HomeMy WebLinkAboutNCC200575_Modification Documentation Emails_20200728Georgoulias, Bethany
From: Pace, Kelsey M <Kelsey.Pace @duke-energy.com>
Sent: Tuesday, July 28, 2020 12:38 PM
To: Georgoulias, Bethany
Subject: [External] RE: Construction COC NCC200575 - Line 204 Gas Line Relocation Project
Mod Request
Attachments: [EXTERNAL] RE: Construction COC NCC200575 - Line 204 Gas Line Relocation Project
Mod Request
External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
report.spam@nc.gov
Hi Bethany,
See attached email regarding previous conversations.
Thanks,
Kelsey
From: Georgoulias, Bethany <bethany.georgoulias@ncdenr.gov>
Sent: Monday, July 27, 2020 2:22 PM
To: Pace, Kelsey M <Kelsey.Pace@duke-energy.com>
Subject: [EXTERNAL] Construction COC NCC200575 - Line 204 Gas Line Relocation Project Mod Request
* * * CAUTION! EXTERNAL SENDER * * *
STOP & THINK! Do you know and trust this sender? Were you expecting this email? Is grammar and spelling correct?
Does the content make sense? If suspicious, then do not click links, open attachments or enter your ID or password.
Kelsey,
We received the modification request for this project that noted LOD had been reduced. Was there any documentation
from the E&SC approval authority, or just the revised plans that were uploaded?
Thanks,
Bethany Georgoulias
Environmental Engineer
Stormwater Program, Division of Energy, Mineral, and Land Resources
N.C. Department of Environmental Quality
919 707 3641 office
bethany.georgoulias@ncdenr.gov
512 N. Salisbury Street, Raleigh, NC 27604 (location)
1612 Mail Service Center, Raleigh, NC 27699-1612 (mailing)
Website: http://deq.nc.gov/about/divisions/energy-mineral-land-resources/stormwater
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties
Based on the current guidance to minimize the spread of COVID-19, the Department of Environmental Quality has
adjusted operations to protect the health and safety of the staff and public. Many employees are working remotely or
are on staggered shifts. To accommodate these staffing changes, all DEQ office locations are limiting public access to
appointments only. Please check with the appropriate staff before visiting our offices, as we may be able to handle your
requests by phone or email. We appreciate your patience as we continue to serve the public during this challenging
time.
Georgoulias, Bethany
From: Suzanne Herron <Suzanne.Herron@eli-Ilc.com>
Sent: Monday, July 27, 2020 2:55 PM
To: Pace, Kelsey M; DePalma, Alicia
Cc: Keith Gualtieri
Subject: [EXTERNAL] RE: Construction COC NCC200575 - Line 204 Gas Line Relocation Project
Mod Request
Attachments: Marti-2020-001 - Piedmont Natural Gas Line 204 Gas Line Relocation project .msg
Kelsey —
I talked to Randall Jones prior to sending the attached email. He told me to send him an email with the revised plans and
that was all we would need to do since we were reducing the LOD. He did not mention the Mod form.
Suzanne
Suzanne Herron, PE, CPESC
Environmental Practice Lead
Energy Land & Infrastructure, LLC (PLLC in NCJ
1420 Donelson Pike, Suite A-12
Nashville, TN 37217
(615) 383-6300 Office
(615) 477-8286 Cell
Suzanne. Herron@eli-Ilc.com
From: Pace, Kelsey M <Kelsey.Pace@duke-energy.com>
Sent: Monday, July 27, 2020 1:30 PM
To: Suzanne Herron <Suzanne.Herron@eli-Ilc.com>; DePalma, Alicia <Alicia.DePalma@duke-energy.com>
Subject: FW: Construction COC NCC200575 - Line 204 Gas Line Relocation Project Mod Request
* Caution External Email *
This message is from an external source. Do not open attachments or click on links from unknown senders or unexpected
emails.
Hi Suzanne,
See below question from Bethany. Are you able to answer this?
Thanks,
Kelsey
From: Georgoulias, Bethany<bethany.georgoulias@ncdenr.gov>
Sent: Monday, July 27, 2020 2:22 PM
To: Pace, Kelsey M <Kelsey.Pace@duke-energy.com>
Subject: [EXTERNAL] Construction COC NCC200575 - Line 204 Gas Line Relocation Project Mod Request
Georgoulias, Bethany
From: Suzanne Herron
Sent: Tuesday, July 7, 2020 12:19 AM
To: james.edwards@ncdenr.gov; Randall Jones
Cc: Pace, Kelsey M; Alicia DePalma - Piedmont Natural Gas (alicia.depalma@duke-
energy.com); Parham, Michael A; Keith Gualtieri (keith.gualtieri@eli-Ilc.com)
Subject: Marti-2020-001 - Piedmont Natural Gas Line 204 Gas Line Relocation project
Attachments: 0228252_20200701_Project_Information_Sheet_Line_204.pdf, IFC-Rev2-060820.pdf
Mr. Edwards and Mr. Jones —
Attached is the Project Information Sheet for the Piedmont Natural Gas Line 204 Gas Line Relocation project.
There has been a re-route of the proposed pipeline since the plans were approved. I have attached the revised pages.
This re-route reduced the LOD by 1.0 acres. The summary of the changes are below.
1. Cover Sheet — Updated the sheet index to note which sheets are revised as part of Rev 2.
2. Sheet 6—Access Road Detail for AR-002 updated to reflect the change in the alignment at the beginning of the
project.
3. Sheet 19 — Updated to reflect the shift in the alignment. Stationing equation used to make up the shortened
length of the alignment. Access Road AR-001 has been removed.
4. Sheet 40— Updated to reflect the shift in the alignment.
5. Sheet 52 — Updated to reflect the shift in the alignment.
Please let me know if you have any questions or comments.
Thanks!
Suzanne
Suzanne Herron, PE, CPESC
Environmental Practice Lead
Energy Land & Infrastructure, LLC (PLLC in NCJ
1420 Donelson Pike, Suite A-12
Nashville, TN 37217
(615) 383-6300 Office
(615) 477-8286 Cell
Suzanne. Herron@eli-Ilc.com
% UNERGr 4AND &
INFRASTRUCTURE
PRIVILEGED AND CONFIDENTIAL COMMUNICATION - This electronic transmission, including any attachments, may contain confidential and/or
privileged information. This communication is to be used only by the intended recipient. If you received this email in error, please notify the sender and
delete the email. Any disclosure, copying, distribution, or use of information received in error is strictly prohibited.