Loading...
HomeMy WebLinkAbout20091046 Ver 1_Information Letter_20100204(9 Ir 11"Z4o.? 20,0 LJ ms fo tem a ?'1ncht q? `A PROGRAM January 27, 2010 Ms. Kimberly Garvey U. S. Army Corps of Engineers Wilmington Regulatory Field Office 69 Darlington Avenue Wilmington, North Carolina 28402 Dear Ms. Garvey: Subject: EEP Mitigation Acceptance Letter: 1-4407, Improvements to US 220 (Future 1-73/1-74) from South of NC 124/US 220 Business to North of SR 1462 in Asheboro, Randolph County; Yadkin River Basin (Cataloging Units 03040103 and 03040104); Central Piedmont (CP) Eco-Region The purpose of this letter is to notify you that the Ecosystem Enhancement Program (EEP) will provide the compensatory stream mitigation for the unavoidable impact associated with the above referenced project. As indicated in the NCDOT's mitigation request received on January 25, 2010, stream mitigation from EEP is required for 219 feet of warm stream impact (52 feet in Cape Fear 03030003 and 167 feet in Yadkin 03040104). Stream Wetlands Buffer IMPACTS /MITIGATION UNITS Cold Cool Warm RW NRW CM Zone 1 Zone 2 Impacts - CaFear 03030003 CP 52 Mitigation Units - Ca Fear 03030003 104 Impacts - Yadkin 03040104 CP 167 Mitigation Units - Yadkin 03040104 334 Impacts - Total Project 210 Mitigation Units - Total Project 438 This mitigation acceptance letter replaces the mitigation acceptance letter issued on July 9, 2009. Mitigation associated with this project will be provided in accordance with Section X of Amendment No. 2 to the Memorandum of Agreement between the N. C. Department of Environment and Natural Resources, the N. C. Department of Transportation, and the U. S. Army Corps of Engineers fully executed on March 8, 2007 (Tri-Party MOA). EEP commits to implement sufficient compensatory stream mitigation as listed above to offset the impacts associated with this project by the end of the MOA year in which this project is permitted. If the above referenced impact amounts are revised, then this mitigation acceptance letter will no longer be valid and a new mitigation acceptance letter will be required from EEP. If you have any questions or need additional information, please contact Ms. Beth Harmon at 919-715-1929. Sincerely, William D. Gilmore, P.E. EEP Director cc: Mr. Gregory J. Thorpe, Ph.D., NCDOT-PDEA Mr. Brian Wrenn, Division of Water Quality, Wetlands/401 Unit File: 1-4407 Revised RP.storut9... EKk"Xi;1?5... Prot" Oar Stag AL, WDI R North Carolina Ecosystem Enhancement Program, 1652 Mail Service Center, Raleigh, NC 27699-1652 / 919-715-0476 /www.nceep.net rb:IAV- PROGRAM January 27, 2010 Mr. Greg Thorpe, Ph.D. Environmental Management Director Project Development and Environmental Analysis Branch North Carolina Department of Transportation 1548 Mail Service Center Raleigh, North Carolina 27699-1548 Dear Mr. Thorpe: Subject: EEP Mitigation Acceptance Letter: GI(014Cv `sq?q ,o 1-4407, Improvements to US 220 (Future 1-73/1-74) from South of NC 1241US 220 Business to North of SR 1462 in Asheboro, Randolph County; Yadkin River Basin The purpose of this letter is to notify you that the Ecosystem Enhancement Program (EEP) will provide the compensatory stream mitigation for the unavoidable impact associated with the above referenced project. Based on the information supplied by you on January 25, 2010, the impacts are located in CU 03030003 of the Cape Fear River Basin and 03040104 of the Yadkin River Basin in the Central Piedmont (CP) Eco-Region, and are as follows. Stre am Wetlands Buffer IMPACTS / MITIGATION UNITS Cold Cool Warm RW NRW CM Zone 1 Zone 2 Impacts - Cape Fear 03030003 CP 52 Mitigation Units - Cape Fear 03030003 104 Impacts - Yadkin 03040104 CP 167 Mitigation Units - Yadkin 03040104 334 Impacts -Total Project 219 Mitigation Units - Total Project 438 This mitigation acceptance letter replaces the mitigation acceptance letter issued on July 9, 2009. EEP commits to implementing sufficient compensatory stream mitigation credits to offset the impacts associated with this project by the end of the MOA Year in which this project is permitted, in accordance with Section X of the Amendment No. 2 to the Memorandum of Agreement between the North Carolina Department of Environment and Natural Resources, the North Carolina Department of Transportation, and the U. S. Army Corps of Engineers, fully executed on March 8, 2007. If the above referenced impact amounts are revised, then this mitigation acceptance letter will no longer be valid and a new mitigation acceptance letter will be required from EEP. If you have any questions or need additional information, please contact Ms. Beth Harmon at 919-715-1929. Sincerely, William D. Gilmore, P.E. EEP Director cc: Ms. Kimberly Garvey, USACE- Wilmington Regulatory Field Office Mr. Brian Wrenn, Division of Water Quality, Wetlands/401 Unit File: 1-4407 Revised NO" OGf,1' Sta& Wfflk North Carolina Ecosystem Enhancement Program, 1652 Mail Service Center, Raleigh, NC 27699-1652 / 919-715-0476 / www.nceep.net