Loading...
HomeMy WebLinkAbout20200817 Ver 1_USACE Permit_20200717Strickland, Bev From: Thompson, Emily B CIV USARMY CESAW (US) < Emily.B.Thompson@usace.army.mil > Sent: Tuesday, July 28, 2020 9:34 AM To: Pullinger, Robert C Subject: RE: [External] RE: Farrington Trace- Greenville, NC (Firetower Road/Farrington Drive location) Attachments: SAW-2020-01081.pdf • ' External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to ort.s am nc. ov Great information, I thought that was the case. I can't remember if I copied you on the permit for this, so I attached it. Luckily, I'm not in the field today, but I will be tomorrow and Thursday. Looks like we'll have scattered storms, but it's hard to know what it will do hour by hour haha. I hope you're doing well — I know you're swamped even more so with Anthony gone. I hope y'all are able to get some help quickly! From: Pullinger, Robert C <chris.pullinger@ncdenr.gov> Sent: Tuesday, July 28, 2020 9:04 AM To: Thompson, Emily B CIV USARMY CESAW (US) <Emily.B.Thompson@usace.army.mil> Subject: [Non-DoD Source] RE: [External] RE: Farrington Trace- Greenville, NC (Firetower Road/Farrington Drive location) Emily, Sorry for the late reply on this one (and you may have already issued it), but using the NW 18 makes sense to me/won't be any problem for me. Like you/Corps, normally we/DWR normally wouldn't allow any wetland/stream impacts associated with stormwater BMPs, but for this project, since the feature (or at least the portion in question) was exempted from the buffers as likely being "man-made", and they didn't extend it down to where the wetland flares out into the floodplain of the receiving feature, I don't see it as an issue on our end. Thanks again for the info, and hope you're staying cool, even if you're in the field, because today's supposed to be the hottest yet... Chris Pullinger Environmental Specialist II Division of Water Resources — Water Quality Regional Operations North Carolina Department of Environmental Quality 943 Washington Square Mall Washington, NC 27889 252 948 3918 office/desk phone 252-943-1036 state cell phone chris.pullingera-ncdenr.gov From: Tristan Williams <tristan@taftmillsgroup.com> Sent: Wednesday, July 08, 2020 5:14 PM To: Thompson, Emily B CIV USARMY CESAW (US) <Emily.B.Thompson@usace.army.mil> Cc: Pullinger, Robert C <chris.pullinger@ncdenr.gov> Subject: [External] RE: Farrington Trace- Greenville, NC (Firetower Road/Farrington Drive location) External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to report.spam@nc.gc Thank you so much! We appreciate all of your help on this project! Tristan D. Williams Development Associate A Division of Taft Family Ventures P.O. Box 566 1 Greenville, NC 27835 2217 Stantonsburg Rd. I Greenville, NC 27834 252-341-8150(C) Visit our website Blockedwww.tafamilyventures.com/taft-mills-rouB [taftfamilyventures.com �tafT.(M][facebook.com][linkedin.com] This message, including any attachments, may contain PRIVILEGED and/or CONFIDENTIAL information. The contents of this email are intended only for the recipient(s) listed above. If you are not the intended recipient, you are directed not to read, disclose, distribute or otherwise use this transmission. Any such distribution or use of this email by anyone other than the intended recipient(s) is strictly prohibited. If you have received this email in error, please notify the sender immediately and delete the transmission. Please consider your environmental responsibility. Before printing this email, ask yourself whether you need a hard copy! From: Thompson, Emily B CIV USARMY CESAW (US) <Emily.B.Thompson@usace.army.mil> Sent: Wednesday, July 8, 2020 5:12 PM To: Tristan Williams <tristan@taftmillsgroup.com> Cc: Pullinger, Robert C <chris.pullinger@ncdenr.gov> Subject: RE: Farrington Trace- Greenville, NC (Firetower Road/Farrington Drive location) Hi Tristan, I'm glad you were able to hear back from SHPO. One other issue (not really) is that for NWP29 (Residential Developments), the Wilmington District does not allow this permit to authorize discharges of fill material in intermittent streams or wetlands for the purpose of stormwater management facilities. With the impacts being less than 0.1 acres, we would be able to verify a NWP18 (Minor Discharges). I've copied Chris Pullinger just so that he's aware and to see if that affects anything on his end. I will be sending an email to the USFWS, according to our programmatic consultation procedures, for the Northern long-eared bat because the project is within the range of white nose syndrome; however, we do not have to hear back from them to verify the permit for this project. I'm working on the permit documents now to be able to turn it around as soon as possible. Sincerely, Emily Emily B. Thompson Regulatory Specialist U.S. Army Corps of Engineers Washington Regulatory Field Office 2407 W. 5th Street Washington, NC 27889 (910) 251-4629 Emily.B.Thompsona-usace.army. mil From: Tristan Williams <tristan@taftmillsgroup.com> Sent: Wednesday, July 8, 2020 4:09 PM To: Thompson, Emily B CIV USARMY CESAW (US) <Emily.B.Thompson@usace.army.mil> Subject: [Non-DoD Source] RE: Farrington Trace- Greenville, NC (Firetower Road/Farrington Drive location) I called Renee Early and she indicated working from home she is not as quick and would be in excess of 30 days as Covid has slowed them down. I will keep you posted if I hear more. Tristan D. Williams Development Associate .......G ROUPt ............................................ A Division of Taft Family Ventures P.O. Box 566 1 Greenville, NC 27835 2217 Stantonsburg Rd. I Greenville, NC 27834 252-341-8150(C) Visit our website BlockedBlockedwww. taffamilyventures. com/taft-mills-group f in This message, including any attachments, may contain PRIVILEGED and/or CONFIDENTIAL information. The contents of this email are intended only for the recipient(s) listed above. If you are not the intended recipient, you are directed not to read, disclose, distribute or otherwise use this transmission. Any such distribution or use of this email by anyone other than the intended recipient(s) is strictly prohibited. If you have received this email in error, please notify the sender immediately and delete the transmission. Please consider your environmental responsibility. Before printing this email, ask yourself whether you need a hard copy! From: Thompson, Emily B CIV USARMY CESAW (US) <Emily.B.Thompson@usace.army.mil> Sent: Wednesday, July 8, 2020 3:21 PM To: Tristan Williams <tristan@taftmillsgroup.com> Subject: RE: Farrington Trace- Greenville, NC (Firetower Road/Farrington Drive location) Hey Tristan, I initiated consultation with SHPO for concurrence on our determination that the project will have No Effect on Cultural Resources and/or Historic Properties. They have different timelines than what we have, but you could call SHPO to see if they will expedite their review. I cannot verify the permit without concurrence from them. Sincerely, Emily Emily B. Thompson Regulatory Specialist U.S. Army Corps of Engineers Washington Regulatory Field Office 2407 W. 5th Street Washington, NC 27889 (910) 251-4629 Emily. B.Thompsona-usace.army. mil From: Tristan Williams <tristan@taftmillsgroup.com> Sent: Wednesday, July 8, 2020 2:17 PM To: Thompson, Emily B CIV USARMY CESAW (US) <Emily.B.Thompson@usace.army.mil> Subject: [Non-DoD Source] RE: Farrington Trace- Greenville, NC (Firetower Road/Farrington Drive location) Good Afternoon Emily Hope that this finds you well! I wanted to touch base to see if you have any update I can share with the closing team on the permit process. They have asked for any update and want to assure letting them know the latest. Thank you in advance for any feedback you can share! Tristan D. Williams Development Associate 1, A ¢ ............................................ tf Rot, P ............................................. A Division of Taft Family Ventures P.O. Box 566 1 Greenville, NC 27835 2217 Stantonsburg Rd. I Greenville, NC 27834 252-341-8150(C) Visit our website BlockedBlockedBlockedwww. taftfamilyventures. com/taft-mills- rrM f in This message, including any attachments, may contain PRIVILEGED and/or CONFIDENTIAL information. The contents of this email are intended only for the recipient(s) listed above. If you are not the intended recipient, you are directed not to read, disclose, distribute or otherwise use this transmission. Any such distribution or use of this email by anyone other than the intended recipient(s) is strictly prohibited. If you have received this email in error, please notify the sender immediately and delete the transmission. Please consider your environmental responsibility. Before printing this email, ask yourself whether you need a hard copy! From: Thompson, Emily B CIV USARMY CESAW (US) <Emily.B.Thompson@usace.army.mil> Sent: Thursday, June 25, 2020 5:05 PM To: Tristan Williams <tristan@taftmillsgroup.com> Subject: RE: Farrington Trace- Greenville, NC (Firetower Road/Farrington Drive location) Hi Tristan, As discussed, we do not have fees associated with our permits (that's for North Carolina Division of Water Resources). I will be in contact with the Scott Anderson if I need any additional information for the project. Thank you, Emily Emily B. Thompson Regulatory Specialist U.S. Army Corps of Engineers Washington Regulatory Field Office 2407 W. 5th Street Washington, NC 27889 (910) 251-4629 Emily.B.Thompsona-usace.army.mil From: Tristan Williams <tristan@taftmillsgroup.com> Sent: Thursday, June 25, 2020 3:37 PM To: Thompson, Emily B CIV USARMY CESAW (US) <Emily.B.Thompson@usace.army.mil> Subject: [Non-DoD Source] RE: Farrington Trace- Greenville, NC (Firetower Road/Farrington Drive location) Good Afternoon Emily Hope that you have had a nice week thus far. I wanted to verify that you received the application payment for Farrington Trace, Greenville, NC. Please keep me posted if you need anything else for the permit/application review process. Thank you in advance for your help on this!! Tristan D. Williams Development Associate TA FT X1 I L . ...........................................GROU .............. A Division of Taft Family Ventures P.O. Box 566 1 Greenville, NC 27835 2217 Stantonsburg Rd. I Greenville, NC 27834 252-341-8150 (C) Visit our website BlockedBlockedBlockedBlockedwww. taffamilyventures. com/taft-mills-grouB T in This message, including any attachments, may contain PRIVILEGED and/or CONFIDENTIAL information. The contents of this email are intended only for the recipient(s) listed above. If you are not the intended recipient, you are directed not to read, disclose, distribute or otherwise use this transmission. Any such distribution or use of this email by anyone other than the intended recipient(s) is strictly prohibited. If you have received this email in error, please notify the sender immediately and delete the transmission. Please consider your environmental responsibility. Before printing this email, ask yourself whether you need a hard copy! From: Tristan Williams Sent: Friday, June 19, 2020 10:50 AM To: Thompson, Emily B CIV USARMY CESAW (US) <Emily.B.Thompson@usace.army.mil> Subject: RE: Farrington Trace- Greenville, NC (Firetower Road/Farrington Drive location) I apologize if you have tried to call 252-341-8150 as I have been on the phone all morning. The PCN should be to you this afternoon. We are allowed timing for permits but we have two years from the time of the award to get all approvals and the project built to comply and get tax credits on the development. I appreciate any and all that you can do to help us. We may have some lee way on time but not a lot until we are then hit with penalties for not closing and then the tax credits are then effected. I will call our engineer again and ask to get to you early afternoon instead of the end of the day if possible. I thank you again for your help on this! Tristan D. Williams Development Associate T A j° T ............................................ G R0UP} ........................................... A Division of Taft Family Ventures P.O. Box 566 1 Greenville, NC 27835 2217 Stantonsburg Rd. I Greenville, NC 27834 252-341-8150 (C) Visit our website BlockedBlockedBlockedBlockedwww. taffamilyventures. com/taft-mills-grouB ZM f in This message, including any attachments, may contain PRIVILEGED and/or CONFIDENTIAL information. The contents of this email are intended only for the recipient(s) listed above. If you are not the intended recipient, you are directed not to read, disclose, distribute or otherwise use this transmission. Any such distribution or use of this email by anyone other than the intended recipient(s) is strictly prohibited. If you have received this email in error, please notify the sender immediately and delete the transmission. Please consider your environmental responsibility. Before printing this email, ask yourself whether you need a hard copy! From: Thompson, Emily B CIV USARMY CESAW (US) <Emily.B.Thompson@usace.army.mil> Sent: Friday, June 19, 2020 10:40 AM To: Tristan Williams <tristan@taftmillsgroup.com> Subject: RE: Farrington Trace- Greenville, NC (Firetower Road/Farrington Drive location) Hi Tristan, I've tried calling the number listed in your signature to discuss your questions. The Corps does not have fees associated with our Nationwide Permits and do not have an expedited process in place like the State. I've worked on several FEMA- funded projects and they typically allow timeframes for permitting. I understand this is a different agency with different deadlines. I will do my best, but I cannot promise that you'll have a permit verification by July 1st since I don't have the PCN yet to complete my review. You may forward my emails to the POC for the agency you're receiving funding from or give them my contact information to confirm that you may need more time. Sincerely, Emily Emily B. Thompson Regulatory Specialist U.S. Army Corps of Engineers Washington Regulatory Field Office 2407 W. 5th Street Washington, NC 27889 (910) 251-4629 Emily. B.Thompsona-usace.army. mil From: Tristan Williams <tristan@taftmillsgroup.com> Sent: Friday, June 19, 2020 10:15 AM To: Thompson, Emily B CIV USARMY CESAW (US) <Emily.B.Thompson@usace.army.mil> Subject: [Non-DoD Source] RE: Farrington Trace- Greenville, NC (Firetower Road/Farrington Drive location) HI again This is an affordable housing development and financed with the North Carolina Housing Finance Agency and we have strict regulatory deadlines. Is there any possible way we can pay an expedited fee to speed up the process some? If that is a possibility? Tristan D. Williams Development Associate TA FT ...........................................oKoL, .............. A Division of Taft Family Ventures P.O. Box 566 1 Greenville, NC 27835 2217 Stantonsburg Rd. I Greenville, NC 27834 252-341-8150 (C) Visit our website BlockedBlockedBlockedBlockedBlockedwww. taftfamilyventures. com/taft-mills- rr f in This message, including any attachments, may contain PRIVILEGED and/or CONFIDENTIAL information. The contents of this email are intended only for the recipient(s) listed above. If you are not the intended recipient, you are directed not to read, disclose, distribute or otherwise use this transmission. Any such distribution or use of this email by anyone other than the intended recipient(s) is strictly prohibited. If you have received this email in error, please notify the sender immediately and delete the transmission. Please consider your environmental responsibility. Before printing this email, ask yourself whether you need a hard copy! From: Thompson, Emily B CIV USARMY CESAW (US) <Emily.B.Thompson@usace.army.mil> Sent: Friday, June 19, 2020 10:00 AM To: Tristan Williams <tristan@taftmillsgroup.com> Subject: RE: Farrington Trace- Greenville, NC (Firetower Road/Farrington Drive location) Tristan, I can issue a PJD with a NWP verification, but once the PCN is submitted I have 30 days to determine whether or not it's complete, so you could expect (if no issues) to have a permit within —60 days from receipt of a complete PCN. Sincerely, Emily Emily B. Thompson Regulatory Specialist U.S. Army Corps of Engineers Washington Regulatory Field Office 2407 W. 5th Street Washington, NC 27889 (910) 251-4629 Emily. B.Thompsona-usace.army. mil From: Tristan Williams <tristan@taftmillsgroup.com> Sent: Friday, June 19, 2020 9:53 AM To: Thompson, Emily B CIV USARMY CESAW (US) <Emily.B.Thompson@usace.army.mil> Subject: [Non-DoD Source] RE: Farrington Trace- Greenville, NC (Firetower Road/Farrington Drive location) Importance: High Thank you for the update! I called our engineer and Stuart will get the Pre -Construction Notification and package to you today! We were waiting to assure the JD map was accurate. Our closing is presently set for July 1. If you were to get the package today, would it be feasible to forsee getting the materials back by then? Thank you so much for your assistance on this! Tristan D. Williams Development Associate #fix A 5 ............................................ ki Ru(' .............. A Division of Taft Family Ventures P.O. Box 566 1 Greenville, NC 27835 2217 Stantonsburg Rd. I Greenville, NC 27834 252-341-8150 (C) Visit our website BlockedBlockedBlockedBlockedBlockedBlockedwww. taffamily ventures. com/taft-mills-grouB f in This message, including any attachments, may contain PRIVILEGED and/or CONFIDENTIAL information. The contents of this email are intended only for the recipient(s) listed above. If you are not the intended recipient, you are directed not to read, disclose, distribute or otherwise use this transmission. Any such distribution or use of this email by anyone other than the intended recipient(s) is strictly prohibited. If you have received this email in error, please notify the sender immediately and delete the transmission. Please consider your environmental responsibility. Before printing this email, ask yourself whether you need a hard copy! From: Thompson, Emily B CIV USARMY CESAW (US) <Emily.B.Thompson@usace.army.mil> Sent: Friday, June 19, 2020 9:37 AM To: Tristan Williams <tristan@taftmillsgroup.com> Subject: RE: Farrington Trace- Greenville, NC (Firetower Road/Farrington Drive location) Hi Tristan, The revised JD map that Stuart sent me is accurate, it's a matter of getting the JD paperwork together. Permits take priority over JDs, but if you let me know your deadlines, I'll do my best to get to it as soon as I can. You keep mentioning the permitting for this site, but I have yet to see anything submitted (a Pre -construction Notification) ... am I missing something? Thanks, Emily Emily B. Thompson Regulatory Specialist U.S. Army Corps of Engineers Washington Regulatory Field Office 2407 W. 5th Street Washington, NC 27889 (910) 251-4629 Emily. B.Thompsona-usace.army. mil From: Tristan Williams <tristan@taftmillsgroup.com> Sent: Friday, June 19, 2020 9:18 AM To: Thompson, Emily B CIV USARMY CESAW (US) <Emily.B.Thompson@usace.army.mil> Subject: [Non-DoD Source] RE: Farrington Trace- Greenville, NC (Firetower Road/Farrington Drive location) Importance: High Good Morning Emily Hope that this finds you well! I am hoping to possibly get an update regarding the JD and permitting status for Farrington Trace. Are there any updates you can provide me on timelines to expect the JD or additional requirements needed from us? We are getting closer to City approvals and trying to see if this will fall in line with the closing timeline. Any information you can provide would be helpful to share with the closing team. Thank you so much for your help! Have a great weekend! Tristan D. Williams Development Associate TA ........................................... P,oL, .............. A Division of Taft Family Ventures P.O. Box 566 1 Greenville, NC 27835 2217 Stantonsburg Rd. I Greenville, NC 27834 252-341-8150 (C) Visit our website BlockedBlockedBlockedBlockedBlockedBlockedBlockedwww. taffamilyventures. com/taft-mills-grouB f in This message, including any attachments, may contain PRIVILEGED and/or CONFIDENTIAL information. The contents of this email are intended only for the recipient(s) listed above. If you are not the intended recipient, you are directed not to read, disclose, distribute or otherwise use this transmission. Any such distribution or use of this email by anyone other than the intended recipient(s) is strictly prohibited. If you have received this email in error, please notify the sender immediately and delete the transmission. Please consider your environmental responsibility. Before printing this email, ask yourself whether you need a hard copy! From: Thompson, Emily B CIV USARMY CESAW (US) <Emily.B.Thompson@usace.army.mil> Sent: Wednesday, June 10, 2020 7:31 AM To: Tristan Williams <tristan@taftmillsgroup.com> Subject: RE: Farrington Trace- Greenville, NC (Firetower Road/Farrington Drive location) Hi Tristan, I have been in contact with your consultant, so we're working towards getting a JD map to put with the JD paperwork that I'll be putting together. I have several permits that I'm working on that take priority over JDs, but I'll do my best to issue the JD within a timely manner of receiving the revised JD map. I'm not aware of the plans for this site as I've only seen a JD request, so once you have this map if there are impacts to waters, including wetlands, then yes it would take a permit. I would suggest contacting your consultant to discuss these matters in more detail because they would be able to help you fill out a Preconstruction Notification, if necessary. Sincerely, Emily Emily B. Thompson Regulatory Specialist U.S. Army Corps of Engineers Washington Regulatory Field Office 2407 W. 5th Street Washington, NC 27889 (910) 251-4629 Emily. B.Thompsona-usace.army. mil From: Tristan Williams <tristan@taftmillsgroup.com> Sent: Tuesday, June 9, 2020 8:22 PM To: Thompson, Emily B CIV USARMY CESAW (US) <Emily.B.Thompson@usace.army.mil> Subject: [Non-DoD Source] Re: Farrington Trace- Greenville, NC (Firetower Road/Farrington Drive location) Good evening Emily - Hate to be the pest that continues to email on this one. Do you feel from the analysis you have that the Corps will require a permit on this one? I only ask as they process may hinder the closing timeline. If you feel your JD report would suffice please can you share that so I can relay to the investors and assure we can potentially close in the next 30 days? Any update is appreciated Thank you so much!! Tristan Williams Taft -Mills Group, LLC From: Tristan Williams <tristan@taftmillsgroup.com> Sent: Monday, June 8, 2020 8:07:42 AM To: Thompson, Emily B CIV USARMY CESAW (US) <Emily.B.Thompson@usace.army.mil> Subject: Re: Farrington Trace- Greenville, NC (Firetower Road/Farrington Drive location) Thank you for the update! Did Stuart mention if able to get you those materials this week? If so do you feel we could