HomeMy WebLinkAboutSW6200501_2020-07-17 Medlin SCM Submittal Pkg_20200717CurrY ENGINEERING TRANSMITTAL FORM TO: Mr. Jim Farkas Environmental Engineer NC Department of Environmental Quality 512 N Salisbury Street Raleigh, NC 27699 919-707-3646 jim_farkas(ancden•r.gay SUBJECT: Medlin Self -Storage DATE: July 17, 2020 CURRY PROJECT NO: 2020-010 SENT BY: Don Curry We are sending you the following items: COPIES ITEM DESCRIPTION 2 Plans Full Sized Plans — REV 1 Letter Original Comment Letter I i 2 Letter Comment Response Letter 1 Stormwater Calculations Stormwater & EC Narrative 1 Forms Supplement Forms I I These are transmitted as checked below; For Information _ Approved as Noted — Revise and Resubmit As Requested _ Not Approved — Revise and Resubmit x For Review and Comments _ For Record and File For Revision x Submittal x For Approval _ For Recording Approved _ For Signature, then return to: REMARKS: RRY E N G� T (9191 552-0849 205 S. Fuquay Avenue G� N� F (9191 552-2043 Fuquay-Varina, NC 27526 E5 r 0o 10 �r �P� ti CA R off-• CurrYENGINEERING July 17, 2020 Mr. Jim Farkas Environmental Engineer NC Department of Environmental Quality 512 North Salisbury Street Raleigh, NC 27699-1612 RE: Dennis & Sheri Medlin Open Shelf Storage Facility — 2ND Submittal Dear Jim: The purpose of this letter is to respond to your review comments dated June 12, 2020, for the above referenced project. Your comments and corresponding responses are summarized below: Division of Energy, Mineral and Land Resources 1. Please ensure that the percent impervious area for the project is calculated correctly (Section IV, 81. Per the Soil Weighted CN Values calculation pages in the stormwater management report, there will be 5,54 acres (5.38 + 0 + 0.10 + 0.06) of BUA within the project area in proposed conditions and the project area is shown as 9.59 acres, resulting in a percent BUA of 58% whereas 63% is shown in the Application. Revise as needed for correctness and consistency. The numbers have been updated. We have separated the different bypass areas and their corresponding impervious areas. The impervious for the entire property is 58% whereas the impervious for what drains to the pond is 66%. 2. Per the NC Surface Water Classification Map, the receiving stream appears to be NeiRs (Neals) Creek (Section IV, 10). You are correct. This has been corrected. 3. The drainage area to the proposed wet pond is shown as 8.55 acres in Section IV, 10 of the Application and Water Quality & Surface Area Calculation page whereas on plan sheet SW-02 and on the Soil Weighted CN Values page the drainage area is shown as 8.18 acres. Revise as needed for correctness and consistency. The drainage area column of Section IV, 10 should be an accounting of the entire drainage area to the proposed SCM. 8.18 acres to the pond is correct. This has been corrected. 4. Please break down the "Other" type of BUA for the drainage area in Section IV, 10. The storage lots can be considered "On -site Parking" and the access road can be considered "On -site Streets". Revise as needed for correctness and consistency. This has been revised. T (9191 552-0849 205 S. Fuquay Avenue F (9191 552-2043 Fuquay-Varina, NC 27526 / G�1RRY E N G/ES 4L� F� Z cz:]_ 10 T ��j. P I y cARW-� / 5. Please provide 2 signed, sealed, & dated copies of the plans (Section VI, 81. The provided plans were not signed. Revised plans are now signed. It is noted that basic dimensioning for the BUA is provided on plan sheet C-02, however, the information provided in the calculations and Application should be verifiable on the plan sets (Section VI, 8i). Please either provide callouts showing the type and area of each BUA or a BUA table similar to the one in Section IV, 10 of the Application. Also, the total BUA for the site, as shown on plan sheet C-00 (177,643 sf) does not coincide with the rest of the submission. See revised site data table and application with reconciled values. 7. Please delineate the wetlands on the plans or provide a note stating that no wetlands exist. Provide documentation of the qualifications and identity of the individual who made this determination (Section VI, 8m). We are requesting a letter from our environmental consultant documenting this and will forward ASAP. 8. Please initial the items from Section VI, 9-11 if they are included in the submission. See updated form. 9. Section IX is not required since the Applicant is the Property Owner. With your permission, I will cross out this item in red pen on the original, signed copy. If that is not acceptable to you, please provide revised original signature pages without Section IX signed. That is fine. Thanks. 