Loading...
HomeMy WebLinkAbout19981158 Ver 1_Complete File_19981116State of North Carolina Department of Environment and Natural Resources Division of Water Quality James B. Hunt, Jr., Governor Wayne McDevitt, Secretary A. Preston Howard, Jr., P.E., Director A NC ENR NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES November 30, 1998 Polk County WQC 401 Project # 981158 APPROVAL of 401 Water Quality Certification Mr. Bill Gilmore NC DOT PO Box 25201 Raleigh, NC 27611-5201 Dear Mr. Gilmore: You have our approval, in accordance with the attached conditions for the purpose of constructing a bridge, as you described in your application dated November 16, 1998. After reviewing your application, we have decided that this fill is covered by General Water Quality Certification Number 3114. This Certification allows you to use Nationwide Permit Number 33 when the Corps of Engineers issues it. In addition, you should get any other federal, state or local permits before you go ahead with your project including (but not limited to) Sediment and Erosion Control, Coastal Stormwater, Non-Discharge and Water Supply Watershed regulations. Also this approval will expire when the accompanying 404 or CAMA permit expires unless otherwise specified in the General Certification. This approval is only valid for the purpose and design that you described in your application. If you change your project, you must notify us and you may be required to send us a new application for a new certification. If the property is sold, the new owner must be given a copy of the Certification and approval letter and is thereby responsible for complying with all conditions. If total wetland fills for this project (now or in the future) exceed one acre, compensatory mitigation may be required as described in 15A NCAC 2H.0506 (h). For this approval to be valid, you must follow the conditions listed in the attached certification. If you do not accept any of the conditions of this certification, you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition which conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, P.O. Box 27447, Raleigh, N.C. 276 1 1-7447. This certification and its conditions are final and binding unless you ask for a hearing. This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have any questions, please telephone John Dorney at 919-733-1786. .nc el rest owar , J J. Attachment cc: Wilmington District Corps of Engineers Corps of Engineers Asheville Field Office Asheville DWQ Regional Office Mr. John Domey Central Files 981158.1tr Division of Water Quality • Environmental Sciences Branch Environmental Sciences Branch, 4401 Reedy Creek Rd., Raleigh, NC 27607 Telephone 919-733-1786 FAX 919-733-9959 An Equal Opportunity Aff irmative Action Employer • 50% recycled/10% post consumer paper Cr I\ J M STAN STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION JAMES B. HUNT JR. P.O. BOX 25201, RALEIGH, N.C. 2761 1-5201 E. NORRIS TOLSON GOVERNOR SECRETARY November 12, 1998 U.S. Army Corps of Engineers Regulatory Field Office P. O. Box 1890 Wilmington, NC 28402-1890 ATTN: Mr. Steve Lund USACE - Asheville Office Dear Sir: SUBJECT: APPLICATION FOR A NATIONWIDE 33 PERMIT FOR BRIDGE NO. 104 OVER GREEN RIVER ON SR 1151. POLK COUNTY. TIP NO. 13- 2604. On June 15, 1998 the US Army