HomeMy WebLinkAboutWQ0041756_Application (FTSE)_20200615State of North Carolina
DWR Department of Environmental Quality
Division of Water Resources
l5A NCAC 02T .0300 — FAST TRACK SEWER SYSTEM EXTENSION APPLICATION
Division of Water Resources FTA 04-16 & SUPPORTING DOCUMENTATION
Application Number 1 0 I / J (tn be completed by DWR)
Ali items must be completed or the a licAtIOD will be returned
1. APPLICANT INFORMATION: L S
1. Applicant's name: City of Durham (company, municipality, HOA, utility, etc.)
2. AppIicant type: ❑ Individual ❑ Corporation ❑ General Partnership
❑ Federal ❑ State/County ® Municipal
3. Signature authority's name: Donald F. Greeley per 15A NCAC 02T .0I06(b)
Title: Water Management Director
4. Applicant's mailing address: 1600 Mist Lake Drive
City: Durham State: NC Zip: 27704-
5. Applicant's contact information:
Phone number: 919 560-4381 Email Address: don.greelevtccr�durhamne. og_v
II. PROJECT INFORMATION:
1. Project name: 751 South Primary LS
❑ Privately -Owned Public Utility
❑ Other
NC Dept of Environmental Quality
JUN 15 2020
Raleigh Regional Office
2. Application/Project status: ® Proposed (New Permit) ❑ Existing Permit/Project
If a modification, provide the existing permit number. WQ00 and issued date:
If new construction but part of a master plan, provide the existing permit number: WQ00
3. County where project is located: Durham
4. Approximate Coordinates (Decimal Degrees): Latitude: 35.8760881 Longitude:-78.95472a'
5. Parcel ID (if applicable): 0717-03-33-9416
(or Parcel ID to closest downstream sewer)
M. CONSULTANT INFORMATION:
1. Professional Engineer: Mark P. Ashness License Number: 18894
Firm: CESroun, Inc
Mailing address: 301 Glenwood Avenue, Suite 220
City: Raleigh State: NC Zip: 27�Q3
Phone number: (9919) 367-8790 Email Address: markftegrouninc.com
IV. WASTEWATER TREATMENT FACILITY (WWTF) INFORMATION:
1. Facility Name: South Durham WRF Permit Number: NC 0047597
Owner Name: City of Durham
V. RECEIVING DOWNSTREAM SEWER INFORMATION (if different than WWTF):
1. Permit Number(s): M0039295 Downstream (Receiving) Sewer Size: 12" FM inch
S.vsteni Wide Collection System PrrmitNumbers (if a-s ijcablr : W CS00005
Owner Name(s): City -of Durham
FORM: FTA 04-16 Page I of 5
VI. GENERAL REQUIREMENTS
1. If the Applicant is a Privately -Owned Public Utility, has a Certificate of Public Convenience and Necessity been attached?
❑ Yes []NO ®N+A
2. If the Applicant is a Developer of lots to be sold, has a Developer's Operational Agreement (FORM: DEV) been attached?