10. It does not appear that sufficient impervious area is being treated in the proposed SCM (15A NCAC 02H .1002(43)). In order to meet the definition of runoff treatment, "the volume of stormwater runoff generated from all of the built -upon area of a project at build -out... is treated in one or more primary SCMs." The only areas not treated are small portions of the entrance driveways in the current and future configurations. The actual impervious area not collected (shown in bypass area #3) is a programmed amount that will likely be reduced once that property is developed. 11. The pond cross-section on plan sheet C-05 appears to have the bottom/sediment storage top elevations for the main pool and forebay switched. Revise as needed for correctness and consistency. This has been corrected. 12. The cross -sectional area of the main pool at elevation 307 appears to be incorrect (Pond Volumes calculation page). Revise as needed for correctness and consistency. This has been corrected. 13. When calculating the volume of the main pool and the forebay, the sediment storage area should not be included. Revise as needed for correctness and consistency. Additional depth was provided at the pond to account for this_ 14. The project narrative states that the project area is 6.32 acres whereas the Application indicates that the project area is 9.59 acres. Revise as needed for correctness and consistency. The narrative has been revised to explain the total site including future development, which is 9.59 ac. 15. The entrance of the forebay must be deeper than the exit of the forebay (Wet Pond MDC 5b) and both the entrance and exit of the forebay must have at least 6 inches of sediment storage (Wet Pond MDC 3). Both the entrance and exit of the forebay are located on the "bottom" (not the sides) of the forebay. Please refer to Figure 5 in Part C-3 of the Design Manual for clarification. This has been adjusted. 16. The concrete riser detail on plan sheet C-05 shows the pond bottom elevation as 384. This has been corrected, 17. Please correct the following issues with the Supplement-EZ Form: a. Cover Page: i. Lines 7-10 -Vegetated setbacks are only required from "blue line" streams as shown on the USGS topographic map. Since there aren't any on or around the project area, these items are not needed. ii. Re-sign & seal the cover page. Make sure to provide the original hard copy in the resubmission. b. Drainage Area Page: i. Entire Site Column: 1. The entire site column should be a listing of all of the BUA that will exist within the project area post -construction. 2. Line 7 - This item should be a summation of the items of Line 10. 3. Line 10 - Ensure that these values correspond to the values and types shown in Section IV, 10 of the Application. 4. Line 16 - Ensure that this item is calculated correctly and corresponds to Section IV, 8 of the Application. 5, Lines 17-19 - These items are not required for the entire site column. ii. Drainage Area 1 Column: 1. The drainage area 1 column should be a listing of all of the BUA that will exist within the drainage area to the proposed SCM post -construction. 2. Lines 4, 5, 7, 10, & 16-19 should be filled out. 3. Line 19 - this should be either the "Simple" method, or the "Discrete NRCS" method. iii. Line 20 - "Future" BUA has its own line and should not be shown as "Other". Wet Pond Page: i. Line 27 - Revise per earlier comment. ii. Line 28 - Revise per earlier comment. iii. Line 29 - Per the calculations, it appears that Equation 3 is used. Revise as needed. iv. Line 30 - If Equation 2 was used, this item is not needed. v. Line 31 - If Equation 3 was used, please provide this item. vi. Line 32 - Revise per earlier comment. vii. Line 35 - The design volume should match Line 2 of the Wet Pond Page and Line 18 of the drainage area 1 column of the Drainage Areas Page. viii. Line 44 - Revise per earlier comment. ix. Revise any other items that may change from addressing other issues. These comments are addressed in the resubmittal. 18, Provide pdfs of all revisions, 2 hardcopies of revised plan sheets, and 1 hardcopy of other documents. Pdfs must be uploaded using the form at: htt P s: edacs.deq,nc.gov/Form /S PLn eet 5�4bmLittaL Understood. While it is no-t required, it is recommended that the depth of the forebay be increased to reduce the chance of resuspending sediment and to reduce the frequency of required maintenance. It is also recommended to consider utilizing an SCM more well suited to well drained soils, such as an infiltration system or bioretention cell. Acknowledged. Thank you. Feel free to contact me with any questions or concerns regarding this project. Sincerely, The Curry Engineering Group, PLLC Donald Curry, PE President ROY COOPER Governor MICHAEL S. REGAN Secretary BRIAN WRENN Acting Director Donald L. Curry, PE 205 S. Fuquay Avenue Fuquay-Varina, NC 27526 NORTH