Loading...
HomeMy WebLinkAboutNC0026689_INSPECTION_20000308NPDES DOCUMENT SCANNING COVER SNEET NPDES Permit: NC0026689 Denton WWTP Document Type: Permit Issuance Wasteload Allocation Authorization to Construct (AtC) Permit Modification Complete File - Historical In�spe�ction ; Instream Assessment (67b) Environmental Assessment (EA) Permit History Document Date: March 8, 2000 Tlzis document is printed oa reuse paper - ignore any oo mteat oa the reirerse side NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY (•iiBV:k`G: i`iYf.C.N i FTc£.;.T'L March 8, 2000 Pi19R .; 4 2100n Mr. David Beal, Town Manager *F p; 9"WiNUM."IPt 4,0A UIT Town of Denton i C9 s!"aE 9EA" 4:41 GiR4( p Post Office Box 306 66� l Denton, North Carolina 27239 ���� SUBJECT. Town.of-Denton C Wastewater Treatment Plant Expansion Project No. CS370519-04 Interim Inspection Dear Mr. Beal: An interim inspection for the federally funded portion of the subject pollution abatement project was performed by the Construction Inspection Unit of the Construction Grants and Loans Section on March 7, 2000. This inspection was conducted in conjunction with the monthly progress meeting. Please note that our inspection report covers both loan administration and construction. A copy of the inspection report is attached for your records. If you have any questions regarding this inspection, please contact me at (919) 715-6204. Sincerely, �[ Alan C. Amor, P.E. F QConstruction InspectionMAR 1 5 2000 ACA/nw Enclosure POINT - WATER QUALITY POINT SOURCE BRANCH cc: Jamestown Engineering Group Crowder Construction Company Ie Regional Office PMB, CIU, SRF CONSTRUCTION GRANTS & LOANS SECTION 1633 MAIL SERVICE CENTER, RALEIGH, NORTH CAROLINA 27699-1633 PHONE 919-733-6900 FAX 919-715-6229 AN EQUAL OPPORTUNITY / AFFIRMATIVE ACTION EMPLOYER - SOBS RECYCLED/10% POST -CONSUMER PAPER I. II. CONSTRUCTION GRANTS AND LOANS SECTION INSPECTION REPORT TOWN OF DENTON TREATMENT PLANT EXPANSION .AND OUTFALL SRF PROJECT NO. CS370519-04 MARCH 7, 2000 LOAN ADMINISTRATION A. SCHEDULE (overall Status of Loan) - The SRF loan amount is $2,300,000 with an interest rate of 2.6% and a 20-year term. Construction is scheduled to be completed and interest will begin accruing on June 7, 2000. B. AMENDMENTS (Need and Status) - None C. LOAN PAYMENT - #7 Date of Request - 2/8/00 Requested to Date - $1,407,764 This Request - $270,793 Actual 63% Recommendations and Comments - None D. GENERAL None CONSTRUCTION ADMINISTRATION A. CONSTRUCTION CONTRACT NO. 1 Contractor Name - Crowder Construction Company Address - 310 Indian Trail -Fairview Road, Indian Trail, NC 28079 Contract No. - 1 Contract Amount - Total - $1,379.500 Amount Based on Latest Change Order - $N/A Current Loan Eligible Contract Amount - $1,379,500 Contract Description - General Construction - WWTP Upgrade Superintendent at Site - Ed Jenkins Date of NTP - June 17, 1999 Contract Time - 360 CDs Total Original Completion Date - June 12, 2000 Current Completion Date - June 12, 2000 Current Loan Eligible Contract Time Period - 360 CDs Scheduled % Complete - 66% Actual % Complete - Approximately 65% based on field observation. -2- C. CHANGE ORDER UPDATE Possible change order for air piping for blowers and a modified micro screen. CONSTRUCTION CONTRACT NO. 2 Contractor Name - Southern Industrial Constructors Address - 6101 Triangle Drive, Raleigh, NC 27613 Contract No. - 2 Contract Amount - Total - $140,000 Amount Based on Latest Change Order - $N/A Current Loan Eligible Contract Amount - $140,000 Contract Description - Electrical - WWTP Upgrade Superintendent at Site - Emory Kimrey Date of NTP - June 17, 1999 Contract Time - 360 CDs Total Original Completion Date - June 12, 2000 Current Completion Date - June 12, 2000 Current Loan Eligible Contract Time Period - 360 CDs Scheduled % Complete - 66% CHANGE ORDER UPDATE N/A CONSTRUCTION CONTRACT NO. 3 Actual % Complete - Approximately 50% based on field observation. Contractor Name - M & M Builders Address - Pos t Office Box 1609, High Point, NC 27261 Contract No. - 3 Contract Amount - Total - $364,537 Amount Based on Latest Change Order - $N/A Current Loan Eligible Contract Amount - $364,537 Contract Description - WWTP Effluent Outfall Superintendent at Site - Larry Lindsey Date of NTP - June 17, 1999 Contract Time - 360 CDs Total Original Completion Date - June 12, 2000 Current Completion Date - June 12, 2000 Current Loan Eligible Contract Time Period - 360 CDs Scheduled % Complete - 66% Actual % Complete - Approximately 55% based