Loading...
HomeMy WebLinkAboutSW8051203_Historical File_20170501Coastal Land Design, PLLC Civil Engineering/Landscape Architecture Land Planning/Construction Management P.O. Box 1172 Phone: 910-254-9333 Wilmington, NC 28402 Fax: 910-25"502 www.cldeng.com To: NCDENR —Wilmington Regional Office 127 Cardinal Drive Extension Wilmington, NC 28405 (910) 796 — 7215 Attn: 1.1 Christini%il f ❑ As Requested ❑ Sent via Mail I Date: May 1, 2017 File: 1 310-04 Subject: Modification to Existing Permit SWS 051203 for Savannah Lakes at the Meadowlands for Stormwater Ponds #6 and #7 ❑ For Your Files ❑ For Distribution ® For your Review / Action / Approval ❑ Sent via Courier Quantity Drawing No. Description 1 Original Response Letter to Request for Additional Information 1 Original Third Supplemental Declaration of Protective Covenants, Restrictions, Easements, Charges and Liens for Meadowlands Golf Club — Phase 3 1 Copy Third Supplemental Declaration of Protective Covenants, Restrictions, Easements, Charges and Liens for Meadowlands Golf Club — Phase 3 2 Copies Revision E: Sheet SW-1 Remarks I Please contact our office should you have any questions or concerns. Thank you. CC: File A Client MAY o Z 2 1: PLLC R. Carmine, PE CLD Transmittal 05012017 Hall, Christine From: Hall, Christine Sent: Tuesday, May 02, 2017 10:01 AM To: 'Jay Carmine' Subject: RE --.Savannah Lakes - SW8 051203 Thanks! Christine Hall Environmental Engineer Division of Energy, Mineral and Land Resources — State Stormwater Program Department of Environmental Quality 910 796 7215 office 910 796 7335 direct christine.hall@ncdenr.gov 127 Cardinal Drive Ext. Wilmington, NC 28405 Con- N.-C.- . 'i " Spa Em,:# correspondrnra to and rom this cgdfYre--:3 !_ suh t'?,:t to .-0� : North Carolina Put --Pr Records Lau! and may ?)a cis ;losed 10 From: Jay Carmine [mailto:jcarmine@cldeng.com] Sent: Tuesday, May 02, 2017 9:54 AM To: Hall, Christine <Christine.Hall @ncdenr.gov> Cc: Weaver, Cameron <cameron.weaver@ncdenr.gov> Subject: RE: Savannah Lakes - SW8 051203 I do not believe that it has been recorded yet. However, we made it clear to our client that recordation was a requirement and that it would likely be expressly required in the permit. The final recorded version will be submitted to the State. Very Respectfully, Jay Carmine, PE, Ii Coastal Land Design, PLLC PO Box 1172 Wilmington, NC 28402 Telephone: 910.254.9333 ext. 1001 Cell: 910.742.4000 www.CoastalLandDesicin.net From: Hall, Christine [mailto:Christine.Hall Pncdenr.gov] Sent: Tuesday, May 2, 2017 9:45 AM To: Jay Carmine <icarmine@cldeng.com> Cc: Weaver, Cameron <cameron.weaver@ncdenr.gov> Subject: RE: Savannah Lakes - SW8 051203 Jay, Can you clarify if the original signed supplemental declaration submitted was recorded or if it is intended to act as a promise to be recorded and submit the final recorded version when available? Christine Hall Environmental Engineer Division of Energy, Mineral and Land Resources — State Stormwater Program Department of Environmental Quality 910 796 7215 office 910 796 7335 direct Christine. hall0modenr.gov 127 Cardinal Drive Ext. Wilmington, NC 28405 From: Jay Carmine [mailto:icarmine@cldeng.com] Sent: Thursday, April 27, 2017 4:44 PM To: Hall, Christine <Christ;ne.HallI@ncden. r.gov> Cc: Weaver, Cameron <caameron.weaver@ncdenr.eov> Subject: RE: Savannah Lakes - SW8 051203 I will ensure that we do forward a copy of the approved plans to the developer. Thank you for the consideration. Very Respectfully, ]ay Carmine, PE, PMP r V4 L _Jh' Coastal Land Design, PLLC PO Box 1172 Wilmington, NC 28402 Telephone: 910.254.9333 ext. 1001 Cell: 910.742.4000 www.CoastalLandDesign.net From: Hall, Christine [mailto:%hristine.Hall@ncdenr.go_v-] Sent: Thursday, April 27, 2017 4:39 PM To: Jay Carmine <icarmine@cldenn.com> Hall, Christine From: Hall, Christine Sent: Friday, April 28, 2017 9:32 AM To: 'Jay Carmine' Subject: RE: Savannah Lakes - SW8 051203 Thanks Christine Hall Environmental Engineer Division of Energy, Mineral and Land Resources State Stormwater Program Department of Environmental Quality 910 796 7215 office 910 796 7335 direct christine.hall@ncdenr.gov 127 Cardinal Drive Ext. Wilmington, NC 28405 INoihinc N. Z-- I Compwvs Ema# cof7e covlcM,;i: z go 5?n(f `r^i;'1 this _,t_,'C±I B:: hs tjjf� Ncrllh GOff7iff l-� J—(.r o�J�l�' fi' ��'.i1i U•i �.`.'t. 31lC� if f ��� '�G:_ C:G'� : i �f lf. i P'• i f .�. From: Jay Carmine [mailto:jcarmine@cldeng.com] Sent: Thursday, April 27, 2017 4:43 PM To: Hall, Christine <Christine.Hall@ncdenr.gov> Cc: Weaver, Cameron <cameron.weaver@ncdenr.gov> Subject: RE: Savannah Lakes - SW8 051203 Phase 3 will have 99 lots comprised as: 8 lots in Phase 3A, 29 lots in Phase 313, and 62 lots in Phase 3C. We are drafting a deed restriction (similar to those that were recorded for Phase 1 and 2, and that you referenced in your earlier email) for Phase 3. 1 will note the 50-foot buffer setback in them for Phase 3C and reference that Phase 3A and 38 are subject to the original Declarations. My plan is to send the deed restrictions over to the Client for signature tomorrow and will submit the original to you for your records before May 41. The final recorded deed restrictions will have all the standard legalese and polish for recordation. Very Respectfully, JaYVCar ine, PE, PMP Coastal Land Design, PLLC PO Box 1172 Wilmington, NC 28402 Telephone: 910.254.9333 ext. 1001 Cell: 910.742.4000 www.Coasta[LandDesicin.net From: Hall, Christine[mailto:Christine.Hall @ncdenr.gov_] Sent: Thursday, April 27, 2017 4:19 PM To: Jay Carmine <icarmine@cldeng.com> Cc: Weaver, Cameron <cameron.weaver@ncdenr.xov> Subject: RE: Savannah Lakes - SW8 051203 Jay, I'm sorry to have to send a follow up e-mail but I'm trying to draft the permit and came across a few pieces of information that need to be confirmed: The previous permit identified the number of lots within Phase 1, 2, and 3 as being 92, 82, and 100 lots, respectively. Are these numbers still accurate? Being that the new phases are subject to the 2008 rules, the deed restrictions are usually required to include a statement about the 50' buffer. Please advise how that has been or will be handled. Christine Hall Environmental Engineer Division of Energy, Mineral and Land Resources — State Stormwater Program Department of Environmental Quality 910 796 7215 office 910 796 7335 direct chhstine.hall a-ncdenr.go_v 127 Cardinal Drive Ext. Wilmington, NC 28405 From: Hall, Christine Sent: Thursday, April 27, 2017 2:17 PM To: 'Jay Carmine' <icarmin,2W.cldeng.com>; Jeff Petroff <ipetroff@cldeng.com> Cc: Weaver, Cameron <cameron.wedver@ncdenr.gov> Subject: RE: Savannah Lakes - SW8 051203 I didn't see anything else during my review. How about May 411, which would be the standard 5 days. Christine Hall Environmental Engineer Division of Energy, Mineral and Land Resources — State Stormwater Program Department of Environmental Quality 910 796 7215 office 910 796 7335 direct christine. hall ODncdenr. gov Request for Additional Information Stormwater Project No. SW8 051203 Savannah Lakes at the Meadowlands Brunswick County 01-May-2017 Dear Christine Hall, On April 26, 2017, we received an email request for additional information pertaining to the reason deed restrictions were not needed for Phase 3 and the lack of annotation on the plans for the drainage easement in Phase 3B for Lot 261. After a few email communications between us (attached to this response letter), we are providing the additional information in this resubmittal. To aid in the review, we have included the email request for additional information in the body of this email and how the each comment was addressed or satisfied below the insertion. Jay / Jeff, I have had a chance to look over the application to modify Savannah Lakes, SW8 051203 and have two small things. First, can you remind me why deed restrictions are not needed for these phases? Secondly, I couldn't find a notation on the plans that a drainage easement was provided on lot 261 in Phase 3B (pond 6). Am I overlooking it? Thanks, Christine Hall Deed Restrictions We have included an original and copy of the Third Supplemental Declaration of Protective Covenants, Restrictions, Easements, Charges and Liens for Meadowlands Golf Club with this response. This third supplemental Declaration is for Phase 3 development in similar fashion to how the recorded first and second supplemental Declarations are pursuant to Phases 1 and 2, respectively. Drainage Easements Each lot within this development maintains an easement and right-of-way over and upon the rear and front ten (10) feet of each Unit for drainage and the installation and maintenance of utilities and services. This is outlined in Article 5, Section 6 of the Master Declaration — Meadowlands Golf Club (Deed Book 1198 at Page 0916-941). This easement and right of way is illustrated and annotated on Sheet SW-01 included with this response. Should you have any questions or concerns, please feel free to contact our office. Thank you, i Jay Carmine, PE, PMP Coastal Land Design, PLLC PO Box 1172 Wilmington, NC 28402 (910) 254-9333 x 1001 ECEIVE ti 02 2017 BY: 310-05 NCDENR RFI Response 05012017 Page 1 of 1 Jay Carmine From: Hall, Christine <Christine.Hall@ncdenr.gov> Sent: Thursday, April 27, 2017 4:39 PM To: Jay Carmine Cc; Weaver, Cameron Subject: RE: Savannah Lakes - SW8 051203 I'm so sorry — but I had one more thought as I'm finishing up the drafted permit. You might want to consider sending in an extra set of plans. One of the two sets that's submitted is sent to the permittee (the HOA in this case) and the second is kept on file here. So unless the HOA shares, the developer will be left without a set for them to work off of. Christine Hall Environmental Engineer Division of Energy, Mineral and Land Resources State Stormwater Program Department of Environmental Quality 910 796 7215 office 910 796 7335 direct christine.hall@ncdenr.gov 127 Cardinal Drive Ext. Wilmington, NC 28405 E-mail correspondence to and from this address is subject to the !North Carolina Public Records Lays, and may be disclosed to third parties. From: Hall, Christine Sent: Thursday, April 27, 2017 4:19 PM To:'Jay Carmine' <jcarmine@cldeng.com> Cc: Weaver, Cameron <cameron.weaver@ncdenr.gov> Subject: RE: Savannah Lakes - SW8 051203 Jay, I'm sorry to have to send a follow up e-mail but I'm trying to draft the permit and came across a few pieces of information that need to be confirmed: The previous permit identified the number of lots within Phase 1, 2, and 3 as being 92, 82, and 100 lots, respectively. Are these numbers still accurate? Being that the new phases are subject to the 2008 rules, the deed restrictions are usually required to include a statement about the 50' buffer. Please advise how that has been or will be handled. Christine Hall Environmental Engineer Division of Energy, Mineral and Land Resources — State Stormwater Program ����VE Department of Environmental Quality 910 796 7215 office MAY 0 2 2017 i BY: 910 796 7335 direct christine. hall(aD-ncdenr.00v 127 Cardinal Drive Ext. Wilmington, NC 28405 l Wit•3i it i'w[a ct)ri�a€`t' , w Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Hall, Christine Sent: Thursday, April 27, 2017 2:17'PM To: 'Jay Carmine' <jcarmine@cldene.com>; Jeff Petroff <jpetroff@cldene.com> Cc: Weaver, Cameron <cameron.weaver@ncdenr.gov> Subject: RE: Savannah Lakes - SW8 051203 I didn't see anything else during my review. How about May 4th, which would be the standard 5 days. Christine Hall Environmental Engineer Division of Energy, Mineral and Land Resources — State Stormwater Program Department of Environmental Ouality 910 796 7215 office 910 796 7335 direct christine.hall(o)ncdenr.gov 127 Cardinal Drive Ext. Wilmington, NC 28405 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Jay Carmine [mailto:icarmine@cldene.com] Sent: Thursday, April 27, 2017 2:14 PM To: Hall, Christine <Christine.HaII@ncdenr.gov>; Jeff Petroff <jpetroff@cldene.com> Cc: Weaver, Cameron <cameron.weaver@ncdenr.eov> Subject: RE: Savannah Lakes - SW8 051203 OK. That sounds fair enough. I'll get on this right away. How long do I have to get this back to you? Very Respectfully, ]ay Carmine, PE, PMP Coastal Land Design, PLLC PO Box 1172 Wilmington, NC 28402 Telephone: 910.254.9333 ext. 1001 Cell: 910.742.4000 www.CoastalLandDesion.net From: Hall, Christine fmailto:Christine.Hall@ncdenr.gov] Sent: Thursday, April 27, 2017 2:12 PM To: Jay Carmine <icarmine@cldeng.com>; Jeff Petroff <ipetroff@cldeng.com> Cc: Weaver, Cameron <cameron.weaver@ncdenr.gov> Subject: RE: Savannah Lakes - SW8 051203 The plan sheets are not a standard place to reference any citation to deed restrictions. It would be better if citation was included in a cover letter. An even better alternative would be a copy of the recorded document with the section noting that Phase 3A and 313 is also covered under the original declaration somehow highlighted or called out. Christine Christine Hall Environmental Engineer Division of Energy, Mineral and Land Resources — State Stormwater Program Department of Environmental Quality 910 796 7215 office 910 796 7335 direct christine-hall (a)ncdenr.gov 127 Cardinal Drive Ext: Wilmington, NC 28405 Nothnq Compares Email correspondence to and from this address is subject to the Notth Carolina Public Records Law and msy be disclosed to Third parties. From: Jay Carmine [mailto:ocarmine@cldeng.com Sent: Thursday, April 