been or will be completed in accordance with the MDC as set forth in Rules 15A NCAC
02H .1050 through .1062, to the best of my knowledge;
2. the completed design meets or will meet the MDC and that the percentage BUA that is the basis for the
design shall not be exceeded, to the best of my knowledge; and
3. As the applicant, I shall maintain a licensed professional of record for the duration of the project
who will prepare and certify the as -built package. If I retain another licensed
professional before the project is complete, then I shall provide an updated
guaranty with the current licensed professional's seal. A licensed professional shall inform
the Division if he is no longer associated with this project.
The above information is true and correct to the best of my knowledge and belief and was provided by me under oath
agree to provide corrected information should there be any change in the information provided herein.
Ben Catt
Manager
Type or,,print name Title or Authority
Signature
Date 11 13) -Zoq o
I, N #AA �4,a Notary Public for the State of Jvy,Y A
County of Veit, rrA , do hereby certify that
personally appeared before me this day of, and acknowledge the
due exe r%afthe application for a stormwater permit. Witne my hand and official seal,
Nellie Moraru
NOTARY PUBLIC
UNION COUNTY, NC
My Commission moires August 24,
commission expires
Stormwater Fast Track ATC Application Form Page 7 of 10 Feb. 10, 2018
H. DESIGN PROFESSIONAL'S CERTIFICATION
To be completed by the Design Professional identified in Section D.5.
i Greg Hoffman , attest to the following:
1. This application has been reviewed by me and is accurate and complete, to the best of my knowledge;
2. The design has been completed in accordance with the MDC as set forth in Rules 15A NCAC 02H
.1050 through .1062, as applicable;
3. The percentage built -upon area that is the basis for the design will not be exceeded; and
4. 1 have the expertise, education, and experience required to design the SCMs proposed in this
application in accordance with the MDC as set forth in Rules 15A NCAC 02H .1050 through .1062.
5. 1 will provide all documents and certified as -built plans in hard copy and electronic format related to
this permit to a new Applicant/Property Owner and to DEMLR upon transfer of this permit to a new
ApplicanttProperty Owner.
Note: In accordance with N.C.G.S. 143-215.6A and 143-215.613, any person who knowingly makes any false
statement, representation, or certification in any application shall be guilty of a Class 2 misdemeanor which may
include a fine not to exceed $10,000 as well as civil penalties up to $25,000 per violation. In addition, any person
who knowingly makes any false statement, representation, or certification in any application may be reported to
the appropriate NC ppfgssional licensing board.
Sig
Hdss;,
Rp(L'e i-.i/�< SEAL
SEAL °
° 035093 _-
e°
R.
��rlrr+lltr+����
Date: ~ Z`�- Z 6
Stormwater Fast Track ATC Application Form Page 8 of 10 Feb. 10, 2018
I. PROPERTY OWNER'S AUTHORIZATION (IF APPLICANT IS NOT 'THE PROPERTY OWNER)
, (print or type name of the Property Owner) Donna R. Faulkner , certify
that I own the property identified in this permit application, and thus give permission to (print or type name of
Applicant) Pine Gate Renewables, LLC with (print or type name of Applicant's
organization) Pine Gate Renewables LLC to develop the project as
currently proposed. A copy of the lease agreement or pending property sales contract has been provided with the
submittal, which indicates the party responsible for the operation and maintenance of the stormwater system.
As the legal property owner I acknowledge, understand, and agree by my signature below, that if my designated
agent (entity listed in Contact Information, item 1) dissolves their company and/or cancels or defaults on their
lease agreement, or pending sale, responsibility for compliance with the DEMLR Stormwater permit reverts back
to me, the property owner. As the property owner, it is my responsibility to notify DEMLR immediately and submit
a completed NamelOwnership Change Form within 30 days; otherwise I will be operating a Stormwater treatment
facility without a valid permit. I understand that the operation of a Stormwater treatment facility without a valid
permit is a violation of NC General Statue 143-215.1 and may result in appropriate enforcement action including
the assessmer;t of civil penalties of up to $25,000 per day, pursuant to NCGS 143-215.6.
Signatu
Date-,
I, �i.Cep in fee lJ a Notary Public for the State of I��t n CCU rD r nr,
County of QoL S�l , do hereby certify thatl6naa P-_ _ _f-�aU l mr
personally appeared before me this day of l ?6zoand acknowledge the
du ution of the a ation for a stormwater permit. Witness my hand and official seal,
MACON REID
SEAL NOTARY PUBLIC
Nash County, North Carolina
My commission expires ON - 0 ZD 24
Stormwater Fast Track ATC Application Form Page 9 of 10 Feb. 10, 2018
J. CERTIFICATION OF CURRENT PERMITTEE (COMPLETE ONLYIF PERMIT TRANSFER IS
REQUESTED)
I, (print or type name of the Current Permittee) , am submitting
this request for a transfer of Fast Track ATC permit #t SWA With the
submission of this transfer request I am providing a copy of the most recent permit, all related documents and as -
built plans certified by my design professional in hard copy and electronic format to the Proposed
Permittee/Applicant identified in Section G of this application and to DEMLR _ I further attest that this request for
a permit transfer is accurate and complete to the best of my knowledge. I assign all rights and obligations as
permittee to the proposed permittee named in Section G of this form.
Signature:
a Notary Public for the State of
County of , do hereby certify that
Date:
personally appeared before me this day of , and acknowledge the
due execution of the application for a stormwater permit. Witness my hand and official seal,
SEAL
My commission expires
Stormv inter Fast Track ATC Application: Form Page 10 of 10 Feb. 10, 2018