HomeMy WebLinkAboutSW6191001_SW Report_20200728DRAINAGE DESIGN NARRATIVE & CALCULATIONS Yard Storage Inc Request July 2020 Engineer Firm Castle Keep 22 Long Ridge Ct Willow Springs, NC 27592 919-796-8561 Project Description The purpose of the project is to construct gravel parking area for recreation vehicles. Approximately 1.7 acres will be disturbed during this construction period. The site is 2.2 acres located in Buckhorn Township, Harnett. Site Description The site has rolling topography with slopes generally 2 to 7%. Slopes steepen to 10% in the northeast portion of the property where the proposed stormwater basin will be located. The site at present is predominantly stripped off of vegetation, rest of the areas are covered with short grass and woody vegetation at north boundary. There is no evidence of significant erosion under present site conditions. Adjacent Property Land use in the vicinity is residential. The land immediately to the north and east has been developed for residential use. Area to the north is predominantly undeveloped. The existing ditch along the gravel drive will receive the overflow from the sand filter. Sediment control measure will be taken to protect the existing ditch and the adjacent residential properties. Soils The subsurface is sandy loam, 10 inches thick. The subsoil consists of clay, 45 inches thick. Below 55 inches is a layer of loam. Soil morphological characteristics indicating a seasonal high-water table (SWHT) were not observed within 120 inches below surface. Infiltration rates (permeability) range from 0.2 in/hr in the clay layer to as high as 2 in/hr in the loamy sand. Proposed SCM Open bottom sand filter system is proposed to capture stormwater runoff from all disturbed areas. Volume in excess of the storage capacity will outlet via drain pipe and be dissipated by riprap pad. Stormwater Calculations Total Area = 96,333 sq.ft = 2.21 acre Impervious Area = 72,000 sq.ft = 1.65 acre Impervious fraction, IA = 1.65 / 2.21= 0.747 Runoff Volume Calculation: Rv=0.05*0.91A Where: Rv = Runoff coefficient (unitless) IA = Impervious fraction (unitless) Rv = 0.05 + 0.9(0.747) Rv = 0.722 Dv = 3630 * RD * Rv* A Where: Dv = Design volume (cu.ft) Ra = Design storm depth (in) A = Drainage area (ac) Rp = tin Dv = 3630 * 1 * 0.722 * 2.21 Dv = 5,792.10 cu.ft Forebay and Sand Filter Calculations Treatment Volume Tv = 7S% of Design Volume, Dv = 0.75 x 5,792.10 cu.ft. Tv = 4,344.08 cu.ft Sand filter Sizing Sv = 50% of Treatment Volume, Tv = 0.50 x 4,344.08 Sv = 2,172.04 cu.ft. Use pond depth over sand = 4 ft. < 6 ft. max. SA = 2,172.04/4 SA = 543.01 sci t. Area provided = 544 sq.ft. Forebay Sizing Fv = 50% of Treatment Volume, Tv = 0.50 x 4,344.08 Fv = 2,172.04 cu.ft. Use forebay depth = 4 ft. FA = 2,172.04/4 Fa = 543.01 sq.ft. Area provided = 550 sq.ft. Outlet Pipe Design Description of Surface Runoff Coefficient, C Area, ac C x A Gravel 0.85 1.65 1.40 Basin 1.0 0.22 0.22 Total CxA 1.62 Composite C 0.87 Time of Concentration, Tc Maximum slope length = 287 ft overland flow Average slope = 2% Location: Holly Springs, North Carolina Surface Manning's, n = 0.011(from Table 8.03a) Using Kinematic Wave Equation Tc (overland) = 1.60 minutes (for 100 ft) V = 20.3282 x 51/2 V = 2.87 minutes V _ 1.49 Rz/3S1/2 n R = 0.44 V = 17.05 fps Channel Length = 466 ft Tc (channel) = L / (60 x V) Tc (channel) = 0.46 minutes Tc = Tc (overland) + Tc (shallow concentrated) +Tc (channel) Tc = 1.45 + 2.87 + 0.46 Tc = 4.78 minutes Use Tc = 5 minutes Rainfall Intensity, I I = 7.55 in/hr (from Table 8.03C) using a 10-year storm, 5-minute duration. -.G .4 ,0 Peak rate of Runoff, Q10 Q10 = CIA Q10 = 0.87 x 7.55 in/hr x 1.62 acre Q10=10.64cfs Length = 76.5 ft Slope, So = 0.01 ft/ft Allowable Headwater Depth, AHW = 6.62 ft Culvert type: PVC headwall Ke = 0.2 n = 0.012 Tailwater (TW) = 1,25 ft Z�4 '4 OUTLET CONTROL, CIRCULAR CONCRETE PIPE - 2000 Boo 20 Ito too K .0s 72 -ss -60 - 34 +s p='n 42 2t SP� Ls —.F.•. *. .r.. ". a.w ra.... HEAD FOR CONCRETE PIPE CULVERTS FLOWING FULL n-0.022 I\LLT CONTROL, CIRCULAR R (- DVE PIPE r' fa L r r _ _ HEADWATER DEPTH FOR Q DrTrRi. GATED HOPE GUhVERTa WITH MLET CONTROL ��A C RITC AL DEI' F11. CIRCULAR WIPE CHART 4 s S �+' 14 ~ E �t :Mlgt 4.�:kk7 3a �� •.