Loading...
HomeMy WebLinkAboutWQ0041756_Application (FTSE)_20200615State of North Carolina DWR Department of Environmental Quality Division of Water Resources l5A NCAC 02T .0300 — FAST TRACK SEWER SYSTEM EXTENSION APPLICATION Division of Water Resources FTA 04-16 & SUPPORTING DOCUMENTATION Application Number 1 0 I / J (tn be completed by DWR) Ali items must be completed or the a licAtIOD will be returned 1. APPLICANT INFORMATION: L S 1. Applicant's name: City of Durham (company, municipality, HOA, utility, etc.) 2. AppIicant type: ❑ Individual ❑ Corporation ❑ General Partnership ❑ Federal ❑ State/County ® Municipal 3. Signature authority's name: Donald F. Greeley per 15A NCAC 02T .0I06(b) Title: Water Management Director 4. Applicant's mailing address: 1600 Mist Lake Drive City: Durham State: NC Zip: 27704- 5. Applicant's contact information: Phone number: 919 560-4381 Email Address: don.greelevtccr�durhamne. og_v II. PROJECT INFORMATION: 1. Project name: 751 South Primary LS ❑ Privately -Owned Public Utility ❑ Other NC Dept of Environmental Quality JUN 15 2020 Raleigh Regional Office 2. Application/Project status: ® Proposed (New Permit) ❑ Existing Permit/Project If a modification, provide the existing permit number. WQ00 and issued date: If new construction but part of a master plan, provide the existing permit number: WQ00 3. County where project is located: Durham 4. Approximate Coordinates (Decimal Degrees): Latitude: 35.8760881 Longitude:-78.95472a' 5. Parcel ID (if applicable): 0717-03-33-9416 (or Parcel ID to closest downstream sewer) M. CONSULTANT INFORMATION: 1. Professional Engineer: Mark P. Ashness License Number: 18894 Firm: CESroun, Inc Mailing address: 301 Glenwood Avenue, Suite 220 City: Raleigh State: NC Zip: 27�Q3 Phone number: (9919) 367-8790 Email Address: markftegrouninc.com IV. WASTEWATER TREATMENT FACILITY (WWTF) INFORMATION: 1. Facility Name: South Durham WRF Permit Number: NC 0047597 Owner Name: City of Durham V. RECEIVING DOWNSTREAM SEWER INFORMATION (if different than WWTF): 1. Permit Number(s): M0039295 Downstream (Receiving) Sewer Size: 12" FM inch S.vsteni Wide Collection System PrrmitNumbers (if a-s ijcablr : W CS00005 Owner Name(s): City -of Durham FORM: FTA 04-16 Page I of 5 VI. GENERAL REQUIREMENTS 1. If the Applicant is a Privately -Owned Public Utility, has a Certificate of Public Convenience and Necessity been attached? ❑ Yes []NO ®N+A 2. If the Applicant is a Developer of lots to be sold, has a Developer's Operational Agreement (FORM: DEV) been attached? ❑ Yes ❑No ®N/A 3. If the Applicant is a Home/Proper X Otg1e1;;' Association_. has an Operational Agreement (FORM: HOA1 been attached? ❑ Yes []No ®N'A 4. Origin of wastewater. (check all that apply): ® Residential Owned ® Retail (stores, centers, malls) ❑ Car Wash ® Residential Leased ® Retail with food preparationlservice ❑ Hotel and/or Motels ❑ School / preschool / day care ❑ Medical / dental f veterinary facilities ❑ Swimming Pool /Clubhouse ❑ Food and drink facilities ❑ Church ❑ Swimming Pool/Filter Backwash ® Businesses / offices / factories ❑ Nursing Home ❑ Other (Explain in Attachment) 5. Nature of wastewater: 100 % Domestic/Commercial % Commercial % Industrial (See 15A NCAC 02T .0103(201) &Is there a Pretreatment Program in effect? ❑ Yes ❑ No 6. Hasa flow reduction been approved under 15A NCAC 02T .0114(f)? ❑ Yes ®No O If yes, provide a copy of flow reduction approval letter 7. Summarize wastewater generated by project: 11 (Vt'_ Establishment Type (see O11.0I M fl) Daily Design Flow '° No. of Units Flow Residential 4 BR 120 gal/BR 208 99840 GPD Residential 3 BR 120 gal/BR 59 21240 GPD Apartments & Townhome 120 gal/BR 765 183600 GPD Office 25 gal/Emp 1200 30000 GPD Shopping Center without Food 100 gal/1000 SF 255000 25500 GPD Restaurant Full Service Community Center / Amenity 40 gal/seat 10 gal 1 2erson 500 500 20000 GPD 5000 GPD F Total 385,100 GPD a See 15A NCAC 02T .01 14(b). (d)_ (el(l) and {e)12) for caveats to wastewater design flow rates (i.e., minimum flow per dwelling; proposed unknown non-residential development uses; public access facilities located near high public use areas; and residential