CAROLINA Environmental Quality June 12, 2020 Subject: Request for Additional Information Stormwater Permit No. SW6200501 Medlin Self -Storage Harnett County Dear Mr. Curry: The Division of Energy, Mineral and Land Resources (DEMLR), received a Stormwater Management Permit Application for the subject project on May 5, 2020. A review of that information has determined that the application is not complete. The following information is needed to continue the stormwater review: Please ensure that the percent impervious area for the project is calculated correctly (Section IV, 8). Per the Soil Weighted CN Values calculation pages in the stormwater management report, there will be 5.54 acres (5.38 + 0 + 0.10 + 0.06) of BUA within the project area in proposed conditions and the project area is shown as 9.59 acres, resulting in a percent BUA of 58% whereas 63% is shown in the Application. Revise as needed for correctness and consistency. 2. Per the NC Surface Water Classification Map, the receiving stream appears to be Neills (Neals) Creek (Section IV, 10). 3. The drainage area to the proposed wet pond is shown as 8.55 acres in Section IV, 10 of the Application and Water Quality & Surface Area Calculation page whereas on plan sheet SW-02 and on the Soil Weighted CN Values page the drainage area is shown as 8.18 acres. Revise as needed for correctness and consistency. The drainage area column of Section IV, 10 should be an accounting of the entire drainage area to the proposed SCM. 4. Please break down the "Other" type of BUA for the drainage area in Section IV, 10. The storage lots can be considered "On -site Parking" and the access road can be considered "On -site Streets". Revise as needed for correctness and consistency. .OX 11 . North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources 512 North Salisbury Street 1 1612 Mail Service Center I Raleigh, North Carolina 27699-1612 919.707.9200 Please provide 2 signed, sealed, & dated copies of the plans (Section VI, 8). The provided plans were not signed. 6. It is noted that basic dimensioning for the BUA is provided on plan sheet C-02, however, the information provided in the calculations and Application should be verifiable on the plan sets (Section VI, 81). Please either provide callouts showing the type and area of each BUA or a BUA table similar to the one in Section IV, 10 of the Application. Also, the total BUA for the site, as shown on plan sheet C-00 (177,643 sf) does not coincide with the rest of the submission. 7. Please delineate the wetlands on the plans or provide a note stating that no wetlands exist. Provide documentation of the qualifications and identity of the individual who made this determination (Section VI, 8m). Please initial the items from Section VI, 9-1 1 if they are included in the submission. 9. Section IX is not required since the Applicant is the Property Owner. With your permission, I will cross out this item in red pen on the original, signed copy. If that is not acceptable to you, please provide revised original signature pages without Section IX signed. 10. It does not appear that sufficient impervious area is being treated in the proposed SCM (15A NCAC 02H .1002(43)). In order to meet the definition of runoff treatment, "the volume of stormwater runoff generated from all of the built -upon area of a project at build -out... is treated in one or more primary SCMs." 11. The pond cross-section on plan sheet C-05 appears to have the bottom/sediment storage top elevations for the main pool and forebay switched. Revise as needed for correctness and consistency. 12. The cross -sectional area of the main pool at elevation 307 appears to be incorrect (Pond Volumes calculation page). Revise as needed for correctness and consistency. 13. When calculating the volume of the main pool and the forebay, the sediment storage area should not be included. Revise as needed for correctness and consistency. 14. The project narrative states that the project area is 6.32 acres whereas the Application indicates that the project area is 9.59 acres. Revise as needed for correctness and consistency. 15. The entrance of the forebay must be deeper than the exit of the forebay (Wet Pond MDC 5b) and both the entrance and exit of the forebay must have at least 6 inches of sediment storage (Wet Pond MDC 3). Both the entrance and exit of the forebay are located on the "bottom" (not the sides) of the forebay. Please refer to Figure 5 in Part C-3 of the Design Manual for clarification. 16. The concrete riser detail on plan sheet C-05 shows the pond bottom elevation as 384. 