Loading...
HomeMy WebLinkAboutSW3200601_07_SpeedwaySubstation_ConstructionDocuments_2020-06-23_20200720SPEEDWAYSUBSTATIONPREPARED FORSWINERTONCOVER SHEETC0.0©PROJECT TEAM GOVERNING AGENCIES GENERAL INFORMATION VICINITY MAP CIVIL CONSTRUCTION DRAWINGS FOR SPEEDWAY SUBSTATION 2410 WALLACE ROAD, MIDLAND, NORTH CAROLINA 28107 CABARRUS COUNTY, NC PARCEL PIN: 55432835280000 SITE PROJECT SITE EROSION CONTROL NOTES Know what's below. before you dig.Call R LANDOWNER EARTHWORK QUANTITIES NORTH SHEET LIST TABLE SHEET NUMBER SHEET TITLE SPEEDWAYSUBSTATIONPREPARED FORSWINERTONGENERAL NOTESC0.1©GENERAL NOTES:EROSION CONTROL NOTESGENERAL EROSION CONTROL GRADING: PHASE 1 CONSTRUCTION SEQUENCE PHASE 2 CONSTRUCTION SEQUENCE SPEEDWAYSUBSTATIONPREPARED FORSWINERTONGENERAL NOTESC0.2©” “” ” GUIDELINES FOR SITE DEVELOPMENT OF DUKE ENERGY SUBSTATIONS: ” ”” ” “” “” ” ” “” ”” ” ” ”“”” ”” ·”“”” ”“” ·” ·” · · ·” · · · GUIDELINES FOR ACCESS DRIVES OF DUKE ENERGY SUBSTATIONS: “” “ “” “”“” “” “ ”“” “” DUKE ENERGY ELECTRIC TRANSMISSION RIGHT-OF-WAY GUIDELINES/ RESTRICTIONS VALID FOR NORTH CAROLINA AND SOUTH CAROLINA: TT JONATHAN CHAD HAIGLER APRIL A. HAIGLER PIN: 55433945120000 DB. 9514 PG. 104 KARYN W HOLT-DRAKE REGINALD J DRAKE PIN: 55432963740000 DB. 1980 PG. 16 CELIA H HOOKS PIN: 55432984400000 DB. 2409 PG. 169 SUSAN S FURR THOMAS K FURR PIN: 55433906700000 DB. 8700 PG. 283 IRA B. HOWELL JR. PIN: 55432835280000 DB. 303 PG. 36 BUILDING 68' UTILITY RIGHT OF WAY DB. 6954 PG. 201 ELENA TUCKER PIN: 55433949570000 DB. 11681 PG. 300 WILLIAM F. TROUTMAN, SR & HILDA C. TROUTMAN, TRUSTEES OF THE TROUTMAN LIVING TRUST PIN:55433744680000 DB 4134 PG 242 WALLACE ROAD SPEEDWAYSUBSTATIONPREPARED FORSWINERTONEXISTINGCONDITIONS ANDDEMOLITION PLANC1.0©Know what's below. before you dig.Call R DEMOLITION LEGEND NORTH TT JONATHAN CHAD HAIGLER APRIL A. HAIGLER PIN: 55433945120000 DB. 9514 PG. 104 KARYN W HOLT-DRAKE REGINALD J DRAKE PIN: 55432963740000 DB. 1980 PG. 16 CELIA H HOOKS PIN: 55432984400000 DB. 2409 PG. 169 SUSAN S FURR THOMAS K FURR PIN: 55433906700000 DB. 8700 PG. 283 IRA B. HOWELL JR. PIN: 55432835280000 DB. 303 PG. 36 BUILDING 68' UTILITY RIGHT OF WAY DB. 6954 PG. 201 ELENA TUCKER PIN: 55433949570000 DB. 11681 PG. 300 WILLIAM F. TROUTMAN, SR & HILDA C. TROUTMAN, TRUSTEES OF THE TROUTMAN LIVING TRUST PIN:55433744680000 DB 4134 PG 242 WALLACE ROAD SPEEDWAYSUBSTATIONPREPARED FORSWINERTONPHASE 1 EROSIONCONTROL PLANC2.0©EROSION CONTROL LEGEND NPDES GROUND COVER SELF MONITORING AND INSPECTION NOTIFICATION Know what's below. before you dig.Call R NORTH TT JONATHAN CHAD HAIGLER APRIL A. HAIGLER PIN: 55433945120000 DB. 9514 PG. 104 KARYN W HOLT-DRAKE REGINALD J DRAKE PIN: 55432963740000 DB. 1980 PG. 16 CELIA H HOOKS PIN: 55432984400000 DB. 2409 PG. 169 SUSAN S FURR THOMAS K FURR PIN: 55433906700000 DB. 8700 PG. 283 IRA B. HOWELL JR. PIN: 55432835280000 DB. 303 PG. 36 BUILDING 68' UTILITY RIGHT OF WAY DB. 6954 PG. 201 ELENA TUCKER PIN: 55433949570000 DB. 11681 PG. 300 WILLIAM F. TROUTMAN, SR & HILDA C. TROUTMAN, TRUSTEES OF