property located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals as defined in C.S. 42A-4). b Per 15A NCAC 02T .4114(c), design flow rates for establishments not identified [in table I5A NCAC 02T.01141 shall be determined using available flow data, water using fixtures, occupancy or operation patterns, and other measured data. 8. Wastewater generated by project: 4 GPD (per 15A NCAC 02T .0114 D Do not include future flows orpreviouslypermitted allocations If permitted flow is zero, indicate why: X Pump Station or Gravity Sewer where flow will be permitted in subsequent permits that connect to this line ❑ Flow has already been allocated in Permit Number: __ ❑ Rehabilitation or replacement of existing sewer with no new flow expected ❑ Other (Explain): FORM: FTA 04-16 Page 2 of 5 f2�uo%c� VH. GRAVITY SEWER DESIGN CRITERIA (If Applicable) - 02T .0305 & AIDC (Gravity Sewers): I. Summarize gravity sewer to be permitted: Size (inches) Length (feet) Material ➢ Section II & III of the MDC for Permitting of Gravity Sewers contains information related to design criteria ➢ Section III contains information related to minimum slopes for gravity sewer(s) ➢ Oversizing lines to meet minimum slope requirement is not allowed and a violation of the MDC VM. PUMP STATION DESIGN CRITERIA (If Applicable) — 02T .0305 & MDC (Pump Stations/Force Mains): COMPLETE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT 1. Pump station number or name: 751 South Primar +BLS 2. Approximate Coordinates (Decimal Degrees): Latitude: 35.877' Longitude:-78.955' 3. Design flow of the pump station: 1.58 millions gallons per day (firm capacity) 4. Operational point(s) of the pump(s): 1098 gallons per minute at 116 feet total dynamic heat 5. Summarize the force main to be permitted (for this Pump Station): Size (inches) Length (feet) Material NIA 6. Power reliability in accordance with 15A NCAC 02T .0305 h 1 : ® Standby power source or pump with automatic activation and telemetry - 15A NCAC 0: ➢ Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day ➢ Must be permanent to facility Or if the pump station has an average daily flow less than 15,000 gallons per day: ❑ Portable power source with manual activation, quick -connection receptacle and telemetry - 15A NCAC 02T .0305(h)(1)(C) or ❑ Portable pumping unit with plugged emergency pump connection and telemetry - 15A NCAC 02T .0305(h)(1)(C): ➢ It shall be demonstrated to the Division that the portable source is owned or contracted by the applicant (draft agreement) and is compatible with the station. ➢ If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall be provided in the case of a multiple station power outage. FORM: FTA 04-16 Pane 3 of 5 IX. SETBACKS & SEPARATIONS — (02B .0200 & 15A NCAC 02T .0305(f)): 1. Does the project comply with all separations found in 15A NCAC 02T�0305(.f)_&jo Yes ❑ No ➢ 15A NCAC 02T.0305(f) contains minimum senarat;nn< that chntt be nrnv;deA Fr,r �.."..r �.,�ra..,�• Setback Parameter* Separation Required Storm sewers and other utilities not fisted below vertical 24 inches Water mains vertical -water over sewer including in benched trenchesl 18 inches Water mains horizontal 10 feet Reclaimed water lines vertical - reclaimed over sewer 18 inches Reclaimed water lines(horizontal - reclaimed over sewer 2 feet **Any private or public water supply source, including any wells, WS-I waters of Class I or Class II impounded reservoirs used as a source of drinking water 100 feet **Waters classified WS (except WS-I or WS-V), B, SA, ORW, HQW, or SB from normal hi h water or tide elevation and wetlands see item IX.2 50 feet **Any other stream, lake, impoundment, or ground water lowering and surface drainage ditches 10 feet LAAM building foundation 5 feet _Any basement 10 feet Top slope of embankment or cuts of 2 feet or more vertical height 10 feet Drainage systems and interceptor drains 5 feet _My swimming pools 10 feet Final earth grade vertical 36 inches ➢ 15A NCAC 02T.0305(e) contains alternatives where separations in 02T.0305(f) cannot be achieved. ➢ **Stream classifications can be identified using the Division's NC Surface Wa er Classificati ns webaCe ➢ If noncompliance