❑ Yes ❑No ®N/A
3. If the Applicant is a Home/Proper X Otg1e1;;' Association_. has an Operational Agreement (FORM: HOA1 been attached?
❑ Yes []No ®N'A
4. Origin of wastewater. (check all that apply):
® Residential Owned ® Retail (stores, centers, malls) ❑ Car Wash
® Residential Leased ® Retail with food preparationlservice ❑ Hotel and/or Motels
❑ School / preschool / day care ❑ Medical / dental f veterinary facilities ❑ Swimming Pool /Clubhouse
❑ Food and drink facilities ❑ Church ❑ Swimming Pool/Filter Backwash
® Businesses / offices / factories ❑ Nursing Home ❑ Other (Explain in Attachment)
5. Nature of wastewater: 100 % Domestic/Commercial % Commercial
% Industrial (See 15A NCAC 02T .0103(201)
&Is there a Pretreatment Program in effect? ❑ Yes ❑ No
6. Hasa flow reduction been approved under 15A NCAC 02T .0114(f)? ❑ Yes ®No O
If yes, provide a copy of flow reduction approval letter
7. Summarize wastewater generated by project:
11
(Vt'_
Establishment Type (see O11.0I M fl)
Daily Design Flow '°
No. of Units
Flow
Residential 4 BR
120 gal/BR
208
99840 GPD
Residential 3 BR
120 gal/BR
59
21240 GPD
Apartments & Townhome
120 gal/BR
765
183600 GPD
Office
25 gal/Emp
1200
30000 GPD
Shopping Center without Food
100 gal/1000 SF
255000
25500 GPD
Restaurant Full Service
Community Center / Amenity
40 gal/seat
10 gal 1 2erson
500
500
20000 GPD
5000 GPD
F Total
385,100 GPD
a See 15A NCAC 02T .01 14(b). (d)_ (el(l) and {e)12) for caveats to wastewater design flow rates (i.e., minimum flow per
dwelling; proposed unknown non-residential development uses; public access facilities located near high public use areas;
and residential property located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals as defined
in C.S. 42A-4).
b Per 15A NCAC 02T .4114(c), design flow rates for establishments not identified [in table I5A NCAC 02T.01141 shall be
determined using available flow data, water using fixtures, occupancy or operation patterns, and other measured data.
8. Wastewater generated by project: 4 GPD (per 15A NCAC 02T .0114
D Do not include future flows orpreviouslypermitted allocations
If permitted flow is zero, indicate why:
X Pump Station or Gravity Sewer where flow will be permitted in subsequent permits that connect to this line
❑ Flow has already been allocated in Permit Number: __
❑ Rehabilitation or replacement of existing sewer with no new flow expected
❑ Other (Explain):
FORM: FTA 04-16 Page 2 of 5
f2�uo%c�
VH. GRAVITY SEWER DESIGN CRITERIA (If Applicable) - 02T .0305 & AIDC (Gravity Sewers):
I. Summarize gravity sewer to be permitted:
Size (inches) Length (feet) Material
➢ Section II & III of the MDC for Permitting of Gravity Sewers contains information related to design criteria
➢ Section III contains information related to minimum slopes for gravity sewer(s)
➢ Oversizing lines to meet minimum slope requirement is not allowed and a violation of the MDC
VM. PUMP STATION DESIGN CRITERIA (If Applicable) — 02T .0305 & MDC (Pump Stations/Force Mains):
COMPLETE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT
1. Pump station number or name: 751 South Primar +BLS
2. Approximate Coordinates (Decimal Degrees): Latitude: 35.877' Longitude:-78.955'
3. Design flow of the pump station: 1.58 millions gallons per day (firm capacity)
4. Operational point(s) of the pump(s): 1098 gallons per minute at 116 feet total dynamic heat
5. Summarize the force main to be permitted (for this Pump Station):
Size (inches) Length (feet) Material
NIA
6. Power reliability in accordance with 15A NCAC 02T .0305 h 1 :
® Standby power source or pump with automatic activation and telemetry - 15A NCAC 0:
➢ Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day
➢ Must be permanent to facility
Or if the pump station has an average daily flow less than 15,000 gallons per day:
❑ Portable power source with manual activation, quick -connection receptacle and telemetry - 15A NCAC 02T
.0305(h)(1)(C)
or
❑ Portable pumping unit with plugged emergency pump connection and telemetry - 15A NCAC 02T .0305(h)(1)(C):
➢ It shall be demonstrated to the Division that the portable source is owned or contracted by the applicant (draft agreement)
and is compatible with the station.
➢ If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations' storage
capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall be provided
in the case of a multiple station power outage.
