Loading...
HomeMy WebLinkAboutWQ0029363_Sewer Extension_20050928Z _O H Q O U. _Z Z 0 Q V J a Q L e ( I W a 51539 pJ 66-456-531 DATE / USE THE TAB KEY TO MOVE FROM FIELD TO FIELD! Application Number: (to be completed by DWQ) � U[� - .----- ---------------, 1. Owner.• 1a. PEMBROKE HARDWARE Full Legal Name (company, municipality, HOA, utility, etc.) 1b. LINDSAY LOCKLEAR, OWNER - Signing Official Name and Title (Please review 15A NCAC 2H .0206(b) for authorized signing officials!) 1 c. The legal entity who will own this system is: ® Individual ❑ Federal ❑ Municipality ❑ State/County ❑ Private Partnership ❑ Corporation ❑ Other (specify): 1d. PO BOX 1027 le. PEMBROKE Mailing Address City 1f. NORTH CAROLINA 1g. 28372 State Zip Code 1 h. 910-521-3406 1 i. 1 j. Telephone Facsimile E-mail 2. Project (Facility) Information: 2a. PEMBROKE HARDWARE 2b. ROBESON Brief Project Name (permit will refer to this name) County Where Project is Located 3. Contact Person` 3a. LARRY ANDERSON, P.E. Name and Affiliation of Someone Who Can Answer Questions About this Application 3b. (910) 671-9530 3c. Anderson@carolina.net Phone Number _ _ _ E-mail 1. Project is ® New ❑ Modification (of an existing permit) If Modification, Permit No. PEMBROKE HARDWARE COMPANY 118 W. 3RD STREET P.O. BOX 1027 PEMBROKE, NC 28372 (910) 521-3406 PAY TO THE��''�% ORDER OF DOLLARS DUIRED PEMBROKE NORTH CAROuru 28M FOR 11'0005153911' 1:053045613i: M330024100 u • •r�•^�^•w��^��^'^�"J u moutuuviI 1UU % UomestiGCommercial ❑ Mobile Home Park ❑ Hospital ❑ School ❑ Church ❑ Restaurant ❑ Nursing Home ❑ Office ® Other (specify): COMMERCIAL - 7. Volume of wastewater to be allocated for this particular project: 5,000 gallons per day *Do not include previously permitted allocations 8. If the permitted flow is zero, indicate why: ❑ Interceptor Line - Flow will be permitted in subsequent permits that connect to this line ❑ Flow has already been allocated in Permit No. ❑ Rehabilitation or replacement of existing sewer with no new flow expected % Industrial % Other (specify): 1'0103/2005 16:57 910GI80838 ANDERSON ENGINEERING IPAGE 01 Anderson ,Engineering & Assoc., P.A. PO. Box 1736 Larry Anderson, P.E. 305 North Chippewa President Lumberton, N.C. ,28359 SUBMITTAL COVER SHEET DATE: ID - 3 -oS SUBMITTED TO: ATTE NTION: I REFERENCE: NUMBER OF COPIES:•- FROM: ;Z COMMENTS: •n P� 1 ,• •I ,. •.'. .,:1 oaf f 7 4 National Society of Professional 6..Z,:neers® XSPEUcaAasAMemAei Phone: (910) 671-9530 • Fax: (910) 618-0838 • Email: anderson 0 carolina. net 10/03/2005 16:57 9106180838 _A NDERSON ENGINEERING PAGE 04 FAST -TRACK APPLICATION for GRAVITY SENVERS, PUMP STATIONS, AND FORCE MAINS PAGE 3 USE THE TAB KEY TO MOVE FROM FIELD TO FIELDI Application Number: (to be completed by DWQ) 1. Owner.- 1 a. PEMBROKE HARDWARE ...... .. . ... .............. . .... .... . Full Legal Name (company, municipality, HOA, Wily, etc.) . .. ... .. ...... . .... .. ... .. ... ........ ............... --- .......... .. I ............. . . .. . . ...... 0 1b. LINDSAY LOCKLEAR, OWNER Signing Official Name and Title (Please review I SA NCAC 2H .0206(b) for authorized signing officials!) .. . . .... . ............ . ... ... ........... ..... ........ . . ...... . ... ..................... ......... .. ...... .......... . ... ..... ..... ...... ......... .. ... .. ........ .... . ..... ...... ............. . . .. ... ......... ............... .. . '-.- .. ...... ..... .... ........ .... 1c. The legal entity who YAII own this system is - Individual El Federal E........Municipality EState/County...E] ..Private Partnership_[].....C.o....r.p.o....r.ation COther-(specify)- ... ..... 0 LL Id- PO BOX 1027 le. PEMBROKE , Mailing Address city - ----- ----- - - Z �11f. NORTH CAROLINA 11g. 2-8-372 - ------- c) state Zip Code ...... ... .... .. ... . ............................... .. ..... ..... ..... ............ .. ... ...... - . ................. . . . . . --.