Corps of Engineers (USACE) issued a Section 404 Nationwide Permits 23 and 33, Action ID # 199830829 and 199830830. The information regarding the project has not changed since the distribution of these permits. The bridge will be replaced on new location just north of the existing structure. Traffic will be maintained on Bridge No. 105 during construction. It will be necessary to construct a temporary crossing of the river for project construction since the existing bridge does not have the capacity to support the construction equipment. NCDOT has designed a temporary bridge to facilitate this crossing. Construction of the temporary bridge will result in approximately 0.06 acre of temporary fill in surface waters. The fill material will consist of washed Class II Rip Rap and washed Class "B" Rip Rap. Upon completion of the project, the fill will be removed to the extent practicable without disturbing the river bottom. The bridge will be in place for approximately six months. Drawings of the bridge are attached. It is anticipated that these activities will be authorized under Section 404 Nationwide Permit 33 (Temporary Construction Access and Dewatering) and NCDOT is requesting the issuance of the permit. By copy of this letter, it is also requested that a General Water Quality Certification 43114 be issued by the North Carolina Division of Water Quality. If you have any questions or need any additional information, please contact Mr. Michael Wood at (919) 733-7844 extension 306. Sincerely, ? l?t,cl?M ?I Wi iam D. Gilmore, P.E., Manager Planning and Environmental Branch WDG/mgw cc: Mr. David Franklin, COE, Wilmington Office Mr. John Dorney, Division of Water Quality Mr. William J. Rogers, P.E., Structure Design Mr. Tom Shearin, P.E., Roadway Design Mr. Whit Webb, P.E., Program Development Mr. R. L. Hill, P.E., Highway Design Mr. A. L. Hankins, P.E., Hydraulics Mr. Bill Moore, P.E., Geotechnical Unit Mr. F. D. Martin, P.E., Division 14 Engineer Mr. John Williams, Planning & Environmental DEM ID: CORPS ACTION ID: 199830830 & 19930829 NATIONWIDE PERMIT REQUESTED (PROVIDE NATIONWIDE PERMIT #): 33 PRE-CONSTRUCTION NOTIFICATION APPLICATION FOR NATIONWIDE PERMITS THAT REQUIRE: 1) NOTIFICATION TO THE CORPS OF ENGINEERS 2) APPLICATION FOR SECTION 401 CERTIFICATION 3) COORDINATION WITH THE NC DIVISION OF COASTAL MANAGEMENT SEND THE ORIGINAL AND (1) COPY OF THIS COMPLETED FORM TO THE APPROPRIATE FIELD OFFICE OF THE CORPS OF ENGINEERS (SEE AGENCY ADDRESSES SHEET). SEVEN (7) COPIES SHOULD BE SENT TO THE N.C. DIVISION OF ENVIRONMENTAL MANAGEMENT (SEE AGENCY ADDRESSES SHEET). PLEASE PRINT. 1. OWNERS NAME: NC Dept of Transportation; Planning & Environmental 2. MAILING ADDRESS: Post Office Box 25201 SUBDIVISION NAME CITY: Raleigh STATE: NC ZIP CODE: PROJECT LOCATION ADDRESS, INCLUDING SUBDIVISION NAME FROM MAILING ADDRESS ABOVE): 3. TELEPHONE NUMBER (HOME): (WORK): 919-733-3141 4. IF APPLICABLE: AGENT'S NAME OR RESPONSIBLE CORPORATE OFFICIAL, ADDRESS, PHONE NUMBER: William D. Gilmore , P.E., Manager 5. LOCATION OF WORK (PROVIDE A MAP, PREFERABLY A COPY OF USGS TOPOGRAPHIC MAP OR AERIAL PHOTOGRAPHY WITH SCALE): COUNTY: Polk NEAREST TOWN OR CITY: Saluda 25201 (IF DIFFERENT 1 SPECIFIC LOCATION (INCLUDE ROAD NUMBERS, LANDMARKS, ETC.): Bridge No. 47 on SR 1151 over Green River 6. IMPACTED OR NEAREST STREAM/RIVER: RIVER BASIN: Broad Green River 7a. IS PROJECT LOCATED NEAR WATER CLASSIFIED AS TROUT, TIDAL SALTWATER (SA), HIGH QUALITY WATERS (HQW), OUTSTANDING RESOURCE WATERS (ORW), WATER SUPPLY (WS-I OR WS-II)? YES [X] NO [ ] IF YES, EXPLAIN: Green River is classified as trout waters just upstream of bridge 47. 