HomeMy WebLinkAboutNCG050240_Inspection Report_20200728ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
BRIAN WRENN
Director
Molded Fiber Glass Company
Attention: Jeremy McFalls
213 Reep Drive
Morganton, North Carolina 28655
NORTH CAROLINA
Environmental Quality
July 28, 2020
Subject: Compliance Evaluation Inspection
Permit: NCGO50000
Certificate of Coverage: NCGO50240
Burke County, North Carolina
Dear Mr. McFalls:
Enclosed please find a copy of the Compliance Evaluation Inspection Report for the
inspection I conducted at the subject facility on July 15, 2020.
The report should be self-explanatory; however, should you have any questions
concerning this report, please do not hesitate to contact me at (828) 296-4500 or by email
at Isaiah.reed@ncdenr.gov.
Sinc ,
Isaiah Reed, CPS Q, MS4CECI
Environmental Specialist
Land Quality Section
Enclosure: Inspection Report
North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
Asheville Regional Office 1 2090 U.S. Highway 70 1 Swannanoa, North Carolina 28778
orv.mm.oi u�.w m.omuomiry 828.296A500
Compliance Inspection Report
Permit: NCG050240 Effective: 06/01/18 Expiration: 05/31/23 Owner: Molded Fiber Glass Comp
SOC: Effective: Expiration: Facility: Molded Fiber Glass Comp
County: Burke 213 Reep Dr
Region: Asheville
Morganton NC 28655
Contact Person: Gary Propst Title: Phone: 828-584-4974
Directions to Facility:
140E. Exit 100. RIGHT at stop light. Enter 140W ramp. RIGHT on paved road on ramp. 1/2 mile on LEFT.
System Classifications:
Primary ORC: Certification: Phone:
Secondary ORC(s):
On -Site Representative(s):
Related Permits:
Inspection Date: 07/15/2020 Entry Time 09:50AM Exit Time: 11:OOAM
Primary Inspector: Isaiah L Reed Phone: 828-296-4614
Secondary Inspector(s):
Reason for Inspection: Routine Inspection Type: Compliance Evaluation
Permit Inspection Type: Apparel/Printing/Paper/Leather/Rubber Stormwater Discharge COC
Facility Status: 0 Compliant ❑ Not Compliant
Question Areas:
Storm Water
(See attachment summary)
Page 1 of 3
Permit: NCG050240 Owner- Facility: Molded Fiber Glass Comp
Inspection Date: 07/15/2020 Inspection Type : Compliance Evaluation Reason for Visit: Routine
Inspection Summary:
On July 15, 2020 this facility was inspected to follow up on a previously issued non -compliant inspection report. I met with
Jeremy McFalls on site. No major issues were noted during the inspection. The disturbed area at the rear of the site has
been seeded and matted. Riprap has been added to areas of excessive erosion. It is recommended that the permittee
continue to evaluate possible measures to allow for faster and better access to the outfalls on site.
If you have any questions, please contact this office at (828) 296-4614
Page 2 of 3
Permit: NCGO50240 Owner - Facility: Molded Fiber Glass Comp
Inspection Date: 07/15/2020 Inspection Type : Compliance Evaluation Reason for Visit: Routine
Stormwater Pollution Prevention Plan Yes No NA NE
Does the site have a Stormwater Pollution Prevention Plan? 0 ❑ ❑ ❑
# Does the Plan include a General Location (t1SGS) map? ❑ ❑ ❑
# Does the Plan include a "Narrative Description of Practices'? ❑ ❑ ❑
# Does the Plan include a detailed site map including outfall locations and drainage areas? 0 ❑ ❑ ❑
# Does the Plan include a list of significant spills occurring during the past 3 years? E ❑ ❑ ❑
# Has the facility evaluated feasible alternatives to current practices?
0 ❑ ❑ ❑
# Does the facility provide all necessary secondary containment?
0 ❑ ❑ ❑
# Does the Plan include a BMP summary?
N ❑ ❑ ❑
# Does the Plan include a Spill Prevention and Response Plan (SPRP)?
0 ❑ ❑ ❑
# Does the Plan include a Preventative Maintenance and Good Housekeeping Plan?
0 ❑ ❑ ❑
# Does the facility provide and document Employee Training?
0 ❑ ❑ ❑
# Does the Plan include a list of Responsible Party(s)?
E ❑ ❑ ❑
# Is the Plan reviewed and updated annually?
0 ❑ ❑ ❑
# Does the Plan include a Stormwater Facility Inspection Program?
0 ❑ ❑ ❑
Has the Stormwater Pollution Prevention Plan been implemented?
0 ❑ ❑ ❑
Comment:
Qualitative Monitoring Yes No NA NE
Has the facility conducted its Qualitative Monitoring semi-annually? 0 ❑ ❑ ❑
Comment:
Permit and Outfalls
Yes No NA NE
# Is a copy of the Permit and the Certificate of Coverage available at the site?
E
❑ ❑ ❑
# Were all outfalls observed during the inspection?
0
❑ ❑ ❑
# If the facility has representative outfall status, is it properly documented by the Division?
❑
❑ 0 ❑
# Has the facility evaluated all illicit (non stormwater) discharges?
0
❑ ❑ ❑
Comment
Page 3 of 3