- . ..... .......... ......... ..... I h. (910) 521-3406 ... Telephone Facsimile E-mail .. ......... . -1.......-...... 1.11 ...... .. ......... ..... ............. ........ . .............. ... ........ . ... ...... ..... . ................. . ...... . .. ........................... ... . . . . ........ ...... .... . ............ ... . .. .... .. .. .. ... ... ... ... ......... .... ... . Project (Facility) Information: _J ......... .. ... I .... . ..... ......... ............. . ... ............ . . . ............. ..... ... ...... .......... . ..... :� a. PEMBROKE HARDWARE 12b. ROBESON Brief Project Name (permit will refer to this name) County Where Project Is Located 3 ' . Contact ' ' ' ' " Person: ' ' ' . .. .... ... ... ..... ........ Pa. LARRY W. ANDERSON PE eend Som acne Who Can Answer Questions About this Application ',..N..a.m. .-Affiliation ..of 1. .......... ...... ... .. ...................... .. ... .. .. .. .. . 3b. (910) 671-9530 Phone Number E-mail Project is Z New 0 Modification (of an existing permit) If Modification, Permit No.: For modifications, attach a separate sheet clearly explaining the reason for the modification (i.e. adding another phase, changing line size/length, etc.). Only Include the modified Information In this permit application - do not duplicate project Information In B(7) and 13(10-11) that has already been Included In the original permit. 1. Owner is El Public (skip to Item B(3)) Private (go to Item 2(a)) 2a. If private, applicant will be: 2b. If §2W, facilities owned by a (must choose 2aa) X Retaining Ownership (Le. store, church, single office, etc.) or Public Utility (instruction N., Z'❑ El Le etc Leasing units (lots, townhomes, - - skip to Item B(3)) El Homeowner Assoc./Developer (instruction IV) CJ Selling Sg units (lots, townhomes, etc. - go to Item R(2b)) TOWN OWN OF PEMBROKE Owner of Wastewater Treatment Facility (WWTF) Treating Wastewater From This Project 4a, TOWN OF PEMBROKE - ----------- b. NC0027103 Name of WWTF Permit No. �.Sa. TOWN OF PEMBROKE Gravity 5c. Owner Downstream Sewer of Se7ReceIvIng Size ❑IM Force Main Sewer Permit Number of Downstream Sewer (if known) :6- The origin of this wastewater is (check all that apply): El Residential Subdivision F-1 Car Wash EJ Apartments/Condominiums El Institution 100 % Domestic/Commerclal E Mobile Home Park El Hospital d. L1 School EJ Church - % Industrial [I Restaurant El Nursing Home % Other (specify): 0 Office Other (specify): -Q-WMERICAL 7. Volume of wastewater tg bg i2JlQcj3!ed for this particular project: QQ gallons per day 'Do not Include previously permitted allocations 8. If the permitted flow IS zero, indicate why: El Intemaptor Line - Flow will be permitted in subsequent pen -nits that connect to this line D Flow has already been allocated in Permit No. El Rehabilitation or replacement of existing sewer with no new flow expected r'r A A'I /1)'l 1[3— 1 nA If) C 10/031/2005 16:57 9106180838 ANDERSON ENGINEERING PAGE 05 FAST -TRACK APPLICATION for GRAVITY SENVERS, PIJMP STATIONS, AND FORCE MAINS PAGE 4 9. Provide the wastewater flow calculations used In determining the permitted flow in accordance with 15A NCAC 2H .0219(I) for Item 13(7) or the design flow for line or pump station sizing if zero flow in the space below. Values other than that in 15A NCAC 2H .0219(I)(1-2) must be supported with actual water or wastewater use data in accordance with 15A NCAC 2H .0219(I)(3). 20 EMPLOYEES 0 25 GALLON PER OAY PER EMPLOYEE = 500 GPD _._ . _..... .-...... _.... 10. Summary of Sewer Lines to be Permitted (attach additional sheets If necessary) Size (inches) 810 4" 0 Length (feet) 800 210 ENTER TOTAL LINE LENGTH IN MILES 0 19 _ __._ ....... _... Summary of Pump Stations to be Permitted (attach additional sheets as necessary) Gravity or Force Main se the pull down menu) ................... C^• I!TY GRAVITY t, Location ID Power Reliability Option (self chosen • as shown on I Design Flow Operational Point (1- dual line feed; 2- permanent generator w1ATS; 3- fGPM TDH._portable�raor w/tel_e...m._etrY•.4..