7b. IS THE PROJECT LOCATED WITHIN A NORTH CAROLINA DIVISION OF COASTAL MANAGEMENT AREA OF ENVIRONMENTAL CONCERN (AEC)?YES[ ] NO[X] 7c. IF THE PROJECT IS LOCATED WITHIN A COASTAL COUNTY (SEE PAGE 7 FOR LIST OF COASTAL COUNTIES), WHAT IS THE LAND USE PLAN (LUP) DESIGNATION? No 8a. HAVE ANY SECTION 404 PERMITS BEEN PREVIOUSLY REQUESTED FOR USE ON THIS PROPERTY? YES [X] NO [ ] IF YES, PROVIDE ACTION I.D. NUMBER OF PREVIOUS PERMIT AND ANY ADDITIONAL INFORMATION (INCLUDE PHOTOCOPY OF 401 CERTIFICATION) : 199830830 & 19930829 8b. ARE ADDITIONAL PERMIT REQUESTS EXPECTED FOR THIS PROPERTY IN THE FUTURE? YES [ ] NO [X] IF YES, DESCRIBE ANTICIPATED WORK: 9a. ESTIMATED TOTAL NUMBER OF ACRES IN TRACT OF LAND: 0.01 acre 9b. ESTIMATED TOTAL NUMBER OF ACRES OF WETLANDS LOCATED ON PROJECT SITE: 0 acres 2 i 10a. NUMBER OF ACRES OF WETLANDS IMPACTED BY THE PROPOSED PROJECT BY: FILLING: FLOODING: DRAINAGE: EXCAVATION: OTHER: TOTAL ACRES TO BE IMPACTED: 0.0 10b. (1) STREAM CHANNEL TO BE IMPACTED BY THE PROPOSED PROJECT (IF RELOCATED, PROVIDE DISTANCE BOTH BEFORE AND AFTER RELOCATION): LENGTH BEFORE: N/A FT AFTER: FT WIDTH BEFORE (based on normal high water contours): N/A FT WIDTH AFTER: AVERAGE DEPTH BEFORE: N/A FT AFTER: FT (2) STREAM CHANNEL IMPACTS WILL RESULT FROM: (CHECK ALL THAT APPLY) OPEN CHANNEL RELOCATION: PLACEMENT OF PIPE IN CHANNEL: CHANNEL EXCAVATION: CONSTRUCTION OF A DAM/FLOODING: OTHER: Placement of class II rip rap in channel 11. IF CONSTRUCTION OF A POND IS PROPOSED, WHAT IS THE SIZE OF THE WATERSHED DRAINING TO THE POND? WHAT IS THE EXPECTED POND SURFACE AREA? 12. DESCRIPTION OF PROPOSED WORK INCLUDING DISCUSSION OF TYPE OF MECHANICAL EQUIPMENT TO BE USED (ATTACH PLANS: 8 1/2" X 11" DRAWINGS ONLY): Temporary placement of a causeway into the river to facilitate the drilling of shafts and removal of the existing bridge Equipment will consist of heavy duty trucks, dozer, crane. 13. PURPOSE OF PROPOSED WORK: Temporary work pads to facilitate construction of a new bri FT 3 14. STATE REASONS WHY IT IS BELIEVED THAT THIS ACTIVITY MUST BE CARRIED OUT IN WETLANDS. (INCLUDE ANY MEASURES TAKEN TO MINIMIZE WETLAND IMPACTS) : Project is water dependent. Minimization efforts are outlined in CE document 15. YOU ARE REQUIRED TO CONTACT THE U.S. FISH AND WILDLIFE SERVICE (USFWS) AND/OR NATIONAL MARINE FISHERIES SERVICE (NMFS) (SEE AGENCY ADDRESSES SHEET) REGARDING THE PRESENCE OF ANY FEDERALLY LISTED OR PROPOSED FOR LISTING ENDANGERED OR THREATENED SPECIES OR CRITICAL HABITAT IN THE PERMIT AREA THAT MAY BE AFFECTED BY THE PROPOSED PROJECT. DATE CONTACTED: see CE (ATTACH RESPONSES FROM THESE AGENCIES.) 