on field observation. CHANGE ORDER UPDATE Response or No. Approval Date 1 12/6/99 12/6/99 Time Amount (Days) Remarks $ 2,775 -0- Open cut of two roads instead of bores. $0 eligible $32,500 -0- Modified railroad bore -3- 1. The Following Work Was Observed to Be Completed a. Gravity Outfall Line: Clearing and mulching have been completed for approximately 95% of the outfall easement. Additional clearing was done by the contractor outside of the easement in error. The road crossings for High Rock and Hunt Roads have been completed utilizing an open cut. Pre -drilling has been completed from station 00+50 through 27+50, 73+00 through 97+00 and at different spot locations throughout the rest of the outfall line. The gravity pipe has been installed from approximately stations 0+00 to 39+00 and 51+15 to 74+57. Most of the pipe and manholes installed to date have been tested. Manholes #103, 4104 and 9105 have been partly completed with their pits left open. An extra manhole was installed at approximately station 62+50 due to the pipe alignment being off by more then seven feet. Surface water, groundwater and debris appears to be entering in the pipes. The line work has been dressed, seeded and mulched from approximately station 0+00 to 15+75 and dressed through station 27+50. Additional seeding should be completed as soon as possible. Erosion and sedimentation control measures should be maintained along the outfall line at this time. The railroad boring has been completed. All of the 15" pipe, DI pipe and the manholes have been delivered to the site. b. Mechanically Cleaned Bar Screen: No work has been completed at this time. C. Influent Pump Station: Both sets of cores into the wetwell have been completed. Some piping has been completed. d. New Oxidation Basin: The basin area has been excavated. The base slab, outside walls, center wall and walkway have been completed. The two inner radius walls and clarifier distribution chamber have been completed. All of the piping has been installed to the distribution box. Most of the final rubbing and grinding of the wall has been completed. Most of the oxidation equipment is now being installed in the basin. Both of the rotor shafts and blades have been installed with the rotor hoods now being stored on site at this time. The main distribution chamber base slab and outside walls have been completed. Additionally, all the gates and the tie-ins for the piping have been installed in the distribution box. Existing Oxidation Basin: No work has been completed at this time. New Clarifiers: Clarifiers #3 and 44 have been excavated to grade. The base slabs and outside walls for #3 and #4 have been completed. The pipes under the slabs have been installed. All of the weir plates for both clarifiers have been installed. All of the equipment such as the center column, grate, rotor, rake, bridge, railing, scum box and skimmer have been installed in both of the clarifiers. The electrical wiring to both of the motors were being pulled and connected at the time of the inspection. The bottom slab will be grouted using the rake within the next couple of weeks. Most of the final rubbing and grinding of the walls had been started. Most of the yard piping for these basins has been installed. g. Sludge Holding Tank: The tank has been excavated to grade. The base slab and outside wall for the tank have been completed. Most of the final rubbing and grinding of the walls has been completed. The floating aerator has been installed. The disconnect for the basin has been installed and wired. All of the yard piping for the tank has been installed. h. Tertiary Filters/Chlorine Contact Chamber/Mudwell/Cascade Aerator: This area has been excavated. The chlorine contact chamber base slab and walls have been completed. The pipe under the slab has been installed. The block and grout for the chlorine chamber have been completed. The chemical feed lines, gates and piping appear to be installed. The control panel for the chamber was being completed at the time of the inspection. The filter base slabs and walls have been completed. The underdrain piping and filter material has been installed. Some of the air valves for the filters are expected to be delivered to the site within the next two weeks. One blower has been placed on the pad, but the other was sent back to the manufacturer due to damage during delivery. The precast wetwell and top have been placed. The mud pumps have been delivered to the site and will be installed within the next week. The