have something by next week if that's the case? Thank you so much!! Tristan Williams Taft -Mills Group, LLC From: Thompson, Emily B CIV USARMY CESAW (US) <Emily.B.Thompson@usace.army.mil> Sent: Monday, June 8, 2020 7:30:36 AM To: Tristan Williams <tristan@taftmillsgroup.com> Subject: RE: Farrington Trace- Greenville, NC (Firetower Road/Farrington Drive location) Good morning, I apologize for the delay getting back to you — I was doing fieldwork on Friday. I went to the Farrington site on Friday and I've been in contact with Stuart about a few changes that will need to be made before I would be able to move forward with the JD paperwork. I don't know when your closing deadlines are, but I'm not sure if I'll be able to get to the paperwork this week. 10 Sincerely, Emily Emily B. Thompson Regulatory Specialist U.S. Army Corps of Engineers Washington Regulatory Field Office 2407 W. 5th Street Washington, NC 27889 (910) 251-4629 Emily. B.Thompsona-usace.army. mil From: Tristan Williams <tristan@taftmillsgroup.com> Sent: Friday, June 5, 2020 8:18 AM To: Thompson, Emily B CIV USARMY CESAW (US) <Emily.B.Thompson@usace.army.mil> Subject: [Non-DoD Source] Re: Farrington Trace- Greenville, NC (Firetower Road/Farrington Drive location) Good morning Emily - I wanted to touch base to see if by chance you were able to do a site visit this week for Farrington Trace in Greenville? Can you provide any update so I can share with our team to assure we are able to meet our closing deadline. Do you feel it would be possible to get a report in the coming days or do you feel it would be a week or so before able to distribute? Any update is appreciated Thank you for your time! Tristan Williams Taft -Mills Group, LLC From: Tristan Williams Sent: Friday, May 29, 2020 9:07:55 AM To: Thompson, Emily B CIV USARMY CESAW (US) <Emily.B.Thompson@usace.army.mil> Subject: RE: Farrington Trace- Greenville, NC (Firetower Road/Farrington Drive location) Good Morning Emily - I just wanted to circle back and see if you felt you would need a site visit next week in Pitt County or if it was determined a site visit would not be needed. Any feedback is welcome, thank you! Tristan D. Williams Development Associate T A F x.. . ................. 6 R 0 U ..................... A Division of Taft Family Ventures P.O. Box 566 1 Greenville, NC 27835 11 2217 Stantonsburg Rd. I Greenville, NC 27834 252-341-8150 (C) Visit our website BlockedBlockedBlockedBlockedBlockedBlockedBlockedBlockedBlockedwww. taf familyventures. com/taft-mills-grouB This message, including any attachments, may contain PRIVILEGED and/or CONFIDENTIAL information. The contents of this email are intended only for the recipient(s) listed above. If you are not the intended recipient, you are directed not to read, disclose, distribute or otherwise use this transmission. Any such distribution or use of this email by anyone other than the intended recipient(s) is strictly prohibited. If you have received this email in error, please notify the sender immediately and delete the transmission. Please consider your environmental responsibility. Before printing this email, ask yourself whether you need a hard copy! From: Thompson, Emily B CIV USARMY CESAW (US) <Emily.B.Thompson@usace.army.mil> Sent: Wednesday, May 27, 2020 3:46 PM To: Tristan Williams <tristan@taftmillsgroup.com> Subject: RE: Farrington Trace- Greenville, NC (Firetower Road/Farrington Drive location) Hi Tristan, I just took a quick look at the JD request paperwork and I believe I have everything I need to review the submittal. I'm going to use some desktop tools to determine whether or not I need to make a site visit, but I plan to stop at a few sites in Pitt County next week and would add this to the list if so. Let me know if any of the contact information has changed — especially if who the JD should be issued to has changed. Sincerely, Emily Emily B. Thompson Regulatory Specialist U.S. Army Corps of Engineers Washington Regulatory Field Office 2407 W. 5th Street Washington, NC 27889 (910) 251-4629 Emily. B.Thompsonausace.army. mil From: Tristan Williams <tristan@taftmillsgroup.com> Sent: Wednesday, May 27, 2020 9:24 AM To: Thompson, Emily B CIV USARMY CESAW (US) <Emily.B.Thompson@usace.army.mil> Subject: [Non-DoD Source] Farrington Trace- Greenville, NC (Firetower Road/Farrington Drive location) Importance: High Good Morning Emily! I hope that this finds you well! I wanted to reach out and touch base on a development project we are working on in Greenville, NC and the project is named Farrington Trace, LLC. Scott Anderson, our engineer, has processed some paperwork for us on this development to your office. I wanted to reach out to assure you have all that you need to 12 review this file? I also wanted to see your timeline on the review process. I only ask as we are quickly approaching closing and need to provide this piece for review/approval to stay on track. Can you provide a tentative timeline to expect the response of the wetland materials on this particular project? I appreciate any feedback you can provide so that we can update our investors and lending team of the timeline and if we are looking at potential delays for closing. Thank you in advance for your time on this matter! Have a great day! Tristan D. Williams Development Associate T A # T 'M I L 1 ...........................................Itt1, .............. A Division of Taft Family Ventures P.O. Box 566 1 Greenville, NC 27835 2217 Stantonsburg Rd. I Greenville, NC 27834 252-341-8150 (C) Visit our website BlockedBlockedBlockedBlockedBlockedBlockedBlockedBlockedBlockedBlockedwww. taf familyventures. com/taft-mills- rg ouB f This message, including any attachments, may contain PRIVILEGED and/or CONFIDENTIAL information. The contents of this email are intended only for the recipient(s) listed above. If you are not the intended recipient, you are directed not to read, disclose, distribute or otherwise use this transmission. Any such distribution or use of this email by anyone other than the intended recipient(s) is strictly prohibited. If you have received this email in error, please notify the sender immediately and delete the transmission. Please consider your environmental responsibility. Before printing this email, ask yourself whether you need a hard copy! 13 U.S. ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Action Id. SAW-2020-01081 County: Pitt U.S.G.S. Quad: NC -Greenville SE GENERAL PERMIT (REGIONAL AND NATIONWIDE) VERIFICATION Permittee: Farrington Trace, LLC Mr. Dustin Mills Address: 2217 Stantonsburg Road Greenville, North Carolina 27834 Telephone Number: 252-752-7101 E-mail: dustin(&taftmillsgroup.com Size (acres) 6.923 Nearest Town Greenville Nearest Waterway Meeting House Branch River Basin Pamlico USGS HUC 03020103 Coordinates Latitude: 35.570792 Longitude:-77.346075 Location description: The project area is located adjacent of the property addressed 2345 E Fire Tower Road and west of Meeting Place in Greenville, NC. Description of projects area and activity: This verification authorizes the discharge of fill material in 0.03 acres of wetlands and 80 linear feet of a tributary for the construction of a stormwater pond associated with a multi -family residential development. Applicable Law(s): ® Section 404 (Clean Water Act, 33 USC 1344) ❑ Section 10 (Rivers and Harbors Act, 33 USC 403) Authorization: NWP 18. Minor Discharges SEE ATTACHED NWP GENERAL, REGIONAL, AND/OR SPECIAL CONDITIONS Your work is authorized by the above referenced permit provided it is accomplished in strict accordance with the enclosed Conditions, your application signed and dated 6/19/2020, and the enclosed plans Impact Exhibit Farrington Trace dated 6/19/2020. Any violation of the attached conditions or deviation from your submitted plans may subject the permittee to a stop work order, a restoration order, a Class I administrative penalty, and/or appropriate legal action. This verification will remain valid until the expiration date identified below unless the nationwide authorization is modified, suspended or revoked. If, prior to the expiration date identified below, the nationwide permit authorization is reissued and/or modified, this verification will remain valid until the expiration date identified below, provided it complies with all requirements of the modified nationwide permit. If the nationwide permit authorization expires or is suspended, revoked, or is modified, such that the activity would no longer comply with the terms and conditions of the nationwide permit, activities which have commenced (i.e., are under construction) or are under contract to commence in reliance upon the nationwide permit, will remain authorized provided the activity is completed within twelve months of the date of the nationwide permit's expiration, modification or revocation, unless discretionary authority has been exercised on a case -by -case basis to modify, suspend or revoke the authorization. Activities subject to Section 404 (as indicated above) may also require an individual Section 401 Water Quality Certification. You should contact the NC Division of Water Resources (telephone 919-807-6300) to determine Section 401 requirements. For activities occurring within the twenty coastal counties subject to regulation under the Coastal Area Management Act (LAMA), prior to beginning work you must contact the N.C. Division of Coastal Management in Washington, NC, at (252) 946-6481. This Department of the Army verification does not relieve the permittee of the responsibility to obtain any other required Federal, State or local approvals/permits. If there are any questions regarding this verification, any of the conditions of the Permit, or the Corps of Engineers regulatory program, please contact Emily B. Thompson at (910)251-4629or Emily.B.Thompsonna,usace.army.mil. 4 j� � Corps Regulatory Official: �✓. �� Date: 07/17/2020 Expiration Date of Verification: 03 8/2022 The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at http://corpsmapu.usace.army.mil/cm_apex/Pp=13 6:4:0 Copy furnished (via e-mail): Agent: Ark Consulting Group, PLLC Mr. Scott T. Anderson Address: 2755-B Charles Boulevard Greenville, North Carolina 27858 Telephone Number: 252-558-0888 E-mail: scottAarkconsultingaroup.com Action ID Number: SAW-2020-01081 County: Pitt Permittee: Farrington Trace, LLC, Mr. Dustin Mills Project Name: Farrington Trace Apartments/Pitt Date Verification Issued: 07/17/2020 Project Manager: Emily B. Thompson Upon completion of the activity authorized by this permit and any mitigation required by the permit, sign this certification and return it to the following address: US ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Attn: Emily B. Thompson Washington Regulatory Office U.S Army Corps of Engineers 2407 West Fifth Street Washington, North Carolina 27889 or Emily.B.Thompson@usace.army.mil Please note that your permitted activity is subject to a compliance inspection by a U. S. Army Corps of Engineers representative. Failure to comply with any terms or conditions of this authorization may result in the Corps suspending, modifying or revoking the authorization and/or issuing a Class I administrative penalty, or initiating other appropriate legal action. I hereby certify that the work authorized by the above referenced permit has been completed in accordance with the terms and condition of the said permit, and required mitigation was completed in accordance with the permit conditions. Signature of Permittee Date • • , a Iwo STREAMi� .