27, 2017 1:53 PM To: Hall, Christine <Christine.HaII@ncdenr.gov>; Jeff Petroff <ipetroff@cldeng.com> Cc: Weaver, Cameron <cameron.weaver@ncdenr.gov> Subject: RE: Savannah Lakes - SW8 051203 Christine; I think that this email will suffice as notice for additional information. I will update Sheet SW-1 with clarification to the drainage easement and both Sheets SW-1 and SW-3 with a citation to the associated deed and restrictive covenances. Will this action be sufficient to satisfy this request for additional information? If so, I can turn this around and submit this back to you by close of business on Friday. Thanks and please let me know. Very Respectfully, 3ay Carmine, PE, PMP Coastal Land Design, PLLC PO Box 1172 Wilmington, NC 28402 Telephone: 910.254.9333 ext. 1001 Cell: 910.742.4000 www.CoastalLandDesian.net From: Hall, Christine fmailto:Christine.Hall@ncdenr.eov] Sent: Thursday, April 27, 2017 1:39 PM To: Jay Carmine <icarmine@cldene.com>; Jeff Petroff <lpetroff@cldene.com> Cc: Weaver, Cameron <cameron.weaver(a@ncdenr.eov> Subject: RE: Savannah Lakes - SW8 051203 Thanks Jay. Lot 261: Please either provide a revised SW-1 that either includes that line type in the legend or has the drainage easement called out on the plans. For instance, in comparing with SW-3 for Phase 3C, SW-3 includes the easement line type in the legend and specifically calls out the drainage easement on the plans. Deed restrictions: Supplemental Declaration of Protective Covenants, Restrictions, Easements, Charges and Liens for Meadowlands Golf Club were recorded for other phases of this development to document that those phases were subject to the original Declaration of Covenants, Conditions, and Restrictions recorded in Book 1198 on Page 916. In looking through the file, there is a copy of the supplement recorded in Deed Book 2200 on Page 582 with a handwritten note it is for Phase 1. There is also a copy of the supplement recorded in Deed Book 2326 Page 1220 with a handwritten note that it is for Phase 2. I'll either need a citation to a recorded document that says these two phases are subject to the original declaration for this subdivision or a signed form agreeing to record it. i can formalize this in a letter requesting addition information if that would be helpful. Christine Hall Environmental Engineer Division of Energy, Mineral and Land Resources — State Stormwater Program Department of Environmental Quality 910 796 7215 office 910 796 7335 direct christine.hall cOcdenr.gov 127 Cardinal Drive Ext. Wilmington, NC 28405 4 1--mail correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Jay Carmine [mailto:icarmine@cldeng.com] Sent: Thursday, April 27, 2017 8:27 AM To: Hall, Christine <Christine.Hall@ncdenr.eov>; Jeff Petroff <jpetroff@cldene.com> Cc: Weaver, Cameron <cameron.weaver@ncdenr.gov> Subject: RE: Savannah Lakes - SW8 051203 Good morning Christine; Thank you for the touching base with me about these items. Lot 261 The plans are unquestionably a little busy in the vicinity of Lot 261, but in there is a drainage easement (10' off the pipe alignment) that transects the northeast corner of Lot 261. The dashed line of the easement is partly overlaid by the metes and bounds text of that lot — and partly by the revision cloud. Deed Restrictions It was my understanding that new deed restrictions would not be necessary since we did not change the Allowable Lot BUA allocations for either of these phases. The existing permitted ones from the Thomas and Hutton submittal remain as the overall deed restrictions for the entire development. Please let me know should you have any questions, comments, or concerns; and, have a great day. Very Respectfully, Jay Carmine, PE, PMP Coastal :.and Design, PLLC PC Box 1172 Wilmington, NC 28402 Telephone: 910.254.9333 ext. 1001 Cell: 910.742.4000 www.CoastaILandDesian.net From: Hall, Christine[mailto:Christine.Hall@ncdenr.gov] Sent: Wednesday, April 26, 2017 5:03 PM To: Jay Carmine <jcarmine@cldene.com>; Jeff Petroff <jpetroff@cldene.com> Cc: Weaver, Cameron <cameron.weaver@ncdenr.eov> Subject: Savannah Lakes - SW8 051203 Jay / Jeff, I have had a chance to look over the application to modify Savannah Lakes, SW8 051203 and have two small things. First, can you remind me why deed restrictions are not needed for these phases? Secondly, I couldn't find a notation on the plans that a drainage easement was provided on lot 261 in Phase 3B (pond 6). Am I overlooking it? Thanks, Christine Hall Environmental Engineer Division of Energy, Mineral and Land Resources — State Stormwater Program Department of Environmental Quality 910 796 7215 office 910 796 7335 direct christine.hallOncdenr.aov 127 Cardinal Drive Ext. Wilmington, NC 28405 Email correspondence to and from this address is subject to the Notth Carolina Public Rc cords Law and may be disclosed to third parties. Hall, Christine From: Hall, Christine Sent: Thursday, April 27, 2017 2:17 PM To: 'Jay Carmine'; Jeff Petroff Cc: Weaver, Cameron Subject: RE: Savannah Lakes SW8 051203 I didn't see anything else during my review. How about May 41h, which would be the standard 5 days. Christine Hall Environmental Engineer Division of Energy, Mineral and Land Resources — State Stormwater Program Department of Environmental Quality 910 796 7215 office 910 796 7335 direct christine.hall@ncdenr.gov 127 Cardinal Drive Ext. Wilmington, NC 28405 'Nothinq Compares K-C.- -1 Email coirespcn,_;uiie,,e tr, an) Ili-o ,; 67is r 'Ji - :; 'b Noah Caroiia i Public Re;L'L rd6 Law rj,:'d ma+r : ai._ ;',7;;, ;d r' to ihi �•' ;:1. ?`ts ,:' From: Jay Carmine [mailto:jcarmine@cldeng.com] Sent: Thursday, April 27, 2017 2:14 PM To: Hall, Christine <Christine.Hall @ncdenr.gov>; Jeff Petroff <jpetroff@cldeng.com> Cc: Weaver, Cameron <cameron.weaver@ncdenr.gov> Subject: RE: Savannah Lakes - SW8 051203 OK. That sounds fair enough. I'll get on this right away. How long do I have to get this back to you? Very Respectfully, ]ap Carmine, PE, PMP L Coastal Land Design, PLLC PO Box 1172 Wilmington, NC 28402 Telephone: 910.254.9333 ext. 1001 Cell: 910.742.4000 www.CoastalLandDesign.net From: Hall, Christine[mailto;Christine.Hall@ncdenr.gov] Sent: Thursday, April 27, 2017 2:12 PM To: Jay Carmine <'c� armine@ lde ,g,.com>; Jeff Petroff <' etroff cldeng.com> Cc: Weaver, Cameron <cameron.weaver@ncdenr.gov> Subject: RE: Savannah Lakes - SW8 051203 The plan sheets are not a standard place to reference any citation to deed restrictions. It would be better if citation was included in a cover letter. An even better alternative would be a copy of the recorded document with the section noting that Phase 3A and 3B is also covered under the original declaration somehow highlighted or called out. Christine Christine Hall Environmental Engineer Division of Energy, Mineral and Land Resources — State Stormwater Program Department of Environmental Quality 910 796 7215 office 910 796 7335 direct christine.hall,rr7i nc i nrgov 127 Cardinal Drive Ext. Wilmington, NC 28405 From: Jay Carmine [mailto:icarrninP@clden�.com] Sent: Thursday, April 27, 2017 1:53 PM To: Hall, Christine <Christine.Hall@ncdenr.gov>; Jeff Petroff <ipetroff(LDcideng.com> Cc: Weaver, Cameron <cameron.weaver@ncdenr.gov> Subject: RE: Savannah Lakes - SW8 051203 Christine; I think that this email will suffice as notice for additional information. I will update Sheet SW-1 with clarification to the drainage easement and both Sheets SW-1 and SW-3 with a citation to the associated deed and restrictive covenances. Will this action be sufficient to satisfy this request for additional information? If so, I can turn this around and submit this back to you by close of business on Friday. Thanks and please let me know. Very Respectfully, Jay Carmine, PE, PMP 'Vr L _A6 Coastal Land Design, PLLC PO Box 1172 Wilmington, NC 28402 Telephone: 910.254.9333 ext. 1001 Cell: 910.742.4000 www.CoastalLandDesign.net From: Hall, Christine[mailto:Christine.Hall@ncdenr.sov] Sent: Thursday, April 27, 2017 1:39 PM To: Jay Carmine <icarmine@cldeng.::om>; Jeff Petroff <' eip, trocldg .cnm> Cc: Weaver, Cameron <cameron.vreaver,,ZDncdenr.gov> Subject: RE: Savannah Lakes - SW8 051203 Thanks Jay. %Lot 261: Please either provide a revised SW-1 that either includes that line type in the legend or has the drainage easement called out on the plans. For instance, in comparing with SW-3 for Phase 3C, SW-3 includes the easement line type in the legend and specifically calls out the drainage easement on the plans. Deed restrictions: Supplemental Declaration of Protective Covenants, Restrictions, Easements, Charges and Liens for Meadowlands Golf Club were recorded for other phases of this development to document that those phases were subject to the original Declaration of Covenants, Conditions, and Restrictions recorded in Book 1198 on Page 916. In looking through the file, there is a copy of the supplement recorded in Deed Book 2200 on Page 582 with a handwritten note it is for Phase 1. There is also a copy of the supplement recorded in Deed Book 2326 Page 1220 with a handwritten note that it is for Phase 2. I'll either need a citation to a recorded document that says these two phases are subject to the original declaration for this subdivision or a signed form agreeing to record it. I can formalize this in a letter requesting addition information if that would be helpful. Christine Hall Environmental Engineer Division of Energy, Mineral and Land Resources — State Stormwater Program Department of Environmental Quality 910 796 7215 office 910 796 7335 direct christine.hallici)-ncdenr.gov 127 Cardinal Drive Ext. Wilmington, NC 28405 ""'�s*thing Compares ..._ [=rn ;li Gull �'��JC? 1(ICl1C� to arid, om this addle-s i '3 S{.ibjO("1 Q) ifiR ".i":.. T,il a1L.,�;?izt ! �l•r :._ }fly Law and i-,Ita by rjYs;;!Useo to, !h,.'tf From: Jay Carmine [mailto:icarmine@cidene.com] Sent: Thursday, April 27, 2017 8:27 AM To: Hall, Christine <Christine.Hall@ncdenr.gov>; Jeff Petroff <jpetroff@cideng.com> Cc: Weaver, Cameron <cameron.weaver@ncdenr.gov> Subject: RE: Savannah Lakes - SW8 051203 Good morning Christine; Thank you foi the touching base with me about these items. Lot 261 The plans are unquestionably a little busy in the vicinity of Lot 261, but in there is a drainage easement (10' off the pipe alignment) that transects the northeast corner of Lot 261. The dashed line of the easement is partly overlaid by the metes and bounds text of that lot — and partly by the revision cloud. Deed Restrictions It was my understanding that new deed restrictions would not be necessary since we did not change the Allowable Lot BUA allocations for either of these phases. The existing permitted ones from the Thomas and Hutton submittal remain as the overali deed restrictions for the entire development. Please let mE l::now should you have any questions, comments, or concerns; and, have a great day. Very Respectfully, Jay Carmine, PE, PMP Coastal Land Design, PLLC PO Box 1172 Wilmington, NC 28402 Telephone: 910.254.9333 ext. 1001 Cell: 910.742.4000 www.CoastaILandDesign.net From: Hall, Christine [milt:Chri�tine.Hall_ ncdenroy] Sent: Wednesday, April 26, 2017 5:03 PM To: Jay Carmine <icarmine@cldcnf!xom>; Jeff Petroff <' etvoff , clden .com> Cc: Weaver, Cameron <cameron.vleaver@ncdenr.gov> Subject: Savannah Lakes - SW8 051203 Jay / Jeff, I have had a chance to look over the application to modify Savannah Lakes, SW8 051203 and have two small things. First, can you remind me why deed restrictions are not needed for these phases? Secondly, I couldn't find a notation on the plans that a drainage easement was provided on lot 261 in Phase 313 (pond 6). Am I overlooking it? Thanks, Christine Hall Environmental Engineer Division of Energy, Mineral and Land Resources — State Stormwater Program Department of Environmental Quality 910 796 7215 office 910 796 7335 direct christine.hall ncd`rr.g_oy 127 Cardinal Drive Ext. Wilmington, NC 28405 Meadowlands Property Owners Association, Inc. 1031 Meadowlands Trail Calabash, North Carolina 28467 (c/o Atalaya Property Management, PO Box 769, North Myrtle Beach, SC 29597) Re: Stormwater Submittal Meeting April 18 I, Carl Ruopp, authorize Teresa A. McLamb to represent me at the Express Stormwater Submittal Meeting regarding the Project Savannah Lakes at the Meadowlands (modification to SW8 051203 dated 1/24/2008). Date Carl Ruopp, President Meadowlands Property Owners Association, Inc. EGEIVE APR 18 2017 Supplemental Corporation Filings �CEI�E BV:`- C201622200520 SOSID: 0415500 Date Filed: 8/12/2016 4:15:00 PM State of North Carolina Elaine F. Marshall Department of the Secretary of State North Carolina Secretary of State C2016 222 00520 NONPROFIT CORPORATION'S STATEMENT OF CHANGE OF PRINCIPAL OFFICE Pursuant to §55A-16-23(b) of the General Statutes of North Carolina, the undersigned nonprofit corporation does hereby submit the following for the purpose of changing its principal office address currently on file with the Secretary of State. INFORMATION CURRENTLY ON FILE The name of the corporation is: Meadowlands Property Owners Association, Inc. The street address and county of the principal office of the corporation currently on file is: Number and Street: 1031 Meadowlands Trail NW City, State, Zip Code: Calabash, NC 28467 County: Brunswick The mailing address if different from the street address of the principal office currently on file is: NEW INFORMATION The street address and county of the new principal office of the corporation is: Number and Street: 523 6th Avenue South City, State, Zip Code: North Myrtle Beach, SC 29582 2. The mailing address if different from the street address of the new principal office is: PO Box 769 North Myrtle Beach, SC 29597 This statement will be effective upon filing, unless a later date and/or time is specified: This is the a'i day of J u I v , 20jk . County: Horry Meadowlands Property Owners Association, Inc. Name of Corporation ea � / —�0 5lgnaeiyu lIMG We Alt ova . Qi��s•.r„�T Type or)WntflaAe and Title NOTES: 1. Filing fee is $5. This statement and one exact or conformed copy of it must be filed with the Secretary of State. Revised January 2000 Form N-12 CORPORATIONS DIVISION P. O. BOX 29622 RALEIGH, NC 27626- 0622 Supplemental Property Deed Phase 3C (Previously Submitted) ECEIVE� APR 18 2017 av: 11/18/1999 $16.00 13 AA " J �y": Peal Elam E.CIIe Tzx `A 1,-.) ibKl� �-► Brunswick County —Register of Deeds Robert J. Robinson Trust 130615 Book 1342Page 1429 11/18/1999 04:35pa Rea! a%_& Tax Lot No ................ ........... AK f •---••----...-.................................. Parcel Identi IerNo:• � Vcriftedby............................................................. County on the ............. day of ................................................... 19.......... by......................................•----................................................................................................................................................. Mailalter recording to............................................................................................................................................................ This instrument was prepared by SHEILA K. McLAMB Attorney at Law Post Office Box 3168 Shallotte, NC 29459 (910)754-6908 Brief description for the Index Approx. 3.14 acres THIS NORTH CAROLINA GENERAL WARRANTY DEED BILLY WILLIAMS, and wife, ROSA LEE G. WILLIAMS Post Office Box 843 North Myrtle Beach, SC 29597 and between GRANTLL MEADOWLANDS GOLF CLUB, INC., a North Carolina corporation with its principal office and place of business located in Brunswick County, North Carolina Post Office Box 4159 Calabash, NC 29467 Enter in appropriate hh,ck for eaeh parry: name, address, and H appropriate. character of entity. e.g. corporation ar partnership. The designation Grantor and Grantee as used herein shall include said parlies, their heirs, successors, and assigns, and shall include singular, plural, masculine, feminine or neuser as required by context. W ITNESSETI I, that the Grantor, for a valuable consideration paid by the Grantee, the receipt of which is hereby acknowledged, has and by these presents does grant, bargain, sell and convey unto the Grantee in fee simple, all that certain lot or parcel of land situated in the Shallotte Township, Brunswick County, North Carolina and more particularly described as follows: BEING ALL of that 3.14 acre tract or parcel of land as shown on a survey prepared by James R. Tompkins, RLS, dated July 29, 1999, and duly recorded in Map Cabinet „ 2 l at Page /B of the Brunswick County Registry. This instrument conveys all right and interest to a 1981 Conner Mobile Hom& located on the above described Real Property. Seller disclaims any liahility fnr future use or possession of said Mobile Home. Inst 4 30615 Rook 1342Page: 1430 The property hereinahnve described was acquired by Grantor by instrument recorded in Book 340 at Page 262 of the Brunswick County Registry - A num showing the ahove described property is recorded in Plat Book _at face TO HAVE AND TO HOLD the aforesaid lot or parcel of land and all privileges and appurtenances thereto belonging to the Grantee in fee simple. And the Grantor covenants with the Grantee, that Grantor is seized of the premises in fee simple, has the right to convey the same in fee simple, that title is marketable and free and clear of all encumbrances, and that Grantor will warrant and defend the title against the lawful claims ofall persons whomsoever except for the exceptions hereinafter stated. Title to the property hereinabove described is subject to the following exceptions: IN WITNESS WIIEREOF, the Grantor has hereunto set his hand and seal, the day and year first above written. 6-'(SEAL) BILLY WILLIAMS 4LZ�ae .(SEAL) ROSA LEE G. WILLIAMS IjMP ; :. - . ` STATE OF ORTH CAR0 INA, County of Brunswick • fir <We < 1. Notary Public ofthe County and State aforesaid, aentfy that BILLY WILLIAMS, and wife, ROSA LEE G. WILLIAMS personally appeared Wive me this day and iy; c ies acknowledged the execution orthe raregoing instrument. `'.'•r �G 1 U Witness hand and official sl amp or seal, this day or November, 1999. `,L �•r Cy,titi , ' NOTARY PUS iC biy commission expires: SPATE OF NORTH CAROLINA COUNTY OF BRUNSWICK The Foregoing (ar annexed) Certifirate(s) of HEATHER D ELLIS Nntary(ies) Public is (arc) Cerlifiel to be Correct. q r h November This Instrument was Filed for Registration on this Day of me r 199g in the Book and Page shown on the First Page hereof. ROBERTI ROBIJSONJ Register of Deeds I.• ­AVE.NERRMG, PREVA AND DGEW N,90i°iYHT1AW iOYTM,RRT, R. G 10 TA Ai!'.1f~£RRGb, TM-05FUR RMORD 110V 1 31975 STAT3 OF NORTH CAT=NA a wvw'.zx wurcry, N. C TT�AjX SUPERVISOR COM= OF BRUNS ICK ry.._Og.......... _... __..__.....--•` ME MM, Made and entered into this the f 'g day of povember 1975, by and between DARIUS STANALAM, UMM&rri.ed, of Brunswick County, MT't" Carolina, Party of the first Part, and BILLY WIS,LIAMS'and wife, ROSA LEB G. WILLV MS, Routs 1, Sox 299, North Myrtle Beach, South Carolina 29582, Parties of the second Part, . WITUBSSETH TEAT said Party of the ficat part. for and in consideration of the a= of T6N DOLLAPS AM OMER VALUABLE COMSIDBRATIONS to him in hand Paid by e receipt of which is hereby acknowledged, said parties of the second part, th has bargained and sold and by these.presents does hereby bargain, sell and - convey unto said parties of the second part, their heirs and assigns, all that certain tract or parcel of land lying and being in Shallotte TownshiP. Bruns- wick County° North Carolina, more Particularly described as follows: South BEGINMIRG in Lacy Bennett's southwest Bich ditch,runs thence 75° west 5 chains and 20 links to the Smi north q° west 5o links with said ditch, thence north 18° east 3 chains, thence north 10. east 1 chain; thence north 220 west 2 chains and 50 links to a stake, thence north 79. east 6 chains and 75 links to a stake in Lacy, Bennett's line, thence with said Lacy Beanstt's line south 22° west 5 chains and 95 links to an iron Pip thence sfuth 4) east 95n links to Bthe BEGI'RRIN , tsinin4 And being the same tract or parcel of land conveyed to Ord Darius Stanaland by Alice E. stanaland and filed for County in the rec office of the Register of Deeds of Brunswick AND TO BOLD the above described tract or Parcel of land. TO HAVE , unto the together with all privileges and appurtenances thersunto belonging the second part, their heirs and assigns, to their only use n said parties of and behoof po=VBR. .-� g_h:V "`�, _s.i ':i.•,: — ' R r T 0 3.00 E:a io,RG K*P 9�S 00 RPccrt 04 340 I'ME wrr i AND said party of the first part covenants to and with said parties of the second part, their heirs and assigns, that he is seized of the said Promises in fee and has the right to convey the same in fee simple, that same are free and clear of all encumbrances and that he -does hereby and will for- ever warrant and defend title to sane against the lawful claims of. all Persons WHOMSOEVER. IN TESTIMONY WHEREOF, said party of the first part has hereunto set his hand and seal the day and year first above written. STATE OF NORTH CAROLImt COUNTY OF BRUNSWICK I, M07REY PUBLIC, do here- by certify that DARIUS STANAIANO, unmarried, personally appeared before me tLis day and acknowledged the due execution of the foregoing deed for the purposes therein set forth. Witness my hand and notarial eea3. AM9 the day of November, 1975. n .My commission expireas MWATIL IfRnnee, rRWATn II STATE OF NORTH CAROLINA- Brunswick County The Foregoing Certificate(s) o3USAN $ - CARSON, NOTARY PUBLICof. (bxare) certified to be correct. Recorded this 13th dsy of NOV$MBER 19'/-5--.,t 12 : U o'clock P • M. :A0hur V ..Xjox, Register of Deeds [C�l�Ll .rrY e-P ............ "a 6 � as as 1.Im 1P x z1 k ' HIMOPU 0� d i J _ U 0- - d d1 Q W y+ - N' �errE swc°ry i '�E°at � � o � ill V!!!IIji, —r.11 will 4� A 4 M MCGCB.i �`� ADbE� � es H I R � ddddodcdddddddddddd666 112 §1391a9385.99399;e®gma l I % 4W�qQ Coastal Land Desian, PLLC Civil Engineering/Landscape Architecture Land Planning/Construction Management P.O. Box 1172 Phone: 910-254-9333 Wilmington, NC 28402 Fax: 910-254-0502 www.cideng.com To: NCDENR— Wilmington Regional Office 127 Cardinal Drive Extension Wilmington, NC 28405 (910) 796 — 7215 Attn: Christine Hall ❑ As Requested ❑ Sent via Mail Date: I April 18, 2017 File: 310-04 Subject: IModification to Existing Permit SW8 051203 for Savannah Lakes at the Meadowlands for Stormwater Ponds #6 and #7 ❑ For Your Files ❑ For Distribution ® For your Review / Action / Approval ❑ Sent via Courier Quantity Drawing No. Description 1 Original Express Stormwater Review Resubmittal Letter 1 Check In the Amount of $4,000.00 (Check 91255) 1 Original Stormwater Management Permit Application Form i Copy Stormwater Management Permit Application Form i Original We Detention Basin Operation and Maintenance Agreement (Pond 6) 1 Original Wet Detention Basin Operation and Maintenance Agreement (Pond 7) 1 Original Wet Detention Basin Supplement (Pond 6) 1 Original Wet Detention Basin Supplement (Pond 7) 1 Original Express Stormwater Design Narrative 1 Original Express Stormwater Design Calculations 1 Original Supplemental USGS Quad Map 1 Copy Supplemental Soils Investigation (Phase 3C) — previously submitted 1 Copy Supplemental Property Deed 1 Copy Supplemental Corporation Filings 1 Original Stormwater Meeting Representative Authorization Letter 2 Copies Stormwater Design Plans Remarks Please contact our office should you have any questions or concerns. Thank you. CLD Transmittal 04182017 Express Stormwater Design Calculations Modification to State Stormwater Permit: SW8 051203-MOD For Savannah Lakes at the Meadowlands Phase 313 and 3C Calabash, Brunswick County, NC Prepared for: Meadowlands Golf Club, Inc. PO Box 4159 Calabash, NC 28467 Prepared by: r Coastal land Design, PLLC Civil Engineering / Landscape Architecture Land Planning / Construction Management P.O. Box 1172 (910) 254 - 9333 Wilmington, NC 28402 (910) 254 - 0502 vwwe.cidena.com CAR0//'/; AL , • IrfIl-4 • A April 18, 2017 EC E IVE APR 18 2017 BY: Savannah lakes Phase 3B Stormwater Piping System Calculations Savannah Lakes Phase 3B Brunswick County Stormwater Drainage System Calculations Designer:........... Jay Carmine, PE Checked: ............. Jeff Petroff, PE Date: ................... 3/7/2017 File Location:...... W:\CLD Projects\310-00 Farmstead properties, LLC\310-03 Meadowlands - Savannah Lakes\CALCS\2017 Resubmittal\[Piping System Calculations.xls]CB Design (2) Open Space CN, CNimp = 98 (for all SHGs) Space CN, CNopenA = 39 (Baymeade O fine sands; good condition) Open Space CN, CNopenB = 61 (Griffon fine sandy loam; good condition) Sheet Flow Average Length, Lsf = 65 [ft] Sheet Flow Average Slope,! = 1.0 [%] Mannings Sheef Flow Runoff Coeff, Csf = 0,24 (dense grass) NOAA Atlas-14 2-yr Rainfall, P2 = 4.31 [in/hr] Average Sheet Flow Time, Tsf = 11.5 [min] Shallow Concentrated Average Grass Distance, Lscg = 20 [ft] Shallow Concentrated Average Grass Slope, Sscg = 1-0 [%] Average Grassed Shallow Concentrated Time, Tscg = 0.2 [min] Shallow Concentrated Average Road Slope, Sscr = 0 5 [%] Time = 25-yr Rainfall Intensity = Inverse 25-yr Rainfall Intensity = NOAA Atlas 14- Preci itation Estimates 5 10 15 30 60 10 20F Bag 6184 5.06 337 0.098 0.124 0.146 0.198 0.297 [min] [in/hr] [hr/in] 25-yr Storm Event Intensity Coefficient, g = 283.1 (1/slope of inverse rainfall intensity) 25-yr Storm Event Intensity Coefficient, h = 24.8 (intercept of inverse rainfall intensity a slope of inverse rainfall intensity) Standard Pipe Material, n = 0.011 (CPP) ID Upstream Basin Total Basin Roadway Impervious Building Im ervious Other Im ervious Remaining�Percent Pervious vious SHG A Basin Percent SHG B Basin Percent no 1 2 name CI3 C12 s 76 szoo s 8175 5 785 s 36 ON 16 000 s 13.0 1505 s 30,095 18,910 60.6 55.2 50 50 20 3 C13 200 5 685 20 1480 17,035 61.5 --so 100 0 4 HOGES 23,100 5,610 8000 1455 0 8,035 65.2 50 50 5 49,000 v 1 4 830 11 0 39 190 20.0 50 50 Drainage Basin I Basin I Basin Time of I 25-yr Rainfall Concentrated Basin CN C Length I -_-1 I Concentration Intensity C11 79.1 0.58 515 1 430 -1 16.7 6.82 C12 79.4 0.59 265 180 13.8 7.33 C13 75.3 0.51 F 350 265 14.8 7.15 C14 81.3 1 0.63F 250 165 13.6 7.37 DG5 59.6 1 0.20 F 4zs 350 16.5 6.R9 Subbasin Discharge Downstream Basin Total Flow cfs cfs cfs 7.0 7.0 4.2 POND 11.1 3.7 �C12 1 C14 I3.7 2.4 PQ,ND 6.1 1.5 POND 1.5 Pipe Pipe Length Pipe Slope Min Pipe Diameter Designed Pipe Diameter Mil Cl/Qfull Vfull V/Vfull Pipe Velocity name ft % in in cis] I --- 1 [fps]f s C11-02 14.5 ® 12.4 0.56 7.0 0.88 6.2 151 16.0 24 32.9 0.34 10.5 0.76 7.9 CI3-CI4 1.00 11.4 15 7.7 0.48 6.2 0.84 5.3 �#-110 CI4 POND 145 1.47 12.8 18 15.1 0.40 8.5 0.80 6.8 DG5-POND 450 6.30 10.3 ® 0.8 0.98 2.2 Noce: Ub-FUNU conveys drainage through two 8-inch pipes Page 1 of 1 m IL it 0 � � � � E E 0 co LM � � � co E � 0 *a co § § % «. k k k� k E 0 0 \ c$0 2 § o.z w k c Cm_ Cl c m � J m m k § \ 0CLF � m $ CN CV R ƒ % �^ ° �� \ / f 2 E� 2 % k �2— t! CLE k � !r- Q % CD CN �q£ § q `� _ & g ■t�_£ I q � CL §g °°— §]£ - CD ~ §aF P.