THE TROUTMAN LIVING TRUST PIN:55433744680000 DB 4134 PG 242 WALLACE ROAD SPEEDWAYSUBSTATIONPREPARED FORSWINERTONPHASE 2 EROSIONCONTROL PLANC2.1©NPDES GROUND COVER SELF MONITORING AND INSPECTION NOTIFICATION EROSION CONTROL LEGEND Know what's below. before you dig.Call R NORTH SPEEDWAYSUBSTATIONPREPARED FORSWINERTONEROSION CONTROLDETAILSC2.2©01TEMPORARY SILT FENCE ⁰ 03SILT FENCE OUTLET 04TEMPORARY CONSTRUCTION ENTRANCE ”” 02COIR FIBER COMPOST SOCK SFSFSFSF CONCRETE WASHOUT CONCRETE WASHOUT STATION 05 06 SPEEDWAYSUBSTATIONPREPARED FORSWINERTONEROSION CONTROLDETAILSC2.3©01SKIMMER SEDIMENT BASIN 02TEMPORARY DIVERSION DITCH SECTION A PLAN VIEW 03 SPEEDWAYSUBSTATIONPREPARED FORSWINERTONEROSION CONTROLDETAILSC2.4©SKIMMER BAFFLE XX NCDEQ TEMPORARY SEEDING RECOMMENDATIONS · · · · · TEMPORARY SEEDING RECOMMENDATIONS - LATE WINTER/EARLY SPRING TEMPORARY SEEDING - FALLTEMPORARY SEEDING - SUMMER 03 02 01 SPEEDWAYSUBSTATIONPREPARED FORSWINERTONEROSION CONTROLDETAILSC2.5©XX SURFACE ROUGHENING AND SLOPE TRACKING DETAIL “” 01BENCHING / KEYING SLOPES DETAIL 02 SPEEDWAYSUBSTATIONPREPARED FORSWINERTONEROSION CONTROLDETAILSC2.6©CHANNEL INSTALLATION DETAIL Drawing Not To Scale 1.Prepare soil before installing rolled erosion control products (RECPs), including any necessary application of lime, fertilizer, and seed. 2.Begin at the top of the channel by anchoring the RECPs in a 6"(15cm) deep X 6"(15cm) wide trench with approximately 12"(30cm) of RECPs extended beyond the up-slope portion of the trench. Use ShoreMax mat at the channel/culvert outlet as supplemental scour protection as needed. Anchor the RECPs with a row of staples/stakes approximately 12"(30cm) apart in the bottom of the trench. Backfill and compact the trench after stapling. Apply seed to the compacted soil and fold the remaining 12"(30cm) portion of RECPs back over the seed and compacted soil. Secure RECPs over compacted soil with a row of staples/stakes spaced approximately 12" apart across the width of the RECPs. 3.Roll center RECPs in direction of water flow in bottom of channel. RECPs will unroll with appropriate side against the soil surface. All RECPs must be securely fastened to soil surface by placing staples/stakes in appropriate locations as shown in the staple pattern guide. 4.Place consecutive RECPs end-over-end (Shingle style) with a 4"-6" overlap. Use a double row of staples staggered 4" apart and 4" on center to secure RECPs. 5.Full length edge of RECPs at top of side slopes must be anchored with a row of staples/stakes approximately 12"(30cm) apart in a 6"(15cm) deep X 6"(15cm) wide trench. Backfill and compact the trench after stapling. 6.Adjacent RECPs must be overlapped approximately 2"-5" (5-12.5cm) (Depending on RECPs type) and stapled. 7.In high flow channel applications a staple check slot is recommended at 30 to 40 foot (9 -12m) intervals. Use a double row of staples staggered 4"(10cm) apart and 4"(10cm) on center over entire width of the channel. 