--wet ...... storage) cross-re ii 12. Does the sewer system comply with the Minimum Design Criteria for the Fast Track Permitting of Pump Stations and Farce Mains (latest version), the Gravity Sewer Minimum Design Criteria (latest version) and 15A NCAC 2H .b200 as applicable? ® Yes ❑ No If no, please reference the pertinent minimum design criteria or regulation and Indicate why a I..:•:j variance Is requested. SUBMIT TWO COPIES OF PLANS, SPECIFICATIONS OR CALCULATIONS ' PERTINENT TO THE VARIANCE WITH YOUR APPLICATION 3. Have the following permits/certifications been submltted for approval? Wetland/Stream Crossings -General Permit or 401 Certification? ❑ Yes ❑ No M N/A Sedimentation and Erosion Control Plan? ® Yes ❑ No ❑ N/A Stormwater? ❑ Yes ❑ No ® N/A Y i14. Does this proJecf involve aorial !Ines or blphorls? Check if yes; ❑ ....__. iihe�.�.lin�aa..�cill.Ae.s�zn»idt3rasi hlah.adodty and,r►t�+�t �.�..chm�k�d vin�e evanr-alx.months................... ..............,....-...-..__—_---_-_.-.-- 15. Does this project have gravity sewer lines designed at minimum slopes? ' ��� �� � ��... .. Be aware that the Division will not accept Installed Imes more than 10%flatter than the minimum slope- Lines Installed outside this tolerance should he corrected prior to submitting the final engineering certiflcatlon.. L— OF NATF9 State of North Carolina Department of Environment and Natural Resources y Division of Water Quality SFP 2 M. FAST -TRACK APPLICATION for GRAVITY SEWERS, PUMP STATIONS, AND FORCE MAINS (Pressure sewers systems are not to be included as part of this application package) INSTRUCTIONS: Indicate that you have included/addressed the following list of required application package items by checking the space provided next to each applicable item. Failure to submit all required items will lead to your application being returned as incomplete. This form may be photocopied for use as an original. 01. Application Form - Submit one original and one copy of the completed and appropriately executed application form. Any changes to this form will result in the application being returned. The Division of Water Quality (Division) will only accept application packages that have been fully completed with all applicable items addressed. You do not need to submit detailed plans and specifications unless you respond NO to Item B(12). ® II. Application Fee - Submit a check in the amount of $400 made payable to: North Carolina Department of Environment and Natural Resources (NCDENR). Checks shall be dated within 90 days of application submittal. ❑ III. Certificates of Public Convenience and Necessity — If the application is being submitted in the name of a privately -owned public utility, submit two copies of the Certificate of Public Convenience and Necessity (CPCN) which demonstrates that the public utility is authorized to hold the utility franchise for the area to be served by the sewer extension. If a CPCN has not been issued, provide two copies of a letter from the North Carolina Utilities Commission's Public Staff that states that an application for a franchise has been received, that the service area is contiguous to an existing franchised area, and/or that franchise approval is expected. The project name in the CPCN or letter must match that provided in Item A(2a) of this application. ❑ IV. Operational Agreements — Submit one original and two copies of a properly executed operational agreement if the sewer extension is permitted by a private applicant and will be serving residential or commercial lots (e.g., houses, condominiums, townhomes, outparcels, etc.) that will be sold to another entity. If the applicant is a homeowners' association, use Form HOA 02/03. If the applicant is a developer, use Form DEV 02/03. EVEN IF THE PROJECT WILL BE TURNED OVER