� 2 Ee� §(D @ 2 \» N d) § \ § 9 L 4 ) § \ B § LL ' w �© o �z _ � IL z / c .0 � � � � � � � � ca E � 0 -W co \ g § } § d § \ a E q m j § N % k C & C ; CL § / w ® N x c A 2 m m m C4 $ CL E k � B w R k ° k E o§ E Q q Cl) 2 CL E § f - m co c 0 . m_ $co LO Q2 £ R § »■ g § � / 122 2 ( f ° E ƒ OD .. . a c / £ / k / # LO ~ 12 2 f I f d L X § ) q } k G CM / £ a E 2 �0 v $ @ + ■a o C. k ED a k � L � \ a � 2 o k k G q w / - d \ ci \ E I � . 2 \ £ W _ E ) k � ƒ e a 2 r. O Q. C" m E E co LM W co E L 4w co C O O O C C C C_ F- E E r� O O U U N N PL O C C ° G _ Z c co O W 0 IInnV y C F Cl)c 0 �.. N N C N O rL O O J 2 v CD N N LO L N N O w O J C N C i (P Ln LO E O N N 2 d C 0, J Ip a O tt Go In >J C Lu N N C 0 G .-. cn c+1 > -i S n Cw v N N N_ C -. C J N �.. G! m a cr U U J W c 0 C . � C Go LO L U i� _ N J Oad+ M Io M cC'p' lC t 7 E N W �� ® � o J U 07 a Cl) M E d U LL U a� v cnAi U U LL Fi U w ° F- o ° J Z � N a z � a .� � � � � � � 4) � 4) ca E � 0 14-0 co @ I a k § \! ; §CL i � | m j 0 $ R . $ k c r- C § C%l ; a $ 0 2 m k � m m . 04 ■ CL E OR � ) 2 R � $ 1 q 2 � E E § k 2 CL / § ■ ® IL A £ �R t2 � § p / C%l _ a_ g o v2 § 11 )) G I.- 2 f e e- Cl) . - ® ® @ / § � / / 1 - --- u ¥ 2 LO N a, xLD a e R g / 6 C E co v R G ■� o d + E ja § E . « S k k G§ � E w c § - a _ 4 a k ' c E LO R A a § ƒ 2 $ § k § o C-4 z w it AAO cl W R E E A L //al A E L ♦*a c/ c O i/ d C Q. i� c c /� 0 o I- Z Z Z 0 N O C C O O M O_Z W r N M y JCD C N N N N C w $ O CO O r r_ 2.2CL O G C O J S O x M x r x O xIt fOD dj LO N LO N co N CC N C - w O J C � C7 OD CO N S a v O N N N N Z c O GoCDwrn J W N N N N O G C) C] a m N It N M >J. C w N N N N C O F N � ti� C0 L v v v v N N N N d I S J C O ^ CO W CO (O r N a C1 0 C N N N v L c 2 E.k C CD CO CO CO U 9 Jw'%7l O a ns J C W LL U � r LM V 7 V) E N m Ci } O aQ- o � u � o J N CD CL 3 c w W LL N Cl) N LL -U N -- w m "o cO J Z r N M � a z � a c 0 � � � � � � 4) � 4) co E LM 0 14W co g § E , L� C� C? C v Cl) CN 0 . w E g E 7 m § § m m k k ° R § a E $ 8 8 9 C 04 m m m E R � � S r m k k k c £ 2 g r m k § co k - ■ E CD, q 00 7 « R (D w m 04 K 0 0 V k E % 8 ■ E m k k 4 2 CL / q m m q E o 0 a 0 — co Do Go « p $ § § § Cl) i � CL F § q § q A • )J f q �__ co \ •- + # k k k k k12 . 2 I ¥ f o 0 0 ~ k k B a n • a 0 e e � Q § 8 8 8 14: _ 6 0 0 0 ` % / % CD 0 0 0 o P, n S d a d a + k ) k � CN� CN i J Cb CD CL o k k 8 8 8 ~ \ \ G < § E o � Go a Go S » ! n 7 :3 ~ ® L \ ® w 2 f R 2 — CN n - a Savannah Lakes Phase 3B Wet Detention Basin 6 Water Quality Calculations Surface Area Calculations Wet Detention Basin Design Sheet Savannah Lakes Phase 3B Stormwater Pond #6 Drainage Area, Ad = I 262 300 [sf] Phase 1 Lot 247 Impervious: Phase 1 Lot 248 Impervious: Phase 1 Lot 249 Impervious: Phase 1 Lot 250 Impervious: Phase 1 Lot 251 Impervious: Phase 1 Lot 252 Impervious: Phase 1 Lot 253 Impervious: Onsite Building Impervious: Onsite Street Impervious: Onsite Parking Impervious: Onsite Sidewalk Impervious: Onsite Miscellaneous Impervious: Onsite Future Impervious: Offsite Impervious: [sf] [sf] [sf] [sf) [sf] [sf] [sf] [sf] [sf] [sf] [sf] [sf] [sf] Isf] Total Impervious Area, Ai = 130,840 [sf] Percent Impervious, %Imp = 49.88 1 [%] IDForeba e th (Incremental Volume Accumulative Volume ft cf Sediment Storage 6.0 0 0 5.0 694 694 4.0 915 1,609 3.0 1,164 2,773 2.0 1,443 4,216 1.0 1,752 5,968 O.5 1,001 6,968 0.0 1,105 8,073 Main Pond Contour Elevation Main Pond ContourArea Pond Depth . Incremental Volume Accumulative Vo_lu_m_e_ fmsl s ft 17.0 880 Sediment Storage 18 0 3,528 6.00 0 0 i 19.0 4,236 5.00 3,882 3,882 20..0 51006 4.00 4,621 8,503 21.6 5,838 3.00 5,422 13,925 210 6,733 2.00 6,286 20,211 23.0 7,690 1.00 7,212 27,422 23-5 8,192 0.50 3,971 31,393 24,.0 10,042 1 0.00 1 4,559 35,951 Pond Depth, D = 5.5 [ft] (23.5 fmsl -18.0 fmsl) Area of Bottom of Shelf, Abot_shelf = 10,280 [sf) (2,088 sf+8,192 sf) Area of Permanent Pool, Aperm_pool = 12,375 [sf] (2,333 sf+ 10,042 sf) Area of Bottom of Pond, Abot_pond = 3 528 [sf] (main pond only) Volume of Permanent Pool, Vperm_pool = 44,024 [cf] (8,073 cf + 35,951 cf) Average Depth, day = 4.15 [ft] [0.25*(1 + 10,280sf/12,375sf)] +[((10,280sf+3,528sf)/2)*(5.5ft/10,280sf)] 11 Min Average Depth = 3 00 ft < 4.15 < 7 50 ft = Max Average Depth OK 11 Page 1 of 3 Wet Detention Basin Design Sheet Savannah lakes Phase 3B Stormwater Pond.#6 Sediment Removal Efficiency = 9Q [%] SA/DA Ratio Determination Higher Percents e = 50 S DA % Higher Depth = 4.5 3.90 Lower Depth = 4.0 4.30 Lower Percentage = 40 SA/DA % Higher Depth = 4.5 3.10 Lower Depth = 4.0 3.50 SA/DA Percent = 4.17 [%] Min Surface Area = (SA/DA)*Ad Min Surface Area = 4.17% *(262,300 sf) Min Surface Area = 1 10,936 1 [sf] Interpolation (Bi-Directional 1st - SA/DA @ Depth InterpolationSA/DA % SA/DA at Imp = 50%, d = 4.15 ft SA/DA at Imp = 40%, d = 4.15 ft 2nd - SA/DA @ Impervious Interpolation 4.18 3.38 SAIDA % SA/DA Ratio at Imp = 49.88%, d = 4.15 ft 4.17 Surface Area Provided (sf) = 14375 > 10,936 = Min Surface Area (on OK Temporary Storage Volume Calculations Minimum Required Volume (Simple Method by Tom Scheuler): Receiving water body watershed ............................ Receiving water body name ..................................... Receiving water body classification ........................ Receiving water body location ................................. Lumber (river Basin Shm letree Swamp Canal CSw 18-23-2 Brunswick County, North Carol a First Flush Volume Required, P = 1.5 [in] Rv= 0.05+0.009 * (100*Imp ) Rv = 0.05 + 0.009 * 10N49.88%) Rv = 0.499 Min Temporary Storage Volume, MTSV = P * Rv * Ad Min Temporary Storage Volume, MTSV = 1.5in/12in/ft * 0.499)*(262,3D0 sf) Min Temporary Storage Volume, MTSV = 16,359 [cf] Pond Staae Storage Functinn Contour Elevation Contour Area Pond Stage Incremental Volume Accumulative Volume Ifmsll Isfl Iftl lcfl Icf1 i li 24.0 12.375 0.00 0 0 24r5. 14,400 0.50 6,694 6,694 25.0 1S 137 1.00 7,384 14,078 26.0 1 fS4 2.00 15,896 29,974 27-0 219 3.00 17,437 47,410 Designed Temporary Pool Elevation, DTPE...................................... 25.15 [fmsl] Surface Area at Temporary Pool Elevation ....................................... 15,365 [sf] Provided Temporary Storage Volume, PTSV.................................... 16,462 [cf] Temporary Vol. Provided (cf) = 16,462 > 16,359 = Min Temporary Volume (ef) OK Page 2 of 3 Forebay sizing Calculations Wet Detention Basin Design Sheet Savannah Lakes Phase 3B Stormweter Pond #6 Minimum Forebay Volume = (18%)*(Vperm_pool) Minimum Forebay Volume = 18% * 44,024 cf Minimum Forebay Volume = 1 7,924 [cf] Maximum Forebay Volume = (22%)*(Vperm_pool) Maximum Forebay Volume = 22% * 44 024 cf Maximum Forebay Volume = I 9,685 [cf] 11 Min Forebay Volume =7,924 cf < 8,073 < 9,685 cf = Max Forebay Volume . OK Drawdown Orifice $ilzing Calculations Orifice Diameter, D = 2.0 [in] Orifice Coefficient, Cd = 0.6 [unitiess] Ao = 0.25*p*(D)Z Ao = 0.78540*(tin/12in/ft)A2 Ao = 0.022 [sf] Qorifice = Cd*Ao*(2g*Havg)0'S0 Qorifice =(0.6)*(0.022sf)*(64.4fpss*0.36ft)A0.5 Qoritice = 0.063 [cfs] Havg= (DTPE-PPE-D/2)/3 Havg = 25.15ft - 24.Oft- 0.50*tin/12in/ft) / 3 Havg = 1 0.36 1 IN tdd = MTSV / Qorifice tdd = ( 16,359cf / 0.063cfs) / 86,400sec/day tdd = 3.02 [days] Min Drawdown Time = 2 0 days < 3.02 < 5.0 days = Max Drawdown Time OK Page 3 of 3 Savannah Lakes Phase 3B Wet Detention Basin 6 Water Quantity Calculations Hydraflow Table of Contents Wet Detention Basin 6 Routing.gpw Hydraflow Hydrographs by Intelisolve v9.2 Wednesday, Mar 8, 2017 Watershed Model Schematic........................................................................... 1 Hydrograph Return period Recap................................................................... 2 1 -Year SummaryReport ............................................................................................................... 3 HydrographReports......................................................................................................... 4 Hydrograph No. 1, SCS Runoff, Pre -Development Flow ................................................ 4 TR-55 Tc Worksheet.................................................................................................. 5 Hydrograph No. 2, SCS Runoff, Pond Influent............................................................... 6 TR-55 Tc Worksheet.................................................................................................. 7 Hydrograph No. 3, Reservoir, Post -Development Flow .................................................. 8 Pond Report - Stormwater Pond #6........................................................................... 9 10 -Year SummaryReport ............................................................................................................. 10 HydrographReports....................................................................................................... 11 Hydrograph No. 1, SCS Runoff, Pre -Development Flow .............................................. 11 Hydrograph No. 2, SCS Runoff, Pond Influent............................................................. 12 Hydrograph No. 3, Reservoir, Post -Development Flow .............. ....... .:......................... 13 100 -Year ....................................................................................... �o Summary Report ...................... 14 J+ Hydrograph Reports....................................................................................................... 15 sd� Hydrograph No. 1, SCS Runoff, Pre -Development Flow Hydrograph No. 2, SCS Runoff, Pond Influent............................................................. 16 Hydrograph No. 3, Reservoir, Post -Development Flow ................................................ 17 cv+ OFReport ....................................................................................................... 18 Watershed Model Schematic 7 -Pre CD 3 - Post -Development Flow Legend Hyd• Origin Description 1 SCS Runoff Pre -Development Flow 2 SCS Runoff Pond Influent 3 Reservoir Post -Development Flow Hydraflow Hydrographs by Intelisolve v9.2 Project: Wet Detention Basin 6 Routing.gpw Wednesday, Mar 8, 2017 2 Hydrograph Return Period Recap HydraflowHydrographsbylntelisolvev9.2 Hyd. Hydrograph Inflow Peak Outflow (cfs) Hydrograph No. type Hyd(s) description (origin) 1-Yr 2-Yf 3-Yr 5-Yr 10-Yr 25-Yr 50-Yr 100-Yr 1 SCS Runoff ---- 3.726 ------ ------ ---- 14.71 ---- ---- 31.42 1 Pre -Development Flow 2 SCS Runoff ---- 6.219 --- ---- --- 17.03 ----- --- 31.54 Pond Influent 3 Reservoir 2 0.738 ----- ----- ---- 14.74 ------ ---- 30.33 Post -Development Flow Proj. file: Wet Detention Basin 6 Routing.gpw Wednesday, Mar 8, 2017 Hydrograph Summary Report HydraflowHydrographsbylntelisolvev9.2 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph description 1 SCS Runoff 3.726 1 739 19,736 Pre -Development Flow 2 SCS Runoff 6.219 1 746 36,283 -- --- --- Pond Influent 3 Reservoir 0.738 1 885 22,464 2 25.22 65,247 Post -Development Flow Wet Detention Basin 6 Routing.gpw Return Period: 1 Year Wednesday, Mar 8, 2017 Hydrograph Report 4 Hydraflow Hydrographs by Intelisolve v9.2 Hyd. No. 1 Pre -Development Flow Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 1 min Drainage area = 6.020 ac Basin Slope = 0.0 % Tc method = TR55 Total precip. = 3.70 in Storm duration = 24 hrs * Composite (Area/CN) = [(2.870 x 77) + (2.870 x 55)] 16.020 Q (cfs) 4.00 3.00 KOX 1.00 0.00 0 120 240 - Hyd No. 1 Pre -Development Flow Hyd. No. 1 -- 1 Year Wednesday, Mar 8, 2017 Peak discharge = 3.726 cfs Time to peak = 739 min Hyd. volume = 19,736 cult Curve number = 66* Hydraulic length = 0 ft Time of conc. (Tc) = 22.36 min Distribution = Type III Shape factor = 484 Q (cfs) 4.00 3.00 2.00 1.00 0.00 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (mire) TR55 Tc Worksheet 5 Hyd. No. 1 Pre -Development Flow Hydraflow Hydrographs by Intelisolve v9.2 Description A B C Totals Sheet Flow Manning's n-value = 0.240 0.011 0.011 Flow length (ft) = 100.0 0.0 0.0 Two-year 24-hr precip. (in) = 4.31 0.00 0.00 Land slope (%) = 0.80 0.00 0.00 Travel Time (min) = 17.74 + 0.00 + 0.00 = 17.74 Shallow Concentrated Flow Flow length (ft) = 400.00 0.00 0.00 Watercourse slope (%) = 0.80 0.00 0.00 Surface description = Unpaved Paved Paved Average velocity (ft/s) = 1.44 0.00 0.00 Travel Time (min) = 4.62 + 0.00 + 0.00 = 4.62 Channel Flow X sectional flow area (sqft) = 0.00 0.00 0.00 Wetted perimeter (ft) = 0.00 0.00 0.00 Channel slope (%) = 0.00 0.00 0.00 Manning's n-value = 0.015 0.015 0.015 Velocity (ft/s) = 0.00 0.00 0.00 Flow length (ft) = 0.0 0.0 0.0 Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00 TotalTravel Time, Tc.............................................................................. 22.36 min Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.2 Hyd. No. 2 Pond Influent Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 1 min Drainage area = 6.020 ac Basin Slope = 0.0 % Tc method = TR55 Total precip. = 3.70 in Storm duration = 24 hrs " Composite (Area/CN) = [(2.800 x 98) + (1.470 x 80) + (1.470 x 39)] 16.020 6 Wednesday, Mar 8, 2017 Peak discharge = 6.219 cfs Time to peak = 746 min Hyd. volume = 36,283 cuft Curve number = 78* Hydraulic length = 0 ft Time of