�k i �- 70 y�j •p SO to 70 so to '00 QrSC�R6E-0-tr5 I I E i •� s� i st cfir"n Top Or P yr r 30 too too ioo ` Z3 5-00 coo too •oo too too* v � �4 i I � 1 • � � 1 I * .__. f � 4 _!• - aj Ci�w: fit CL[DTOP OfFt/i F L--lflj 3000 s000 DjSC"+RLE - Q -CFS GRM CAL DE PTH CIRCULAR PIPE - (D 3Lo Z LLJ qq0. k % w AA,*O,3A CO z \ „ Ln jLj s w Q k 0 0 » ■ ww Z it 0| � � 2 s d LLA% Lai4 \ 22 6|- - _ E $ C4 Is , q 7 ■ © +cv m a ■ w 2 I. z 4 2 z e 0 u LO 00 di q gLLI o 2 R z 9 _ o ® W w _Or M cr 6 � w w ® k 2 � « w S « 3 2 q E 2 U � k © N L ■ 0 k k w x ' k d § 0 cr %E k � o ± g. R ,�z> ( t"FLETCON"FROL, CIRCULAR CONCRETE f 1PE RECOMMENDED tf. NNENG'S n-VALUES T%pecft'atwlok W.111 rkwriptian IT C'xxxctc Pipe Smtxuh oatll+ Ei i1IEt - 0.01 COM--rctc Boxes SnuxiGh u alL, 0.012 - 0-01 C'�-tttt;xtcd WW ' , s t"� ' is'lch o- (12r' - 0.027 Pip, and Boxc>. _'granular or eorrugatin"nN llelwA Pipc h b% I inch 0.022 - 0.025 corrui!atiom 5 b� I inch 0.025 - 0.026 corruzations ? br I ittch 0.027 - 0.028 conueatinns 6 hv _' inch 0.033 - 0.035 Smoutai )^Banc q br _' `= inch 0.0113 -0.0i7 titructuraf plate Corrugated Metal 2 _' _, by 12 inch corrueatiom 0.012 - 0.024 Pipe T Spiral Rib Wtal Saxxith %:ells 0-012-0.01 z (StM or Alum.l PVC Snxwth itsicnot G -010 - 01.012 i'ol velhviene I PE or HDPE i Srnmuh inwnku 0 011 - 0 it l C'ormg- alcd PE or 11DPE C orrugatcd antcrior 0.0i2 - i1.026 Ncitc J _Th%- %rduw, irwlicatcd in this table arc recx*mmendecl 'arming-s -n" deign values. Actual field ►alues amy card depew ing on the effects of abrasion, corrosion. deflection. and joint conditions. Cuncn-tc pipe with pcx.+r joints and dctenoraled halls may ha%a "n" +allucs of 0.014 to O.01:t_ Comtgatcd metal with join and %aill problems may also hat c .hugger "n' ►aluc-S. and in at&&iiom uny ciPivicatY shape claauzves v►hirh cc uJd ad--crklti .al%-ct llsc -eneral hydrJulic rlsatac-tcristics ofth- culat-rt. ` Note _':Fore further infumaation con:emin-, %twining n %aloe, Cor,cJccfcd c.mduits ,:k1nNult Hydraulic Design of Hizhua% Culccrts. Federal Highwar Aduministralion. HDS No. 5. page 163_ Riprap Outlet Protection for Outlet Pipe Q10 = it cfs Pipe Diameter = 15 inches Tailwater = 1.25 ft Length of apron = 23 ft (Figure 8.06b) D50 = 0.25 ft or 3 inches Depth of rprap (laid flush with ground surface) = 1.5 x dmax = 4.5inches; Use 1 ft Upstream apron width = 3 x pipe diameter = 3.75 ft Downstream apron width = apron length + pipe diameter =24.25 ft. -4e--'0 E�D o,aes rf14r«--- La f f 3 1 a 13 r 10 v 15 aschalgo tttAdsftj GufveS rraY rlct Z* callapotatcc: Figure 0.06b .Cv5gn of o e.:f p'o?;Cf of bcm a to rmf p o %jwr 2 S.i+ ni�a' r :r�vakw COn{ Ofl S>.2 Sda na9Elj Sand Media Specification The media in the sand filter shall be cleaned, washed, course masonry sand such as ASTM C33 or the equivalent. The sand particles shall be less than 2 mm average diameter. The entire surface area of the sand chamber must contain sand. Maintenance of Media The sand filter shall be maintained in a manner that results in a drawdown of at least two inches per hour at the sand surface. Clean -out Pipes At least one clean -out pipe shall be provided at the low point of each underdrain line. Clean out pipes shall be capped. Access to Underground Sand Filters It is recommended to provide access to underground sand filters that applies with OSHA regulations. Maintenance Sand filters shall be inspected at least once a quarter and shall be maintained as needed to remove surface sediment accumulation, trash, debris, and leaf litter to prevent the filter from clogging. Sediment should be cleaned out of the forebay/sedimentation chamber when it accumulates to a depth of more than 6 inches. During inspection, structures such as outlets and flow diversions should be checked at least annually for damage or degradation. Maintenance Plan 1. Manage the drainage area to reduce the sediment load to the sand filter. 2. Clean out the sedimentation chamber or forebay whenever sediment depth exceeds six inches. 3. At least once a year, skim the sand media. 4. Replace the sand filter media whenever it fails to function properly after maintenance. 5. Inspect the sand filter at least quarterly. Any problems that are found shall be repaired immediately. �t;era+►�.■r„r� o �� C ARoO4.. =o. �o�ESSlpy••.9 �'.. r' Q SEAL 9� 9519