Loading...
HomeMy WebLinkAboutNCC203098_ESC Approval Submitted_20200724ROY COOPER G u rrnoar MICHAEL S. REGAN St.cretarp BRIAN WRENN :Ic ring U,rc_ rar NORTH CAROLINA Environmental Qualify June 4, 2020 LETTER OF APPROVAL Johnston County ATTN: Rick J. Hester, County Manager PO Box 2263 Smithfield, NC 27577 RE: Project Name: Johnston County 210 Wastewater Treatment Facility Acres Approved: 23.1 Project ID: JOHNS-2020-027 County: Johnston, City: Smithfield, Address: 684 Count Home Rd., 1300 Galilee Rd River Basin: Neuse Stream Classification: Other Submitted By: Hazen and Sawyer Date Received by LQS: May 29, 2020 Plan Type: Revised Dear Mr. Hester: The subject erosion and sedimentation control plan has been approved. The enclosed Certificate of Approval must be posted at the job site. This plan approval shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 413.0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the $100 annual permit fee. After the fee is received, you will receive the COC via email. You MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed at .nc. ov NCG 1. Please direct questions about the eNOI form to Annette Lucas at Annette. Lucas u,nedenr.go% or Paul Clark at Paul.Clark a ncdenr.gov. If the owner'operator of this project changes in the future, the new responsible party is required to apply for hisrher own COC. Title 15A NCAC 4B .01 I8(a) and the NCGO1 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCGO1 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. ��� North Car�rlina Department of Environmenial Quality fJ:visirrn of Gtcryy Mineral and Land Rr>:iur � es D_ E—/ Raleigh Regional Of firr 14,28 Kta l Service C:entrr 'M00 barwoI Urivr Valvidh Vnrth C,�rniirva 2iFof1" Letter of Approval Johnston County June 4, 2020 Page 2 of) Title 15A NCAC 4B .0118(a) requires that a copy of the approved erosion control plan be on file at the job site. Also, this letter gives the notice required by G.S. I I3A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute I I3A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. This permit allows for a land -disturbance, as called for on the application plan, not to exceed the approved acres. Exceeding the acreage will be a violation of this permit and would require a revised plan and additional application fee. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction conference. Your cooperation is appreciated. Sincerely, Sally Castle, EI Regional Engineering Associate Land Quality Section Enclosures: Certificate of Approval NPDES NCGO1 Fact Sheet cc: Bret Edwards, PE (bedwards0whazenandsawyer.com) — Electronic Copy Regional Office file