conc. (Tc) = 36.20 min Distribution = Type III . Shape factor = 484 Pond Influent Q (cfs) Hyd. No. 2 --1 Year Q (cfs) 7.00 6.00 5.00 4.00 3.00 2.00 1.00 0.00 7.00 6.00 5.00 4.00 3.00 2.00 1.00 0 00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) TR55 Tc Worksheet 7 Hyd. No. 2 Pond Influent Hydraflow Hydrographs by Intelisolve v9.2 Description A B C Totals Sheet Flow Manning's n-value = 0.240 0.011 0.011 Flow length (ft) = 130.0 0.0 0.0 Two-year 24-hr precip. (in) = 4.31 0.00 0.00 Land slope (%) = 0.50 0.00 0.00 Travel Time (min) = 26.41 + 0.00 + 0.00 = 26.41 Shallow Concentrated Flow Flow length (ft) = 350.00 0.00 0.00 Watercourse slope (%) = 0.50 0.00 0.00 Surface description = Unpaved Paved Paved Average velocity (ft/s) = 1.14 0.00 0.00 Travel Time (min) = 5.11 + 0.00 + 0.00 = 5.11 Channel Flow X sectional flow area (sqft) = 0.70 0.00 0.00 Wetted perimeter (ft) = 4.21 0.00 0.00 Channel slope (%) = 0.29 0.00 0.00 Manning's n-value = 0.015 0.015 0.015 Velocity (ft/s) = 1.62 0.00 0.00 Flow length (ft) = 450.0 0.0 0.0 Travel Time (min) = 4.64 + 0.00 + 0.00 = 4.64 TotalTravel Time, Tc.............................................................................. 36.20 min Hydrograph Report 8 Hydraflow Hydrographs by Intelisolve v9.2 Hyd. No. 3 Post -Development Flow Hydrograph type = Reservoir Storm frequency = 1 yrs Time interval = 1 min Inflow hyd. No. = 2 - Pond Influent Reservoir name = Stormwater Pond #6 Storage Indication method used. Wet pond routing start elevation = 23.50 ft Wednesday, Mar 8, 2017 Peak discharge = 0.738 cfs Time to peak = 885 min Hyd. volume = 22,464 cuft Max. Elevation = 25.22 ft Max. Storage = 65,247 cuft Post -Development Flow Q (cfs) Hyd. No. 3 --1 Year Q (cfs) 7.00 7.00 6.00 6.00 5.00 5.00 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 — 0.00 0 300 600 900 1200 1500 1800 2100 2400 2700 3000 Time (min) Hyd No. 3 ,�, Hyd No. 2 ® Total storage used = 65,247 cult Pored Deport 9 Hydraflow Hydrographs by Intelisolve v9.2 Wednesday, Mar 8, 2017 Pond No. 1 - Stormwater Pond #6 Pond Data Contours - User -defined contour areas. Average end area method used for volume calculation. Begining Elevation = 17.00 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cult) Total storage (cult) 0.00 17.00 3,295 0 0 1.00 18.00 4,119 3,707 3,707 2.00 19.00 5,033 4,576 8,283 3.00 20.00 6,038 5,536 13,819 4.00 21.00 7,134 6,586 20,405 5.00 22.00 8,323 7,729 28,133 6.00 23.00 9,604 8,964 37,097 6.50 23.50 10,280 4,971 42,068 7.00 24.00 12,375 5,664 47,731 7.50 24.50 14,400 6,694 54,425 8.00 25.00 15,137 7,384 61,809 9.00 26.00 16,654 15,896 77,705 10.00 27.00 18,219 17,437 95,141 Culvert / Orifice Structures Weir Structures [A] [B] [C] [Prf'Rsr] [A] [B] [C] [D] Rise (in) = 30.00 2.00 0.00 0.00 Crest Len (ft) = 13.33 10.00 0.00 0.00 Span (in) = 30.00 2.00 0.00 0.00 Crest El. (ft) = 25.15 25.75 0.00 0.00 No. Barrels = 1 1 0 0 Weir Coeff. = 3.33 2.60 3.33 3.33 Invert El. (ft) = 21.96 24.00 0.00 0.00 Weir Type = Rect Broad - Length (ft) = 45.00 1.00 0.00 0.00 Multi -Stage = Yes No No No Slope (%) = 0.50 0.50 0.00 n/a N-Value = .011 .011 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 ExfII.(Inlhr) = 0.000 (by Contour) Multi -Stage = n/a Yes No No TW Elev. (ft) = 24.00 Stage (ft) 10.00 , 8.00 6.00 4.00 2.00 0.00 1 ' 0.00 8.00 - Total Q Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s) Stage / Discharge 16.00 24.00 32.00 40.00 48.00 56.00 64.00 72.00 Elev (ft) 27.00 25.00 23.00 21.00 19.00 -L- 17.00 80.00 Discharge (cfs) 10 Hydrograph Summary Report Hydraflow Hydrographs by Intelisolve v9.2 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Hyd. volume (cult) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph description 1 SCS Runoff 14.71 1 736 69,400 ---- ---- ---- Pre -Development Flow 2 SCS Runoff 17.03 1 745 98,342 --- -- - --- Pond Influent 3 Reservoir 14.74 1 757 84,271 2 I 25.73 73,332 Post -Development Flow Wet Detention Basin 6 Routing.gpw Return Period: 10 Year Wednesday, Mar 8, 2017 Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.2 Hyd. No. 1 Pre -Development Flow Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 1 min Drainage area = 6.020 ac Basin Slope = 0.0 % Tc method = TR55 Total precip. = 7.00 in Storm duration = 24 hrs " Composite (Area/CN) = [(2.870 x 77) + (2.870 x 55)] / 6.020 12.00 WE 6.00 3.00 120 240 Hyd No. 1 Pre -Development Flow Hyd. No. 1 --10 Year 360 480 600 11 Wednesday, Mar 8, 2017 Peak discharge = 14.71 cfs Time to peak = 736 min Hyd. volume = 69,400 cuft Curve number = 66* Hydraulic length = 0 ft Time of conc. (Tc) = 22.36 min Distribution = Type III Shape factor = 484 Q (cfs) 15.00 12.00 a nn we 3.00 0.00 720 840 960 1080 1200 1320 1440 1560 Time (min) Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.2 Hyd. No. 2 Pond Influent Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 1 min Drainage area = 6.020 ac Basin Slope = 0.0 % Tc method = TR55 Total precip. = 7.00 in Storm duration = 24 hrs " Composite (Area/CN) = [(2.800 x 98) + (1.470 x 80) + (1.470 x 39)] / 6.020 Moll] 12.00 MR, . �� MIX Pond Influent Hyd. No. 2 --10 Year 120 240 360 480 600 720 Hyd No. 2 12 Wednesday, Mar 8, 2017 Peak discharge = 17.03 cfs Time to peak = 745 min Hyd. volume = 98,342 cuft Curve number = 78* Hydraulic length = 0 ft Time of conc. (Tc) = 36.20 min Distribution = Type III Shape factor = 484 Q (cfs) 18.00 15.00 12.00 •e .M 3.00 0.00 840 960 1080 1200 1320 1440 1560 Time (min) Hydrograph Report 13 Hydraflow Hydrographs by Intelisolve v9.2 Hyd. No. 3 Post -Development Flow Hydrograph type = Reservoir Storm frequency = 10 yrs Time interval = 1 min Inflow hyd. No. = 2 - Pond Influent Reservoir name = Stormwater Pond #6 Storage Indication method used. Wet pond routing start elevation = 23.50 ft. Q (cfs) 18.00 iimel 12.00 . @C • Peak discharge Time to peak Hyd. volume Max. Elevation Max. Storage Post -Development Flow Hyd. No. 3 --10 Year Wednesday, Mar 8, 2017 = 14.74 cfs = 757 min = 84,271 cuft = 25.73 ft = 73,332 cuft Q (cfs) 18.00 15.00 12.00 4 • 3.00 0.00 120. 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 3 - Hyd No. 2 � Total storage used = 73,332 cult Time (min) Hydraflow Rainfall Report 18 Hydraflow Hydrographs by Intelisolve v9.2 Return Period Intensity -Duration -Frequency Equation Coefficients (FHA) (Yrs) B D E (N/A) 1 69.6992 12.1000 0.8722 2 84.4178 12.6000 0.8723 -------- 3 0.0000 0.0000 0.0000 5 92.8574 13.1000 0.8451 ---- 10 91.2234 12.6000 0.8081 25 79.6106 11.1000 0.7416 ---- 50 72.4317 10.0000 0.6944 ----- 100 66.5852 9.0000 0.6515 ----- File name: Savannah Lakes-BrunsCo.IDF Intensity = B / (Tc + D)"E Wednesday, Mar 8, 2017 Return Period (Yrs) Intensity Values (in/hr) 5 min 10 15 20 25 30 35 40 45 50 65 60 1 5.86 4.68 3.92 3.38 2.98 2.67 2.42 2.22 2.05 1.90 1.78 1.67 2 6.92 5.56 4.67 4.04 3.57 3.20 2.90 2.66 2.46 2.29 2.14 2.01 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5 8.04 6.54 5.54 4.82 4.28 3.86 3.52 3.24 3.00 2.80 2.62 2.47 10 8.99 7.34 6.25 5.46 4.87 4.40 4.02 3.71 3.45 3.22 3.03 2.86 25 10.14 8.30 7.09 6.22 5.57 5.06 4.65 4.31 4.02 3.77 3.56 3.37 50 11.05 9.05 7.75 6.83 6.13 5.59 5.15 4.79 4.48 4.22 3.99 3.79 100 11.93 9.78 8.40 7.42 6.69 6.12 5.66 5.27 4.95 4.67 4.43 4.22 Tc = time in minutes. Values may exceed 60. Precio. file name: Savannah Lakes-BrunsCo.oco Storm Rainfall precipitation Table (in) Distribution 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr SCS 24-hour 3.70 4.31 0.00 0.00 7.00 8.27 9.67 11.24 SCS 6-Hr 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff -1st 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-2nd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-3rd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-4th 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-Indy 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1 0.00 Custom 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Savannah Lakes Phase 3B Wet Detention Basin 6 Outlet Calculations Inlet Report Hydraflow Express by Intelisolve Pond 6 Primary Spillway Riser -10 year Drop Curb Inlet Location = Sag Curb Length (ft) = 13.33 Throat Height (in) = 7.20 Grate Area (sgft) = -0- Grate Width (ft) = -0- Grate Length (ft) = -0- Gutter Slope, Sw (ft/ft) Slope, Sx (ft/ft) Local Depr (in) Gutter Width (ft) Gutter Slope (%) Gutter n-value a dmenaims in ret = 100.000 = 100.000 _ -0- _ -0- _ -0- _ -0- Wednesday, Mar 8 2017, 11:50 AM Calculations Compute by: Known Q Q (cfs) - 17.03 Highlighted Q Total (cfs) = 17.03 Q Capt (cfs) = 17.03 Q Bypass (cfs) = -0- Depth at Inlet (in) = 6.77 Efficiency (%) = 100 Gutter Spread (ft) = 0.01 Gutter Vel (ft/s) = -0- Bypass Spread (ft) = -0- Bypass Depth (in) = -0- Culvert Report Hydraflow Express by Intelisolve Pond 6 Primary Spillway Barrel -10 year Invert Elev Dn (ft) = 21.35 Pipe Length (ft) = 45.00 Slope (%) = 1.36 Invert Elev Up (ft) = 21.96 Rise (in) = 30.0 Shape = Cir Span (in) = 30.0 No. Barrels = 1 n-Value = 0.011 Inlet Edge = Sq Edge Coeff. K,M,c,Y,k = 0.0098, 2, 0.0398, 0.67, 0.5 Embankment Top Elevation (ft) = 25.75 Top Width (ft) = 4.67 Crest Width (ft) = 4.67 Elev (ft) 26:00 25.00 24.00 23.00 22.M 21.00 20.00 Panel 6 Primary Spillway Barrel -1'0 year £ir Culvert HGL Embank Wednesday, Mar 8 2017, 11:56 AM Calculations Qmin (cfs) = 0.00 Qmax (cfs) = 17.03 Tailwater Elev (ft) = (dc+D)/2 Highlighted Qtotal (cfs) = 17.03 Qpipe (cfs) = 17.03 Qovertop (cfs) = 0.00 Veloc Dn (ft/s) = 4.14 Veloc Up (ft/s) = 6.00 HGL Dn (ft) = 23.30 HGL Up (ft) = 23.36 Hw Elev (ft) = 24.04 Hw/D (ft) = 0.83 Flow Regime = Inlet Control Kw Depth-N 4.04 304 2.04 1.04 004 -0:96 •1.96 Reach [IO S RIP RAP APRON DESIGN SHEET DATE: March 6, 2017 1205 PM SHEET 1 OF 1 PROJECT: Savannah Lakes Phase 3B I.D. NO.: DESIGN BY: JRC PROJECT NO.: 310-03 FILE: CHECKEDBY: JBP DESCRIPTION: Pond 6 Primary Spillway Barrel LOCATION: Brunaxiek County, North Carolina 25 20 15 Z O 10 B 5 0+ 0 Rip Rap Zone Delineation 7 5 10 15 20 25 DD, Depth of Flow (ft.) Notes: 1. Use nwd highermne for wades >10%. 2. For pipe arch, arch, bar culvert, Pawed channel oudst% use Do -Cross sectional was of outlet now. Number of Culverts: 1 Design Velocity, Vd : 4.14 are Flow, Q : 17.03 It Pipe Diameter, Do: 2.5 ft Slope, swra,= 0.0136 tflL Using NCDOT Rip Rap Apron Design: Use: Zone 1 L7: 7.5 ft L2: 10 ft W. 6.0 ft W: 6.5 ft CLASS'A' RIP RAP USE MINIMUM 12" STONE THICKNESS TOTAL STONE VOLUME= 45.0 R3 65.0 ft3 ■ Design Point *Based upon L7 'Based upon L2 MINIMUM CLASS L1 Lt STONE NCDOT RIP OF Coefficient Coefficient THICKNESS ZONE RAP CLASS STONE ft n. 1 'A' FINE 3 4 12 2 -B. LIGHT 3 6 16 3 1 MEDIUM 4 B 24 4 1 HEAVY 4 6 36 5 2 HEAVY S 1D 36 6 2 HEAVY 5 10 1 3, 7 1 Design is B nd the Some of This Method L1 =Length to Protect Culvert L2=Lengtlt to Pm.M Scar Hole NAME I WEIGHT SIZE SPECIFICATIONS LBS RIP -RAP CLASS 1 5-200 30% SHALL WEIGH AT LEAST 50 LBS. EACH. NO MORE 10%SHALL WEIGH LESS THAN 15 LBS. H CLASS 2 25-250 60% SHALL WEIGH AT LEAST 60 LBS. EACH. NO MORE THAN 5%SHALL WEIGH LESS THAN 50 LBS. EACH ROSION CONTROL STONE CLASSA 2- 10% TOP S BOTTOMSIZES. NO GRADATION SPECIFIED CLASS B 15-300 5-15' NO GRADATION SPECIFIED Weir Report Hydraflow Express by Intelisolve Pond 6 Emergency Spillway Nappe -100 year Trapezoidal Weir Crest = Sharp Bottom Length (ft) = 10.00 Total Depth (ft) = 1.25 Side Slope (z:1) = 2.00 Calculations Weir Coeff. Cw = 3.00 Compute by: Known Q Known Q (cfs) = 31.54 Depth (ft) 2.00 1.50 1.00 M Wednesday, Mar 8 2017, 11:39 AM Highlighted Depth (ft) = 0.95 Q (cfs) = 31.54 Area (sqft) = 11.30 Velocity (fUs) = 2.79 Top Width (ft) = 13.80 Pond 6 Emergency Spillway Jappe -100 year 2 4 6 8 10 12 14 16 18 Weir - , W.S. Depth (ft) 2.00 1.50 1.00 0.50 M -0.50 20 22 24 Length (ft) I RIP RAP APRON DESIGN SHEET DATE March 6, 2017 12:04 PM SHEET 1 OF 1 PROJECT: Savannah Lakes Phase 3B I.D. NO.: DESIGN By: JRC PROJECTNO.: 310-03 FILE CHECKED By: JBP DESCRIPTION: Pond 6 Emergency Spillway Neppe LOCATION: Brunswick Co.*, North Carolina 25 20 W 15 10 5 J Rip Rap Zone Delineation 7 0 5 10 15 20 25 Do, Depth of Flow (fL) Notes: 1. Use next higher sore for prades 1D%. 2. For pipe", arch, box culvert, paved channel ou6ets, use D,=Cross sectional area of outletflow. Number of Culverts: 1 Design Velocity, Vd : 2.76 ere Flnw, Q : 31.54 R Pipe Diameter, Do: 3,36 a Slope, S 0 RM. Using NCDOT Rip Rap Apron Design: Use: Zone 2 LI: 10.08 ft. 1-2: 20.16 ft. W: 7.4 ft. W: 11.4 ft. CLASS W RIP RAP USE MINIMUM 1 T' STONE THICKNESS TOTAL STONE VOLUME= 111.8 ft 345.5 ft ■ Design Point 'Based upon LI "Based upon L2 MINIMUM CLASS L, L, STONE NCDOT RIP OF CoefticierA Coefficient THICKNESS ZONE RAP CLASS STONE ft. (ft. in.) 1 'A' FINE 3 4 12 2 'B' LIGHT 3 6 16 3 1 MEDIUM 4 6 24 4 1 HEAVY 4 B 36 5 2 HEAVY 5 10 36 6 2 HEAVY 5 10 36 7 1 ..Inn Is B nd the Se a oT This Method L1 =Largth to Protect Culver L2 =Length to Prevert Scour Hole NAME I WEIGHT SIZE SPECIFICATIONS 11 ass RIP -RAP CLASS 1 5-200 30%SHALL WEIGH AT LEAST 60 LBS. EACH. NO MORE THAN 10% SHALL WEIGH LESS THAN 15 LBS. EACH CLASS 25-250 60% SHALL WEIGH AT LEAST 60 LBS. EACH. NO MORE THAN 5%SHALL WEIGH LESS THAN 50 LEIS. EACH EROSION CONTROL STONE CLASS A 24r 10% TOP 6 BOTTOM SIZES. HOG ON SPECIFIED CLASS B I 15-300 5-15' NO GRADATION SPECIFIED 1 e Channel Report Hydraflow Express by Intelisolve Pond 6 Emergency Spillway Slope -100 year Trapezoidal Botom Width (ft) = 10.00 Side Slope (z:1) = 2.00 Total Depth (ft) = 1.25 Invert Elev (ft) = 25.75 Slope (%) = 1.00 N-Value = 0.035 Calculations Compute by: Known Q Known Q (cfs) = 31.54 Elev (ft) Section 28.00 27.50 27.00 26.50 r� 25.50 25.00 0 Wednesday, Mar 8 2017, 11:39 AM Highlighted Depth (ft) = 0.82 Q (cfs) = 31.54 Area (sqft) = 9.54 Velocity (fUs) = 3.30 Wetted Perim (ft) = 13.67 Crit Depth, Yc (ft) = 0.65 Top Width (ft) = 13.28 EGL (ft) = 0.99 2 4 6 8 10 12 Reach (ft) 14 Depth (ft) 2.25 1.75 1.25 0.75 0.25 -0.25 -0.75 16 18 20 RIP RAP APRON DESIGN SHEET GATE: March S, 2017 12:03 PM SHEET 1 OF 1 PROJECT: Savannah Lakes Phase 313 I.D. NO.: DESIGN BY: JRC PROJECT NO, 310-03 FILE: CHECKED BY: JBP DESCRIPTION: Pond 6 Emergency SpIIKM Slope LOCATION Brunmock County, Nadh Carofna 25 20 N 15 O 10 5 0+ 0 Rip Rap Zone Delineation 7 5 10 15 20 25 Do, Depth of Flow (ft.) Notes: 1. Use nod higher me far grades M0%. Z For pipe arch, arch, bw wlverk paved chamal outlets, use Da=Cross secdwal eras of outlet Bow. Number of Culverts: I Design Velocity, Vd : 3.3 EJs Flow, Q : 31.54 t Pipe Diameter, De : 3.09 t Slope, S.