17. Please correct the following issues with the Supplement-EZ Form: a. Cover Page: i. Lines 7-10 — Vegetated setbacks are only required from "blue line" streams as shown on the USGS topographic map. Since there aren't any on or around the project area, these items are not needed. ii. Re-sign & seal the cover page. Make sure to provide the original hard copy in the resubmission. b. Drainage Area Page: i. Entire Site Column: 1. The entire site column should be a listing of all of the BUA that will exist within the project area post -construction. 2. Line 7 — This item should be a summation of the items of Line 10. 3. Line 10 — Ensure that these values correspond to the values and types shown in Section IV, 10 of the Application. 4. Line 16 — Ensure that this item is calculated correctly and corresponds to Section IV, 8 of the Application. 5. Lines 17-19 — These items are not required for the entire site column. ii. Drainage Area 1 Column: 1. The drainage area 1 column should be a listing of all of the BUA that will exist within the drainage area to the proposed SCM post - construction. 2. Lines 4, 5, 7, 10, & 16-19 should be filled out. 3. Line 19 — this should be either the "Simple" method, or the "Discrete NRCS" method. iii. Line 20 — "Future" BUA has its own line and should not be shown as "Other". c. Wet Pond Page: i. Line 27 — Revise per earlier comment. ii. Line 28 — Revise per earlier comment. ill. Line 29 — Per the calculations, it appears that Equation 3 is used. Revise as needed. iv. Line 30 — If Equation 2 was used, this item is not needed. v. Line 31 — If Equation 3 was used, please provide this item. vi. Line 32 — Revise per earlier comment. vii. Line 35 — The design volume should match Line 2 of the Wet Pond Page and Line 18 of the drainage area 1 column of the Drainage Areas Page. viii. Line 44 — Revise per earlier comment. ix. Revise any other items that may change from addressing other issues. 18. Provide pdfs of all revisions, 2 hardcopies of revised plan sheets, and 1 hardcopy of other documents. Pdfs must be uploaded using the form at: https://edoes.deq.nc.gov/Forms/`SW Project Submittal While it is not re aired, it is recommended that the depth of the forebay be increased to reduce the chance of resuspending sediment and to reduce the frequency of required maintenance. It is also recommended to consider utilizing an SCM more well suited to well drained soils, such as an infiltration system or bioretention cell. Please note that this request for additional information is in response to a preliminary review. The requested information should be received by this Office prior to July 10, 2020, or the application will be returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. Please reference the State assigned project number SW6200501 on all correspondence. If you need additional time to submit the information, please submit your request for a time extension to the Division at the contact below. The request must indicate the date by which you expect to submit the required information. The Division is allowed 90 days from the receipt of a completed application to issue the permit. The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143-215.6A. If you have any questions concerning this matter please feel free to contact me at Jim.Farkas@ncdenr.goy or (919) 707-3646. Sincerely, Jim Farkas Environmental Engineer Stormwater Program cc: Fayetteville Regional Office DEMLR USE ONLY Date Received Fee Paid Permit Number Applicable Rules: ❑ Coastal SW - 1995 ❑ Coastal SW - 2008 ❑ Ph II - Post Construction (select all tlzat apply) ❑ Non -Coastal SW- HQW/ORW Waters ❑ Universal Stormwater Management Plan ❑ Other WQ M mt Plan: State of North Carolina Department of Environment and Natural Resources Division of Energy, Mineral and Land Resources STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form may be photocopied for use as an original I. GENERAL INFORMATION 1. Project Name (subdivision, facility, or establishment name - should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): Medlin Self 2. Location of Project (street address): NC 210 City:Angier T County:Harnett Zip:27501 3. Directions to project (from nearest major intersection): From intersection of NC-55 and NC-210 head southwest for 1.3 miles. 4. Latitude:35129' 46" N II. PERMIT INFORMATION: Longitude:78° 45' 27.5" W of the main entrance to the project. 