16. YOU ARE REQUIRED TO CONTACT THE STATE HISTORIC PRESERVATION OFFICER (SHPO) (SEE AGENCY ADDRESSES SHEET) REGARDING THE PRESENCE OF HISTORIC PROPERTIES IN THE PERMIT AREA WHICH MAY BE AFFECTED BY THE PROPOSED PROJECT. DATE CONTACTED: See CE 17. DOES THE PROJECT INVOLVE AN EXPENDITURE OF PUBLIC FUNDS OR THE USE OF PUBLIC (STATE) LAND? YES [X] NO [] (IF NO, GO TO 18) a. IF YES, DOES THE PROJECT REQUIRE PREPARATION OF AN ENVIRONMENTAL DOCUMENT PURSUANT TO THE REQUIREMENTS OF THE NORTH CAROLINA ENVIRONMENTAL POLICY ACT? YES [X] NO [ ] b. IF YES, HAS THE DOCUMENT BEEN REVIEWED THROUGH THE NORTH CAROLINA DEPARTMENT OF ADMINISTRATION STATE CLEARINGHOUSE? YES [X] NO [ IF ANSWER TO 17b IS YES, THEN SUBMIT APPROPRIATE DOCUMENTATION FROM THE STATE CLEARINGHOUSE TO DIVISION OF ENVIRONMENTAL MANAGEMENT REGARDING COMPLIANCE WITH THE NORTH CAROLINA ENVIRONMENTAL POLICY ACT. See CE QUESTIONS REGARDING THE STATE CLEARINGHOUSE REVIEW PROCESS SHOULD BE DIRECTED TO MS. CHRYS BAGGETT, DIRECTOR STATE CLEARINGHOUSE, NORTH CAROLINA DEPARTMENT OF ADMINISTRATION, 116 WEST JONES STREET, RALEIGH, NORTH CAROLINA 27603-8003, TELEPHONE (919) 733-6369. 4 18. THE FOLLOWING ITEMS SHOULD BE INCLUDED WITH THIS APPLICATION IF PROPOSED ACTIVITY INVOLVES THE DISCHARGE OF EXCAVATED OR FILL MATERIAL INTO WETLANDS: a. WETLAND DELINEATION MAP SHOWING ALL WETLANDS, STREAMS, LAKES AND PONDS ON THE PROPERTY (FOR NATIONWIDE PERMIT NUMBERS 14, 18, 21, 26, 29, AND 38). ALL STREAMS (INTERMITTENT AND PERMANENT) ON THE PROPERTY MUST BE SHOWN ON THE MAP. MAP SCALES SHOULD BE 1 INCH EQUALS 50 FEET OR 1 INCH EQUALS 100 FEET OR THEIR EQUIVALENT. b. IF AVAILABLE, REPRESENTATIVE PHOTOGRAPH OF WETLANDS TO BE IMPACTED BY PROJECT. C. IF DELINEATION WAS PERFORMED BY A CONSULTANT, INCLUDE ALL DATA SHEETS RELEVANT TO THE PLACEMENT OF THE DELINEATION LINE. d. ATTACH A COPY OF THE STORMWATER MANAGEMENT PLAN IF REQUIRED. e. WHAT IS LAND USE OF SURROUNDING PROPERTY? Rural f. IF APPLICABLE, WHAT IS PROPOSED METHOD OF SEWAGE DISPOSAL? N/A g. SIGNED AND DATED AGENT AUTHORIZATION LETTER, IF APPLICABLE. NOTE: WETLANDS OR WATERS OF THE U.S. MAY NOT BE IMPACTED PRIOR TO: 1) ISSUANCE OF A SECTION 404 CORPS OF ENGINEERS PERMIT, 2) EITHER THE ISSUANCE OR WAIVER OF A 401 DIVISION OF ENVIRONMENTAL MANAGEMENT (WATER QUALITY) CERTIFICATION, AND 3) (IN THE TWENTY COASTAL COUNTIES ONLY), A LETTER FROM THE NORTH CAROLINA DIVISION OF COASTAL MANAGEMENT STATING THE PROPOSED ACTIVITY IS CONSISTENT WITH THE NORTH CAROLINA COASTAL MANAGEMENT PROGRAM. ???? l??f < < l z ? ? OWNER'S/AGENT'S SIGNATURE DATE (AGENT'S SIGNATURE VALID ONLY IF AUTHORIZATION LETTER FROM THE OWNER IS PROVIDED (18g.)) 5 i ?1 LJ? Neu • ate: T.Imunu I 1' 1 ' R,W jeM ?a le, Ple as and Guden+ t,'C rte/ `• I * 'unnell YS Alexander G V 1• 0 s,.,.aer.?, :.,,C ?, , .\SV ?N 110 / ?+y anon ?? oIn SNddeurand 'Anlo Q ?` C ' :Morganton , •?,1 91aCk R K• r C 27 r. J Nr wooa \4onti aid 0 m g C IH) '. _ - i ?_tlcesle I ° .tMl I Mountd ln?},5 ) _ ' Pleasana Gr nv•? -` . 25 Glenwood Asheville tee,,o 7p '^ 5 Q Rrd alGe51 °/' pysarl3vrll' 1 ED A, uvar Hill , 221 r iv . r a i., ?? to ( a2 r G 74A u- as 11 f?r`,al Fauvlew 9 `r rherma1 C11y ?0!' I 9n Andler is, 2%A y V y '' lab Union I . $tYland Gorton Idales • veI SSArden / - ti Cw? r,ra•n . ? ?1eea i r Hat Cave ?'f nrmner koU RUT G.. F, I.M RsI?.( sunsnrne, 7a ,s Lukr l.wn nonsler Hollis Polay s*? Fletcher 64 1,- s I e l 1 use I 2 7 Mountain Frlutlan 6ch-^.ry«. oQan 1 +a Laae Lwe u rWashburn - --1 \ Mills Rive, Home ?'? 'rte it6 74A Ruth t I dnaY•rlla y \ + I Forest ' Isl" - .Nu than for d to osI.c `H 12 N S' O N K \ a Ci y' 14B 0 L 10 PmAa(e • P / enba r -w. .1 Horse nbe • :?.:1?" ? TEtowa?