—= 0.01 *AL Using NCDOT Rip Rap Apron Design: Use: Zone 2 L1: 9.27 ft. L2: 18.54 ft. W: 6.8 ft. W: 10.5 ft. CLASS W RIP RAP USE MINIMUM 18" STONE THICKNESS TOTAL STONE VOLUME= 94.5 ft' 292.2 ft' ■ Design Point "Based upon L, "Based upon L2 MINIMUM CLASS L7 L7 STONE NCDOT RIP OF Coefficient Coefficient THICKNESS ZONE RAP CLASS STONE ft.) (ft.) (In. 1 'A' FINE 3 4 12 2 -B. LIGHT 3 a 18 3 1 MEDIUM 4 8 24 4 1 HEAVY 4 S 36 5 2 HEAVY 5 10 36 S 2 HEAVY 5 10 36 7 Deai is B nd me Sw a of Thls Meehod L1 =Length to Protect Ch4vert 1-2 -Length to Preverd Swur Hale NAME I WEIGHT SIZE SPECIFICATIONS LBS RIP -RAP CLASS 1 5200 30% SHALL WEIGH AT LEAST So LBS. EACH. NO MORE THAN 10% SHALL WEIGH LESS THAN 15 LBS. EACH CLASS 2 25-250 80% SHALL WEIGH AT LEAST 50 LBS. EACH. NO MORE THAN 5%SHALL WEIGH LESS THAN 50 LBS, EACH EROSION CONTROL STONE CLASS A 26' 10% TOP IL BOTTOM SRE3. NO GRADATION SPECIFIED CLASS 8 1 15-300 5-15' IND GRADATION SPECIFIED r Savannah lakes Phase 3C Stormwater Piping System Calculations Savannah Lakes Phase 3C Brunswick County Stormwater Drainage System Calculations Designer:........... Jay Carmine, PE Checked: ............. Jeff Petroff; PE Date: ................... 3/7/2017 File Location:...... W:\CLD Projects\330-00 Farmstead properties, LLC\310-04 Meadowlands - Savannah Lakes 3C\Calcs\Stormwater\[Piping System Calculations.xls]CB Design Open Space CN, CNimp = 98 (for all SHGs) Open Space CN, CNopenA= 39 (Baymeade fine sands and Leon fine sands, drained; good condition) Open Space CN, CNopenB = 61 (Griffon fine sandy loam; good condition) Sheet Flow Average Length, Lsf = 65 [ft] Sheet Flow Average Slope, Ssf = 1.0 [%] Mannings Sheef Flow Runoff Coeff, Csf = 0.24 (dense grass) NOAA Atlas-14 2-yr Rainfall, P2 = 4,31 [in/hr] Average Sheet Flow Time,Tsf= 11.5 [min] Shallow Concentrated Average Grass Distance, Lscg = 20 [ft] Shallow Concentrated Average Grass Slope, Sscg = 1.0 [%] Average Grassed Shallow Concentrated Time, Tscg = 0.2 [min] Shallow Concentrated Average Road Slope, Sscr = 0.5 [%] Time = 25-yr Rainfall Intensity = Inverse 25-yr Rainfall Intensity = NOAA Atlas 14 - Preci itation Estimates 401 10 15 30 60 3 37 0.124 0.146 0.198 0.297 [min] [in/hr] [hr/in] 25-yr Storm Event Intensity Coefficient, g = 283.1 (1/slope of inverse rainfall intensity) 2..5-yr Storm Event Intensity Coefficient, h = 24.8 (intercept of inverse rainfall intensity _ slope of inverse rainfall intensity) Standard Pipe Material, n = 0.011 (CPP) ID Upstream Basin Total=Road7y Basin Building Im ervious Other Im ervious Remaining Pervious Percent Im ervious SHG A Basin Percent % SHG B Basin Percent no name sf] I fsfl I Isf]s sfl I f%l % 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 C113 C12 C13 CI4 J64A cis C17 C16W39,304D C17A CIS CI9 Clio C111 DG32 C113 C114 C135 C116 617 G18 $0 900 16-100 6 800 16 600 $3 800 0 47 3D0 29100 I 73,400 42,OW 21300 8 7W 20 7D0 48100 38 60D 39,500 56,6D0 3 140 2,985 1L 7,275 0 6 570 Z 980 3 490 7 430 7 285 3,965 j I 4645 4 690 0 3190 3 O10 5 540 5 395 4 85S 8100 8 000 0L 4,000 20 fl 24 000 12000 8 000 20 000 16 OOD 20000 16,000 0 00 8 000 24 0000 i6 DOD 8 000 24 000 0� 0 0 0 0 0 0 0 0 0 0 0 0 0__j 0 0 0 16,800 3,660 9,615 22,525 0 16,730 7,320 7,610 28,770 16,015 9,135 48,755 21,310 21,300 5,510 9,690 18,560 17,205 26,635 24 500 45.6 46.2 42.1 58 0.0 64.6 67.2 60.2 48.8 59.2 68.6 33.6 49.3 0.0 36.7 53.2 61.4 55.4 32.6 56.7 0 100 0 100 20 so 0 0 100 100 100 30 30 30 70 70 70 30 ^ -50 90. 70 s0 10 80 80 0 20 20 100 0 90 80 80 100 10 20 20 100 0 Page 1 of 2 Savannah Lakes Phase 3C Brunswick County Stormwater Drainage System Calculations Designer:........... Jay Carmine, PE Checked: ............. Jeff Petroff, PE Date: ................... 3/7/2017 File Location:...... W:\CLD Projects\310-00 Farmstead properties, LLC\310-04 Meadowlands - Savannah Lakes 3C\Calcs\Stormwater\[Piping System Calculations.xls]CB Design Drainage Basin Basin CN Basin C Basin Length Shallow Concentrated Road Len h Time of Concentration 25-yr Rainfall Intensity Subbasin Discharge Downstream Basin Total Flow name - ft ft min in hr cfs cf., cfs Cll 77.9 0.56 237 14.4 7.21 2.9 CF3 2.9 C12 78.1 0.56 729 � 144 13.4 7.41 0.7 C13 0.7 C13 74.0 0.48 249 164 13.6 7.37 1.3 C14 4.9 C14 82.5 0.65 245 160 13.6 7.38 5.9 J84A 10.8 JB4A - - -- - -- - FES1 10.8 CIS 84.9 0.70 274 189 13.9 7.31 5.5 C17 5.5 C16 83.7 0.67 320 235 14.4 7.21 2.5 CI7 2.5 C17 80.6 0.61 $30 245 14.5 7.19 1.9 C17A 10.0 C17A 75.7 0.51 285 200 14.0 7.29 4.8 FE52 14.8 C18 80.2 0.60 305 220 14.3 7.25 4.0 cis 4.0 C19 82.9 0.66 270 185 13.8 7.32 3.2 0612 7.2 CI30 60.3 0.21 300 215 14.2 7.26 2.5 011 2.5 C111 70.3 0.41 307 222 14.3 7.24 2.8 DG12 5.3 DG12 43.4 0.20 259 174 13.7 7.35 0.7 533 13.2 013 74.6 0.49 98 13 11.9 7.72 0.8 C114 14.0 C114 80.7 0.61 199 �57 114 13.0 7.48 2.2 FES3 16.2 CI3s 76.1 0.52 172 13.7 7.35 4.2 cll6 4.2 C116 73.7 0.47 L 281 196 14.0 7.30 3.1 FES4 7.3 017 61.2 0.22 325 240 14.5 7.20 1.5 CI18 1.5 C118 72.5 0.45 322 237 14.4 7.21 4.2 FESS 5.7 Pipe I Pipe I Pipe I Min Pipe I Designed Pipe I Qfull Length Slope Diameter Diameter 10.4 [ 15 I 7.6 6.5 14.1 15 18 6.1 9.2 20.2 24 17.0 20.2 24 17.0 13.5 15 7.3 1.0.7 1S. 6.1 18.5 18 9.2 22.8 12.7 24 15 17.0 6.2 16.4 18 9.2 10.7 14.7 15 18 6.2 9.2 21.8 24 17.2 22.0 24 17.6 23.6 13.0 24 15 17.0 6.2 16.5 18 9.2 8.7 15 6.2 15.0 1 18 1 9.2 Q/Qfull Vfull V/Vfull Pipe Velocity [fps] [fps] 0.37 6.2 0.78 4.9 0.11 5.0 0.53 2.7 0.53 5.2 1 0.87 4.5 0.64 5.4 0.92 4.9 0.64 5.4 0.92 4.9 0.76 6.0 0.97 5.8 0.41 SA 0.8D 4.0 1.08 5.2 1.08 5.6 0.87 5.4 1.01 5.4 0.64 5.0 0.92 4.6 0.78 5.2 0.97 5.1 0.41 5.0 0.80 4.0 0.58 5.2 0.89 4.7 0.77 5.5 0.97 5.3 0.80 5.6 0.98 5.5 0.95 5.4 1.04 5.6 0.69 5.0 0.94 4.7 0.79 5.2 0.98 5.1 0.24 5.0 0.68 3.4 0.61 5.2 0.91 4.7 Page 2 of 2 U- a m co FL as 3 d co E L O -Wo 3 _® L ■■ Q m E zi co W LL m U E N T m C .Q d N iz 16 CD � a It O � � � � � � � � � � � � � cn E � ,w cn g § \ C� C� o g e e q � w S 7 I £ -■ § m § a $ m m § N m � q o § z] G a G G G » a e a Cl d @E © 2 2 § § 3 § § \ � 2 @§$ .0 2� _ cv « a co f 2 E a z 2 \ F_ OD k m $ m - S ` @ B k k m ■ E m S G § Go e- a ad o It r- 04 G ® q Q k C%l m a®Z CD CD - It / § % § / - 2 o 2 N 0 0 0 o o 2ƒ S ■ _ § 8 'm § o% e a a d c -- o$ 8 8 8 8 8 a d Cl a Cl i § » 2 v § v v § §-- r0 f in e A 2 in 7 t § CD Im \ 7 G 7 m 2 Cl) ] 2- IL kz - Cl) LL 16 6 /CL § - CN n _ � O C L■ E E co L A E L 4a co c O i+ N N •O N •O N .O c a N o O 2 = = 2 '~ i n U U U U N 00 O C C C a co o_a w r N Cl) m d M J C7 " LO LO Ol LO c N N N N N C fNCD /! O N O r L6 O g ` L7 C O C O = O M w LO r, co M LO N N N N N N N C - w O J 3 O " LO O LO (g O O M M Op aD E _ v N N N N N z d O C or,w J W �► (I wm LO LO O w It O O O r O d I It 0) Cl) Or coo > J La N N N N N C v N > J $' O v It n co C w ... LM 6 4 6 6 N N N N N O O IMF J C O) (co M LO O U N O C d O. Fr U U U U U J M c 3 0 v we v N a N co LO to m 0 O J 2 cq LL Go It v LV a to l6 u LLLL Q N U } E LO N :? n � T � O co C J 01 c_ N a cn W Q n E LL m tt M CM d O in V M r N lL U U U U .6 in w .o as Fd p �a 04 CO v tt) a z F 3 as ca E L O co O L � a it 0 � � � 0 � � � � � � � � � ca E � 0 -W co g c � § 6 LO ¥ 0 o u o § � 2 7 f F % @ G @ - § m m m c k % E 2 § § § » a 6 6 6 £ t 2 2 \ � £ - e a L M '� ~ E E £ CL F_ § I Q N m m �2 2 - 2 § $ ] � d a 6 0 go E_ % = I G `� K " Q m • £ C. to CD # I ) § § § LL E q $ q G o . ; 8 8 8 -- - 8 � §o � 2 \ \ \ \ CO CA k m f o R I \ § o P ©k- o � t § f § S ƒ F 0 7 d 3 a oz ƒ / § ) - N n - EL � a it 0 rl � � � � E E 3 co � � � � E � 0 1*0# ca § w � k} ) ) ) & 6 d 0 J 0 § § r@0 2 § o= z W- N m / 2 ■ S § Of k " N "' § § § k § k ) I � 0)m m m 3 % O F k k) k ) I § m m m z \ 7 3 2 � k \ § o a e d CL > � & $ '7 A £ LU m 04 LO R N _ >q E q = q I w- G K k q 7 2 m 2 § 0k §CL C § § § § co B §# 2 7 3 2 e ) �' m CN ) © Lq § m 2 m 2 6 a & e L •- e ) � § CN o \ 0 § 0. g ± § E o Q v ? } w G G - e o Q 8 \ . .U) / ¥ z to -i z C%l 0 _ c cc FL as 3 d E L O /� -W/� ca 3 _O L U x t CL W O L A3 W N E L �I d N U U 0 U U U U o ri Cl C14 CV C ..r N N N N N N N to LO LONLOO000oY L] O N O - O V O O O O O O O > O O O O O O O d J t U U U U U U U y M C � O v d N tl! = C C J '� .— N N Nr N c0 LO co t d E a v z CL ?me _� OOR N � W � CR C W .... N N co N N N N C O eE VM' 'd' � (IO � tOo J (a "� O 0 O 0 0 0 0 OR f*.Z CR rl� P.:aD N W " r) 't v 0 w ui 0N N N N N N N d •� w M C) N C E C-i r cei 4 O� Lq CM N R N O O O 0 O O 0 0 LL C m V d' N ll� (O O) N f0 !0 "' O O O O O O �CJ O O O O O O O Y 0 0 0 0 0 0 0 m Q U a n 5 U co)W 4 m^ � C 'p N W— O O N N O� ILO N � O N 06 E U r s E _�Im Q d a) J d Cl) Cl) M - N N Cl) 01 C V -IT 'aO_ W Iq d 0 I Z — N co M c0 LL N U N O J Z — N M V O (O 1- a � a it 0 CL O W6 � � E E 3 co � � � co E � 0 -W co § N,eN N N tj CL ) ) ) ) ) �k � F- �§ o k k k $ 13 z § 3 C-4 n IT Cl) m .] j_@E % 2$ 8 S G c m k� m� m m § - 2 5 7 o ■ a 6 w G k k @ « m m k d§ k f K % 2_ CO « § § § / ) § a 04 CN a 04 04�� 2 @06 7 k \ \ § § k k Q 2— 0 Cl 0 6 0 0 0 E N 2 m QP■@ 2� k N g k k k k c q r t £_ ` §� q p r n IN N k k k m m] q) Q CV § a . .CL § 9 k ®©— ~ v - ~ - a w 2 w L �§ ] £ b e \\ \ r § $ E a w w § � _ § k § - B � E CN ) j S a n LL B §§0 \ \ a § ) ƒ § § @o I ] z a n_ LO= w a Un bm a) 3 as ca E L O ''-WA ca _® L � a �t 0 CL 4) � � 0 � � � � � � � 4) (a E � � ca g § § � U- u k § § e e ) § �WE q 8 2 - m m c O©Z S CD d zk� \ \ » a d �� CV U)CD \ -J E E CL ;:)F Lo In q m £w- to m q Lo ■o @ S 2i a d §E % e £w- 4 k I&k § \ § § m o � . ■a CO - C 8 8 u a Co E LU L6 t �r0 o.� - o k § B § I E .k 22- C-4 n Im r\) » L - ƒ 16 §o AD / -iz � . n � a V. 0 � � � � � E E 0 cn � � � � ca E � 0 -W cn § N . kE ) ) �# ¥ - v d / co ( rid 2 § o.z LU _ & k �2F § G � % CV k®® )Ek § » W Ncq f % CD ° 9 g 9 o j \ to m c00 k § �2— 6 6 ;_E § q m m c e ■§F `LU § 4 co m m k ■tE 22� \ n ~ § a .E §0A \ k @§§ 2 0 0 � § a /r, q 2 / �e3 w 4 § § 2 \ CO § @ B » CV § @ \ ) � � k § 2 � Ur o ' 6 a a § § / § @j a.z -1z CN �C W LL E LO w W LL aD U U E a� N T U1 G .Q a ui lL V N �O a` � a r 0 � � � � 0 � � � � � � � � � co E � 0 *0 co g � § 2 Go I § ® k » § G § § § » �I E o m R @ a « -■ com o CD 002 G 4§- a zk£ k § » d d r_� CN Q § ° @■2 � 2 � z CL 9mg R = Iw m k c . S G �w d a >§E q § Iw- 'i m 0,£ _Lq I&k ƒ / t0 S - t 2 o a E § G d a @E ; 2 0 gC o.3 � # § & :32 / Q k\)LU w cd r- :3zCN d k K k ƒ m Im w a it ^O^ W E E �0 I L+ W 3 ,as co E L 6 *a c A c O N N = _ a F- a -2 r` > > U C.)N O C C C C r7 G_Z w lQ 0 J c v N C 2 N N C c O CL J N i O — O c N N 0 O J 3 0 o a _ _ D co N Z C_ O ° J W v It w ul (O O O >Ei >F n J.. C w N N dC G .-. rn co > J r+ CO O) C w sf Lri N N L J C d) N O C. d � J Y) C N S r J N �, O2 i9Go 2 I.224 L V Lq c ram', O U N C } N O II m O _ J U') c n E 4 U ao u) N U U LL w d =o Z J Z N Savannah Lakes Phase X Wet Detention Basin 7 water Quality Calculations Wet Detention Basin Design Sheet Savannah Lakes Phase 3C Stormwater Pond #7 Foreblay 7A For eba 7B Main Pond Total Drainage Area, Ad = 170 000 637 000 107.300 914,300 [sf] On -Site Building Impervious: On -Site Roadway Impervious: On -Site Parking Impervious: On -Site Sidewalk Impervious: Other On -Site Impervious: On -Site Future Impervious: Off -Site Impervious: F­36,00-0­11 212,000 1 0 248,000 19,500 71195 0 90,655 L-.o 0 0 0 0 0 0 0 0 0 0 6,5,00 23 500 0 30000 0 0 0 0 [sf] [sf] [sf] [sf] [sf] [sf] [sf] Total Impervious Area, Ai = 62,000 306,655 0 368,655 [sf] Percent Impervious, %Imp = 36.47 48.14 0.00 40.32 [%] Surface Area Calculations Forebay 7A Contour Elevation Fare�ay 7A Contour Area Forebay Depth Incremental Volume Accumulative Volume fmsl s ft 20 0 827 Sediment Storage Depth 21.0 1,693 3.1 0 0 LL 0 4,154 2.1 2,924 2,924 23 0 5,043 1.1 4,599 7,522 23.6 5,727 ^-; 0.5 3,231 10,753 24.0 6 13Z 0.1 2,372 13,125 24-1 6 237 0.0 618 13,743 Forebay 7B Contour Elevation Forebay 7B Contour Area Forebay Depth Incremental Volume Accumulative Volume fms11 [sfl Ifti 20,0 5,322 Sediment Storage Depth 21.0 6,416 5.00 0 0 22-0 7 667 4.00 7,042 7,042 23.0 8,944 3.00 8,306 15,347 2.30 9 73,0 2.40 5,602 20,949 24-0 10,254 2.00 3,997 24,946 2.5.0 11572 1.00 10,913 35,859 26,0 12 924 0.00 12,248 1 48,107 Main Pond Contour Elevation Main Pond Contour Area Pond Incremental Depth Volume Accumulative Volume fmsl s ft c 170 28,722 Sediment Storage Depth 1810 L 31,590 6.10 0 0 19.0 34,542 5.10 33,066 33,066 20.0 37,579 4.10 36,060 69,126 21.0 40694 3.10 39,136 108,262 22.0 43,987 2.10 42,291 150,553 23.0 471..65 1.10 45,526 196,079 23.6 49,157 0.50 28,897 224,975 24.0 52,862 0.10 20,404 245,379 24.1 54,233 0.00 5,355 250 734 Page 1 of 4 Wet Detention Basin Design Sheet Savannah Lakes Phase X Stormwater Pond #7 11 Pond Depth, D = 5.6 [sf] (23.6 fmsl - 18.0 fmsl) for Main Pond Only Area of Bottom of Shelf, Abot_shelf = 64,614 [sf] (5,727 sf+ 9,730 sf+49,157 sf) @ Elev = 23.6 fmsl Area of Permanent Pool, Aperm_pool = 73,394 [sf] (6,237 sf+ 12,924 sf+ 52,862 sf) Area of Bottom of Pond, Abot_pond = 31,590 [sf] (Main Pond Only) Volume of Permanent Pool, Vperm_pool = 312,584 [sf] (13,743 cf+48,107 cf+ 250,734 cf) Average Depth, dav= 4.64 [ft][0.25*(1+64,614sf/73,394sf)]+[((64,614sf+31,590sf)/2)*(5.6ft/64,614sf)] Min Average Depth = 3 00 ft < 4.64 < 7.50 ft = Max Average Depth OK Sediment Removal Efficiency (Percent) = 90 [%] SA/DA Ratio Determination Higher Percentage = 50 SA/DA % Higher Depth = 5.0 3.50 Lower Depth = 4.5 3.90 Lower Percentage = 40 SA/DA % Higher Depth = 5.0 2.80 Lower Depth = 4.5 3.10 SA/DA = 3.04 [%] Min Surface Area = (SA/DA)*Ad Min Surface Area = 3.04% *(914,300 sf) Min Surface Area = 1 27,807 1 [sf] Interpolation (Bi-Directional) 1st - SA/DA @ Depth Interpolation SA/DA % SA/DA at Imp = 50%, d = 4.64 ft SA/DA at Imp = 40%, d = 4.64 ft 2nd-SA/DA @impervious Interpolation 3.79 3.02 SA/DA% SA/DA Ratio at Imp = 40.32%, d = 4.64 ft 3.04 11 Aperm_pool (sf) = 73,394 > 27,807 = Min Surface Area (sf) OK ITemporary Storage Volume Calculations Minimum Required Volume (Simple Method by Tom Scheuler Receiving water body watershed ............................. Receiving water body name ...................................... Receiving water body classification ......................... Receiving water body location ................................. Lumber River Basin Shm letree Swamp Canal CSw! 18-23-2 Brunswick County, North Carolina First Flush Volume Required, P = 1.S [in] Rv= 0.05+0.009*(100*Imp) Rv= 0.05+0.009*(100x40.32%) Rv = 0.413 Min Temporary Storage Volume, MTSV = P * Rv * Ad Min Temporary Storage Volume, MTSV = (1.Sin/12in ft * 0.413)*(914,300 sf) Min Temporary Storage Volume, MTSV = 47,188 I [cf] Pond Staee Storasm Funrtinn INn Temnnram Pnnl Ctnraua in Pnrahav 7111 Contour Elevation Contour Area Incremental Storage Incremental Stora a Accumulative Storage fmsl s ft 24.1 1 60,470 0.0 0 0 25.0 68,686 0.9 58,120 58,120 26.0 ( 72,071 1.9 70,379 128,499 27.0 75,513 2.9 73,792 202,291 28.0 79,611 3.9 77,562 279,853 Page 2 of 4 Wet Detention Basin Design Sheet Savannah Lakes Phase 3C Stormwater Pond #7 Designed Temporary Pool Elevation, DTPE....................................... 2589 [fmsl] Surface Area at Temporary Pool Elevation ........................................ 71,699 [sf] Provided Temporary Storage Volume, PTSV..................................... 120,757 [cf] Temporary Vol. Provided (cf) = 120,757 > 47,188 = Min Temporary Volume (cf) OK Forebay Sizing Calculations Forebay 7A Drainage Area Ratio, FBR7A = 0.211 [unitless] [170,000 sf- (170,000 sf+ 637,000 sf)] Forebay 7B Drainage Area Ratio, FBR7B = 0.789 [%] (1- FBR7A) = (1- 0.211) Forebay-7A Permanent Volume = 13,743 [cf] Forebay-7B Permanent Volume = 48,107 [cf] Total Forebay Permanent Volume = 61,850 [cf] (13,743 cf+48,107 cf) Main Pond Permanent Volume = 250,734 [cf] Vperm_pool = 312,584 [cf] (13,743 cf+48,107 cf+250,734 cf) Minimum Total Forebay Volume = (18%)*(Vperm_pool) Minimum Total Forebay Volume = (18%)*(312,584 cf Minimum Total Forebay Volume = F 56,265 [cf] Maximum Total Forebay Volume = (22%)*(Vperm_pool) Maximum Total Forebay Volume = 22% * 312 584 cf Maximum Total Forebay Volume = 1 68,768 [cf] Min Total Forebay Volume = 56,265 of < 61,850 < Max Total Forebay Volume = 68,768 d OK Minimum Forebay 7A Volume = (18%)*(FBR-7A)*(Vperm_pool) Minimum Forebay 7A Volume = (18%)* 21.1% *(312,584 cQ Minimum Forebay 7A Volume = 1 11,853 1 [cf] Maximum Forebay 7A Volume= (22%)*(FBR-7A)*(Vperm_pool) Maximum Forebay 7A Volume = (22% *(21.1% * 312,584 cf) Maximum Forebay 7A Volume = 14,487 [cf] Min Forbay 7A Volume=11,853 of < 13,743 < Max Forebay 7A Volume=14,487 of OK Minimum Forebay 7B Volume = (18%)*(FBR-7B)*(Total Permanent Volume) Minimum Forebay 7B Volume = 18% "(78.9%)*(312,5B4cf) Minimum Forebay B Volume = 1 44,412 [cf] Maximum Forebay 7B Volume = (22%)*(FBR-7B)*(Total Permanent Volume) Maximum Forebay 7B Volume = (22%)* 78.9% *(312,584cf) Maximum Forebay 7B Volume = 1 54,282 [cf] Min Forebay 7B Volume = 44,412 d < 48,107 < Max Forebay 78 Volume = 54,282 cf OK Page 3 of 4 Wet Detention Basin Design Sheet Savannah Lakes Phase X Stormwater Pond #7 Drawdown Orifice Sizing Calculations Orifice Diameter, D = 3 0 [in] Orifice Coefficient, Cd = 0.6 = [unitless] Ao = 0.25*p*(D)2 Ao = 0.78540*(3in 12in/ft)A2 Ao = 0.049 1 [sf] Qorifice = Cd*Ao*(2g*Havg)040 Qorifice =(0.6)*(0.049sf)*(64.4fpss*0.56ft)A0.5 Qorifice = 0.176 [cFs] Havg = (DTPE - PPE - D/2) / 3 Havg= (25.89ft-24.1ft-0.50*3in/12in/ft)/3 Havg = O.Sfi [ft] tdd = MTSV / Qorifice tdd = ( 47,188cf / 0.176cfs) / 86,400sec/day tdd = 3.10 [days] Min Drawdown Time = 2,.0 days < 3.10 5.0 days = Max Drawdown Time OK Page 4 of 4 Savannah lakes Phase 3C Wet Detention Basin 7 !eater Quantit;/ Calculations r Hydraflow Table of Contents Wet Detetion Basin 7 Routing - 2017.gpw Hydraflow Hydrographs by Intelisolve v9.2 Tuesday, Apr 4, 2017 Watershed Model Schematic........................................................................... 1 Hydrograph Return Period Recap................................................................... 2 1 -Year SummaryReport............................................................................................................... 3 HydrographReports......................................................................................................... 4 Hydrograph No. 1, SCS Runoff, Forebay-7A PreCon.................................................... 4 TR-55 Tc Worksheet.................................................................................................. 5 Hydrograph No. 2, SCS Runoff, Forebay-713 PreCon.................................................... 6 TR-55 Tc Worksheet.................................................................................................. 7 Hydrograph No. 3, SCS Runoff, Main Pond PreCon...................................................... 8 TR-55 Tc Worksheet.................................................................................................. 9 Hydrograph No. 4, Combine, Site PreCon Discharge .................................................. 10 Hydrograph No. 6, SCS Runoff, Foreba%/-7A PostCon................................................. 11 TR-55 Tc Worksheet................................................................................................ 12 Hydrograph No. 7, SCS Runoff, Forebay-713 PostCon................................................. 13 TR-55 Tc Worksheet................................................................................................ 14 Hydrograph No. 8, SCS Runoff, Main fond PostCon .................................................. 1 TR-55 Tc Worksheet................................................................................................ 16 Hydrograph No. 9, Reservoir, Forebay-713 Discharge .................................................. 17 PondReport - Forebay-713 ....................................................................................... 18 Hydrograph No. 10, Combine, Main Pond Influent....................................................... 19 Hydrograph No. 11, Reservoir, Main Pond Discharge .................................................. 20 Pond Report - Main Pond + Forebay-7A.................................................................. 21 10 -Year SummaryReport ............................................................................................................. 22 HydrographReports....................................................................................................... 23 Hydrograph No. 1, SCS Runoff, Forebay-7A PreCon.................................................. 23 Hydrograph No. 2, SCS Runoff, Forebay-713 PreCon.................................................. 24 Hydrograph No. 3, SCS Runoff, Main Pond PreCon.................................................... 25 Hydrograph No. 4, Combine, Site PreCon Discharge .................................................. 26 Hydrograph No. 6, SCS Runoff, Forebay-7A PostCon................................................. 27 Hydrograph No. 7, SCS Runoff, Forebay-713 PostCon......... :....................................... 28 Hydrograph No. 8, SCS Runoff, Main Pond PostCon.................................................. 29 Hydrograph No. 9, Reservoir, Forebay-713 Discharge .................................................. 30 Hydrograph No. 10, Combine, Main Pond Influent....................................................... 31 Hydrograph No. 11, Reservoir, Main Pond Discharge .................................................. 32 100 -Year SummaryReport............................................................................................................. 33 N Hydrograph Reports....................................................................................................... 34 JG Hydrograph No. 1, SCS Runoff, Forebay-7A PreCon.................................................. 34 �s Hydrograph No. 2, SCS Runoff, Forebay-713 PreCon.................................................. 35 diC Hydrograph No. 3, SCS Runoff, Main Pond PreCon.................................................... 36 C � Hydrograph No. 4, Combine, Site PreCon Discharge .................................................. 37 Contents continued... Wet Detetion Basin 7 Routing - 2017.gpw Hydrograph No. 6, SCS Runoff, Forebay-7A PostCon................................................. 38 Hydrograph No. 7, SCS Runoff, Forebay-7B PostCon................................................. 39 Hydrograph No. 8, SCS Runoff, Main Pond PostCon.................................................. 40 Hydrograph No. 9, Reservoir, Forebay-7B Discharge .................................................. 41 Hydrograph No. 10, Combine, Main Pond influent ....................................................... 42 Hydrograph No. 11, Reservoir, Main Pond Discharge .................................................. 43 OFReport....................................................................................................... 44 I Watershed Model Schematic Legend Hvd. Origin Description 1 SCS Runoff Forebay-7A PreCon 2 SCS Runoff Forebay-713 PreCon 3 SCS Runoff Main Pond PreCon 4 Combine Site PreCon Discharge 6 SCS Runoff Forebay-7A PostCon 7 SCS Runoff Forebay-713 PostCon 8 SCS Runoff Main Pond PostCon 9 Reservoir Forebay-713 Discharge 10 Combine Main Pond Influent 11 Reservoir Main Pond Discharge Hydraflow Hydrographs by Intelisolve v9.2 n Pond PostCon - Main Pond Influent 11 Main Pond Discharge Project: Wet Detetion Basin 7 Routing - 2017.gpw Tuesday, Apr 4, 2017 Hydrograph Return Period Recap HydraflowHydrographsbylntelisolvev9.2 Hyd. Hydrograph Inflow Peak Outflow (cfs) Hydrograph No. type Hyd(s) description (origin) 1-Yr 2-Yr 3-Yr 5-Yr 10-Yr 25-Yr 50-Yr 100-Yr 1 SCS Runoff ------ 0.852 ------ ------ ---- 7.368 ----- ------ 19.01 Forebay-7A PreCon 2 SCS Runoff ------ 3.187 ------ ------ ----- 27.57 ------ ----- 71.13 Forebay-713 PreCon 3 SCS Runoff ------ 0.561 ----- ----- ---- -- 4.961 ------ ----- 12.81 Main Pond PreCon 4 Combine 1, 2, 3 4.594 --- ------ ---- -- 39.85 ----- --- --- 102.89 Site PreCon Discharge 6 SCS Runoff ----- 4.154 ----- ------- ----- 13.31 ----- ---- -- 26.17 Forebay-7A PostCon 7 SCS Runoff ----- 15.64 ----- ----- ---- 48.65 --- --- ---- 94.55 Forebay-7B PostCon 8 SCS Runoff ---- 4.036 ---- ----- ---- 11.49 ----- ----- 21.54 Main Pond PostCon 9 Reservoir 7 10.21 ----- ------- ----- 39.83 ------ ----- 81.12 Forebay-7113 Discharge 10 Combine 6, 8, 9 14.31 ----- ------ ----- 56.94 ------ ----- 112.48 Main Pond Influent 11 Reservoir 10 0.243 ----- ----- --- 12.01 ------ ---- 67.96 Main Pond Discharge Proj. file: Wet Detetion Basin 7 Routing - 2017.gpw Tuesday, Apr 4, 2017 Hydrograph Summary Report Hydraflow Hydrographs by Intelisolve v9.2 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph description 1 SCS Runoff 0.852 1 737 5,806 ---- I ------ -- Forebay-7A PreCon 2 SCS Runoff 3.187 1 737 21,726 -- ----- -- Forebay-7B PreCon 3 SCS Runoff 0.561 1 735 3,777 ---- ------ Main Pond PreCon 4 Combine 4.594 1 737 31,309 1 2,3 -- -- Site PreCon Discharge 6 SCS Runoff 4.154 1 732 18,017 -- Forebay-7A PostCon 7 SCS Runoff 15.64 1 733 69,048 --- ------ Forebay-713 PostCon 8 SCS Runoff 4.036 1 726 13,166 --- --- Main Pond PostCon 9 Reservoir 10.21 1 747 56,799 7 26.53 61,331 Forebay-713 Discharge 10 Combine 14.31 1 745 87,981 6, 8, 9 ----- ----- Main Pond Influent 11 Reservoir 0.243 1 1463 28,752 10 25.28 376,151 Main Pond Discharge Wet Detetion Basin 7 Routing - 2017.gpw Return Period: 1 Year Tuesday, Apr 4, 2017 Hydrograph Report 4 Hydraflow Hydrographs by Intelisolve v9.2 Hyd. No. 1 Forebay-7A PreCon Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 1 min Drainage area = 3.910 ac Basin Slope = 0.0 % Tc method = TR55 Total precip. = 3.70 in Storm duration = 24 hrs Composite (Area/CN) = [(3.710 x 55) + (0.200 x 30)] / 3.910 Forebay-7A PreCon Tuesday, Apr 4, 2017 Peak discharge = 0.852 cfs Time to peak = 737 min Hyd. volume = 5,806 cuft Curve number = 55* Hydraulic length = 0 ft Time of conc. (Tc) = 11.90 min Distribution = Type III Shape factor = 484 Q (cfs) Hyd. No. 1 -- 1 Year Q (cfs) 1.00 1.00 0.90 0.90 0.80 0.80 0.70 0.70 0.60 0.60 0.50 0.50 0.40 0.40 ti 0.30 — 0.30 f�. 