TO A MUNICIPALITY, FORM DEV 02/03 IS REQUIRED. ® V. Flow Acceptance Letters — If the owner of the downstream sewers and/or WWTF is different from the applicant, submit two copies of a flow acceptance letter from the owner of the downstream sewers and VVWTF, if different. Flow acceptance letters must contain the following minimum information: applicant and project name, amount of flow accepted, and name and permit number of the receiving sewers/WVVTF. The flow acceptance must not expire prior to permit issuance and must be dated less than a year prior to the application date. Intergovernmental agreements or other contracts will not be accepted in lieu of a project -specific flow acceptance letter. ® VI. Map — Submit an 8.5-inch by 11-inch COLOR copy of the portion of a 7.5-minute USGS Topographic Map along with this form. The map should identify the entire project area location as well as the closest downslope surface waters as clearly as possible. Each map portion must be labeled with the map name and number, the identified location of the sewer line and pump stations, and be of clear and reproducible quality. For instance, if the project involves 4 miles of interceptor sewer that traverses over or near several different waterbodies (or counties, basins, etc.), the map should have location ID's shown for each different waterbody (where the sewer line is within 100 feet of such waterbody - see Instruction VII). This location ID is self chosen and used to cross reference the location in Section C of the permit application. ❑ VII. Stream Classifications — Section C • If any portion of the project is within 100 feet of any down slope surface water, Section C must be completed for the pertinent sections. • If the entire project area is a minimum of 100 feet away from any down slope surface waters BUT there is a pump station involved where a history of power outage is to be used to provide adequate design storage instead of dual feed or permanent or portable generator, Section C must be completed to demonstrate that the closest down slope surface water is Class C (see 15A NCAC 2H .0219(h)(3)(D)). • Use the guidance document entitled, "Determining Watershed Classifications for Form FTA 02/03 (Fast -Track Sewer Systems)" available from http://h2o.enr.state.nc.us/peres or by contacting the appropriate regional office. ❑ Vill. Environmental Assessments — If this project is subject to an Environmental Assessment (EA) [15A NCAC 01C], this application can not be used. Send the project application on Form PSFMGSA 10/99 to the PERCS Unit, 1617 Mail Service Center, Raleigh, NC 27699-1617. Applications can not be accepted until a Finding of No Significant Impact (FONSI) or Environmental Impact Statement (EIS) has been issued. A copy is to be submitted with that permit application. ® IX. Certifications — Section D The application must be certified by both the applicant and a North Carolina Registered Professional Engineer (PE). The applicant signature must match the signing official listed in Item A(lb). The PE should NOT certify the application if he/she is unfamiliar with 15A NCAC 2H .0200, the Gravity Sewer Minimum Design Criteria (most recent version) and the Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains (most recent version), as applicable to the project. Certification by a PE who is unfamiliar with these documents is subject to NC Board referral. ❑ X. Downstream Sewer & Wastewater Treatment Plant Capacity The applicant has assured downstream pipe, pump station and treatment plant capacity. The addition of new sources of wastewater from this project has been evaluated along the route to the receiving treatment plant. The flow from this project will not cause capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving wastewater treatment plant. If the applicant is not the owner of the downstream sewer or receiving treatment plant, submittal of flow acceptance