Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SW6200303__2020-07-21 Boykin - IFP's_20200721
101 Second Street, Ste. 1250 Fx: 415-449-3466 EcoPlexus, Inc. Ph: 415-626-1802 San Francisco, CA 94105A 2345BCD123451ABCDSEALN:\Projects\114003.xx Ecoplexus Solar\114003.19 Ecoplexus - Boykin\1__Dwg\BA Model Files\_G0001 Cover-Boykin.dwg, 7/21/2020 10:58:33 AM, leep 101 Second Street, Ste. 1250 Fx: 415-449-3466 EcoPlexus, Inc. Ph: 415-626-1802 San Francisco, CA 94105A 2345BCD123451ABCDSEALN:\Projects\114003.xx Ecoplexus Solar\114003.19 Ecoplexus - Boykin\1__Dwg\BA Model Files\C0101 Ex Conditions-Boykin.dwg, 7/21/2020 11:08:38 AM, leep 101 Second Street, Ste. 1250 Fx: 415-449-3466 EcoPlexus, Inc. Ph: 415-626-1802 San Francisco, CA 94105A 2345BCD123451ABCDSEALN:\Projects\114003.xx Ecoplexus Solar\114003.19 Ecoplexus - Boykin\1__Dwg\BA Model Files\C0102 Project Area Exhibits.dwg, 7/21/2020 10:57:36 AM, leep 101 Second Street, Ste. 1250 Fx: 415-449-3466 EcoPlexus, Inc. Ph: 415-626-1802 San Francisco, CA 94105A 2345BCD123451ABCDSEALINSET "B": 24' PERMANENT ACCESS DRIVEWAY #1INSET "A": 24' WIDE TEMPORARYCONSTRUCTION ENTRANCE #1INSET "D": 24' PERMANENT ACCESS DRIVEWAY #2INSET "C": 24' WIDE TEMPORARYCONSTRUCTION ENTRANCE #2N:\Projects\114003.xx Ecoplexus Solar\114003.19 Ecoplexus - Boykin\1__Dwg\BA Model Files\C1001 Site Plan-Boykin.dwg, 7/21/2020 11:09:55 AM, leep 101 Second Street, Ste. 1250 Fx: 415-449-3466 EcoPlexus, Inc. Ph: 415-626-1802 San Francisco, CA 94105A 2345BCD123451ABCDSEALN:\Projects\114003.xx Ecoplexus Solar\114003.19 Ecoplexus - Boykin\1__Dwg\BA Model Files\C1001 Site Plan-Boykin.dwg, 7/21/2020 11:10:45 AM, leep 101 Second Street, Ste. 1250 Fx: 415-449-3466 EcoPlexus, Inc. Ph: 415-626-1802 San Francisco, CA 94105A 2345BCD123451ABCDSEALN:\Projects\114003.xx Ecoplexus Solar\114003.19 Ecoplexus - Boykin\1__Dwg\BA Model Files\C1001 Site Plan-Boykin.dwg, 7/21/2020 11:13:11 AM, leep 101 Second Street, Ste. 1250 Fx: 415-449-3466 EcoPlexus, Inc. Ph: 415-626-1802 San Francisco, CA 94105A 2345BCD123451ABCDSEALN:\Projects\114003.xx Ecoplexus Solar\114003.19 Ecoplexus - Boykin\1__Dwg\BA Model Files\C1001 Site Plan-Boykin.dwg, 7/21/2020 11:05:52 AM, leep 101 Second Street, Ste. 1250 Fx: 415-449-3466 EcoPlexus, Inc. Ph: 415-626-1802 San Francisco, CA 94105A 2345BCD123451ABCDSEAL·····N:\Projects\114003.xx Ecoplexus Solar\114003.19 Ecoplexus - Boykin\1__Dwg\BA Model Files\C1201 Erosion Control-Boykin.dwg, 7/21/2020 11:14:18 AM, leep 101 Second Street, Ste. 1250 Fx: 415-449-3466 EcoPlexus, Inc. Ph: 415-626-1802 San Francisco, CA 94105A 2345BCD123451ABCDSEALN:\Projects\114003.xx