�i��(16 76 ........ --- 10, i 0-i'llm V S x mo P. OR 1® ILL �,�"sue - •� ���� �I�./ �,�_ ��� ��; ����� /� I �r .air •.■ r oSTREAM (SAa) � ,/ ,/� ► .. "� ��I` �V, ll���� III �I ' I PL. -A SOUTHRIDGE DR. 0 c�� m �o can "I SITE o GNAR�ES B�vD HWY �3 N Vicinity Map SCALE: 1" = 1000' Impacts LeLiend WIYe[1111110 PERMANENT BUFFER ZONE 1 IMPACTS B1 - 1,457 S.F. (CLEARING & UTILITY INSTALLATION) PERMANENT BUFFER ZONE 2 IMPACTS B2 - 900 S.F. (CLEARING & UTILITY INSTALLATION) (CLEARED FOR FUTURE MAINTENANCE) PERMANENT 404 WETLANDS IMPACT W1 - 1,300 S.F. (GRADING FILL & STORMWATER POND) (0.030 AC) (GRADING FILL) ����vir=2755-B Charles Blvd CONSULTING pmexa AD ,����%/*,pis <> d1lv ��/- /� !I 9LN KNGINEERS & PLANNERS 252.558.0888 19 Re�� �:-��NC License: P-1199 all IMPACT EXHIBIT FARRINGTON TRACE i jell' IFIRETOWER-• City of Greenville, Pitt County, North Carolina DATE • •. • SAW-2020-01081 Determination of Jurisdiction: A. ® There are waters, including wetlands on the above described project area that may be subject to Section 404 of the Clean Water Act (CWA) (33 USC § 1344) and/or Section 10 of the Rivers and Harbors Act (RHA) (33 USC § 403). This preliminary determination is not an appealable action under the Re ug latory Program Administrative Appeal Process (Reference 33 CFR Part 331). However, you y request an approved JD, which is an appealable action, by contacting the Corps district for further instruction. Please note, if work is authorized by either a general or nationwide permit, and you wish to request an appeal of an approved JD, the appeal must be received by the Corps and the appeal process concluded prior to the commencement of and in waters of the United States and prior to any work that could alter the hydrology of waters of the United States. B. ❑ There are Navigable Waters of the United States within the above described project area subject to the permit requirements of Section 10 of the Rivers and Harbors Act (RHA) (33 USC § 403) and Section 404 of the Clean Water Act (CWA) (33 USC § 1344). Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. C. ❑There are waters, including wetlands within the above described project area that are subject to the permit requirements of Section 404 of the Clean Water Act (CWA) (33 USC § 1344). Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. D. ❑ The jurisdictional areas within the above described project area have been identified under a previous action. Please reference jurisdictional determination issued DATE. Action ID: FILE NUMBER. Basis For Determination: The wetlands within the Project area were delineated using the Corps of Engineers 1987 Wetland Delineation Manual and the Atlantic and Gulf Coastal Plain Regional Supplement Version 2.0. The tributaries exhibited OHWM and flow into Meeting House Branch, which flows into the Tar River, a TNW. Remarks: None. E. Attention USDA Program Participants This delineation/determination has been conducted to identify the limits of Corps' Clean Water Act jurisdiction for the particular site identified in this request. The delineation/determination may not be valid for the wetland conservation provisions of the Food Security Act of 1985. If you or your tenant are USDA Program participants, or anticipate participation in USDA programs, you should request a certified wetland determination from the local office of the Natural Resources Conservation Service, prior to starting work. F. Appeals Information (This information applies only to approved jurisdiction determinations as indicated in B and C above). This correspondence constitutes an approved jurisdiction determination for the above described site. If you object to this determination, you may request an administrative appeal under Corps regulations at 33 CFR Part 331. Enclosed you will find a Notification of Appeal Process (NAP) fact sheet and request for appeal (RFA) form. If you request to appeal this determination you must submit a completed RFA form to the following address: US Army Corps of Engineers South Atlantic Division Attn: Phillip Shannin, Review Officer 60 Forsyth Street SW, Room 10M15 Atlanta, Georgia 30303-8801 Phone: (404) 562-5137 In order for an RFA to be accepted by the Corps, the Corps must determine that it is complete, that it meets the criteria for appeal under 33 CFR part 331.5, and that it has been received by the Division Office within 60 days of the date of the NAP. Should you decide to submit an RFA form, it must be received at the above address by Not applicable. **It is not necessary to submit an RFA form to the Division Office if you do not object to the determination in this correspondence.** Corps Regulatory Official: �j� � �✓. J,&m mile B. Thomp on Date of JD: 07/17/2020 Expiration Date of JD: Not applicable Project Study Area //. Potential Wetland Waters of the US Potential Non -Wetland Waters of the US (Stream) Location and extent is approximate. 