HomeMy WebLinkAbout20200812 Ver 1_PCN Application Form Section C Edits_20200722C. Proposed Impacts Inventory
1. Impacts Summary
1 a. Which sections were completed below for your project (check
all that apply):
® Wetlands ® Streams - tributaries
❑ Buffers
❑ Open Waters ❑ Pond Construction
2. Wetland Impacts
If there are wetland impacts proposed on the site, then complete this question
for each wetland area impacted.
2a.
2b.
2c.
2d.
2e.
2f.
Wetland impact
Type of jurisdiction
number —
Type of impact
Type of wetland
Forested
(Corps - 404, 10
Area of impact
Permanent (P) or
(if known)
DWQ — non-404, other)
(acres)
Temporary T
W1 ® P ❑ T
Culvert
Non -Tidal
❑ Yes
® Corps
0.018
Freshwater Marsh
® No
® DWQ
W2 ® P ❑ T
Clearing
Non -Tidal
ElYes
® Corps
0.003
Freshwater Marsh
® No
® DWQ
W3 ® P ❑ T
Fill
Headwater Forest
® Yes
❑ No
® Corps
® DWQ
0.008
W4 ®P ❑ T
Fill (riprap)
Headwater Forest
® Yes
❑ No
® Corps
® DWQ
0.004
W5 ® P ❑ T
Clearing
Headwater Forest
® Yes
❑ No
® Corps
® DWQ
0.001
W6 ® P ❑ T
Excavation
Headwater Forest
® Yes
❑ No
® Corps
® DWQ
0.001
W7 ® P [-IT
Fill (riprap)
Headwater Forest
® Yes
❑ No
® Corps
® DWQ
0.001
W8 ® P ❑ T
Clearing
Headwater Forest
® Yes
❑ No
® Corps
® DWQ
0.001
W9 ®P ❑ T
Fill (riprap)
Headwater Forest
® Yes
❑ No
® Corps
® DWQ
0.001
W10 ® P ❑ T
Clearing
Headwater Forest
® Yes
❑ No
® Corps
® DWQ
0.001
W11 ®P ❑ T
Fill
Non -Tidal
❑ Yes
® Corps
0.003
Freshwater Marsh
® No
® DWQ
2g. Total wetland impacts
0.039
2h. Comments: See attached Impact Figures and Cross -Sections for reference.
Permanent Fill in Wetlands = 1,434 square feet; Mechanized Clearing
in Wetlands = 266 square feet; Permanent Excavation
in Wetlands = 7 square feet.
Total Permanent Impacts = 0.039 acres (1,707 square feet)
3. Stream Impacts
If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then
complete this
question for all stream sites impacted.
3a.
3b.
3c.
3d.
3e.
3f.
3g.
Stream impact
Type of impact
Stream name
Perennial
Type of jurisdiction
Average
Impact
number -
(PER) or
(Corps - 404, 10
stream
length
Permanent (P) or
intermittent
DWQ — non-404,
width
(linear
Temporary (T)
(INT)?
other)
(feet)
feet)
Inlet Protection
® PER
® Corps
S1 ®P ❑ T
Riprap and Bank
Stream A
El INT
®DWQ
8
17
Stabilization
S2 ® P ❑ T
Culvert (60" RCP)
Stream A
® PER
❑ INT
® Corps
® DWQ
8
23
S3 ® P ❑ T
Grading
Stream A
® PER
❑ INT
® Corps
® DWQ
8
5
Outlet Protection
® PER
® Corps
S4 ® P ❑ T
Riprap/Bank
Stream B
❑INT
®DWQ
5
31
Stabilization
S5 ® P ❑ T
Culvert (72" RCP)
Stream C
® PER
❑ INT
® Corps
® DWQ
1.5
170
Outlet Protection
® PER
® Corps
S6 ® P ❑ T
Riprap/Bank
Stream C
❑INT
®DWQ
1
48
Stabilization
S7 ® P ❑ T
Culvert (66" RCP)
Stream C
® PER
❑ INT
® Corps
® DWQ
7
78
Outlet Protection
® PER
® Corps
S8 ® P ❑ T
Riprap/Bank
Stream C
❑INT
®DWQ
7
39
Stabilization
Outlet Protection
® PER
® Corps
S9 ® P ❑ T
Riprap/Bank
Stream C
❑INT
®DWQ
2.5
8
Stabilization
S10 ❑ P ® T
Other (Spillgate
Stream C
® PER
® Corps
6
29
Removal)
❑ INT
® DWQ
3h. Total stream and tributary impacts
448
3i. Comments: See attached Impact Figures and Cross -Sections for reference.
Total Permanent Stream/Tributary Impacts = 419 linear feet. Bank Stabilization accounts for 143 feet.