letter(s) indicates that owner has adequate capacity and will not violate G.S. 143-215.67(a). ' THE COMPLETED FTA 02/03 APPLICATION PACKAGE, INCLUDING ALL SUPPORTING DOCUMENTS AND $400 FEE, SHOULD BE SENT TO THE APPROPRIATE REGIONAL OFFICE REGIONAL OFFICE ADDRESS COUNTIES SERVED Asheville Regional Office 2090 US Highway 70 Avery, Buncombe, Burke, Caldwell, Swannanoa, North Carolina 28778 Cherokee, Clay, Graham, Haywood, (828) 296-4500 Henderson, Jackson, Macon, Madison, (828) 299-7043 Fax McDowell, Mitchell, Polk, Rutherford, Swain, Transylvania, Yancey Fayetteville Regional Office 225 Green Street Suite 714 Anson, Bladen, Cumberland, Harnett, Fayetteville, North Carolina 28301 Hoke, Montgomery, Moore, Robeson, (910) 486-1541 Richmond, Sampson, Scotland (910) 486-0707 Fax Mooresville Regional Office 610 E. Center Avenue, Suite 301 Alexander, Cabarrus, Catawba, Mooresville, North Carolina 28115 Cleveland, Gaston, Iredell, Lincoln, (704) 663-1699 Mecklenburg, Rowan, Stanly, Union (704) 663-6040 Fax Raleigh Regional Office 1628 Mail Service Center Chatham, Durham, Edgecombe, Franklin, Raleigh, North Carolina 27699-1628 Granville, Halifax, Johnston, Lee, Nash, (919) 571-4700 Northampton, Orange, Person, Vance, 919 571-4718 Fax Wake, Warren, Wilson Washington Regional Office 943 Washington Square Mall Beaufort, Bertie, Camden, Chowan, Washington, North Carolina 27889 Craven, Currituck, Dare, Gates, Greene, (252) 946-6481 Hertford, Hyde, Jones, Lenoir, Martin, (252) 975-3716 Fax Pamlico, Pasquotank, Perquimans, Pitt, Tyrrell, Washington, Wayne Wilmington Regional Office 127 Cardinal Drive Extension Brunswick, Carteret, Columbus, Duplin, Wilmington, North Carolina 28405 New Hanover, Onslow, Pender (910) 395-3900 (910) 350-2004 Fax Winston-Salem Regional Office 585 Waughtown Street Alamance, Alleghany, Ashe, Caswell, Winston-Salem, North Carolina 27107 Davidson, Davie, Forsyth, Guilford, (336) 771-4600 Rockingham, Randolph, Stokes, Surry, (336) 771-4631 Fax Watauga, Wilkes, Yadkin Formore information, visit ourweb site at: http.//h2o.enr.state.nc.us/peres/ Z O l� O LL Z Z 0 Q _U J Ill. a Q ai� Z O 1- Q O LL Z H W a Ti USE THE TAB KEY TO MOVE FROM FIELD TO FIELD! Application Number: �/� oo n C] (to be completed by DWQ) �y( 1. Owner. 1 a. PEMBROKE HARDWARE Full Legal Name (company, municipality, HOA, utility, etc.) 1 b. LINDSAY LOCKLEAR, OWNER Signing Official Name and Title (Please review 15A NCAC 2H .0206(b) for authorized signing officials!) 1 c. The legal entity who will own this system is: ® Individual ❑ Federal ❑ Municipality ❑ State/County ❑ Private Partnership ❑ Corporation ❑ Other (specify): 1d. PO BOX 1027 1e. PEMBROKE Mailing Address City 1f. NORTH CAROLINA 1g. 28372 State Zip Code 1 h. 910-521-3406 1 i. 1 j. Telephone Facsimile E-mail 2. Project (Facility) Information: 2a. PEMBROKE HARDWARE 2b. ROBESON Brief Project Name (permit will refer to this name) County Where Project is Located 3. Contact Person: 3a. LARRY ANDERSON, P.E. Name and Affiliation of Someone Who Can Answer Questions About this Application 3b. (910) 671-9530 3c. AndersonAcarolina.net Phone Number E-mail 1. Project is ® New ❑ Modification (of an existing permit) If Modification, Permit No.: For modifications, attach a separate sheet clearly explaining the reason for the modification (i.e. adding another phase, changing line size/length, etc.). Only include the modified information in this permit application - do not duplicate project information in B(7) and B(10-11) that has already been included in the original permit. 