8.The terminal end of the RECPs must be anchored with a row of staples/stakes approximately 12" (30cm) apart in a 6"(15cm) deep X 6"(15cm) wide trench. Backfill and compact the trench after stapling. Drawn on: 5-4-17 Disclaimer: The information presented herein is general design information only. For specific applications, consult an independent professional for further design guidance. 2"-5" (5-12.5cm) 6 2 4 12"(30cm) 6" (15cm) 6" (15cm) 4"-6" (10-15cm) 8 6" (15cm) 5 7 4"(10cm) 3 1 A B C A B C NOTES: *Horizontal staple spacing should be altered if necessary to allow staples to secure the critical points along the channel surface. **In loose soil conditions, the use of staple or stake lengths greater than 6"(15cm) may be necessary to properly secure the RECP's. CRITICAL POINTS A. Overlaps and Seams B. Projected Water Line C. Channel Bottom/Side Slope Vertices 4"(10cm) 6" (15cm) 5401 St. Wendel - Cynthiana Rd. Poseyville, IN 47633 PH: 800-722-2040 www.nagreen.com Drawn on: 5-4-17 Disclaimer: The information presented herein is general design information only. For specific applications, consult an independent professional for further design guidance. STAPLE PATTERN GUIDE NOTES: * Use ECMDS for more accurate staple pattern selection. 2"-5" (5-12.5cm) 3.3' (1m) 6' (1.8m) 3' (0.9m) 4' (1.2m) 1.6' (0.5m) 2' (0.6m) 10" (25cm) 10"(25cm) 20"(0.5m) 0.7 Staples per SQ.YD.1.15 Staples per SQ.YD. 1.7 Staples per SQ.YD.3.4 Staples per SQ.YD.3.75 Staples per SQ.YD. 4:1 Slopes (A) 3:1 Slopes (B) 2:1 Slopes (C) 1:1 & Steeper Slopes (D) Medium/High Flow Channel (D) High Flow Channel And Shoreline (E) Drawing Not To Scale A B C D E 2"-5" (5-12.5cm) 2"-5" (5-12.5cm) 2"-5" (5-12.5cm) 2"-5" (5-12.5cm) 2"-5" (5-12.5cm) 2"-5" (5-12.5cm) 2"-5" (5-12.5cm) 6' (1.8m) 3.3' (1m) 3.3' (1m) 3' (0.9m) 3.3' (1m) 3.3' (1m) 3.3' (1m) 1.6' (0.5m) 4' (1.2m) 4' (1.2m) 2' (0.6m) 2' (0.6m) 20"(0.5m) 5401 St. Wendel - Cynthiana Rd. Poseyville, IN 47633 PH: 800-722-2040 www.nagreen.com SLOPE INSTALLATION DETAIL Drawing Not To Scale 1.Prepare soil before installing rolled erosion control products (RECPs), including any necessary application of lime, fertilizer, and seed. 2.Begin at the top of the slope by anchoring the RECPs in a 6"(15cm) deep X 6"(15cm) wide trench with approximately 12" (30cm) of RECPs extended beyond the up-slope portion of the trench. Anchor the RECPs with a row of staples/stakes approximately 12" (30cm) apart in the bottom of the trench. Backfill and compact the trench after stapling. Apply seed to the compacted soil and fold the remaining 12"(30cm) portion of RECPs back over the seed and compacted soil. Secure RECPs over compacted soil with a row of staples/stakes spaced approximately 12"(30cm) apart across the width of the RECPs. 3.Roll the RECPs (A) down or (B) horizontally across the slope. RECPs will unroll with appropriate side against the soil surface. All RECPs must be securely fastened to soil surface by placing staples/stakes in appropriate locations as shown in the staple pattern guide. 