1. a. Specify whether project is (check one): ®New ❑Modification ❑ Renewal w/ Modificationt tRenezoals zoith modifications also requires SVVU-102 - Renewal Application Form b.If this application is being submitted as the result of a modification to an existing permit, list the existing permit number , its issue date (if known) , and the status of construction: ❑Not Started ❑Partially Completed* ❑ Completed* *provide a designer's certification 2. Specify the type of project (check one): ❑Low Density ®High Density ❑Drains to an Offsite Stormwater System ❑Other 3. If this application is being submitted as the result of a previously returned application or a letter from DEMLR requesting a state stormwater management permit application, list the stormwater project number, if assigned, and the previous name of the project, if different than currently proposed, 4. a. Additional Project Requirements (check applicable blanks; information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748): ❑CAMA Major ❑NPDES Industrial Stormwater ®Sedimentation/Erosion Control: 6.9 ac of Disturbed Area 0404/401 Permit: Proposed Impacts b.If any of these permits have already been acquired please provide the Project Name, Project/Permit Number, issue date and the type of each permit:Sedimentation/ Erosion Control through Fayetteville Regional Office 5. Is the project located within 5 miles of a public airport? ®No ❑Yes If yes, see S.L. 2012-200, Part VI: htti2:Hportal.iicdenr.orgi�veb/Ir/rules-and-regulations Form SWU-10l Version Oct. 31, 2013 Page I of 6 IV. PROJECT INFORMATION 1. In the space provided below, briefly summarize how the stormwater runoff will be treated. Storm drainage will be collected via ditches and enclosed pipe system to proposed Wet Pond SCM. 2. a. If claiming vested rights, identify the supporting documents provided and the date they were approved: ❑ Approval of a Site Specific Development Plan or PUD Approval Date: ❑ Valid Building Permit Issued Date: ❑ Other: Date: b. If claiming vested rights, identify the regulation(s) the project has been designed in accordance with: ❑ Coastal SW - 1995 ❑ Ph II - Post Construction 3. Stormwater runoff from this project drains to the Cape Fear River basin. 4. Total Property Area: 9.59 5. Total Coastal Wetlands Area: 0 acres 6. Total Surface Water Area: 0 acres 7. Total Property Area (4) - Total Coastal Wetlands Area (5) - Total Surface Water Area (6) = Total Project Area+:9.59 acres + Total project area shall be calmlated to exclude the follvu;iaag: the nornurl pool of impounded structures, tlu area between: the banks of streams and rivers, the area be&r[o the Nonnal High Water (NHYV) line or Mean High Water (MHW) line, and coastal wetlands landward front the NHTV (or MHVV) line. The resnitant project area is used to calcidate overall percent built upon area (BUA). Non -coastal zetlands landu+ard of the NHW (or MHL'ti1) line nia�y be included in tine total project area. 8. Project percent of impervious area: (Total Impervious Area / Total Project Area) X 100 = 57.8 % 9. How many drainage areas does the project have?4 (For high density, count 1 for each proposed engineered stornazoater BMP. For low density and other projects, iese 1 for tlae whole property area) 10. Complete the following information for each drainage area identified in Project Information item 9. If there are more than four drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. Basin Information Drainage Area 1 Drainage Area 2 , Drainage Area 3 ^ Drainage Area 4 Receiving Stream Name Neill's Creek Neill's Creek Neill's Creek Neill's Creek Stream Class * WS-IV WS-IV WS-IV WS-IV Stream Index Number * 18-16-(0.7) 18-16-(0.7) 18-16-(0.7) 18-16-(0.7) Total Drainage Area (sf) 356,105 16,117 11,761 33,797 On -site Drainage Area (so 356,105 16,117 11,761 33,797 Off -site Drainage Area (so 0 0 0 0 Proposed Impervious Area** so 234,110 0 4,356 2,614 % Im envious Area** total 65.8 0 37.0 7.7 Impervious" Surface Area Drainage Area 1 Drainage Area 2 Drainage Area 3 Drainage Area 4 On -site Buildings/Lots (so On -site Streets (so 48,711 On -site Parking (sf) 124,233 On -site Sidewalks (sf) Other on -site (so Future (so 61,166 4,356 2,614 Off -site (sf) 0 Existing BUA*** (sf) 0 Total (sf): 234,110 0 4,356 2,614 " Stream Class and Index Nionber can be determined at: lrttjiY&7ortal.ncdenr.org/zc ebfia�r as/rsaa/classt craiioaI Ira �ervio is area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sicnoalks, grmpel areas, etc. Form SWU-101 Version Oct. 31, 2013 Page 3 of 6 'Report only that amount of existing BUA that will remain after development. Do not report any existing BUA that is to be removed and which zoill be replaced by new BUA. 11. How was the off -site impervious area listed above determined? Provide documentation. measured in CAD Projects in Union County: Contact DEMLR Central Office staff to check if the project is located within a Threatened & Endangered Species watershed that may be subject to more stringent stormwater requirements as per 1 SA NCAC 02B . 