FORM: FTA 04-16 Pane 3 of 5
IX. SETBACKS & SEPARATIONS — (02B .0200 & 15A NCAC 02T .0305(f)):
1. Does the project comply with all separations found in 15A NCAC 02T�0305(.f)_&jo Yes ❑ No
➢ 15A NCAC 02T.0305(f) contains minimum senarat;nn< that chntt be nrnv;deA Fr,r �.."..r �.,�ra..,�•
Setback Parameter*
Separation Required
Storm sewers and other utilities not fisted below vertical
24 inches
Water mains vertical -water over sewer including in benched trenchesl
18 inches
Water mains horizontal
10 feet
Reclaimed water lines vertical - reclaimed over sewer
18 inches
Reclaimed water lines(horizontal - reclaimed over sewer
2 feet
**Any private or public water supply source, including any wells, WS-I waters of Class I or
Class II impounded reservoirs used as a source of drinking water
100 feet
**Waters classified WS (except WS-I or WS-V), B, SA, ORW, HQW, or SB from normal
hi h water or tide elevation and wetlands see item IX.2
50 feet
**Any other stream, lake, impoundment, or ground water lowering and surface drainage
ditches
10 feet
LAAM building foundation
5 feet
_Any basement
10 feet
Top slope of embankment or cuts of 2 feet or more vertical height
10 feet
Drainage systems and interceptor drains
5 feet
_My swimming pools
10 feet
Final earth grade vertical
36 inches
➢ 15A NCAC 02T.0305(e) contains alternatives where separations in 02T.0305(f) cannot be achieved.
➢ **Stream classifications can be identified using the Division's NC
Surface Wa er Classificati ns webaCe
➢ If noncompliance with 02T.0305(f) or (e). see Section X of this application
2. Does the project comply with separation requirements for wetlands? (50 feet of separation) ® Yes ❑ No ❑NIA
➢ See the Division's draft separation requirements for situations where separation cannot be meet
D No variance is required if the alternative design criteria specified is utilized in design and construction
➢ As built documents should reference the location of areas effected
3. Does the project comply with setbacks found in the river basin rules per 1.5A NCAC 02B .0200? ❑ Yes ❑ No ® NIA
➢ This would include Trout Buffered Streams per 15A NCAC 213.0202
4. Does the project require coveragelauthorization under a 404 Nationwide or ❑ Yes ® No
individual permits or 401 Water Quality Certifications?
➢ Information can be obtained from the 40I & Buffer Permitting Branch
5. Does project comply with 15A NCAC 02T.0105tcl( (additional permits. certifications)? ® Yes ❑ No
Per IJA UQAC 02T 0105 c directly related environmental permits or certification applications are being prepared, have
been applied for, or have been obtained. Issuance of this permit is contingent on issuance of dependent permits (erosion and
sedimentation control plans, stormwater management plans, etc.).
6. Does this project include any sewer collection lines that are deemed "high -priority?"
Per 15A NCAC 02T.0402. "high -priority sewer" means "any aerial sewer, sewer contacting surface waters, siphon, or sewer
positioned parallel to streambanks that is subject to erosion that undermines or deteriorates the sewer.
❑ Yes ® No ❑ NIA
➢ If yes, include an attachment with details for each line, including type (aerial line, size, material, and location).
High priority lines shall be inspected by the permittee or its representative at least once every six -months and inspections
documented per 15A NCAC 02T.0403(a)(5) or the permitee's individual System -Wide Collection permit.
FORM: FTA 04-16 Page 4 of 5
X. CERTIFICATIONS:
1. Does the submitted system comply with aA N_CAC 02T, the Minimum Design Criteria for the Perm_ itting of Pump Stations
and Force Mains (latest version).. and the Gravity Sewer Minimum Design Criteria (latest version) as applicable?
® Yes ❑ No
If No, complete and submit the Variance Alternative Design Request application (VADC 10-14) and supporting documents for
review. Approval of the request is required prior to submittal of the Fast Track Application and supportine documents.
I,
Certification:
attest that this application for
(P f ssional Engineer's name (romps lion Item II11.)