4.The edges of parallel RECPs must be stapled with approximately 2" - 5" (5-12.5cm) overlap depending on the RECPs type. 5.Consecutive RECPs spliced down the slope must be end over end (Shingle style) with an approximate 3"(7.5cm) overlap. Staple through overlapped area, approximately 12"(30cm) apart across entire RECPs width. Drawn on: 5-4-17 Disclaimer: The information presented herein is general design information only. For specific applications, consult an independent professional for further design guidance. 2"-5" (5-12.5cm) 3B 4 2 5 1 3A 12"(30cm) 6" (15cm) 6" (15cm) *NOTE: In loose soil conditions, the use of staple or stake lengths greater than 6"(15cm) may be necessary to properly secure the RECP's. 3"(7.5cm) 5401 St. Wendel - Cynthiana Rd. Poseyville, IN 47633 PH: 800-772-2040 www.nagreen.com RIP-RAP APRON AT PIPE OUTLET RIP RAP SIZING CHART 02ROCK CHECK DAM 01 SPEEDWAYSUBSTATIONPREPARED FORSWINERTONEROSION CONTROLDETAILSC2.7©NCDEQ IMMEDIATE STABILIZATION SEEDING RECOMMENDATION (NURSE CROP) NCDEQ PRIMARY STABILIZATION SEEDING RECOMMENDATION (NON-NATIVE SPECIES) NCDEQ PRIMARY STABILIZATION SEEDING RECOMMENDATION (NATIVE SPECIES)NCDEQ PRIMARY STABILIZATION NATIVE SPECIES SEED MIXES PERMANENT SEEDING CONSTRUCTION SPECIFICATIONS AND MAINTENANCE TT JONATHAN CHAD HAIGLER APRIL A. HAIGLER PIN: 55433945120000 DB. 9514 PG. 104 KARYN W HOLT-DRAKE REGINALD J DRAKE PIN: 55432963740000 DB. 1980 PG. 16 CELIA H HOOKS PIN: 55432984400000 DB. 2409 PG. 169 SUSAN S FURR THOMAS K FURR PIN: 55433906700000 DB. 8700 PG. 283 IRA B. HOWELL JR. PIN: 55432835280000 DB. 303 PG. 36 BUILDING 68' UTILITY RIGHT OF WAY DB. 6954 PG. 201 ELENA TUCKER PIN: 55433949570000 DB. 11681 PG. 300 WILLIAM F. TROUTMAN, SR & HILDA C. TROUTMAN, TRUSTEES OF THE TROUTMAN LIVING TRUST PIN:55433744680000 DB 4134 PG 242 WALLACE ROAD SPEEDWAYSUBSTATIONPREPARED FORSWINERTONSITE PLANC3.0©Know what's below. before you dig.Call R SITE LEGEND NORTH SPEEDWAYSUBSTATIONPREPARED FORSWINERTONSITE DETAILSC3.1©01GRAVEL PAVEMENT SECTION 02ASPHALT PAVEMENT SECTION BEDDING AND TRENCH TYPICAL CULVERT DETAIL A BB A TT JONATHAN CHAD HAIGLER APRIL A. HAIGLER PIN: 55433945120000 DB. 9514 PG. 104 KARYN W HOLT-DRAKE REGINALD J DRAKE PIN: 55432963740000 DB. 1980 PG. 16 CELIA H HOOKS PIN: 55432984400000 DB. 2409 PG. 169 SUSAN S FURR THOMAS K FURR PIN: 55433906700000 DB. 8700 PG. 283 IRA B. HOWELL JR. PIN: 55432835280000 DB. 303 PG. 36 BUILDING 68' UTILITY RIGHT OF WAY DB. 6954 PG. 201 ELENA TUCKER PIN: 55433949570000 DB. 11681 PG. 300 WILLIAM F. TROUTMAN, SR & HILDA C. TROUTMAN, TRUSTEES OF THE TROUTMAN LIVING TRUST PIN:55433744680000 DB 4134 PG 242 WALLACE ROAD SEE SHEET C4.1 SPEEDWAYSUBSTATIONPREPARED FORSWINERTONGRADING ANDDRAINAGE PLANC4.0©Know what's below. before you dig.Call R NORTH GRADING AND DRAINAGE LEGEND 68' UTILITY RIGHT OF WAY DB. 6954 PG. 201 SPEEDWAYSUBSTATIONPREPARED FORSWINERTONENLARGED PADGRADING ANDDRAINAGE PLANC4.1©Know what's below. before you dig.Call R GRADING AND DRAINAGE LEGEND NORTH SPEEDWAYSUBSTATIONPREPARED FORSWINERTONGRADING ANDDRAINAGE DETAILSC4.2©01BENCHING / KEYING SLOPES DETAIL