Ecoplexus Solar\114003.19 Ecoplexus - Boykin\1__Dwg\BA Model Files\C1201 Erosion Control-Boykin.dwg, 7/21/2020 11:16:02 AM, leep 101 Second Street, Ste. 1250 Fx: 415-449-3466 EcoPlexus, Inc. Ph: 415-626-1802 San Francisco, CA 94105A 2345BCD123451ABCDSEALN:\Projects\114003.xx Ecoplexus Solar\114003.19 Ecoplexus - Boykin\1__Dwg\BA Model Files\C1201 Erosion Control-Boykin.dwg, 7/21/2020 11:17:52 AM, leep 101 Second Street, Ste. 1250 Fx: 415-449-3466 EcoPlexus, Inc. Ph: 415-626-1802 San Francisco, CA 94105A 2345BCD123451ABCDSEALPERMANENT CULVERT CROSSING #1N:\Projects\114003.xx Ecoplexus Solar\114003.19 Ecoplexus - Boykin\1__Dwg\BA Model Files\C1201 Erosion Control-Boykin.dwg, 7/21/2020 11:19:05 AM, leep 101 Second Street, Ste. 1250 Fx: 415-449-3466 EcoPlexus, Inc. Ph: 415-626-1802 San Francisco, CA 94105A 2345BCD123451ABCDSEALN:\Projects\114003.xx Ecoplexus Solar\114003.19 Ecoplexus - Boykin\1__Dwg\BA Model Files\C1201 Erosion Control-Boykin.dwg, 7/21/2020 11:19:47 AM, leep 101 Second Street, Ste. 1250 Fx: 415-449-3466 EcoPlexus, Inc. Ph: 415-626-1802 San Francisco, CA 94105A 2345BCD123451ABCDSEALTEMPORARY SEDIMENT BASIN #4TEMPORARY SEDIMENT BASIN #3TEMPORARY SEDIMENT BASIN #1TEMPORARY SEDIMENT BASIN #2N:\Projects\114003.xx Ecoplexus Solar\114003.19 Ecoplexus - Boykin\1__Dwg\BA Model Files\C1205 Basin Enlargement-Boykin.dwg, 7/21/2020 11:21:19 AM, leep 101 Second Street, Ste. 1250 Fx: 415-449-3466 EcoPlexus, Inc. Ph: 415-626-1802 San Francisco, CA 94105A 2345BCD123451ABCDSEALTEMPORARY SEDIMENT BASIN #8TEMPORARY SEDIMENT BASIN #7TEMPORARY SEDIMENT BASIN #5TEMPORARY SEDIMENT BASIN #6N:\Projects\114003.xx Ecoplexus Solar\114003.19 Ecoplexus - Boykin\1__Dwg\BA Model Files\C1205 Basin Enlargement-Boykin.dwg, 7/21/2020 11:21:56 AM, leep 101 Second Street, Ste. 1250 Fx: 415-449-3466 EcoPlexus, Inc. Ph: 415-626-1802 San Francisco, CA 94105A 2345BCD123451ABCDSEALEXCAVATED STORAGE #2EXCAVATED STORAGE #1RISER BASIN #9N:\Projects\114003.xx Ecoplexus Solar\114003.19 Ecoplexus - Boykin\1__Dwg\BA Model Files\C1205 Basin Enlargement-Boykin.dwg, 7/21/2020 11:22:34 AM, leep 101 Second Street, Ste. 1250 Fx: 415-449-3466 EcoPlexus, Inc. Ph: 415-626-1802 San Francisco, CA 94105A 2345BCD123451ABCDSEALTEMPORARY SKIMMERTEMPORARY CONSTRUCTION ENTRANCESILT FENCE (TYP.)····RIP RAP APRONTEMPORARY SILT FENCE STONE OUTLET··········TEMPORARY SILT FENCE COMPOST SOCK BREAK········N:\Projects\114003.xx Ecoplexus Solar\114003.19 Ecoplexus - Boykin\1__Dwg\BA Model Files\C5201 Details-Boykin.dwg, 7/21/2020 11:23:40 AM, leep 101 Second Street, Ste. 1250 Fx: 415-449-3466 EcoPlexus, Inc. Ph: 415-626-1802 San Francisco, CA 94105A 2345BCD123451ABCDSEALDIVERSION DITCH OUTLETAT SEDIMENT BASINEMERGENCY SPILLWAY SECTIONS··TEMPORARY DIVERSION DITCH SIZING& MATTING INSTALLATIONTYPICAL RACK ELEVATIONSTEMPORARY STOCKPILE AREA DETAIL·EROSION CONTROL MATTING INSTALLATION (TYP.)