cascade aerator base slab, steps and walls have been completed. Most of the final rubbing and grinding of the walls for the basins have been completed. Yard piping connecting the chlorine contact and filters has been installed. The whole area has been backfilled to rough grade. All the panels for the basins and the corresponding electrical work are now being completed. Standby Generator and Electrical Work: The MCC 91, MCC #2 and generator pads have been completed. Conduit to the new oxidation ditch, MCC pads, both clarifiers, the sludge tank and generator pad have been installed. Both MCCs and most of the control panels are now being installed. All the electrical manholes have been installed. Approximately 50% of the wiring has been pulled and installed. The standby generator purchased by the town is now being stored on site. The electrical contractor is behind schedule due to weather, equipment delivery delays, etc. j. General: The contractors' office trailers have been set up. The power has been established to the trailers. All the clearing and grubbing have been performed. Most erosion control measures have been installed. Most of the yard piping and valves have been installed. Some delivery date delays are being reported for butterfly valves, blowers, etc. The general and electrical contractors were on site during this inspection. 2. Work Schedule for Next Month Contract 1 - Continue laying pipe. Contract 2- Finish equipment work on the oxic ditch, clarifiers, chlorine contact chamber, filters, aeration basin and SHB. Continue yard piping installation Contract 3 - Duke power will install connection for 480 power. Continue installation of MCCs, control panels and finish pulling wire. -5- III. CONSTRUCTION INSPECTION CHECKLIST A. CONSTRUCTION SITE: 1. Weather - 70' Site Conditions - Sunny 2. Storage/Protection of Stored Materials and Equipment Adequate: Yes _ No X 3. Safe Conditions/Methods Observed: Yes_ No X If not, note: Good housekeeping of site is needed. The pipe contractor should have all personnel wear hardhats. 4. Were Unsafe Practices Brought to the Inspectors, Contractors or Recipient's Attention? Yes X No 5. Site Comments: Some erosion control measures have been installed but need to be maintained by the outfall contractor. The outfall contractor should have established E&SC as soon as clearing is performed and before grubbing. B. ENGINEERING/INSPECTION: 1. Resident Inspector On -Site: Yes—X No 2. Inspector's Records, Reports, Shops, Files, Etc. Reviewed: Yes X No _ 3. Copies of Required Testing (concrete, soil, other) Reports Reviewed: Concrete: Yes X No_ Soil: Yes X No _ Other: Yes X No 4. As-Builts Being Kept Up -To -Date: Yes X No_ 5. Comments or Recommendations: Engineer reviewed low breaks on some 7-day and 28-day concrete test cylinders. The 56-day breaks were found to meet break requirements. Depth of rock and compaction tests for pavement were reviewed. C. CONTRACTOR(s): 1. N.C. OSHA/Labor Laws Posted: Yes X No 2. Up -To -Date Construction Schedule (Bargraph, CPM) Posted: Yes _ No X 3. Contractor(s) Coordination of Work Observed: Yes X No 4. Comment on Any Known Delays/Impacts in Completing Contract(s) as per Contractor: N/A 5, If Construction Appears Not to be Completed as per Contract Estimate, Additional Time Needed for Completion: Possible time extension for plant work due to rain and equipment delivery delays. D. PROJECT PROGRESS/PAYMENTS 1. Weekly Payrolls of Contractor(s) and Their Subcontractor(s) Being Submitted: Yes X No 2. Payment Milestones Discussed: Yes X No_ 3. J.O.C./S.O.C./Dates/Schedule Discussed: Yes X No_ 4. Work Completed Acceptable for Reimbursement: Yes X No IV. 5. Comments or Recommendations: N/A GENERAL COMMENTS / RECOMMENDED ACTIONS An updated construction schedule needs to be submitted. Equipment delivery delays, etc. should be reflected in the new schedule. The project sign for the project has been installed. 2. Erosion control, seeding and manhole installation are issues that need to be addressed by the outfall contractor as soon as possible. The specifications and all environmental regulations should be adhered to for the outfall work. The next project meetings are scheduled for April 4, 2000, at 10:00 and 11:00 a.m. V. INSPECTION PARTICIPANTS Name Alan Amor Tim Fulton Jeff Dennard Ed Jenkins Jamie Kinney C_ Inspector's Signature- Alan C. Amor, P.E. Representing DENR-CG&L/CIU Jamestown Engineering Town of Denton Crowder Construction Southern Industrial Constructors March 7, 2000 Date