HomeMy WebLinkAboutSW6191001_Supplement-EZ Form_20200728DRAINAGE AREAS
1
Is this a high density project?
Yes
2
If so, number of drainage areaslSCMS
1
3
Is all/part of this project subject to previous rule
versions?
No
FORMS LOADED
DRAINAGE AREA INFORMATION Entire Site
4 Type of SCM Sand Filter
5 Total BUA in project s -W—J
1
96333 sf
6
New BUA on subdivided lots (subject to permitting)
(sq ft
7permitting)
New BUA outside of subdivided lots (subject to
s
72000 sf
8
Offsite - total area (sq ft
9
Offsite BUA (sq ft
10
Breakdown of new BUA outside subdivided lots:
- Parking (sq ft
24600 sf
- Sidewalk (sq ft
- Roof (sq it
- Roadwa s fl
47400 sf
- Future (sq ft
- Other, please specify in the comment box
below (sq ft
11
New infiltrating permeable pavement on
subdivided lots (sq ft
12
New infiltrating permeable pavement outside of
subdivided lots (sq ft
13
Exisitng BUA that will remain (not subject to
1 permitting)s ft
14
Existing BUA that is already permitted (sq ft
15
Existing BUA that will be removed (sq ft
16
Percent SUA
75%
17
Desi n storm inches
1 in
18
Design volume of SCM cu ft
5792 cf
Simple Method for
19 1 Calculation method for design volume Runoff Volume
ADDITIONAL INFORMATION
NCDEQ
Stormwater
Manual Part B
20
Please use this space to provide any additional information about the
drainage area(s):
All parking aisle will be covered with gravel
DRAINAGE AREA INFORMA71ON
Entire Sfie
1
4
Type of SCM
NIA
5
Total BUA from project (sq ft)
6
1995 rules
SL 2006-246
2008 rules
2017 rules
7
New BUA on subdivided lots (subject to
permitting) (sq ft)
1995 rules
SL 2006-246
2008 rules
2017 rules
8
New BUA outside of subdivided lots (subject to
permitting) (sf)
1995 rules
SL 2006-246
2008 rules
2017 rules
9
Offsite - total area (sq ft)
1995 rules
SL 2006-246
2008 rules
2017 rules
10
Offsite BUA (sq ft)
1995 rules
SL 2006-246
2008 rules
2017 rules
11
Design storm (inches)
1995 rules
SL 2006-246
2008 rules
2017 rules
12
Breakdown of new BUA:
- Parking (sq ft
- Sidewalks fl
- Roof (sq ft
Roadway s ft
Future (sq ft
Other, please specify in the comment box
below (sq ft
13
New infiltrating permeable pavement on
subdivided lots (sq tt
14
New infiltrating permeable pavement outside of
subdivided lots (sq ft
15
Exisitng BUA that will remain (not subject to
ermitting) (sq fl
16
Existing BUA that is already permitted (sq ft
17
Existing BUA that will be removed (sq ft
18
Percent BUA
19
1 Design volume of SCM cu ft
20
Calculation method for design volume
ADDITIONAL
INFORMATION
21
Please use this space to provide any additional
information about the drainage area(s):