2. Owner is ❑ Public (skip to Item B(3)) ® Private (go to Item 2(a)) 2a. If private, applicant will be: 2b. If sold, facilities owned by a (must choose one ® Retaining Ownership (i.e. store, church, single office, etc.) or ❑ Public Utility (Instruction III) ❑ Leasing units (lots, townhomes, etc. - skip to Item B(3)) ❑ Homeowner Assoc./Developer (Instruction IV) ❑ Selling units (lots, townhomes, etc. - go to Item B(2b)) 3. TOWN OF PEMBROKE Owner of Wastewater Treatment Facility (WVVTF) Treating Wastewater From This Project 4a. TOWN OF PEMBROKE 4b. NCO027103 Name -of WWLF WWTF Permit No. 5a. �--_�mer of Downstream vas D b mg Sewer Size Gravity ❑ Force Main a permit Number of Downstream Sewer (if known) 6. The origin of this wastewater is (check all that apply): ❑ Residential Subdivision ❑ Car Wash ❑ Apartments/Condominiums ❑ Institution 100 % Domestic/Commercial ❑ Mobile Home Park ❑ Hospital ❑ School ❑ Church % Industrial ❑ Restaurant ❑ Nursing Home % Other (specify): ❑ Office ® Other (specify). COMMERCIAL 7. Volume of wastewater to be allocated for this particular proj!!ct: 5,000 gallons per day `Do not include previously permitted allocations 8. If the permitted flow is zero, indicate why: ❑ Interceptor Line - Flow will be permitted in subsequent permits that connect to this line ❑ Flow has already been allocated in Permit No. ❑ Rehabilitation or replacement of existing sewer with no new flow expected 9. Provide the wastewater flow calculations used in determining the permitted flow in accordance with 15A NCAC 2H .0219(I) for Item 13(7) or the design flow for line or pump station sizing if zero flow in the space below. Values other than that in 15A NCAC 2H .0219(I)(1-2) must be supported with actual water or wastewater use data in accordance with 15A NCAC 2H .0219(I)(3). 20 EMPLOYEES @ 25 GALLONS PER DAY PER EMPLOYEE = 5,000 GPD 10. Summary of Sewer Lines to be Permitted (attach additional sheets if necessary) Size (inches) Length (feet) 8"o 4'e M 210 Gravity or Force Main (use the pull down menu) GRAVITY GRAVITY W Z zspurENTER TOTAL LINE LENGTH ----- ------------- - -- -- -- IN MILES .21 V11. Summary of Pump Stations to be Permitted (attach additional sheets as necessary) Z Location ID Power Reliability Option 0 (self chosen - as shown on Design Flow! Operational Point (1- dual line feed; 2- permanent generator w/ATS; 3- Q plans for cross-reference) (MGD� GPM @ TDH portable generator whelemetry_; 4alvet well storage) LL 12. Does the sewer system comply with the Minimum Design Criteria for the Fast Track Permitting of Pump Stations and Force Mains (latest version), the Gravity Sewer Minimum Design Criteria (latest version) and 15A NCAC 2H .0200 as applicable? LU ® Yes ❑ No If no, please reference the pertinent minimum design criteria or regulation and indicate why a IZ variance is requested. SUBMIT TWO COPIES OF PLANS, SPECIFICATIONS OR CALCULATIONS PERTINENT TO THE VARIANCE WITH YOUR APPLICATION m 13. Have the following permits/certifications been submitted for approval? Wetland/Stream Crossings - General Permit or 401 Certification? ❑ Yes ❑ No ® N/A Sedimentation and Erosion Control Plan? ® Yes ❑ No ❑ N/A Stormwater? ❑ Yes ❑ No ® N/A 14. Does this project involve aerial lines or siphons? Check if yes: ❑ These lines will be considered hiah priority and must be checked once every six months 15. Does this project have gravity sewer lines designed at minimum slopes? Be aware that the Division will not accept installed lines more than 10 % flatter than the minimum slope Lines installed outside this tolerance should be corrected prior to submitting the final engineering certification.. A r1, Use the Division's guidance document entitled, "DETERMINING STREAM CLASSIFICATIONS FOR FORM FTA 02/03 (FAST -TRACK SEWER SYSTEMS)" to collect and record the stream classification data below (attach additional sheets a: necessary). This document is available from our web site or by contacting the appropriate Division of Water Quality regional office (see instructions for addresses) OR indicate the following: ® A Stream Classification is not needed because all parts of the project are at least 100 feet away from any down slope waterbody; AND, ® A Stream Classification is not needed because the design does not depend on wet well storage as a power