NOTES:
1.SEE SITE GRADING PLANS SWALE LOCATIONS
2.FOR DISTURBED AREAS ALONG TRAIL, INSTALL TEMPORARY VEGETATION COVER PER NC EROSION
AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL.
12"
COMPACTED
SUBGRADE
FINISH
GRADE
TEMPORARY EROSION CONTROL
MATTING PER DETAIL 5/C4.00.
EXTEND MAT 1' MIN.
BEYOND TRANSITION
OF DITCH SLOPE
EROSION CONTROL MATTING:
INSTALL CURLEX I EROSION
CONTROL MATTING (OR
APPROVED EQUAL) IN
CHANNEL. MATTING MUST BE
RATED FOR CHANNEL
VELOCITIES UP TO 5 FT/S.
VARIES
SCALE:NTS
GRASS SWALE1
SCALE:NTS
OUTLET PROTECTION5
SCALE:NTS
CHECK DAM3
NOTE: ALL FILTREXX CHECK DAMS TO
BE MADE OF 12" SILTSOXX
SCALE:NTS
SEDIMENT CONTROL PERIMETER BERM4 C4.01
NTS
18165
STELLAR GROUP INC.WILLOW LAKE SPORTS COMPLEXFORT BRAGG NORTH CAROLINAFORT BRAGGKA
MW
SOXX SIZES
BERM #DIAMETER
(IN.)
1 24
2 36
3 24
4 24
5 18
6 18
7 36
8 8
9 36
10 12
BASIN #1
RISER PIPE
DIA.(FT)
3.00
BARREL PIPE
DIA. (FT)
2.00
PERMANENT
POOL ELEV.
(FT)
238.60
DRY STORAGE/
RISER CREST
ELEV. (FT)
239.76
TOP OF
EMBANKMENT
ELEV. (FT)
241.50
BOTTOM OF
BASIN ELEV.
(FT)
236.00
10 YR Qp ELEV.
(FT)
240.32
25 YR Qp ELEV.
(FT)
240.66
CLEANOUT
POINT ELEV
(FT)
237.10
BARREL PIPE
LENGTH (FT)
45.00
SKIMMER DIA.
(IN)
4.00
SKIMMER
ORIFICE (IN)
2.00
SCALE:NTS
SEDIMENT BASIN2
CONSTRUCTION:
1. REMOVE AND PROPERLY DISPOSE OF ALL TREES, BRUSH, STUMPS, OR OTHER OBJECTIONABLE MATERIAL. FILL AND
COMPACT ALL DITCHES, SWALES, OR GULLIES THAT WILL BE CROSSED TO NATURAL GROUND LEVEL OR ABOVE.
2. JUST BEFORE PLACEMENT OF FILL, THE BASE OF THE RIDGE SHOULD BE DISKED BY MACHINERY.
3. EXCAVATE, SHAPE, AND STABILIZE THE DIVERSION TO LINE, GRADE, AND CROSS SECTION, AS REQUIRED IN THE
DESIGN PLAN (FIGURE 6.21B).
4. COMPACT THE RIDGE TO PREVENT UNEQUAL SETTLEMENT, AND TO PROVIDE STABILITY AGAINST SEEPAGE.
5. VEGETATIVELY STABILIZE THE DIVERSION AFTER ITS INSTALLATION.
MAINTENANCE:
INSPECT PERMANENT DIVERSIONS AFTER EVERY RAINFALL DURING THE CONSTRUCTION
OPERATION. IMMEDIATELY REMOVE ANY OBSTRUCTIONS FROM THE FLOW AREA,
AND REPAIR THE DIVERSION RIDGE. CHECK OUTLETS, AND MAKE TIMELY REPAIRS
AS NEEDED. MAINTAIN THE VEGETATION IN A VIGOROUS, HEALTHY CONDITION AT
ALL TIMES.
