Loading...
HomeMy WebLinkAboutNCC203123_ESC Approval Submitted_20200723ROY COOPER Governor MICHAEL S. REGAN Secretary BRIAN WRENN Director NORTH CAROLINA Environmental Quality, July 16, 2020 LETTER OF APPROVAL WITH PERFORMANCE RESERVATIONS Thermal Belt Outreach Ministry, Inc. ATTN: Mr. George AIley P.O. Box 834 Columbus, NC 28722 RE: Project Name: THERMAL BELT OUTREACH MINISTRY, INC. Acres Approved: 2.00 Project ID: POLK-2020-005 County: Polk City: Columbus Address: White Drive River Basin: Broad Stream Classification: C Submitted By: Odom Engineering, Mr. David Odom, P.E. Date Received by LQS: April 13, 2020 Date Revision Received by LQS: June 23, 2020 Date Revision Received by LQS: July 2, 2020 Plan Type: Infrastructure Dear Mr. Alley, This office has reviewed the subject erosion and sedimentatip control plan and hereby issues this Letter of Approval with Performance Reservations.` A list of the performance reservations is attached. This plan approval shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 1SA NCAC 413.0129. Should the plan not perform adequately, a revised plan will be required (G.S. 113A-54.1) (b). As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the $100 annual permit fee. After the fee is received, you will receive the COC via email. You MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed at -EQ� North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Asheville Regional Office 12090 U.S. Highway 70 1 Swannanoa, North Carolina 28778 NORTHCAROLJNA � oeparnmeoemE ihoomeoreigoalRy 828.296.4500 Letter of Approval with Performance Reservations Thermal Belt Outreach Ministry, Inc. ATTN: George Alley July 16, 2020 Page 2 of 4 deq.nc.gov/NCG01. Please direct questions about the eNOI form to Annette Lucas at Annette.lucas@ncdenr.gov or Paul Clark at Paul. clark�ncdenr.gov. If the owner/operator of this project changes in the future, the new responsible party is required to apply for his/her own COC. Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCG01 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Program is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. This permit allows for a land disturbance, as called for on the application plan, not 14o exceed the approved acres. Exceeding the acreage will be a violation of this permit and would require a revised plan and additional application fee. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction conference. Your cooperation is appreciated. ere , Fred Wa ke4P. Express Engineer Land Quality Section Letter of Approval with Performance Reservations Thermal Belt Outreach Ministry, Inc. ATTN: George Alley July 16, 2020 Page 3 of 4 Enclosures: Certificate of Approval NPDES NCG01 Fact Sheet Performance Reservations ec: Mr. David Odom, P.E. [dayidodomgodomengineering.com) cc: Regional Office file Letter of Approval with Performance Reservations Thermal Belt Outreach Ministry, Inc. ATTN: George Alley July 16, 2020 Page 4 of 4 PERFORMANCE RESERVATIONS Additional measures may be required - The developer is responsible for the control of sediment on -site. If the approved erosion and sedimentation control measures prove insufficient, the developer must take those additional steps necessary to stop sediment from leaving this site. Each sediment storage device must be inspected after each storm event. Maintenance and/or clean out, is necessary anytime the device is at 50% capacity. Ref: G.S.113A-54.1 through G.S.113A-57 Sections 15A NCAC 04A.0101 through 15A NCAC 04E.0504 General Permit NCG 010000 NPDES for Construction Activities Im