` • II/!I't urt ?' v 1Ju,. amp' \'F 5 ]! endersonville Spring 2 o 74 Alexander 780 Hendersonville ou ?.\t>,'` 5 ® hldls?, Cawleen ; I? 120 rr enrose Flat Rock (.10 m s e fiena .. ;aS 1 • 2rcomaf', i 51 C PI Qh ` S a C,Wumbu9 uaars Jlsld st U`tle River ruxtAO T y ? 9 3 I r r !fr' r? lvard • . fo ea Is'???.N IA I J? . ..,, rr l .?, oy n;I? ' a I loo '•' - 77, - 1 •Jd, 1 w II l.?ni,v t ?r 5 . Scale of Mlles ands 14 Iman ----?..?.,^? r5 .\y r 1 II Cnesne e. U - 10 20 30 Cedar IAountaln \ 11 FmRervlue Il --- • Caesars HI'd 11 Hew rosw1 l 0 20 30 ac; aN ' Guwensvdle C,lamis ello 6 \ , l'Scale of NilOmeters u 9 ! 1 y I n wi, , nalA, , I i ,Clerelann'k 1 .00000 `y ; oilrm I1I_ I? SCALE Ii, a o y T _ J aAUIFS. ? W I I. - 0.5 I MIIE . \ „, ,Y 114_L v? 1111 Ilfr 1VI A P PROJECT: 8.2980301 ( B-2604 ) REPLACE BRIDGE a 47 OVER THE GREEN RIVER SHEET L OF 7 - r N. C. DEPT. OF TRANSPORTATION DIVISION OF HIGHWAYS V I (1(f-7 I I T1 POLK COUNTY v Ell Z 1? i I O y ? p m 00 ' I r ? :. s U ? III O ^+ C71 W O U J ^ r Q N Z F O C., 1\ Z 8 +0 lu f? ?? GGW I? ? } w r1' fr 't "lt , ?' x e o. Vit 12 rr 94 ® .... O G °ew 3 s ? <? X21 110 Q i L n fi ??? I'd ??? 2 Z 1 p A 1 M L te==a 0 4 4 c? ?'Cr %po WAN ° --- -- ?09ZS -- -- - -- -- - I0COR6278 -ZOO O??cI z ? I i/l W 1 ? o a. ri z LTJ o 00 it 1?1 1 . rD `` 1 I 111 ."'1 ? `? 1 I 1 I ?3 " 0• i / uj 4 I ? i ? U) 2 Q C) I U W Ali J \ 1 INI 1 OIL Q 0 w + J LU W ? p Vl ~ _ J 3?w O t- -? ?I 0 7-- 3 A Q a a O 1 d O Cy-! 4 ell- C-D 0 d- 0 Q a O Q , ? Z w ? cr r O 1? v o 0 0 LL o - o 1 LA - w O o w A Z Ln O cc } J 43 U ? ? f V Q N ? of o ? O ? > F- T 1 _- n N' z I it I 11 ? . 2 W ?rv m U ? LIZ -r o ?J v w ?- V1 < au ? - ? 17- o J N ul C, - o CG J.- Z T o CY, I- n- ,+ ? \A II Q? 3 v c z v ? Q. N ?O N } p p[' J O p W C? ? ? J S LLB u p F- J O O O cn N a u1 111 y ZZ III IIr II, l III III 111 O F -? x ? v' tt x z v ? ? a w r Q IN ? i o > Q x T z r, L r s L w O ?i F <f! Q J N F ? x > z o ? ,r n F I? II? Construction Sequence Proiect 8.2980301 ( B-2604 ) Coun : Polk Description: Replace Bridge # 47 on SR 1151 over the Green River 1) Construct causeways and approaches for the temporary structure. 2) Place surface course ( Washed Class "B" Rip Rap ). 3) Construct temporary structure. Temporary structure shown is a minimum length based on opening width between causeways. 4) Construct approach fill for proposed bridge. 5) Construct proposed bridgv. 6) Remove temporary structure and causeways. Note: Some construction equipment will have to access the project from the north side of the river due to the poor horizontal and vertical alignment of SR 1151 south of the site and due to weight limitations and trusses on Bridge 447. Quantities: +/- 2600 tons Class II Rip Rap ( Washed ) +/- 350 tons Class "B" Rip Rap ( Washed ) N. C. DEPT. OF TR..NSPORTATION DIVISION OF HIGHWAYS POLK COUNTY PROJECT:8.298030t ( B-2604 ) REPLACE BRIDGE ;Z4 OVER THE GREEN RIVER tiHEET 6- J1' N C O L I --? O M W U v Q C/) OQ W C: U- ix LL c W cm c c ter. LL o . C13 (D pZJ w ? C LL OO = 0 0 F I ) a- D Ld W W LL c n Q o w Z n- w N LL U) ` U C w Q ro ? z LL ... . C ,` O U ¢ L I a? Cl) D } c L N ? V Q I O ? Q N y > I c G ? C - I U c ?n I m a °- c ? 2 >a?Q 0 K v z W W iz c: Q S E E ?- _ c C: ro a) T ro c c _ ro U ? y U ,N U) I LA C O J ` O ?. . t + O ro O i O + tD t .? ,n - r - r N J Q O (? Z O