LETTER OF APPROVAL WITH
PERFORMANCE RESERVATIONS
Thermal Belt Outreach Ministry, Inc.
ATTN: Mr. George AIley
P.O. Box 834
Columbus, NC 28722
RE: Project Name: THERMAL BELT OUTREACH MINISTRY, INC.
Acres Approved: 2.00
Project ID: POLK-2020-005
County: Polk
City: Columbus
Address: White Drive
River Basin: Broad
Stream Classification: C
Submitted By: Odom Engineering, Mr. David Odom, P.E.
Date Received by LQS: April 13, 2020
Date Revision Received by LQS: June 23, 2020
Date Revision Received by LQS: July 2, 2020
Plan Type: Infrastructure
Dear Mr. Alley,
This office has reviewed the subject erosion and sedimentatip control plan and hereby
issues this Letter of Approval with Performance Reservations.` A list of the performance
reservations is attached. This plan approval shall expire three (3) years following the date
of approval, if no land -disturbing activity has been undertaken, as is required by Title 1SA
NCAC 413.0129. Should the plan not perform adequately, a revised plan will be required (G.S.
113A-54.1) (b).
As of April 1, 2019, all new construction activities are required to complete and submit an
electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the
NCGO10000 Construction General Permit. After the form is reviewed and found to be
complete, you will receive a link with payment instructions for the $100 annual permit fee.
After the fee is received, you will receive the COC via email. You MUST obtain the COC prior
to commencement of any land disturbing activity. The eNOI form may be accessed at
-EQ� North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
Asheville Regional Office 12090 U.S. Highway 70 1 Swannanoa, North Carolina 28778
NORTHCAROLJNA �
oeparnmeoemE ihoomeoreigoalRy 828.296.4500
Letter of Approval with Performance Reservations
Thermal Belt Outreach Ministry, Inc.
ATTN: George Alley
July 16, 2020
Page 2 of 4
deq.nc.gov/NCG01. Please direct questions about the eNOI form to Annette Lucas at
Annette.lucas@ncdenr.gov or Paul Clark at Paul. clark�ncdenr.gov. If the owner/operator
of this project changes in the future, the new responsible party is required to apply for
his/her own COC.
Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following documentation
be kept on file at the job site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCG01 permit and the COC, once it is received.
3. Records of inspections made during the previous 12 months.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic
inspection to insure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Program is performance -oriented,
requiring protection of existing natural resources and adjoining properties. If, following the
commencement of this project, it is determined that the erosion and sedimentation control
plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of
1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions
to the plan and implementation of the revisions to ensure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and
State water quality laws, regulations, and rules. In addition, local city or county ordinances
or rules may also apply to this land -disturbing activity. This approval does not supersede
any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided
in the Financial Responsibility Form, which you provided. This permit allows for a land
disturbance, as called for on the application plan, not 14o exceed the approved
acres. Exceeding the acreage will be a violation of this permit and would require a revised
plan and additional application fee. You are requested to file an amended form if there is any
change in the information included on the form. In addition, it would be helpful if you notify
this office of the proposed starting date for this project. Please notify us if you plan to have
a preconstruction conference.
Your cooperation is appreciated.
ere ,
Fred Wa ke4P.
Express Engineer
Land Quality Section
Letter of Approval with Performance Reservations
Thermal Belt Outreach Ministry, Inc.
ATTN: George Alley
July 16, 2020
Page 3 of 4
Enclosures: Certificate of Approval
NPDES NCG01 Fact Sheet
Performance Reservations
ec: Mr. David Odom, P.E. [dayidodomgodomengineering.com)
cc: Regional Office file
Letter of Approval with Performance Reservations
Thermal Belt Outreach Ministry, Inc.
ATTN: George Alley
July 16, 2020
Page 4 of 4
PERFORMANCE RESERVATIONS
Additional measures may be required - The developer is responsible for the control of
sediment on -site. If the approved erosion and sedimentation control measures prove
insufficient, the developer must take those additional steps necessary to stop sediment
from leaving this site. Each sediment storage device must be inspected after each storm
event. Maintenance and/or clean out, is necessary anytime the device is at 50% capacity.
Ref: G.S.113A-54.1 through G.S.113A-57
Sections 15A NCAC 04A.0101 through 15A NCAC 04E.0504
General Permit NCG 010000 NPDES for Construction Activities
Im