Thank you for asking the Piedmont Triad Regional Council (PTRC) to assist the Town of Lewisville in
mapping stormwater infrastructure and developing an online database to house all future data. This
inventory will provide your department and others with a number of benefits including easier maintenance,
management, mapping, and reporting, saving the Town of Lewisville significant time and money.
The following proposal and contract letter outlines the PTRC's recommended scope of services, schedule,
and anticipated costs associated with this project.
Project Staff
Primary staff for this project will include Cameron Colvin (Water Resources Planner), Danica
Heflin (Environmental Coordinator), and Malinda Ford (GIS Manager). PTRC may utilize an intern to
assist with field data collection. If so, PTRC will ensure that they are properly trained to provide data
consistency and quality.
Scope of Work
The PTRC proposes to provide the following services and deliverables to fulfill the Town of Lewisville's
stormwater mapping needs:
1. _Database Confizuration $4,700
Working closely with the Town of Lewisville, the PTRC will develop a custom GIS database to house
all stormwater infrastructure data collected over the course of the project. Data layers and attribute
fields will be based on ESRI's Local Government Information Model (LG1M) and customized
according to the Town of Lewisville's specific needs. Where possible, PTRC staff will convert and
incorporate existing data from subdivision plats to save time and effort.
Deliverables: Custom geodatabRse and associated layers and attribute tables to house Town of
Lewisville stormwater infrastructure data.
Infrastructure Mapping $15,900
Based on data provided by the Town of Lewisville, there are approximately 14 miles of curb and gutter
throughout the Town. This includes approximately 564 catch basins and an uncertain number of
stormwater manholes, culverts, and outfalls. Based on PTRC's experience with similar projects, we
estimate that this will require approximately 24 days of fieldwork to acquire the necessary data.
Page 1 of 3
PIEDMONT TIUAD REG12, A , UN I'Ir
13" C11RMLLTON CROSSING 1 RIVE
KERNERSVILLE. NC 27294 "
(336) 904-Q300
MtTMW L 001M - DMcttlTM DMEMA
PTRC staff will conduct up to 24 days of fieldwork surveying stormwater infrastructure within the
Town of Lewisville's jurisdiction, including all catch basins, yard inlets, culverts, stormwater
manholes, and outfalls. PTRC staff will record each feature's GPS location using a Trimble GPS unit,
along with the following descriptive attributes, to provide a detailed and consistent dataset:
Feature Attributes
Catch Basins Type, invert depth(s), material(s), diameter(s), direction(s), visual condition,
(Curb Inlets) condition description, and any additional comments.
Yard Inlets Type, invert depth(s), material(s), diameter(s), direction(s), visual condition,
condition description, and any additional comments.
Manholes j Type, invert depth(s), material(s), diameter(s), direction(s), visual condition,
condition description, and any additional comments.
Culverts Type, material, diameter, direction, structure type, visual condition, condition
description, and any additional comments
Type, material, diameter, direction, structure type; flow presence, pollution,
Outfalls receiving stream, visual condition, condition description, and any additional
comments:
In addition to the attributes listed above, a high -resolution photograph will be taken and linked to each
feature, showing all pipe connections. In instances where stormwater connections cross town limits,
PTRC will trace these features to their source or outlet.
Deliverables: Collected data points for all catch basins, yard inlets, culverts, stormwater manholes,
and outfalls within the Town ofLewisville, including location, attributes, and photographs.
3. Data Cleanup & Digitization $4,500
PTRC staff will review all collected data to ensure quality assurance/quality control (QA/QC),
including spatial accuracy and alignment, and attribute descriptions. Stormwater pipes and connections
will be digitized according to collected inlet and outlet locations and descriptions. Each pipe will have
an associated diameter, material, and flow direction, which will enable the Town to trace stormwater
flows from the point of origin to the surface or stream outfall.
Deliverables: Reviewed data and digitized stormwater pipes and connections.
4. Final Deliverables/Data Sharing $4,200
Stormwater infrastructure data collected by the PTRC will be formatted into a concise and user-friendly
shapefile(s), geodatabase, and/or online map, and delivered to the Town of Lewisville at the completion
of the project. The PTRC will work with the Town of Lewisville to ensure a format that can be
sustainably maintained and updated as needed in the future.
Deliverables: Formatted layers, geodatabase, and/or online map of all collected infrastructure data.
Page 2 of 3
*PIEDMONT TRIAD REGIONAL INCIL;
13" CARWLLTDN CROSSING DRIVE
KERNERSVILLE, NC 27294
(336) 904-0300
Project Schedule
The following timeframes shall apply to the project:
Timeframe
Task
Jan - Feb 2020
Configure database in coordination with Town staff
March - Sept 2020
Complete fieldwork to collect infrastructure data
Oct - Nov 2020
Clean up data and digitize remaining features
Dec 2020
Deliver infrastructure data to Town staff for review & approval
To every extent possible, the PTRC will work to ensure deliverables are completed under budget and
ahead of schedule.
Costs and Billing Schedule
The PTRC local technical assistance program is designed to provide the highest quality professional
services at the least cost to our member governments. Unlike private consulting firms, we do not make a
profit by providing these services. We are, however, required to cover our costs. The total budget for this
project is not to exceed $30,000, which includes travel expenses not to exceed $700. Invoices will be sent
quarterly as work progresses. If certain scope of work elements are not necessary to complete or are
supplanted by existing data, a reduction in billable expenses may be requested by the Town of Lewisville
by an amendment to this agreement.
I£ the Town concurs with the project as described herein and below, please sign this contract letter and
return a copy to me for our records. We are prepared to begin work on this project in January 2020 and
would anticipate completion by December 31, 2020, if not sooner. We're looking forward to the opportunity
to work with you and your staff on this project.
Sincerely,
Cameron Colvin
Water Resources Planner
I here y authorize the 1execuf of contract, as detailed in the proposal above.
r
�J � �4
Hank Perkins, Town Manager Date
"This instrument has been pre -audited in the manner required by the Local Government Budget and Fiscal
Control Act. "
Pam Orrell, Finance Officer Date
Page 3 of 3