HomeMy WebLinkAbout20181666 Ver 1_Compliance Comments_20200728 Wetland Inspection Report
Project Num: 20181666 Version: 1 Status: Issued
Project Name: NCDOT-Replace Bridge 278 on SR 1540 (B-5177) Project Type: Replace bridge with bridge
County: Watauga Region: Winston-Salem
Location: NCDOT-Replace Bridge 278 on SR 1540 (B-5177)
Latitude: +36° 10' 09" Longitude: -81° 38'48"
SW Plan Location:
Site Owner Name: NC DOT Division 11
Inspection Date: 7/22/2020
Reason for Inspection: Routine
Inspection Type: Site Inspection(DOT)
Inspection Contact Person: Title: Phone:
On-Site Representative(s):
Primary Inspector: Dave Wanucha Phone: 336-776-9703
Secondary Inspector(s):
Facility Compliance Status: Compliant ❑ Not Compliant
Program Areas: 401 (includes isolated/non-404)
Question Areas:
II Permit(401 WQC)
Inspection Summary:
page 1
Site Number: 20181666 Owner: Pettvjohn,Michael A.
Inspection Date: 7/22/2020 Inspection Type: Site Inspection(DOT) Reason for Visit: Routine
Permit(401 WOC) Yes No NA NE
Does the impact(s)match what was approved in the 401 WQC or non 404 permit? • ❑ ❑ El
Are the culverts and/or filled areas installed properly? • El El El
Is the site compliant with additional conditions of the 401 WQC or non 404 permit? • El ❑ ❑
Comment: Met with DEO and field staff. Project is not completed. Bypass is working per the plans as culvert is
under construction. Temporary crossing over bypass is ok but some additional precautions were
requested along ibeam where four holes need protection to prevent sediment discharges to stream during
storm events. Staff were toplace sand bags over holes. Inlet at pipe installation needs additional work
to repair temporary impacts. Overall,project is proceeding per the plans.
page 2