CONSTRUCTION:
1. SITE PREPARATIONS- CLEAR, GRUB, AND STRIP TOPSOIL FROM AREAS UNDER THE
SPECIFICATIONS EMBANKMENT TO REMOVE TREES, VEGETATION, ROOTS, AND OTHER
OBJECTIONABLE MATERIAL. DELAY CLEARING THE POOL AREA UNTIL THE DAM IS COMPLETE AND
THEN REMOVE BRUSH, TREES, AND OTHER OBJECTIONABLE MATERIALS TO FACILITATE SEDIMENT
CLEANOUT. STOCKPILE ALL TOPSOIL OR SOIL CONTAINING ORGANIC MATTER FOR USE ON THE
OUTER SHELL OF THE EMBANKMENT TO FACILITATE VEGETATIVE ESTABLISHMENT. PLACE
TEMPORARY SEDIMENT CONTROL MEASURES BELOW THE BASIN AS NEEDED.
2. CUT-OFF TRENCH- EXCAVATE A CUT-OFF TRENCH ALONG THE CENTER LINE OF THE EARTH FILL
EMBANKMENT. CUT THE TRENCH TO STABLE SOIL MATERIAL, BUT IN NO CASE MAKE IT LESS THAN 2
FEET DEEP. THE CUT-OFF TRENCH MUST EXTEND INTO BOTH ABUTMENTS TO AT LEAST THE
ELEVATION OF THE RISER CREST. MAKE THE MINIMUM BOTTOM WIDTH WIDE ENOUGH TO PERMIT
OPERATION OF EXCAVATION AND COMPACTION EQUIPMENT, BUT IN NO CASE LESS THAN 2 FEET.
MAKE SIDE SLOPES OF THE TRENCH NO STEEPER THAN 1:1. COMPACTION REQUIREMENTS ARE THE
SAME AS THOSE FOR THE EMBANKMENT. KEEP THE TRENCH DRY DURING BACKFILLING AND
COMPACTION OPERATIONS.
3. EMBANKMENT- TAKE FILL MATERIAL FROM THE APPROVED AREAS SHOWN ON THE PLANS. IT
SHOULD BE CLEAN MINERAL SOIL, FREE OF ROOTS, WOODY VEGETATION, ROCKS, AND OTHER
OBJECTIONABLE MATERIAL. SCARIFY AREAS ON WHICH FILL IS TO BE PLACED BEFORE PLACING
FILL. THE FILL MATERIAL MUST CONTAIN SUFFICIENT MOISTURE SO IT CAN BE FORMED BY HAND
INTO A BALL WITHOUT CRUMBLING. IF WATER CAN BE SQUEEZED OUT OF THE BALL, IT IS TOO WET
FOR PROPER COMPACTION. PLACE FILL MATERIAL IN 6 TO 8 INCH CONTINUOUS LAYERS OVER THE
ENTIRE LENGTH OF THE FILL AREA AND COMPACT IT. COMPACTION MAY BE OBTAINED BY ROUTING
THE CONSTRUCTION HAULING EQUIPMENT OVER THE FILL SO THAT THE ENTIRE SURFACE OF EACH
LAYER IS TRAVERSED BY AT LEAST ONE WHEEL OR TREAD TRACK OF HEAVY EQUIPMENT, OR A
COMPACTOR MAY BE USED. CONSTRUCT THE EMBANKMENT TO AN ELEVATION 10 PERCENT HIGHER
THAN THE DESIGN HEIGHT TO ALLOW FOR SETTLING.