-7rI �o� �'-I ar~~�
has been reviewed by me and is accurate, cot ---
and consistent with the information supplied in the plans, specifications,
engineering calculations, and all other supporting documentation to the best of my knowledge. I further attest that to the best
of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer
Minimum Design Criteria for Gravity Sewers (latest version), and the Minimum Design Criteria for the Fast -Track Permitting
of Pump Stations and Force Mains (latest version). AIthough other professionals may have developed certain portions of this
submittal package, inclusion of these materials under my signature and seal signifies that I have reviewed this material and
have judged it to be consistent with the proposed design.
NOTE -- In accordance with General Statutes 143-215.6A and 143-215.613, any person who knowingly makes any false
statement, representation, or certification in any application package shall be guilty of a Class 2 mis meanor, which may
include a fine not to exceed $10,000, as well as civil penalties up to $25,000 per violation.
North Carolina Professional Engineer's seal, signature, and date: N,
SEAL
18894
3. Applicant's Certification per 15A NCAC 02T .0106(b): ,i,a�`
11 —w
I, �osyr.�� /� 6�r�� — Ji�s�/l attest that this application for
11 (Sig re Authority' name & title from Application Item I.3.)
has been reviewed by me and is accurate and comp ete to the best of my knowledge. I understand that if all required parts of
this application are not completed and that if all required supporting documentation and attachments are not included, this
application package is subject to being returned as incomplete. I understand that any discharge of wastewater from this non -
discharge system to surface waters or the Iand will result in an immediate enforcement action that may include civil penalties,
injunctive relief, and/or criminal prosecution. I will make no claim against the Division of Water Resources should a condition
of this permit be violated. I also understand that if all required parts of this application package are not completed and that if
all required supporting information and attachments are not included, this application package will be returned to me as
incomplete.
NOTE In accordance with General Statutes t43-215.6A and 143-215.6B, any person who knowingly makes any false
statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may
include a fine not to exceed $10,000 as well as civil penalties up to $25,000 per violation.
Signature: Date: l•�iZ�Z d
FORM: FTA 04-16 Page 5 of 5
TO: NCDENR — DWQ
Raleigh Regional Office
3800 Barrett Drive
Raleigh, NC 27609
ATTENTION: Permitting
CE GROUP
301 GLENWOOD AVENUE, SUITE 220
RALEIGH, NC 27603
Phone: (919) 367-8790
E-Mall: loe(ftearouninc. com
Transmittal
DATE: 6/15/20
PROJECT NO: 199-02
751 Primary Lift Station
Durham County
Quantity
Drawing No.
Description
2
1 copy/1 original
Fast Track Sewer System Extension Application
1
Copy
Project Narrative
1
Check
$480 Application Fee — Check #11003 .SUN 15 2020
1
Copy
Flow Tracking 1 Acceptance Form
1
Copy
USGS Overall Area Map Mvigh RrSion-al Off ice
1
Copy
Aerial Vicinity Location Map
REMARKS Please let us know if you require any additional information.
Memorandum
To: Durham Water Management and DEQ
From: Mark P Ashness PE, CE Group
Date: June 11, 2020
Re: 751 Primary LS
I. LS Design Narrative and Modeling Discussion
2. Site Map Aerial and USGS
3. FTA 04-16
4. FTSE 10-18
CE GROUP
301 GLENWOOD AVENUE, SUITE 220
RALEIGH, NC 27603
Phone: (919) 367-8790
E-Mail: markf8cegroupin"om
ey
751 Primary Lift Station Design Narrative &
p,.0
SE
18894
The 751 Primary LS provides for Duplex 85 HP submersible pumps capable of pumping under
several operating conditions. The pumps are rated at +1-1098 GPM at 116' TDH. This condition is
reflects all 3 LS sharing the 20" FM having (1) pump in operation. The State has confirmed this
scenario as the proper rating for the LS. Based upon run times shared by Water Mgmt for the
Stagecoach LS; the 751 Primary LS will also operate independently of the other lift stations based
upon observed cycle times.