0 100 200 Feet Source: Latest High -Resolution NC Statewide Orthoimagery, INC OneMap Server' Project Study Area approximated by ESI based on Pitt County Parcel Data. Disclaimer: The information depicted in this file is for informational purposes only and was not• prepared for and is not suitable for legal or engineering purposes. This information presented is not for regulatory review and is intended for use only by a Professional Land Surveyor prior to regulatory review. ��MTo— fl, r j! q jy An''� , .y e R s a0 r F` J 3 E::] Pamlico River Basin ENVIRONMENTAL Project: HL207069 SERVICES, INC. Potential Wetlands and Waters of the US AN- COMPANY Date: June 2020 w.a. «Ira«M m Farrington Trace Drwn/Chkd: KT/SB Pitt County, North Carolina Figure: 3 CAUsers\cetalavera\OneDrive - Terracon Consultants Inc\Desktop\QC\HL207069_farrington\Maps\Aerial.mxd Date: 6/12/2020 10:57:56 AM NOTIFICATION OF ADMINISTRATIVE APPEAL OPTIONS AND PROCESS AND FAtta7ched REQUEST FOR APPEAL arrin ton Trace LLC, Mr. Dustin Mills File Number: SAW-2020-01081 Date: 07/17/2020 See Section below ❑ INITIAL PROFFERED PERMIT (Standard Permit or Letter of permission) A ❑ PROFFERED PERMIT (Standard Permit or Letter of permission) B ❑ PERMIT DENIAL C ❑ APPROVED JURISDICTIONAL DETERMINATION D ❑X PRELIMINARY JURISDICTIONAL DETERMINATION E SECTION I - The following identifies your rights and options regarding an administrative appeal of the above decision. Additional information may be found at or http://www.usace.g.M.mil/Missions/CivilWorks/Re ug latoiyProgramandPermits.asox or the Corps regulations at 33 CFR Part 331. A: INITIAL PROFFERED PERMIT: You may accept or object to the permit. • ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the permit. • OBJECT: If you object to the permit (Standard or LOP) because of certain terms and conditions therein, you may request that the permit be modified accordingly. You must complete Section II of this form and return the form to the district engineer. Your objections must be received by the district engineer within 60 days of the date of this notice, or you will forfeit your right to appeal the permit in the future. Upon receipt of your letter, the district engineer will evaluate your objections and may: (a) modify the permit to address all of your concerns, (b) modify the permit to address some of your objections, or (c) not modify the permit having determined that the permit should be issued as previously written. After evaluating your objections, the district engineer will send you a proffered permit for your reconsideration, as indicated in Section B below. B: PROFFERED PERMIT: You may accept or appeal the permit • ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the permit. • APPEAL: If you choose to decline the proffered permit (Standard or LOP) because of certain terms and conditions therein, you may appeal the declined permit under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. C: PERMIT DENIAL: You may appeal the denial of a permit under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. D: APPROVED JURISDICTIONAL DETERMINATION: You may accept or appeal the approved JD or provide new information. • ACCEPT: You do not need to notify the Corps to accept an approved JD. Failure to notify the Corps within 60 days of the date of this notice, means that you accept the approved JD in its entirety, and waive all rights to appeal the approved JD. • APPEAL: If you disagree with the approved JD, you may appeal the approved JD under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the district engineer. This form must be received by the division engineer within 60 days of the date of this notice. E: PRELIMINARY JURISDICTIONAL DETERMINATION: You do not need to respond to the Corps regarding the preliminary JD. The Preliminary JD is not appealable. If you wish, you may request an approved JD (which may be appealed), by contacting the Corps district for further instruction. Also you may provide new information for further consideration by the Corps to reevaluate the JD. SECTION II - REQUEST FOR APPEAL or OBJECTIONS TO AN INITIAL PROFFERED PERMIT REASONS FOR APPEAL OR OBJECTIONS: (Describe your reasons for appealing the decision or your objections to an initial proffered permit in clear concise statements. You may attach additional information to this form to clarify where your reasons or objections are addressed in the administrative record.) ADDITIONAL INFORMATION: The appeal is limited to a review of the administrative record, the Corps memorandum for the record of the appeal conference or meeting, and any supplemental information that the review officer has determined is needed to clarify the administrative record. Neither the appellant nor the Corps may add new information or analyses to the record. However, you may provide additional information to clarify the location of information that is already in the administrative record. POINT OF CONTACT FOR QUESTIONS OR INFORMATION: If you have questions regarding this decision and/or the If you only have questions regarding the appeal process you may appeal process you may contact: also contact: District Engineer, Wilmington Regulatory Division Mr. Phillip Shannin, Administrative Appeal Review Officer Attn: Emily B. Thompson CESAD-PDO Washington Regulatory Office U.S. Army Corps of Engineers, South Atlantic Division U.S Army Corps of Engineers 60 Forsyth Street, Room 1OM15 2407 West Fifth Street Atlanta, Georgia 30303-8801 Washington, North Carolina 27889 Phone: (404) 562-5137 RIGHT OF ENTRY: Your signature below grants the right of entry to Corps of Engineers personnel, and any government consultants, to conduct investigations of the project site during the course of the appeal process. You will be provided a 15-day notice of any site investigation, and will have the opportuni to participate in all site investi ations. Date: Telephone number: Signature of appellant or agent. For appeals on Initial Proffered Permits send this form to: District Engineer, Wilmington Regulatory Division, Attn: Emily B. Thompson, 69 Darlington Avenue, Wilmington, North Carolina 28403 For Permit denials, Proffered Permits and Approved Jurisdictional Determinations send this form to: Division Engineer, Commander, U.S. Army Engineer Division, South Atlantic, Attn: Mr. Phillip Shannin, Administrative Appeal Officer, CESAD-PDO, 60 Forsyth Street, Room 1OM15, Atlanta, Georgia 30303-8801 Phone: (404) 562-5137