4. CONDUIT SPILLWAYS- SECURELY ATTACH THE RISER TO THE BARREL OR BARREL STUB TO MAKE
A WATERTIGHT STRUCTURAL CONNECTION. SECURE ALL CONNECTIONS BETWEEN BARREL
SECTIONS BY APPROVED WATERTIGHT ASSEMBLIES. PLACE THE BARREL AND RISER ON A FIRM,
SMOOTH FOUNDATION OF IMPERVIOUS SOIL. DO NOT USE PERVIOUS MATERIAL SUCH AS SAND,
GRAVEL, OR CRUSHED STONE AS BACKFILL AROUND THE PIPE OR ANTI-SEEP COLLARS. PLACE THE
FILL MATERIAL AROUND THE PIPE SPILLWAY IN 4-INCH LAYERS, AND COMPACT IT UNDER AND
AROUND THE PIPE TO AT LEAST THE SAME DENSITY AS THE ADJACENT EMBANKMENT. CARE MUST
BE TAKEN NOT TO RAISE THE PIPE FROM FIRM CONTACT WITH ITS FOUNDATION WHEN COMPACTING
UNDER THE PIPE HAUNCHES.
DEWATERING- ALLOW THE MAXIMUM REASONABLE DETENTION PERIOD BEFORE THE BASIN IS
COMPLETELY DEWATERED-AT LEAST 48 HOURS. PLACE A MINIMUM DEPTH OF 2 FEET OF
COMPACTED BACKFILL OVER THE PIPE SPILLWAY BEFORE CROSSING IT WITH CONSTRUCTION
EQUIPMENT. ANCHOR THE RISER IN PLACE BY
CONCRETE OR OTHER SATISFACTORY MEANS TO PREVENT FLOTATION. IN NO CASE SHOULD THE
PIPE CONDUIT BE INSTALLED BY CUTTING A TRENCH THROUGH THE DAM AFTER THE
EMBANKMENT IS COMPLETE.
5. EMERGENCY SPILLWAY- INSTALL THE EMERGENCY SPILLWAY IN UNDISTURBED SOIL. THE
ACHIEVEMENT OF PLANNED ELEVATIONS, GRADE, DESIGN WIDTH, AND ENTRANCE AND EXIT
CHANNEL SLOPES ARE CRITICAL TO THE SUCCESSFUL OPERATION OF THE EMERGENCY SPILLWAY.
6. INLETS- DISCHARGE WATER INTO THE BASIN IN A MANNER TO PREVENT EROSION. USE
DIVERSIONS WITH OUTLET PROTECTION TO DIVERT SEDIMENT-LADEN WATER TO THE UPPER END
OF THE POOL AREA TO IMPROVE BASIN TRAP EFFICIENCY (REFERENCES: RUNOFF CONTROL
MEASURES AND OUTLET PROTECTION).
7. EROSION CONTROL- CONSTRUCT THE STRUCTURE SO THAT THE DISTURBED AREA IS MINIMIZED.
DIVERT SURFACE WATER AWAY FROM BARE AREAS. COMPLETE THE EMBANKMENT BEFORE THE
AREA IS CLEARED. STABILIZE THE EMERGENCY SPILLWAY EMBANKMENT AND ALL OTHER
DISTURBED AREAS ABOVE THE CREST OF THE PRINCIPAL SPILLWAY IMMEDIATELY AFTER
CONSTRUCTION (REFERENCES: SURFACE STABILIZATION).
8. INSTALL POROUS BAFFLES AS SPECIFIED IN PRACTICE 6.65, POROUS BAFFLES.
9. SAFETY- SEDIMENT BASINS MAY ATTRACT CHILDREN AND CAN BE DANGEROUS. AVOID
STEEP SIDE SLOPES, AND FENCE AND MARK BASINS WITH WARNING SIGNS IF TRESPASSING IS
LIKELY. FOLLOW ALL STATE AND LOCAL REQUIREMENTS.
MAINTENANCE:
INSPECT TEMPORARY SEDIMENT BASINS AT LEAST WEEKLY AND AFTER EACH SIGNIFICANT (1/2
INCH OR GREATER) RAINFALL EVENT AND REPAIR IMMEDIATELY. REMOVE SEDIMENT AND RESTORE
THE BASIN TO ITS ORIGINAL DIMENSIONS WHEN IT ACCUMULATES TO ONE-HALF THE DESIGN DEPTH.