Under the rated condition, all forcemains achieve a minimum of 2 FPS and 751 Primary has 6 cycles
per hour. When 751 Primary LS is operating independent of other LS (Scenario 1 A); the 20" shared
FM has a velocity of 1.7 FPS. This portion of the FM also receives over 6 hours of contributing flow
from the Stagecoach LS at velocities in excess of 3 FPS.
This design is based upon the City of Durham 2014 LS Design Standards with exception to the
allowance of submersible pumps (agreed upon with the City). All calculations are consistent with the
MDC for Permitting of Pump Stations and FM 03108
The LS discharges into an existing 12" FM permitted by others WQ 0039295. The 12" FM then
connects to the existing 20" Stagecoach LS FM at the intersection of NC 751 and Stagecoach Road.
From there the wastewater is conveyed directly to the South Durham WRF.
This permit is a zero -flow permit. City of Durham assigns wastewater flow with the gravity sewer
extension permits rather than with the LS permit. This LS is sized to accommodate 385,000 GPD of
domestic wastewater as outline on Page 2 of 5 in the FTA application (attached).
k •fit, -{
- ! ire- •✓,Hl
it
�
�
wrmt+ar ro
' 1
�'1 � / �
•} auPao tRta rndr
Lutno
f�
IAW wtw w a.rwarax pl
SP'
lands-
ouct+s+wrn+
11, 1,11r zi lrl
PRIM A—R-Y LS r�
f
b �rvrc nP
30
NO
lb
"4tf IM
�
4
O 2000' 4000'
GREEN LEVEL, NC
2016
SCALE: 1 " = 2000' NORTH �RtFl. US03 X24 Rr•] 13
Division of Water Resources
State of North Carolina
Department of Environmental Quality
Division of Water Resources
Flow Tracking for Sewer Extension Applications
(FTSE 10-18)
Entity Requesting Allocation: City of Durham
Project Name for which flow is being requested: 751 South Primary LS
More than one FTSE may be required far a single project if the owner of the fVIVTP is not responsible for all pump
stations along the route of the proposed wastewater flow.
1. Complete this section only if you are the owner of the wastewater treatment plant.
a. WWTP Facility Name: South Durham WRF
b. WWTP Facility Permit #: NC 0047597
c. WWTP facility's permitted flow
d. Estimated obligated flow not yet tributary to the WWTP
e. WWTP facility's actual avg. flow
f. Total flow for this specific request
g. Total actual and obligated flows to the facility
h. Percent of permitted flow used
A11 flows are in MGD
20MGD
3.7MGD
9.45MGD
0.3851 MGD
13.54MGD
67.7%
II. Complete this section for each pump station you are responsible for along the route of this proposed
wastewater flow.
List pump stations located between the project connection point and the WWTP:
(A)
Design
Pump
Pump
Average
Station
Station
Firm Daily Flow**
(Name or
Permit
Capacity, * (Firm ;` pf),
Number)
No.
MGD MGD
(B)
(C)
(D)=(B+C) (E)=(A-D)
Obligated,
Approx.
Not Yet
Total Current
Current
Tributary
Flow Plus
Avg. Daily
Daily Flow,
Obligated Available
Flow, MGD
MGD
Flow Capacity***
* The Firm Capacity (design flow) of any pump station is defined as the maximum pumped flow
that can be achieved with the largest pump taken out of service.
** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor
(pf) not less than 2.5, per Section 2.02(A)(4)(c) of the Minimum Design Criteria.
*** A Planning Assessment Addendum shall be attached for each pump station located
between the project connection point and the WWTP where the Available Capacity is < 0.