with 02T.0305(f) or (e). see Section X of this application 2. Does the project comply with separation requirements for wetlands? (50 feet of separation) ® Yes ❑ No ❑NIA ➢ See the Division's draft separation requirements for situations where separation cannot be meet D No variance is required if the alternative design criteria specified is utilized in design and construction ➢ As built documents should reference the location of areas effected 3. Does the project comply with setbacks found in the river basin rules per 1.5A NCAC 02B .0200? ❑ Yes ❑ No ® NIA ➢ This would include Trout Buffered Streams per 15A NCAC 213.0202 4. Does the project require coveragelauthorization under a 404 Nationwide or ❑ Yes ® No individual permits or 401 Water Quality Certifications? ➢ Information can be obtained from the 40I & Buffer Permitting Branch 5. Does project comply with 15A NCAC 02T.0105tcl( (additional permits. certifications)? ® Yes ❑ No Per IJA UQAC 02T 0105 c directly related environmental permits or certification applications are being prepared, have been applied for, or have been obtained. Issuance of this permit is contingent on issuance of dependent permits (erosion and sedimentation control plans, stormwater management plans, etc.). 6. Does this project include any sewer collection lines that are deemed "high -priority?" Per 15A NCAC 02T.0402. "high -priority sewer" means "any aerial sewer, sewer contacting surface waters, siphon, or sewer positioned parallel to streambanks that is subject to erosion that undermines or deteriorates the sewer. ❑ Yes ® No ❑ NIA ➢ If yes, include an attachment with details for each line, including type (aerial line, size, material, and location). High priority lines shall be inspected by the permittee or its representative at least once every six -months and inspections documented per 15A NCAC 02T.0403(a)(5) or the permitee's individual System -Wide Collection permit. FORM: FTA 04-16 Page 4 of 5 X. CERTIFICATIONS: 1. Does the submitted system comply with aA N_CAC 02T, the Minimum Design Criteria for the Perm_ itting of Pump Stations and Force Mains (latest version).. and the Gravity Sewer Minimum Design Criteria (latest version) as applicable? ® Yes ❑ No If No, complete and submit the Variance Alternative Design Request application (VADC 10-14) and supporting documents for review. Approval of the request is required prior to submittal of the Fast Track Application and supportine documents. I, Certification: attest that this application for (P f ssional Engineer's name (romps lion Item II11.) -7rI �o� �'-I ar~~� has been reviewed by me and is accurate, cot --- and consistent with the information supplied in the plans, specifications, engineering calculations, and all other supporting documentation to the best of my knowledge. I further attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer Minimum Design Criteria for Gravity Sewers (latest version), and the Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains (latest version). AIthough other professionals may have developed certain portions of this submittal package, inclusion of these materials under my signature and seal signifies that I have reviewed this material and have judged it to be consistent with the proposed design. NOTE -- In accordance with General Statutes 143-215.6A and 143-215.613, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 mis meanor, which may include a fine not to exceed $10,000, as well as civil penalties up to $25,000 per violation. North Carolina Professional Engineer's seal, signature, and date: N, SEAL 18894 3. Applicant's Certification per 15A NCAC 02T .0106(b): ,i,a�` 11 —w I, �osyr.