PLACE REMOVED SEDIMENT IN AN AREA WITH SEDIMENT CONTROLS. CHECK THE EMBANKMENT,
SPILLWAYS, AND OUTLET FOR EROSION DAMAGE, AND INSPECT THE EMBANKMENT FOR PIPING AND
SETTLEMENT. MAKE ALL NECESSARY REPAIRS IMMEDIATELY. REMOVE ALL TRASH AND OTHER
DEBRIS FROM THE RISER AND POOL AREA.
CONSTRUCTION:
INSTALLATION SPECIFICATIONS
1. MATERIALS USED IN THE COMPOST SOCK MUST MEET THE SPECIFICATIONS OUTLINED ABOVE AND IN PRACTICE 6.18, COMPOST BLANKETS.
2. COMPOST SOCKS SHOULD BE LOCATED AS SHOWN ON THE EROSION AND SEDIMENTATION CONTROL PLAN.
3. PRIOR TO INSTALLATION, CLEAR ALL OBSTRUCTIONS INCLUDING ROCKS, CLODS, AND OTHER DEBRIS GREATER THAN ONE INCH THAT MAY INTERFERE WITH
PROPER FUNCTION OF THE COMPOST SOCK.
4. COMPOST SOCKS SHOULD BE INSTALLED PARALLEL TO THE TOE OF A GRADED SLOPE, A MINIMUM OF 10 FEET BEYOND THE TOE OF THE SLOPE. SOCKS LOCATED
BELOW FLAT AREAS SHOULD BE LOCATED AT THE EDGE OF THE LAND-DISTURBANCE. THE ENDS OF THE SOCKS SHOULD BE TURNED SLIGHTLY UP SLOPE TO
PREVENT RUNOFF FROM GOING AROUND THE END OF THE SOCKS.
5. FILL SOCK NETTING UNIFORMLY WITH COMPOST TO THE DESIRED LENGTH SUCH THAT LOGS DO NOT DEFORM.
6. OAK OR OTHER DURABLE HARDWOOD STAKES 2” X 2” IN CROSS SECTION SHOULD BE DRIVEN VERTICALLY PLUMB, THROUGH THE CENTER OF THE COMPOST
SOCK. STAKES SHOULD BE PLACED AT A MAXIMUM INTERVAL OF 4 FEET, OR A MAXIMUM INTERVAL OF 8 FEET IF THE SOCK IS PLACED IN A 4 INCH TRENCH. SEE
FIGURE 6.66B. THE STAKES
SHOULD BE DRIVEN TO A MINIMUM DEPTH OF 12 INCHES, WITH A MINIMUM OF 3 INCHES PROTRUDING ABOVE THE COMPOST SOCK.
7. IN THE EVENT STAKING IS NOT POSSIBLE (I.E., WHEN SOCKS ARE USED ON PAVEMENT) HEAVY CONCRETE BLOCKS SHALL BE USED BEHIND THE SOCK TO HOLD IT
IN PLACE DURING RUNOFF EVENTS.
8. IF THE COMPOST SOCK IS TO BE LEFT AS PART OF THE NATURAL LANDSCAPE, IT MAY BE SEEDED AT TIME OF INSTALLATION FOR ESTABLISHMENT OF
PERMANENT VEGETATION USING THE SEEDING SPECIFICATION IN THE EROSION AND SEDIMENTATION CONTROL PLAN.
9. COMPOST SOCKS ARE NOT TO BE USED IN PERENNIAL OR INTERMITTENT STREAMS.
MAINTENANCE:
INSPECT COMPOST SOCKS WEEKLY AND AFTER EACH SIGNIFICANT RAINFALL EVENT (1/2 INCH OR GREATER). REMOVE ACCUMULATED SEDIMENT AND ANY DEBRIS.