0600. V. SUPPLEMENT AND O&M FORMS The applicable state stormwater management permit supplement and operation and maintenance (O&M) forms must be submitted for each BMP specified for this project. The latest versions of the forms can be downloaded from http://12ortal.ncdeiir.org/web/wg/ws/su/bml2-manual. VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Energy, Mineral and Land Resources (DEMLR). A complete package includes all of the items listed below. A detailed application instruction sheet and BMP checklists are available from h ortal.ncdenr.or web w ws su statesw forms does. The complete application package should be submitted to the appropriate DEMLR Office. (The appropriate office may be found by locating project on the interactive online map ath!W. Zportal.ncdenr.orLy/web/wq/ws/su/maps.) Please indicate that the folIowin re uired information have been provided by initialin in the space provided for each item. All original documents MUST be signed and initialed in blue ink. Download the latest versions for each submitted application package from http:/ / portal.ncdennoriz/ web/wq /ws/su/statesw/forms_docs. itials 1. Original and one copy of the Stormwater Management Permit Application Form. 2. Original and one copy of the signed and notarized Deed Restrictions & Protective Covenants Form. (if required as per Part V11 below) 3. Original of the applicable Supplement Form(s) (sealed, signed and dated) and O&M agreement(s) for each BMP. 4. Permit application processing fee of $505 payable to NCDENR. (For an Express review, refer to h www.envhtl .or a es onesto ex ress.html for information on the Express program and the associated fees. Contact the appropriate regional office Express Permit Coordinator for additional information and to schedule the required application meeting.) 5. A detailed narrative (one to two pages) describing the stormwater treatment/management 6. A USGS map identifying the site location. If the receiving stream is reported as class SA or the receiving stream drains to class SA waters within 1/2 mile of the site boundary, include the 1h mile radius on the map. 7. Sealed, signed and dated calculations (one copy). 8. Two sets of plans folded to 8.5" x 14" (sealed, signed, & dated), including: C a. Development/Project name. b. Engineer and firm. c. Location map with named streets and NCSR numbers. d. Legend. e. North arrow. f. Scale. g. Revision number and dates. h. Identify all surface waters on the plans by delineating the normal pool elevation of impounded structures, the banks of streams and rivers, the MHW or NHW line of tidal waters, and any coastal wetlands landward of the MHW or NHW lines. • Delineate the vegetated buffer landward from the normal pool elevation of impounded structures, the banks of streams or rivers, and the MHW (or NHW) of tidal waters. i. Dimensioned property/ project boundary with bearings & distances. j. Site Layout with all BUA identified and dimensioned. k. Existing contours, proposed contours, spot elevations, finished floor elevations. 1. Details of roads, drainage features, collection systems, and stormwater control measures. m. Wetlands delineated, or a note on the plans that none exist. (Must be delineated by a qualified person. Provide documentation of qualifications and identify the person who made the determination on the plans. n. Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations. o. Drainage areas delineated (included in the main set of plans, not as a separate document). for Form SWU-101 Version Oct. 31, 2013 Page 4 of 6 p. Vegetated buffers (where required). 9. Copy of any applicable soils report with the associated SHWT elevations (Please identify elevations in addition to depths) as well as a map of the boring locations with the existing elevations and boring logs. Include an 8.5"x11" copy of the NRCS County Soils neap with the project area clearly delineated. For projects with infiltration BMPs, the report should also include the soil type, expected infiltration rate, and the method of determining the infiltration rate. (Infiltration Devices submitted to WiRO: Sc hedcde a site visitfor ar DEMLR to ver yiI the SHUVT prior to srchmittal, (910) 796-73.78.) 10. A copy of the most current property deed. Deed book: 3789 Page No: 0468 11. For corporations and limited liability corporations (LLC): Provide documentation from the NC Secretary of State or other official documentation, which supports the titles and positions held by the persons listed in Contact Information, item la, 2a, and/or 3a per 15A NCAC 21-1.1003(e). The corporation or LLC must be listed as an active corporation in good standing with the NC Secretary of State, otherwise the application will be returned. hftp:Z/www.secretary.state.nc.us`/Corporations/CSearch.asj2x VII. DEED RESTRICTIONS AND PROTECTIVE COVENANTS For all subdivisions, outparcels, and future development, the appropriate property restrictions and protective covenants are required to be recorded prior to the sale of any lot. If lot sizes vary significantly or the proposed BUA