Downstream Facility Name (Sewer): 751 South 12" FM Collection SXstem
Downstream Permit Number: WQ0039295
Page 1 of 6
FTSE 10-18
Ill. Certification Statement:
certify to the best of my knowledge that the addition of
the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving
wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity
related sanitary sewer overflows or overburden any downstream pump station en route to the receiving
treatment plant under normal circumstances, given the implementation of the planned improvements
identified in the planning assessment where applicable. This analysis has been performed in accordance
with local established policies and procedures using the best available data. This certification applies to
those items listed above in Sections I and II plus all attached planning assessment addendums for which I
am the responsible party. Signature of this form certifies that the receiving collection system or treatment
works has adequate capacity to transport and treat the proposed new wastewater.
G/Zr d
Signing OjJIcial Signature Date
Title of Signing Official
Page 2 of 6
FTSE 10-18
�J
Cashion, Ted
From: Cashion, Ted
Sent: Tuesday, July 14, 2020 3:23 PM
To: Greeley, Don; mark@cegroupinc.com
Cc: Robinson, Jason; Deck, Erin M
Subject: 751 South Primary LS fast track sewer extension application, WQ0041756
Hi Don and Mark,
We are reviewing the subject application. Just a couple of clarifications are needed before we draft the permit.
Item VI.7 of the application notes a flow of 385,100 gpd, but the narrative states this permit is a zero flow permit. It
appears the 385,100 gpd is existing flow, and there will be no new flow in this permit. Please confirm.
Item VIIIA of the application notes the pump capacity is 1098 gpm. The narrative notes the pumps are rated at 1188
gpm. Please confirm the pump capacity.
We'll start drafting the permit upon submittal and review of the above.
Thx
ted
Ted Cashion
Water Quality Regional Operations
Division of Water Resources
NC Department of Environmental Quality
Raleigh Regional Office
919-791-4254
ted.cashiont@ncdenr.gov
1628 Mail Service Center
Raleigh, NC 27699-1628
3800 Barrett Drive
Raleigh, NC 27609
—
�t}tttisnt of ln.:urwntaf h:�h.Y�'� !!
Subscribe to Collection System & Sewer Permitting Updates
Email correspondence to and from this address may be subject to the North Carolina Public Records Low and may be
disclosed to third parties unless the content is exempt by statute or other regulation.
7/1412020
Mail - Cashion, Ted - Outlook
<t Reply all ul Delete (S) Junk Block •••
Re: [External] RE: 751 South Primary LS fast track sewer extension application, WQ0041756
To: Mark Ashness <mark@cegroupinc.com>
Cc: Greeley, Don <Don.Greeley@durhamnc.gov>; Robinson, Jason; Deck. Erin M
Ok thanks Mark
Sent from my Phone
On Jul 14, 2020, at 4:46 PM, Marls Ashness <mark@cegroupinc.com> wrote:
CAUTION: External email. Do not click links or open attachments unless you verify. Send all
suspicious email as an attachment to report.spam@.nc.gov
Ted: Sorry about that the pump rating is 1098 GPM. I have corrected the narrative and
Page 3 of the FTA (attached).
There is no flow associated with this permit.
Durham assigns flow thru the gravity sewer extension permits rather than on the LS
permit.
thx
Mark Ashness
P.E, LEED AP
<image003jp9>
<image0044 jpg>
301 Glenwood Avenue, Suite 220
Raleigh, NC 27603
Phone: (919) 367-8790
Cell: (919) 606-7704
From: Cashion, Ted <ted.cashion@ncdenr.gov>
Sent: Tuesday, July 14, 2020 3:23 PM
To: Greeley, Don <Don.Greeley@durhamnc.gov>; Mark Ashness
<mark@CEGROUPINC.COM>
Cc: Robinson, Jason <jason.t.robinson@ncdenrgov>; Deck, Erin M
<erin.deck@ncdenr.gov>
Subject: 751 South Primary LS fast track sewer extension application, WQ0041756
https://outlook.office365.comimaiVdeeplink?version=2020070601.02&popoutv2=1 111