Loading...
HomeMy WebLinkAboutNC0026689_AUTHORIZATION TO CONSTRUCT_20010112NPDES DOCUWENT SCANNIM& COVER SHEET NPDES Permit: NC0026689 Denton WWTP Document Type: Permit Issuance Wasteload Allocation F� %'Authorization ' to Construct (AtC) Permit Modification Complete File - Historical Correspondence Instream Assessment (67b) Environmental Assessment (EA) Permit History Document Date: January 12, 2001 This document is printed oa reuse paper - ignore any ooateat oa t2ie reverse side /Vpou F�(" as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically/weekly/full the construction of the project, (Project) (Name or Location) for the ouu 0 mF cv�9.. i hereby state that, to the best of my (Project Owner) abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the o 1 cifications. Signa re kegistrationaxq,' Date ���-E� `M1(4C;'; `••t; K_ L 11659 t➢'➢➢➢➢#f,919xy�y Permit No. ClnC9 (p(c, (V,(q roe Division of Wsw Quality:, wanowte4a rwdpt and accep=w of Ibis B Certification R I Cf E_i 1 V r Q NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY February 16, 1999 Mr. David W. Beal, Town Manager Town of Denton Post Office Box 306 Denton, North Carolina 27239-0306 SUBJECT: Wastewater Treatment Faciliti6s Permit No. NCO026689 �- Authorization to Construct Wastewater Treatment Facilities Project No. CS370519-04 Denton, North Carolina Dear Mr. Beal: The final plans and specifications for the subject project have been reviewed and found to be satisfactory. Authorization is hereby granted for the construction of improvements to upgrade and expand the existing Town of Denton Wastewater Treatment Plant from 0.3 MGD to 0.8 MGD capacity to consist of headworks modifications including installation of a new mechanically cleaned bar screen, upgrade of the existing influent pump station, improvements to the existing oxidation channel, new 0.4 MG oxidation channel, one new 35 ft by 12 ft. SWD clarifier, one new 30 ft. by 12 ft. SWD clarifier, new tertiary filters, new chlorine contact tank, step aeration, one new 41 ft. by 9 ft. sludge holding tank with a 10 HP aerator, and associated yard piping, a new 200 kW generator for emergency standby power, improvements to and extension of the existing gravel access road, and all associated site work, yard piping, and electrical work. Also included is a 9,800 L.F. 15-inch gravity effluent outfall line with 21 manholes to relocate the discharge point. Do not proceed with construction until the Authorization -to -Award package and EEO and MBE documentation/certification have been reviewed, and you are in receipt of our approval, if funding is desired for project construction. The Permittee shall employ an actively State certified wastewater treatment plant operator to be in responsible charge of the wastewater treatment facilities. Such operator must hold a valid State Certificate of the .grade at least equivalent to the classification assigned to the wastewater treatment facilities by the Certification Commission. When a new chief operator must be obtained to be in responsible charge of the new facilities, it is required that this be done by the time the construction of the facilities is 50% complete. CONSTRUCTION GRANTS h LOANS SECTION P.O. BOX 29579, RALEIGH, NORTH CAROLINA 27626-OS79 PHONE 919-733-6900 FAX 919-715-6229 AN EQUAL OPPORTUNITY/AFFIRMATIVE ACTION EMPLOYER -50% RECYCLE./10% POST -CONSUMER PAPER The Authorization -to -Construct is issued in accordance with Part III, Paragraph A of NPDES Permit No. NC0026689, issued February I J, 1998, and shall be subject to revocation unless the wastewater treatment facilities are constructed in accordance with the approved plans, specifications, and supporting documents; and are in compliance with the conditions and limitations specified in Permit No. NC0026689. The Permittee shall have an acceptable sludge analysis and a sludge toxicity analysis which have been approved by the Division of Water Quality prior to the disposal of any sludge from the new wastewater treatment plant. Copies of the analyses, supporting documents, and approvals shall be submitted to the Division of Water Quality's Winston-Salem Regional Office. The disposing, selling or free distribution of wet, dried, composted sludge or sludge -like materials from wastewater facilities without prior review and approval by this Division is illegal. During the construction of the proposed additions/modifications, the permittee shall continue to properly maintain and operate the existing wastewater treatment facilities at all times, and in such a manner, as necessary to comply with the effluent limits specified in the NPDES Permit. You are reminded that it is mandatory for the project to be constructed in accordance with the North Carolina Sedimentation Pollution Control Act, and, when applicable, the North Carolina Dam Safety Act. In addition, the specifications must clearly state what the contractor's responsibilities shall be in complying with these Acts. One (1) set of final approved plans and specification is to be forwarded to you for your files. The copy of the approved plans and specifications shall be maintained on file by the Owner for the life of the project. Upon completion of construction and prior to operation of this permitted facility, a certification must be received from a Professional Engineer certifying that the permitted facility has been installed in accordance with the approved plans and specifications. Mail the Certifica- tion to the Permits and Engineering Unit, P. O. Box 29535, Raleigh, North Carolina 27626- 0535. If there are any questions concerning this matter, please do not hesitate to contact Mr. Cecil Madden at (919) 715-6203. Sincerely, A. Preston Howa d, Jr., P.E. Attachment JR/pe cc: Jamestown Engineering Group David Barnwell (OSHA) Winston-Salem Regional Office CIU PMB Valerie Lancaster John Royal SRF Central Files Unit