allocations vary, a table listing each lot number, lot size, and the allowable built -upon area must be provided as an attachment to the completed and notarized deed restriction form. The appropriate deed restrictions and protective covenants forms can be downloaded from h tp;Llportal.ncden.r.org/web/lr/st7te- stormwater-forms dons. Download the latest versions for each submittal. In the instances where the applicant is different than the property owner, it is the responsibility of the property owner to sign the deed restrictions and protective covenants form while the applicant is responsible for ensuring that the deed restrictions are recorded. By the notarized signature(s) below, the permit holder(s) certify that the recorded property restrictions and protective covenants for this project, if required, shall include all the items required in the permit and listed on the forms available on the website, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the NC DEMLR, and that they will be recorded prior to the sale of any lot. VIII. CONSULTANT INFORMATION AND AUTHORIZATION Applicant: Complete this section if you wish to designate authority to another individual and/or firm (such as a consulting engineer and/or firm) so that they may provide information on your behalf for this project (such as addressing requests for additional information). Consulting Engineer:Donald L. Curry, PE Consulting Firm: The Curry Engineering Group, PLLC Mailing Address:205 S. Fuquay Ave. City:Fuquay-Varina State:NC Zip:27526 Phone: 919 552-0849 Fax: 1 ) Email:don@curryeng.com IX. PROPERTY OWNER AUTHORIZATION (if Contact Information, item 2 has been filled out, complete this section) I, (print or hjpe name of person listed in Contact Information, item 2a) NIA , certify that I own the property identified in this permit application, and thus give permission to (print or hjpe name of person listed in Contact Information, item la) with (print or hjpe name of organization listed in Contact Information, item 1a) to develop the project as currently proposed. A copy of the lease agreement or pending property sales contract has been provided with the submittal, which indicates the party responsible for the operation and maintenance of the stormwater system. Form SWU-101 Version Oct. 31, 2013 Page 5 of 6 SUPPLEMENT-EZ COVER PAGE FORMS LOAD TROJECT INFORMATION 1 Project Name Medlin Self Storage 2 Project Area (ac)_ 959 3 Coastal Wetland Area (ac) _ 0 _ 4�rface Water Area (acj 0 5 Is this project High or Low ❑enst High 6 Does this project use an off -site SCM? No COMPLIANCE WITH 02H.1003(4) 7 i Width of vegetated_ setbacks providad_(fe0t) NIA- 8 Will the vegetated setback remain vegatefed? No 9 Is RI A other that as listed In .1003{4)(ad) out of the setback? _ _ No to j Is streambank stabilization proposed on this project? —Ni; NLIMBER.AND., FF'3C1Itr;: -. 11 1 Infiltration System 0 12 tnamtentian Cell �� 0 13 Wet Pond 1 14 Stormwater Wetland 0 15 Permeable Pavement 0 16 ;Sand Filter 0 17 Rainwater Harvesting RWHj p 18 _ Green Roof_ 0 19 Level Spreader -Filter Ship (LSLFS7 p 20 f Disconnected Impervious Surraee (DI5} 0 21 Treatment Swale 0 22 I)ry Pond 0 23 S.tormFliter 0 .24 Sifva Cell 0 25 Ba alter _ 0 26 Filterra 0 FORMS COADED 27 Name and Title: Andrew S Petty - VP / Senior Engineer 28 prganfxatiDn: Cu y Englheering Group, PLLC 29 Street address: 205 S- Fuquay Avenue 30 C g t State, Zip - - Fuquay-Vadna, NC 27526 31 Phone numlier _ 919-552-0849_ 32 Email: and r 9�r i=rrvann rnm Certification Slaloment I certify, under penalty of low that this Supplement-FZ form and all supporting information were prepared under my direction or supervision; that the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete; and that the engineering plans. specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here. rr 4J2!l,�r 2 Signature a e9igner -1)1-1 1 WZo Date DRAINAGE AREAS 1 Is this a high densily project? yes -2 1f sc, number of drainage areas/SC Ms 4 Is all/part of this project subject to previous rule 3 Iversions? J Na �t7R tLiS ! t7Aa EO nfiAjIINAGE AREA INFORMATION Entire Site 1 2 3 4 4 Type of SCM 5 rTotal BUA in pro'ect (sq ft) Su_mMpy 241080 sf 241060 sf _ sf sf Wet Pond 234110 sf 234110 sf _Bypass 2 sf Bypass 3 4356 sf Bypass 4 2614 sf 2614 sf sf New BUA on subdivided lots (subject to permitting) (sq ft sf _ 4356 sf 7 New BUA outside of subdivided lots (subject to permitting) (sf) sf sf sf 8 Offsite - total area (sq ft) sf sf sf sf 9 Offsite BUA (sq ft) sf sf sf sf sf 10 Breakdown of new BUA outside subdivided lots: Parkin (sq ft) 124233 sf 124233 sf Sidewalk fsq ft Roof (sg ft) Roadway (sq ft) 48711 sf 48711 sf Future (sq ft) 68136 sf 61166 sf 4356 sf 2614 sf Other, please specify in the comment box below (sq ft) New infiltrating