Loading...
HomeMy WebLinkAboutSW6200303_4- O&M EZ - Boykin_20200721Operation & Maintenance Agreement Project Name: Project Location: Boykin PV1 Solar Electric Power Plant Wade, Cumberland County, North Carolina Cover Page Maintenance records shall be kept on the following BMP(s). This maintenance record shall be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired, or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the pollutant removal efficiency of the BMP(s). The BMP($) on this project include (check all that apply & cc Bioretention Cell Quantity: Dry Detention Basin Quantity: Grassed Swale Quantity: Green Roof Quantity: Infiltration Basin Quantity: Infiltration Trench Quantity: Level Spreader/VFS Quantity: Permea'ble Pavement Quantity: Proprietary System Quantity: Rainwater Harvesting Quantity: Sand Filter Quantity: Stormwater Wetland Quantity: Wet Detention Basin Quantity: Disconnected Impervious Area Present: User Defined BMP Present: ing U&M tables wil Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): oe aaa Site I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed for each BMP above, and attached O&M tables. I agree to notify NCDENR of any problems with the system or prior to any changes to the system or responsible party. * Responsible Party: Title & Organization: Street address: City, state, zip: Phone number(s): Email: Signature: County of personally appeared before me this Fresh Air Energy XXXVIII, LLC 101 Second Street Ste. 1250 San Francisco, CA 94105 415-626-1802 Er!kS@ecoplexus.com , a Notary Public for the State of , do he&by certify that of acknowledge the due execution of the Operations and MaiWenance Agreement. Witness my hand and official seal, Date: � ' a70070 and Version 1.4 C&M Moot My commission expires 6/512020 Page 1 of :? CALIFORNIA CERTIFICATE OF ACKNOWLEDGMENT A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document. State of California County of ��i Gyhcasc� ) On � `, ZU� before me, Xl�j (here insert name/and title of the offi r) personally appeared Z5;-;Ie � who proved to me on the basis of satisfactory evidence to be the persot}(s) whose nameW^is/Awsubscribed to the within instrument and acknowledged to me that he/sj:ii/may executed the same in hWhelr/thterr authorized capacity(iO, and that by his/*/th) ' signatureks) on the instrument the personal, or the entity upon behalf of which the person(s) acted, executed the instrument. certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. WITNESS my hand and official seal. Signature MARY K. DULALiA 0 COMM, #2211247 z Notary Public • California o San Ffancisco County Comm, Ex fires Se , X, 202t (Seal) Optional Information Although the information in this section is not required by law, it could prevent fraudulent removal and reattachment of this acknowledgment to an unauthorized document and may prove useful to persons relying on the attached document. Description of Attached Document The preceding Certificate of Acknowledgment is attached to a document titled/for the purpose of „ram containing '-3 pages, and dated 2 16 The signer(s) capacity or authority is/are as: ❑ Individual(s) ❑ Attorney -in -Fact ❑ Corporate Officer(s) Title(s) ❑ Guardian/Conservator ❑ Partner - Limited/General ❑ Trustee(s) ❑ Other: representing: Name(s) or Person(s) or Ent'cty(ies) Signer is Representing Additional Information Method of Signer Identification Proved to me on the basis of satisfactory evidence: Q form(s) of identification Q credible witness(es) Notarial event is detailed in notary journal on: Page # Entry 0 Notary contact: Other ❑ Additional5igner(s) ❑ Signer(s)Thumbprint(s) El G Copyright 2007-2016 Notary Rotary, Inc. PO Box 41400, Des Moines, IA 50311-0507. All Rights Reserved. Item Number 101772. Please contact your Authorized Reseller to purchase copies of this form. STORM-EZ 6/5/2020 Version 1.4 O&M Manual Page 2 of 3 User Defined BMP Maintenance Requirements Section 1 Important operation and maintenance procedures: The entire vegetated area within the Solar Power Plant will be carefully managed to reduce the sediment load leaving the site. After the first-time fertilization to establish the permanent ground cover on the vegetated areas of the Solar Power Plant, Minimize use of Herbicides and Fertilizers per NCDEQ Stormwater Design Manual E-6 Avoid Compaction of Subsoil per NCDEQ Stormwater Design Manual E-6 Recommendation 1 Avoid Concentration of Stormwater per NCDEQ Stormwater Design Manual E-6 Recommendation 3 The system will be visually inspected by the owner/operator at leastquarterly. Records of operation and maintenance will be kept in a known set location and will be available upon request. Section 2 Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potential problem: How to remediate the problem: Entire Vegetated Area Areas of bare soil/ Gullies Regrade necessary to remove the gully, replant disturbed area. Entire Vegetated Area Vegetation Maintain vegetation at a heaight of approximately 12 inches. Receiving Water Body Erosion or signs of damage Contact the NC Division of Water Quality 401 Oversight Unit. STORM-EZ 6/5/2020 Version 1.4 O&M Manual Page 3 of 3