�� /� 6�r�� — Ji�s�/l attest that this application for 11 (Sig re Authority' name & title from Application Item I.3.) has been reviewed by me and is accurate and comp ete to the best of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting documentation and attachments are not included, this application package is subject to being returned as incomplete. I understand that any discharge of wastewater from this non - discharge system to surface waters or the Iand will result in an immediate enforcement action that may include civil penalties, injunctive relief, and/or criminal prosecution. I will make no claim against the Division of Water Resources should a condition of this permit be violated. I also understand that if all required parts of this application package are not completed and that if all required supporting information and attachments are not included, this application package will be returned to me as incomplete. NOTE In accordance with General Statutes t43-215.6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000 as well as civil penalties up to $25,000 per violation. Signature: Date: l•�iZ�Z d FORM: FTA 04-16 Page 5 of 5 TO: NCDENR — DWQ Raleigh Regional Office 3800 Barrett Drive Raleigh, NC 27609 ATTENTION: Permitting CE GROUP 301 GLENWOOD AVENUE, SUITE 220 RALEIGH, NC 27603 Phone: (919) 367-8790 E-Mall: loe(ftearouninc. com Transmittal DATE: 6/15/20 PROJECT NO: 199-02 751 Primary Lift Station Durham County Quantity Drawing No. Description 2 1 copy/1 original Fast Track Sewer System Extension Application 1 Copy Project Narrative 1 Check $480 Application Fee — Check #11003 .SUN 15 2020 1 Copy Flow Tracking 1 Acceptance Form 1 Copy USGS Overall Area Map Mvigh RrSion-al Off ice 1 Copy Aerial Vicinity Location Map REMARKS Please let us know if you require any additional information. Memorandum To: Durham Water Management and DEQ From: Mark P Ashness PE, CE Group Date: June 11, 2020 Re: 751 Primary LS I. LS Design Narrative and Modeling Discussion 2. Site Map Aerial and USGS 3. FTA 04-16 4. FTSE 10-18 CE GROUP 301 GLENWOOD AVENUE, SUITE 220 RALEIGH, NC 27603 Phone: (919) 367-8790 E-Mail: markf8cegroupin"om ey 751 Primary Lift Station Design Narrative & p,.0 SE 18894 The 751 Primary LS provides for Duplex 85 HP submersible pumps capable of pumping under several operating conditions. The pumps are rated at +1-1098 GPM at 116' TDH. This condition is reflects all 3 LS sharing the 20" FM having (1) pump in operation. The State has confirmed this scenario as the proper rating for the LS. Based upon run times shared by Water Mgmt for the Stagecoach LS; the 751 Primary LS will also operate independently of the other lift stations based upon observed cycle times. Under the rated condition, all forcemains achieve a minimum of 2 FPS and 751 Primary has 6 cycles per hour. When 751 Primary LS is operating independent of other LS (Scenario 1 A); the 20" shared FM has a velocity of 1.7 FPS. This portion of the FM also receives over 6 hours of contributing flow from the Stagecoach LS at velocities in excess of 3 FPS. This design is based upon the City of Durham 2014 LS Design Standards with exception to the allowance of submersible pumps (agreed upon with the City). All calculations are consistent with the MDC for Permitting of Pump Stations and FM 03108 The LS discharges into an existing 12" FM permitted by others WQ 0039295. The 12" FM then connects to the existing 20" Stagecoach LS FM at the intersection of NC 751 and Stagecoach Road. From there the wastewater is conveyed directly to the South Durham WRF. This permit is a zero -flow permit. City of Durham assigns wastewater flow with the gravity sewer extension permits rather than with the LS permit. This LS is sized to accommodate 385,000 GPD of domestic wastewater as outline on Page 2 of 5 in the FTA application (attached). k •fit, -{ - ! ire- •✓,Hl it � � wrmt+ar ro ' 1 �'1 � / � •} auPao tRta rndr Lutno f� IAW wtw w a.rwarax pl SP' lands- ouct+s+wrn+ 11, 1,11r zi lrl PRIM A—R-Y LS r� f b �rvrc nP 30 NO lb "4tf IM � 4 O 2000' 4000' GREEN LEVEL, NC 2016 SCALE: 1 " = 2000' NORTH �RtFl. US03 X24 Rr•] 13 Division of Water Resources State of North Carolina Department of Environmental Quality Division of Water Resources Flow Tracking for Sewer Extension Applications (FTSE 10-18) Entity Requesting Allocation: City of Durham Project Name for which flow is being requested: 751 South Primary LS More than one FTSE may be required far a single project if the owner of the fVIVTP is not responsible for all pump stations along the route of the proposed wastewater flow. 1. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: South Durham WRF b. WWTP Facility Permit #: NC 0047597 c. WWTP facility's permitted flow d. Estimated obligated flow not yet tributary to the WWTP e. WWTP facility's actual avg. flow f. Total flow for this specific request g. Total actual and obligated flows to the facility h. Percent of permitted flow used A11 flows are in MGD 20MGD 3.7MGD 9.45MGD 0.3851 MGD 13.54MGD 67.7% II. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP: (A) Design Pump Pump Average Station Station Firm Daily Flow** (Name or Permit Capacity, * (Firm ;` pf), Number) No. MGD MGD (B) (C) (D)=(B+C) (E)=(A-D) Obligated, Approx. Not Yet Total Current Current Tributary Flow Plus Avg. Daily Daily Flow, Obligated Available Flow, MGD MGD Flow Capacity*** * The Firm Capacity (design flow) of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pf) not less than 2.5, per Section 2.02(A)(4)(c) of the Minimum Design Criteria. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is < 0. Downstream Facility Name (Sewer): 751 South 12" FM Collection SXstem Downstream Permit Number: WQ0039295 Page 1 of 6 FTSE 10-18 Ill. Certification Statement: certify to the best of my knowledge that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II plus all attached planning assessment addendums for which I am the responsible party. Signature of this form certifies that the receiving collection system or treatment works has adequate capacity to transport and treat the proposed new wastewater. G/Zr d Signing OjJIcial Signature Date Title of Signing Official Page 2 of 6 FTSE 10-18 �J Cashion, Ted From: Cashion, Ted Sent: Tuesday, July 14, 2020 3:23 PM To: Greeley, Don; mark@cegroupinc.com Cc: Robinson, Jason; Deck, Erin M Subject: 751 South Primary LS fast track sewer extension application, WQ0041756 Hi Don and Mark, We are reviewing the subject application. Just a couple of clarifications are needed before we draft the permit. Item VI.7 of the application notes a flow of 385,100 gpd, but the narrative states this permit is a zero flow permit. It appears the 385,100 gpd is existing flow, and there will be no new flow in this permit. Please confirm. Item VIIIA of the application notes the pump capacity is 1098 gpm. The narrative notes the pumps are rated at 1188 gpm. Please confirm the pump capacity. We'll start drafting the permit upon submittal and review of the above. Thx ted Ted Cashion Water Quality Regional Operations Division of Water Resources NC Department of Environmental Quality Raleigh Regional Office 919-791-4254 ted.cashiont@ncdenr.gov 1628 Mail Service Center Raleigh, NC 27699-1628 3800 Barrett Drive Raleigh, NC 27609 — �t}tttisnt of ln.:urwntaf h:�h.Y�'� !! Subscribe to Collection System & Sewer Permitting Updates Email correspondence to and from this address may be subject to the North Carolina Public Records Low and may be disclosed to third parties unless the content is exempt by statute or other regulation. 7/1412020 Mail - Cashion, Ted - Outlook <t Reply all ul Delete (S) Junk Block ••• Re: [External] RE: 751 South Primary LS fast track sewer extension application, WQ0041756 To: Mark Ashness <mark@cegroupinc.com> Cc: Greeley, Don <Don.Greeley@durhamnc.gov>; Robinson, Jason; Deck. Erin M Ok thanks Mark Sent from my Phone On Jul 14, 2020, at 4:46 PM, Marls Ashness <mark@cegroupinc.com> wrote: CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to report.spam@.nc.gov Ted: Sorry about that the pump rating is 1098 GPM. I have corrected the narrative and Page 3 of the FTA (attached). There is no flow associated with this permit. Durham assigns flow thru the gravity sewer extension permits rather than on the LS permit. thx Mark Ashness P.E, LEED AP <image003jp9> <image0044 jpg> 301 Glenwood Avenue, Suite 220 Raleigh, NC 27603 Phone: (919) 367-8790 Cell: (919) 606-7704 From: Cashion, Ted <ted.cashion@ncdenr.gov> Sent: Tuesday, July 14, 2020 3:23 PM To: Greeley, Don <Don.Greeley@durhamnc.gov>; Mark Ashness <mark@CEGROUPINC.COM> Cc: Robinson, Jason <jason.t.robinson@ncdenrgov>; Deck, Erin M <erin.deck@ncdenr.gov> Subject: 751 South Primary LS fast track sewer extension application, WQ0041756 https://outlook.office365.comimaiVdeeplink?version=2020070601.02&popoutv2=1 111