permeable pavement on 11 subdivided lots (sq ft) sf 12 New infiltrating permeable pavement outside of subdivided lots (sq ft sf 13permitting) Exisitng BUA that will remain (not subject to sq ft sf 14 J Existing BUA that is already permitted (sq ft sf 15 ' Existing BUA that will be removed (s ff sf 16 Percent BUA 58% 66% 0% 37% 8% 17 IDesign storm (inches) 18 Des' n volume of SCM cu ft) NIA 1 in VA WA N/A WA 19343 cf N/A N/A N/A 19 Calculation method for design volume N/A Avg Deptfi #3 NIA WA WA ADDITIOHAL INFORMAMN Please use this space to provide any additional information about the 20 drainage area(s): Drainage area inciudes BUA allocation for future development WET POND 1 Drainage area number f 2 Design volume of SCM (Cu ft) 19343 cf 3 Is the SCM sized to treat the SW from all surfaces at build -out? No 4� Is the SCM locaiea away from contaminated soils? Yes 51 What are the side slopes of the SC_M (H:V)? 3:1 Dees the SCM have retaining walls,.gallon walls or otherangine, r _6 side slopes? No Are the inlets, outlets, And nim iving stream protected from oro, n 7, (10-year storm)? Yes Is there an overflow or bypass for inflow volume in excess Of the a design volume? Yes _ 9• What is the method for dewatering the SCM for m-afntermnce7 Pump [preferred) —If applicable, will the 5CM be cleaned out after construction? Yes 11 ! DOes the maintenance access comply with Generat MDC (S)? Yes 12 Does the drainage. easement si' { Iy wlth Gener [ MD-G (9)? Yes If the.SCM Is on a single family lot, doe's (MN?) The plat comply with 13 General MDC (.10)? 14 Is there an O&M Agreement that complies with General MDC (11)? Yes _ 15 Is there ar 0&M Plan.that,cunfpflps with General. MDC (i2)? Yes 16 Does the SCM follow the device specific MDC? -Yes — — 17 Was the SCM designed by an NC I I _C0 F1 5 ed professional? y i a memoa used SA/DA 19: Has a stagelstorage Table been provided In the caleulation57 Yes 201 Elevation of the excavated main pool depth (bottom of sediment , removal) (fmsl) 302.50 21;ElevAtlon of the meal pool bottom -(top of sediment removal) (fmsl) 303.00 22 E� liar Of the bottom or jhe vegetated $bMt (Fmsl) 307.50 23 ElevaSlon of the permanent pool (fmst) 308.00 24_ Elevation of Via "of the vegetated shelf (fmsl) 303,50 25 Elevation of the temporary pool (fmsq 309.25 26 Surface area of the main permanent pool (square feet) 9953T 27 Volume cif the main permanent pool (rabic Test) 32t358 c€ 28 Average depth of the main pool (feet) 29!Average depth equation used Equ®Itkin 3 30 If UsIl1g equal On 3, main.pooi.petlmeter [featy 5pq,q 31 If using equation 3, width of submerged veg. shelf (feet) 32 Volume of thefQni? (cubiC.ia1=[). 5354 cf 33 Is this 15-20% of the volume in the main pool? Yes 34 Clean -out Depth for forebay (Inches] 241a 35] Design volume of SCM (cu ft) 1993- cf 36 Is the outlet an orifice or a weir? Orifice 37 if ofiffae: rsritice diameter (irlchesj 2 in 36 IIwer, weir Height (inches) 391 If weir, weir length (Incises) 40:Drawdbwn time far tFie tempor" pool (days) 3.3 41 Are the.inlet(S) and outlet located Ina manner that avoids $b&t- clrcuclrculling? Yes 42 Are t rms or baffles P*Ided to improve the flow path? I Yea 43 Depth of forehay at entrance [incites] _i 40 In 44 I?epth aF forebay at exit (inches) 35 In 451 Does water flow out of the foretlay in a ndn4rosive manned yes 4L61 Width of the vegetated shelf (Teel) _ fi ft 47, Slope of vegetated shelf (H:V) Does the orifice drawdown from below the top surface of the 46 permanent pool? Yes 49 Does the pond minimize impacts to the receiving channel from the 1- yr, 24-hr storm? Yes Are fountains proposed? (If Y, please provide dacumerotatlon that 50 MDC(9) is met) No 51 is a tr>dsh rWA_pr pthef device provided to protect the outlet system? Yes I 52 ,Are the dam and embankment planted in non -clumping turf grass? Yes 53-Spedes of turfthat will be used on the dam and embankment Fescue or. enll peed 54, Has a planting plan been provided for the vegetated shelf? �. ADDMONAL INFORMATION Please use this space to provide any additional information about the 55, wet pdnd(s); Wet Pond 4 2:12 PM 7/17/2020 Wet i]etentlon F'and t7esi n Summa vvet rona uiagran) WET POND I FOREBAY MAIN POND Permanent Pool El. 308 Permanent Pool El. 308 Temporary Pool El: 309.25 Temporary Pool El: 309.25 Pretreatment other No Clean Out Depth: 3 Clean Out Depth: 5 than forebay? Sediment Removal El: 305 Sediment Removal El: 303 Has Veg. Filter? No Bottom Elevation: 1 304.5 Bottom Elevation: 302.5 WET POND ID FOREBAY MAIN POND Permanent Pool El. Permanent Pool El. Temporary Pool El: Temporary Pool El: Pretreatment other Clean Out Depth: 0 Clean Out Depth: 0 than forebay?El Sediment Removal El: Sediment Removal El: Has Veg. Filter? Bottom Elevation: Bottom Elevation: FORM-EZ 7/17/2(