Loading...
HomeMy WebLinkAboutSW3200702_Supplement EZ form-SIGNED_20200725SUPPLEMENT-EZ COVER PAGE FORMS LOADED PROJECT INFORMATION 1 Project Name South Main Street Townhomes 2 Project Area (ac) 3.36 3 Coastal Wetland Area (ac) 0 4 Surface Water Area (ac) 0 5 Is this project High or Low Density? High 6 Does this project use an off -site SCM? No COMPLIANCE WITH 02H .1003(4) 7 Width of vegetated setbacks provided ifeetl Will the vegetated setback remain vegetated? Is BUA other that as listed in 1003(4)(c-d out of the setback? Is streambank stabilization proposed on this project? 15 8 Yes 9 Yes 10 No NUMBER AND TYPE OF SCMs: 11 12 Infiltration System 0 Bioretention Cell 0 Wet Pond 0 Stormwater Wetland 1 0 Permeable Pavement I 0 _ Sand Filter 1 Rainwater Harvesting (RWH) 0 Green Roof 0 Level Spreader -Filter Strip (LS-FS) 0 .Disconnected Impervious Surface (DIS) 0 Treatment Swale 0 Pond 0 13 14 15 16 17 18 19 20 21 22_�Dry 23 _ IStormFilter 0 24 +Silva Cell 0 25 Ba filter 0 26 Filterra t 0 FORMS LOADED DESIGNER CERTIFICATION 27 1 Name and Title: 28 Oroanization: _ 29 Street address: 30 City. State, Zip: 31 Phone number(s): 32 Email. Jonathan Carter Bluestone Land Management 470 N. Broad St Mooresville, NC 28115 1 704-664-1973 1 Certification Statement: I certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision; that the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete; and that the engineering plans, specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here. .�vk CAI .,,, :P .0 oo -ys t t SEAL 30916 A Signalurd of Designer Date tp• A. pz0 DRAINAGE AREAS 1 Is this a high densityr p ect? Yes 2 If so number of drains a areas/SCMs 1 Is all/part of this project subject to previous rule 3 versions? No FORMS LOADED DRAINAGE AREA INFORMATION 4 Type of SCM _ 5 Total BUA in pM ect sq ft) New BUA on subdivided lots (subject to 6 permitting) (sq ft) New BUA outside of subdivided lots (subject to 7 permitting) (sfl 8 Offsite - total area (sq ft) 9 Offsite BUA (sq ft) 10 Breakdown of new BUA outside subdivided lots: Parking (sq ft) _ - Sidewalk (sq ft) _ Roof (sq ft) _ Roadway (sq ft) Entire Site 1 Sand filter Sand filter 51,836 sf 51,836 sf 51,836 sf 51,836 sf, sf sf sf sf _sf sf 31,893 sf 31,893 sf 2,210 sf 2,210 sf 15,876 sf 15,876 sf sf sf Future (sq % _ Other, please specify in the comment box below (sq ft) New infiltrating permeable pavement on subdivided lots (sq ft) New infiltrating permeable pavement outside of subdivided lots (sq ft) sf sf 11 sf sf 12 sf I sf 13 Exisitng BUA that will remain (not subject to permitting)isq ft)_ Existin BUA that is already permitted (sq ft) sf sf 14 sf sf 15 Existing BUA that will be removed (sq ft) sf sf 35% 16 Percent BUA 35% 17 Design storm (inches) _ 1 in 18 Design volume of SCM (cu ft) 10448 cf 19 Calculation method for design volume Hydrocad ADDITIONAL INFORMATION 'Please use this space to provide any additional information about the 20 jdrainage area(s): 1 in 10448 cf j Hydrocad DRAINAGE AREA INFORMATION Entire Site 1 4 5 Type of SCM Total BUA from project (sq ft) N/A 51,836 sf 6 1995 rules SL 2006-246 2008 rules 2017 rules 7 New BUA on subdivided lots (subject to permitting) (sq ft) 51,836 sf 1995 rules SL 2006-246 2008 rules 2017 rules New BUA outside of subdivided lots (subject to permitting) (sf) 1995 rules SL 2006-246 2008 rules 8 sf 2017 rules 9 Offsite - total area (sq ft) sf 1995 rules _ SL 2006-246 2008 rules _ 2017 rules I 10 Offsite BUA (sq ft) sf 1995 rules SL 2006-246 _ 2008 rules 2017 rules 11 Design storm (inches) 1 in 1995 rules SL 2006-246 2008 rules 2017 rules 12 ,Breakdown of new BUA: - Jlurwilm 1bq IL� - Roof (sq ft) Roadway (sq ft) Future (sq ft) Other, please specify in the comment box below (sq ft) _ New infiltrating permeable pavement on subdivided lots (sq ft) L,L IV Sr 15,876 sf _ sf J sf sf 13 sf 14 15 New infiltrating permeable pavement outside of subdivided lots (sq ft) Exisitng BUA that will remain (not subject to permitting)(sq ft) Existing BUA that is already permitted (sq ft) Existing BUA that will be removed_ (sq ft) BUA sf _ sf _ 16 sf 17 sf 18 35% -Percent 19 Design volume of SCM (cu ft) Calculation method for design volume 10448 cf 20 Hydrocad ,DDITIONAL INFORMATION Please use this space to provide any additional 21 information about the drainage area(s):