THE COMPOST SOCK MUST BE REPLACED IF CLOGGED OR TORN. IF PONDING BECOMES EXCESSIVE, THE SOCK MAY NEED TO BE REPLACED WITH A LARGER
DIAMETER OR A DIFFERENT MEASURE. THE SOCK NEEDS TO BE REINSTALLED IF UNDERMINED OR DISLODGED. THE COMPOST SOCK SHALL BE INSPECTED UNTIL
LAND DISTURBANCE IS COMPLETE AND THE AREA ABOVE THE MEASURE HAS BEEN PERMANENTLY STABILIZED.
NOTE: REFER TO CHECK DAM INSTALLATION
AND MAINTENANCE MEASURES
CONSTRUCTION:
1. ENSURE THAT THE SUBGRADE FOR THE FILTER AND RIPRAP FOLLOWS
THE REQUIRED LINES AND GRADES SHOWN IN THE PLAN. COMPACT ANY
FILL REQUIRED IN THE SUBGRADE TO THE DENSITY OF THE SURROUNDING
UNDISTURBED MATERIAL. LOW AREAS IN THE SUBGRADE ON UNDISTURBED
SOIL MAY ALSO BE FILLED BY INCREASING THE RIPRAP THICKNESS.
2. THE RIPRAP AND GRAVEL FILTER MUST CONFORM TO THE SPECIFIED
GRADING LIMITS SHOWN ON THE PLANS.
3. FILTER CLOTH, WHEN USED, MUST MEET DESIGN REQUIREMENTS AND
BE PROPERLY PROTECTED FROM PUNCHING OR TEARING DURING
INSTALLATION. REPAIR ANY DAMAGE BY REMOVING THE RIPRAP AND
PLACING ANOTHER PIECE OF FILTER CLOTH OVER THE DAMAGED AREA. ALL
CONNECTING JOINTS SHOULD OVERLAP SO THE TOP LAYER IS ABOVE THE
DOWNSTREAM LAYER A MINIMUM OF 1 FOOT. IF THE DAMAGE IS EXTENSIVE,
REPLACE THE ENTIRE FILTER CLOTH.
4. RIPRAP MAY BE PLACED BY EQUIPMENT BUT TAKE CARE TO AVOID
DAMAGING THE FILTER.
5. THE MINIMUM THICKNESS OF THE RIPRAP SHOULD BE 1.5 TIMES THE
MAXIMUM STONE DIAMETER.
6. RIPRAP MAY BE FIELD STONE OR ROUGH QUARRY STONE. IT SHOULD
BE HARD, ANGULAR, HIGHLY WEATHER-RESISTANT AND WELL GRADED.
7. CONSTRUCT THE APRON ON ZERO GRADE WITH NO OVERFILL AT THE
END. MAKE THE TOP OF THE RIPRAP AT THE DOWNSTREAM END LEVEL WITH
THE RECEIVING AREA OR SLIGHTLY BELOW IT.
8. ENSURE THAT THE APRON IS PROPERLY ALIGNED WITH THE RECEIVING
STREAM AND PREFERABLY STRAIGHT THROUGHOUT ITS LENGTH. IF A
CURVE IS NEEDED TO FIT SITE CONDITIONS, PLACE IT IN THE UPPER
SECTION OF THE APRON.
9. IMMEDIATELY AFTER CONSTRUCTION, STABILIZE ALL DISTURBED
AREAS WITH VEGETATION (PRACTICES 6.10, TEMPORARY SEEDING, AND
6.11, PERMANENT SEEDING).
MAINTENANCE:
INSPECT RIPRAP OUTLET STRUCTURES WEEKLY AND AFTER SIGNIFICANT
(1/2 INCH OR GREATER) RAINFALL EVENTS TO SEE IF ANY EROSION AROUND
OR BELOW THE RIPRAP HAS TAKEN PLACE, OR IF STONES HAVE BEEN
DISLODGED. IMMEDIATELY MAKE ALL NEEDED REPAIRS TO PREVENT
FURTHER DAMAGE.