HomeMy WebLinkAboutNCC203166_ESC Approval Submitted_20200728ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
S. DANIEL SMITH
Interim Director
NORTH CAROLINA
,Environmental Quality
February 14, 2019
LETTER OF APPROVAL WITH MODIFICATIONS
National Renewable Energy Corporation
Attn: Andrew Giraldo, CFO
227 Southside Drive, Suite B
Charlotte, NC 28217
RE: Project Name: Van Buren Solar, LLC
Acres Approved: 20
Project ID: SAMPS-2019-005
County: Sampson, City: Roseboro Address:. Dunn Road
River Basin: Cape Fear
Stream Classification: Other
Submitted By: SEPI Engineering & Construction, Inc.
Date Received by LQS: January 15, 2019
Plan Type: New
Dear Mr. Giraldo:
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to
be acceptable with modifications and hereby issue this Letter of Approval with Modifications. The
Modifications Required for Approval are listed on the attached page. The enclosed Certificate of
Approval must be posted at the job site. This plan approval shall expire three (3) years following
the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A
NCAC 4B .0129.
Please be aware that your project will be covered by the enclosed NPDES Construction
Stormwater General Permit NCG010000. Please become familiar with all the requirements and
conditions of this permit in order to achieve compliance.
Title 15A NCAC 4B .0118(a) requires that a copy of the approved erosion control plan be on file
at the jab site. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of
periodic inspection to insure compliance with the approved plan.
00.mq 14
arH
N North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
Fayetteville Regional Office 1 225 Green Street, Suite 714 I Fayetteville, North Carolina 28301
wftffi -mlQwgiy 910.433.3300
Letter of Approval
National Renewable Energy Corporation
February 14, 2019
Page 2 of 2
Title 15A NCAC 4B .0118(a) requires that a copy of the approved erosion control plan be on file
at the job site. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of
periodic inspection to insure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring
protection of existing natural resources and adjoining properties. If, following the commencement
of this project, the erosion and sedimentation control plan is inadequate to meet the requirements
of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51
through 66), this office may require revisions to the plan and implementation of the revisions to
insure compliance with the Act.
Acceptance and approval of this plan is conditioned uponyour compliance with Federal and State
water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may
also apply to this land -disturbing activity. This approval does not supersede any other permit or
approval.
Please note that this approval is based in part on the accuracy of the information provided in the
Financial Responsibility Form, which you provided. This permit allows for a land -disturbance, as
called for on the application plan, not to exceed the approved acres. Exceeding the acreage will
be a violation of this permit and would require a revised plan and additional application fee. Any
addition in impervious surface, over that already noted on the approved plan, would also require a
revised plan to verify the appropriateness of the erosion control measures and the stormwater
retention measures. (GS 113A-54.1(b)). You are requested to file an amended form if there is any
change in the information included on the form. In addition, it would be helpful if you notify this
office of the proposed starting date for this project. Please notify us if you plan to have a
preconstruction conference.
Your cooperation is appreciated.
Sincerely,
3
V
Jodi Pace, EI
Regional Engineering Associate
UI 1
Enclosures: Certificate of Approval
NPDES Permit
cc: Justin Beard, SEPI Engineering & Construction, Inc. (electronic copy)
Myron Cashwell, Building Inspector (electronic copy)
DEMLR - Fayetteville Regional Office File
Letter of Approval
National Renewable Energy Corporation
February 14, 2019
Page 2 of 2
MODIFICATIONS REQUIRED FOR APPROVAL
Project Name: Van Buren Solar, LLC
Project ID: SAMPS-2019-005
County: Sampson
Provide two full size copies each of revised plan sheets, showing all the Modifications required for
approval, prior to beginning any land -disturbing activity. Per G.S. 113A-57(4), 15A NCAC 0413.0118
& G.S. 113A-54(d)(4)