reliability option for any pump station near a Class C down slope waterbody. Location ID on Map (self chosen - as shown on Name of map for cross-reference) Waterbody la. Waterbody Stream Waterbody County River Basin Index Classification Submit the 8 5" x IV COLOR topographic map as required in Instruction VI regardless of whether a classification is provided! Applicant's Certification: 1, LINDSAY LOCKLEAR, attest that this application for PEMBROKE HARDWARE has been reviewed by me and is accurate and complete to the best of my knowledge. i understand that if all required parts of this application are not completed and that if all required supporting documentation and attachments are not included, this application package is subject to being returned as incomplete. Note: In accordance with North Carolina General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed $10,000 as we// as civil penalties up to 2. Professional Enqineer's Certification: I attest that this application for PEMBROKE HARDWARE has been reviewed by me and is accurate, complete and consistent with the information in the engineering plans, calculations, and all other supporting documentation to the best of my knowledge. I further attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer Minimum Design Criteria for Gravity Sewers adopted February 12, 1996, and the Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 and the watershed classification in accordance with Division guidance. Although certain portions of this submittal package may have been developed by other professionals, inclusion of these materials under my signature and seal signifies that I !, have reviewed this material and have judged it to be consistent with the proposed design. Note: In accordance with NC General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed $10,000 as well as civil penalties up to $25,000 per violation. 2a. LARRY W. ANDERSON, P.E. Professional Engineer Name 2b. ANDERSON ENGINEERING & ASSOCIATES, P.A. Engineering Firm 2c. 305 N. CHIPPEWA STREET Mailing Address 2d. LUMBERTON 2e. NC 2f. 28358 City State Zip 2g. (910) 671-9530 2h. (910) 618-0838 2i anderson@carolina.net Telephone Facsimile E-mail SEAL 13325 lFqq GlNe Seal, Signature & Date 14 • 1 r 31'-10.-5" — op of _ -... b • • .eT '6eptoR► � w�. - � 1 0 �\ y - --- ---- --fir---- '----- - � a �, � ���• ... l ��..�-. q/ • • , / a 711 ram✓ \ \ • a Ol ell 'ti' , - out ',; ' • . .., y Y 7bwe�°. County- -fairgrounds- .. ' ••\' b Com ��.� A ell, �� a • • '. -�= � �:� • ; '� ,�' � . ,fir `.� / all.NN h ew�OB`5.a 60 Cem • o. y 1 Sind t 61 U / • 151 . . \ 4F • + \ ! ..� ' . •- k - it J •- I(MM n.1..w.. MY #WPM. �r,p I I•ffl• IIY.\ *�7MI" V•614.1-14-G1M11 IWIN H: IJ-4 "MiUfl: ♦T\o.l Anderson Engineering & Assoc., P.A. P.O. Box 1736 305 North Chippewa Lumberton, N.C. 28359 September 16, 2005 NCDHNR-DEM 225 Green Street Suite 714 Fayetteville NC 28301 Ref.: Pembroke Hardware Fast Track Application Dear Sir or Madam: Larry Anderson, P.E. President SEP 2 8 205 Please find enclosed the following on the above referenced project for your review and approval: 3 copies of the Fast Track Application, Application Fee ($400.00), Flow Acceptance Letter, Should you have any questions, please do not hesitate to contact me. Sincerely, AN ERSON E EERING & ASSOCIATES, P.A. Dwayne- Johnso CAD Designer DJ/rrc Enclosures National Society of Professional Engineers® NSPEWNW Member Phone: (910) 671-9530 - Fax: (910) 618-0838 - Email: anderson@carolina.net POST OFFICE BOX 866 PEMBROKE. NORTH CAROLINA 28372 OFFICE OF THE MANAGER SEP 2 8 2005 September 14, 2005 To Whom It May Concern: MUNICIPAL BUILDING WEST THIRD STREET The Town of Pembroke will provide sewer service to Pembroke Hardware Co., Inc. located on Hwy 711 East. If you have questions or need additional information, please do not hesitate to let me know. Sincerely, McDu a Cummings McDC/ah PHONE (910) 521.4333 0 FAX (910) 521-0472