Loading...
HomeMy WebLinkAbout20200812 Ver 1_Wetland Impact Table_20200722WETLAND AND SURFACE WATER IMPACTS SUMMARY WETLAND IMPACTS SURFACE WATER (SW) IMPACTS Site No. PCN Form Impact Number Feature ID Structure Size/Type Permanent Fill in Wetlands (ac) Temporary Impact in Wetlands (ac) Excavation in Wetlands (ac) Mechanized Clearing in Wetlands (ac) Hand Clearing in Wetlands (ac) Permanent SW Impacts (ac) Temporary SW Impacts (ac) Existing Channel Impacts Permanent (ft) Existing Channel Impacts Temporary (ft) Average Channel Width (ft) 1 W1 WA Culvert 0.018 1 W2 WA Clearing in Wetlands 0.003 1 W3 WB Roadway Fill 0.008 1 W4 WB Riprap in Wetlands 0.004 1 W5 WB Clearing in Wetlands 0.001 2 W6 WC Cut Slope Excavation 0.001 2 W7 WC Riprap in Wetlands 0.001 2 W8 WC Clearing in Wetlands 0.001 2 S1 Stream A Inlet Protection Riprap and Bank Stabilization 0.004 17* 8 2 S2 Stream A 60" RCP 0.005 23 8 2 S3 Stream A Grading for Channel Alignment 0.001 5 8 3 W9 WD Riprap in Wetlands 0.001 3 W10 WD Clearing in Wetlands 0.001 3 S4 Stream B Outlet Protection Riprap and Bank Stabilization 0.003 31* 5 4 S5 Stream C 72" RCP 0.014 170 1.5 4 S6 Stream C Outlet Protection Riprap and Bank Stabilization 0.003 48* 1 5 W11 WF Roadway Fill 0.003 5 S7 Stream C 66" RCP 0.013 78 7 5 S8 Stream C Outlet Protection Riprap and Bank Stabilization 0.006 39* 7 5 S9 Stream C Outlet Protection Riprap and Bank Stabilization 0.001 8* 2.5 5 S10 Stream C Spillgate Removal 0.004 29 6 TOTALS** 1 1 0.033 0.001 0.006 0.049 0.004 419*** 29 * Riprap to be set (buried) in stream channel ** Rounded totals are the sum of actual impacts *** Bank Stabilization accounts for 143 feet NOTES: Permanent Fill in Wetlands: 1434 SF Permanent Excavation in Wetlands: 7 SF Mechanized Clearing in Wetlands: 266 SF