·····VARIESTYPICAL TRACKER RACK REAR ELEVATIONNOT TO SCALEEXISTING GRADEMAX 10'COLUMN DEPTHVARIESGEAR RACKCOLUMN (TYP)TYPICAL RACK SIDE ELEVATIONNOT TO SCALEPV MODULESVARIES 9.95' (TYP.)GEAR RACKCOLUMN (TYP)COLUMN DEPTHVARIESEXISTING GRADE97"6" ADJUSTMENTRANGE (TYP.)6.61' (TYP.)N:\Projects\114003.xx Ecoplexus Solar\114003.19 Ecoplexus - Boykin\1__Dwg\BA Model Files\C5201 Details-Boykin.dwg, 7/21/2020 11:23:59 AM, leep 101 Second Street, Ste. 1250 Fx: 415-449-3466 EcoPlexus, Inc. Ph: 415-626-1802 San Francisco, CA 94105A 2345BCD123451ABCDSEALHDPE RISER DETAILCOMPOST SOCKRISER SEDIMENT BASIN DETAILSEDIMENT BASIN DETAILCOIR FIBER BAFFLE INSTALLATION····N:\Projects\114003.xx Ecoplexus Solar\114003.19 Ecoplexus - Boykin\1__Dwg\BA Model Files\C5201 Details-Boykin.dwg, 7/21/2020 11:24:23 AM, leep 8887864"4'' (TYP.)1" CHAMFER (TYP.)MECHANICALLYCOMPACTEDSOIL (TYP.)#57, #67, OR #825 CLEAN,CRUSHED STONE/GRAVELFILLCOMPACTED SUBGRADEVARIESCONCRETE EQUIPMENT PADCOMPACTED UPPER 18'' OF SUBGRADE TO 95% OFTHE STANDARD PROCTOR (ASTM D698) 6 INCHESLIFT FOR EACH LAYER COMPATIONVARIES 3:1 SLOPE (TYP.)ELEVATIONS WILL VARY WITHEACH PAD LOCATION AND TIE INTOEXISTING GRADE ELEVATIONTYPICAL SECTION VIEW OF EQUIPMENT PADDETAIL XX - TYPICAL PLAN VIEW OF EQUIPMENT PAD TYPICAL EQUIPMENT101 Second Street, Ste. 1250 Fx: 415-449-3466 EcoPlexus, Inc. Ph: 415-626-1802 San Francisco, CA 94105A 2345BCD123451ABCDSEAL16' GRAVEL ACCESS DRIVE (TYP.)·TEMPORARY COFFERDAM AND PUMP AROUND DETAILEcoplexus, Inc.GENERAL CONCRETE EQUIPMENT PADDETAILSFIG-102/05/2020J. HALLEYJAHN.T.SNOTES:1.SEE REINFORCING NOTES AND CONCRETE NOTES ON STRUCTURAL PAD DRAWINGS.2.SEE ELECTRICAL DRAWINGS FOR PAD DIMENSIONS.3.THE NET ALLOWABLE SOIL BEARING PRESSURE SHALL BE STATED IN THE STRUCTURAL PLANS.CONCRETE EQUIPMENT PAD DETAILHDPE REDUCERN:\Projects\114003.xx Ecoplexus Solar\114003.19 Ecoplexus - Boykin\1__Dwg\BA Model Files\C5201 Details-Boykin.dwg, 7/21/2020 11:26:02 AM, leep 101 Second Street, Ste. 1250 Fx: 415-449-3466 EcoPlexus, Inc. Ph: 415-626-1802 San Francisco, CA 94105A 2345BCD123451ABCDSEALDRAINAGE DIAPHRAGM (TYP.)TYPICAL FENCING & 24' DOUBLE SWING GATE DETAIL7' MIN. TALL WOODEN PRIVACY FENCEN:\Projects\114003.xx Ecoplexus Solar\114003.19 Ecoplexus - Boykin\1__Dwg\BA Model Files\C5201 Details-Boykin.dwg, 7/21/2020 11:26:22 AM, leep