0.20 + 0.20 0.10 0.10 t 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) TR55 Tc Worksheet r� Y Hyd. No. 1 Forebay-7A PreCon Hydraflow Hydrographs by Intelisolve v9.2 Description A B C Totals Sheet Flow Manning's n-value = 0.240 0.011 0.011 Flow length (ft) = 50.0 0.0 0.0 Two-year 24-hr precip. (in) = 4.31 0.00 0.00 Land slope (%) = 1.00 0.00 0.00 Travel Time (min) = 9.32 + 0.00 + 0.00 = 9.32 Shallow Concentrated Flow Flow length (ft) = 250.00 0.00 0.00 Watercourse slope 1%) = 1.00 0.00 0.00 Surface description = Unpaved Paved Paved Average velocity (ft/s) = 1.61 0.00 0.00 Travel Time (min) = 2.58 + 0.00 + 0.00 Channel Flow X sectional flow area (sqft) = 0.00 0.00 0.00 Wetted perimeter (ft) = 0.00 0.00 0.00 Channel slope (%) = 0.00 0.00 0.00 Manning's n-value = 0.015 0.015 0.015 Velocity (ft/s) = 0.00 0.00 0.00 Flow length (ft) = 0.0 0.0 0.0 Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00 Total Travel Time, Tc.............................................................................. 11.90 min Hydrograph Report 6 Hydraflow Hydrographs by Intelisolve v9.2 Hyd. No. 2 Forebay-713 PreCon Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 1 min Drainage area = 14.630 ac Basin Slope = 0.0 % Tc method = TR55 Total precip. = 3.70 in Storm duration = 24 hrs * Composite (Area/CN) = [(7.120 x 55) + (7.510 x 30)] / 14.630 Q (cfs) 3.00 2.00 1.00 Forebay-713 PreCon Hyd. No. 2 -- 1 Year 120 240 360 480 600 720 840 Hyd No. 2 Tuesday, Apr 4, 2017 Peak discharge = 3.187 cfs Time to peak = 737 min Hyd. volume = 21,726 cuft Curve number = 55* Hydraulic length = 0 ft Time of conc. (Tc) = 12.00 min Distribution = Type III Shape factor = 484 Q (cfs) 4.00 3.00 2.00 1.00 0.00 960 1080 1200 1320 1440 1560 Time (min) TR55 Tc Worksheet 7 Hyd. No. 2 Forebay-713 PreCon Hydraflow Hydrographs by Intelisolve v9.2 Description A B C Totals Sheet Flow Manning's n-value = 0.240 0.011 0.011 Flow length (ft) = 50.0 0.0 0.0 Two-year 24-hr precip. (in) = 4.31 0.00 0.00 Land slope (%) = 1.00 0.00 0.00 Travel Time (min) = 9.32 + 0.00 + 0.00 = 9.32 Shallow Concentrated Flow Flow length (ft) = 255.00 0.00 0.00 Watercourse slope (%) = 1.00 0.00 0.00 Surface description = Unpaved Paved Paved Average velocity (ft/s) = 1.61 0.00 0.00 Travel Time (rain) = 2.63 + 0.00 + 0.00 = 2.63 Channel Flow X sectional flow area (sqft) = 0.00 0.00 0.00 Wetted perimeter (ft) = 0.00 0.00 0.00 Channel slope (%) = 0.00 0.00 0.00 Manning's n-value = 0.015 0.015 0.015 Velocity (ft/s) = 0.00 0.00 0.00 Flow length (ft) = 0.0 0.0 0.0 Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00 Total Travel Time, Tc.............................................................................. 12.00 min Hydrograph Report 8 Hydraflow Hydrographs by Intelisolve v9.2 Hyd. No. 3 Main Pond PreCon Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 1 min Drainage area = 2.460 ac Basin Slope = 0.0 % Tc method = TR55 Total precip. = 3.70 in Storm duration = 24 hrs Main Pond PreCon Tuesday, Apr 4, 2017 Peak discharge = 0.561 cfs Time to peak = 735 min Hyd. volume = 3,777 cuft Curve number = 55 Hydraulic length = 0 ft Time of conc. (Tc) = 10.50 min Distribution = Type III Shape factor = 484 Q (ofs) Hyd. No. 3 --1 Year Q (cfs) 1.00 1.00 0.90 0.90 0.80 0.80 0.70 0.70 0.60 0.60 0.50 0.50 0.4U 0.40 0.30 0.30 0.20 0.20 0.10 _`'i► 0.10 -._.�.... s. 1� L _ I;. 0.00 —•-- r - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 - , Hyd No. 3 Time (min) TR55 Tc Worksheet 9 Hyd. No. 3 Main Pond PreCon Hydraflow Hydrographs by Intelisolve v9.2 Description A B C Totals Sheet Flow Manning's n-value = 0.240 0.011 0.011 Flow length (ft) = 50.0 0.0 0.0 Two-year 24-hr precip. (in) = 4.31 0.00 0.00 Land slope (%) = 1.00 0.00 0.00 Travel Time (min) = 9.32 + 0.00 + 0.00 = 9.32 Shallow Concentrated Flow Flow length (ft) = 115.00 0.00 0.00 Watercourse slope 1%1 = 1.0C 0.00 0.00 Surface description = Unpaved Paved Paved Average velocity (ft/s) = 1.61 0.00 0.00 Travel Time (min) = 1.19 + 0.00 + 0.00 = 1.19 Channel Flow . X sectional flow area (sqft) = 0.00 0.00 0.00 Wetted perimeter (ft) = 0.00 0.00 0.00 Channel slope (%) = 0.00 0.00 0.00 Manning's n-value = 0.015 0.015 0.015 Velocity (ft/s) = 0.00 0.00 0.00 Flow length (ft) = 0.0 0.0 0.0 Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00 Total Travel Time, Tc.............................................................................. 10.50 min Hydrograph Report W Hydraflow Hydrographs by Intelisolve v9.2 Hyd. No. 4 Site PreCon Discharge Hydrograph type = Combine Storm frequency = 1 yrs Time interval = 1 min Inflow hyds. = 1, 2, 3 4.00 3.00 2.00 M Site PreCon Discharge Hyd. No. 4 -- 1 Year 120 240 360 480 600 720 Hyd No. 4 > Hyd No. 1 Tuesday, Apr 4, 2017 Peak discharge = 4.594 cfs Time to peak = 737 min Hyd. volume = 31,309 cuft Contrib. drain. area-- 21.000 ac Q (cfs) 5.00 4.00 MIN 2.00 1.00 0.00 840 960 1080 1200 1320 1440 1560 Hyd No. 2 - Hyd No. 3 Time (min) Hydrograph Report 11 Hydraflow Hydrographs by Intelisolve v9.2 Hyd. No. 6 Forebay-7A PostCon Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 1 min Drainage area = 3.910 ac Basin Slope = 0.0 % Tc method = TR55 Total precip. = 3.70 in Storm duration = 24 hrs * Composite (Area/CN) = [(0.980 x 98) + (0.450 x 98) + (2.500 x 61) + (0.130 x 39)] / 3.910 Q (cfs) 4.00 3.00 2.OU 1.00 M 120 240 Hyd No. 6 Forebay-7A PostCon Hyd. No. 6 — 1 Year Tuesday, Apr 4, 2017 Peak discharge = 4.154 cfs Time to peak = 732 min Hyd. volume = 18,017 cuft Curve number = 72* Hydraulic length = 0 ft Time of conc. (Tc) = 16.70 min Distribution = Type III Shape factor = 484 Q (cfs) 5.00 4.00 3.00 01 M 1.00 0.00 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) TR55 Tc Worksheet 12 Hydraflow Hydrographs by Intelisolve v9.2 Hyd. No. 6 Forebay-7A PostCon Description A B C Totals Sheet Flow Manning's n-value = 0.240 0.011 0.011 Flow length (ft) = 100.0 0.0 0.0 Two-year 24-hr precip. (in) = 4.31 0.00 0.00 Land slope (%) = 2.00 0.00 0.00 Travel Time (min) = 12.30 + 0.00 + 0.00 = 12.30 Shallow Concentrated Flow Flow length (ft) = 20.00 0.00 0.00 Watercourse a slope (%) = 1.00 0.00 0.00 Surface description = Unpaved Paved Paved Average velocity (ft/s) = 1.61 0.00 0.00 Travei T ime (min) = 0.21 + 0.00 + 0.00 = 0.21 Channel Flow X sectional flow area (sqft) = 0.24 0.00 0.00 Wetted perimeter (ft) = 4.78 0.00 0.00 Channel slope (%) = 0.50 0.00 0.00 Manning's n-value = 0.015 0.015 0.015 Velocity (ft/s) = 0.95 0.00 0.00 Flow length (ft) = 240.0 0.0 0.0 Travel Time (min) = 4.23 + 0.00 + 0.00 = 4.23 Total Travel Time, Tc.............................................................................. 16.70 min Hydrograph Report 13 Hydraflow Hydrographs by Intelisolve v9.2 Hyd. No. 7 Forebay-713 PostCon Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 1 min Drainage area = 14.620 ac Basin Slope = 0.0 % Tc method = TR55 Total precip. = 3.70 in Storm duration = 24 hrs Tuesday, Apr 4, 2017 Peak discharge = 15.64 cfs Time to peak = 733 min Hyd. volume = 69,048 cuff Curve number = 73* Hydraulic length = 0 ft Time of conc. (Tc) = 18.40 min Distribution = Type III Shape factor = 484 * Composite (Area/CN) = ((0.840 x 98) + (4.870 x 98) + (1.630 x 98) + (4.020 x 61) + (3.810 x 39)] / 14.620 Forebay-71B PostCon Hyd. No. 7 --,1 Year 1i"1111 12.00 • E@ . E 3.00 Q (cfs) 18.00 15.00 12.00 alb] MR 3.00 0.00 -J - 1 . I .-I ! 1 I I I_ I I I°- _ x. - I- 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 7 Time (min) TR55 Tc Worksheet 14 Hyd. No. 7 Forebay-713 PostCon Hydraflow Hydrographs by Intelisolve v9.2 Description A B C Totals Sheet Flow Manning's n-value = 0.240 0.011 0.011 Flow length (ft) = 100.0 0.0 0.0 Two-year 24-hr precip. (in) = 4.31 0.00 0.00 Land slope (%) = 2.00 0.00 0.00 Travel Time (min) = 12.30 + 0.00 + 0.00 = 12.30 Shallow Concentrated Flow Flow length (ft) = 145.00 0.00 0.00 Watercourse slope (%) = 1.00 0.00 0.00 Surface description = Unpaved Paved Paved Average velocity (ft/s) = 1.61 0.00 0.00 Travel Time (min) = 1i.50 + 0.00 + 0u.00 = 'i.5�i Channel Flow X sectional flow area (sqft) = 0.24 3.14 0.00 Wetted perimeter (ft) = 4.78 6.28 0.00 Channel slope (%) = 0.50 0.35 0.00 Manning's n-value = 0.015 0.015 0.015 Velocity (ft/s) = 0.95 3.69 0.00 Flow length (ft) = 135.0 500.0 0.0 Travel Time (min) = 2.38 + 2.26 + 0.00 = 4.63 TotalTravel Time, Tc.............................................................................. 18.40 min Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.2 Hyd. No. 8 Main Pond PostCon Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 1 min Drainage area = 2.460 ac Basin Slope = 0.0 % Tc method = TR55 Total precip. = 3.70 in Storm duration = 24 hrs Composite (Area/CN) = [(0.530 x 98) + (0.180 x 61) + (0.700 x 39)] / 2.460 G �S 3.00 2.00 ` e I] M Main Pond PostCon Hyd. No. 8 --1 Year 15 Tuesday, Apr 4, 2017 Peak discharge = 4.036 cfs Time to peak = 726 min Hyd. volume = 13,166 cuft Curve number = 76* Hydraulic length = 0 ft Time of conc. (Tc) = 7.80 min Distribution = Type III Shape factor = 484 Q (cfs) 5.00 Mile] 3.00 99 1.00 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 = Hyd No. 8 Time (min) TR55 Tc Worksheet 16 Hyd. No. 8 Main Pond PostCon Hydraflow Hydrographs by Intelisolve v9.2 Description A B C Totals Sheet Flow Manning's n-value = 0.240 0.011 0.011 Flow length (ft) = 100.0 0.0 0.0 Two-year 24-hr precip. (in) = 4.31 0.00 0.00 Land slope (%) = 10.00 0.00 0.00 Travel Time (min) = 6.46 + 0.00 + 0.00 = 6.46 Shallow Concentrated Flow Flow length (ft) = 90.00 0.00 0.00 Watercourse slopo (°%) = 0.50 0.00 0.00 Surface description = Unpaved Paved Paved Average velocity (ft/s) = 1.14 0.00 0.00 Travei Time (min) = 1.31 + 0.00 + 0.00 = 1.31 Channel Flow X sectional flow area (sqft) = 0.00 0.00 0.00 Wetted perimeter (ft) = 0.00 0.00 0.00 Channel slope (%) = 0.00 0.00 0.00 Manning's n-value = 0.015 0.015 0.015 Velocity (ft/s) = 0.00 0.00 0.00 Flow length (ft) = 0.0 0.0 0.0 Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00 Total Travel Time, Tc.............................................................................. 7.80 min Hydrograph Report 17 Hydraflow Hydrographs by Intelisolve v9.2 Tuesday, Apr 4, 2017 Hyd. No. 9 Forebay-713 Discharge Hydrograph type = Reservoir Peak discharge = 10.21 cfs Storm frequency = 1 yrs Time to peak = 747 min Time interval = 1 min Hyd. volume = 56,799 cuft Inflow hyd. No. = 7 - Forebay-713 PostCon Max. Elevation = 26.53 ft Reservoir name = Forebay-713 Max. Storage = 61,331 cuft Storage Indication method used. Wet pond routing start elevation = 25.00 ft Q (cfs) 18.00 15.00 12.00 -M M 3.00 w Forebay-713 Discharge Hyd. No. 9 -- 1 Year 120 240 360 480 600 720 Hyd No. 9 -- - Hyd No. 7 Q (cfs) 18.00 15.00 12.00 M . es cm 0.00 840 960 1080 1200 1320 1440 1560 Total storage used = 61,331 cuff Time (min) Pond Report 1$ Hydraflow Hydrographs by Intelisolve v9.2 Tuesday, Apr 4, 2017 Pond No. 1 - Forebay-713 Pond Data Contours - User -defined contour areas. Average end area method used for volume calculation. Begining Elevation = 20.00 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (cuft) Total storage (cult) 0.00 20.00 5,322 0 0 1.00 21.00 6,416 5,869 5,869 2.00 22.00 7,667 7,042 12,911 3.00 23.00 8,944 8,306 21,216 4.00 24.00 10,254 9,599 30,815 5.00 25.00 11,572 10,913 41,728 6.00 26.00 12,924 12,248 53,976 7.00 27.00 14,999 13,962 67,938 8.00 28.00 17,349 16,174 84,112 9.00 29.00 19,254 18,302 102,413 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise (in) = 30.00 0.00 0.00 0.00 Crest Len (ft) = 8.00 10.00 0.00 0.00 Span (in) = 30.00 0.00 0.00 0.00 Crest El. (ft) = 26.00 27.70 0.00 0.00 No. Barrels = 1 0 0 0 Weir Coeff. = 3.33 3.00 3.33 3.33 Invert El. (ft) = 21.89 0.00 0.00 0.00 Weir Type = Rect Broad - -- Length (ft) = 205.00 0.00 0.00 0.00 Multi -Stage = Yes No No No Slope (%) = 0.24 0.00 0.00 n/a N-Value = .011 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfii.(in/hr) = 0.000 (by Contour) Multi -Stage = n/a No No No TW Elev. (ft) = 0.00 Stage (ft) 10.00 8.00 6.00 4.00 2.00 0.00 Note: Culvert/Orifice, outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (a) Stage / Discharge Elev (ft) 30.00 28.00 26.00 24.00 22.00 20 00 0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 80.00 90.00 100.00 Total Q Discharge (cfs) r Hydrograph Report 19 Hydraflow Hydrographs by Intelisolve v9.2 Hyd. No. 10 Main Pond Influent Hydrograph type = Combine Storm frequency = 1 yrs Time interval = 1 min Inflow hyds. = 6, 8, 9 12.00 M 6.00 well] Main Pond Influent Hyd. No. 10 — 1 Year Tuesday, Apr 4, 2017 Peak discharge = 14.31 cfs Time to peak = 745 min Hyd. volume = 87,981 cuft Contrib. drain. area-- 6.370 ac Q (cfs) 15.00 12.00 Me M 3.00 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 10 a- Hyd No. 6 — Hyd No. 8 — Hyd No. 9 Hydrograph Report 20 Hydraflow Hydrographs by Intelisolve v9.2 Hyd. No. 11 Main Pond. Discharge Hydrograph type = Reservoir Peak discharge Storm frequency = 1 yrs Time to peak Time interval = 1 min Hyd. volume Inflow hyd. No. = 10 - Main Pond Influent Max. Elevation Reservoir name = Main Pond + Forebay-7A Max. Storage Storage Indication method used. Wet pond routing start elevation = 24.10 ft. Q (cfs) 15.00 12.00 M 6.00 3.00 0.00 - - - -- 0 300 - , Hyd No. 11 Main Pond Discharge Hyd. No. 11 -- 1 Year 600 900 1200 Hyd No. 10 Tuesday, Apr 4, 2017 = 0.243 cfs = 1463 min = 28,752 cuft = 25.28 ft = 376,151 cult 1500 1800 2100 2400 2700 �� Total storage used = 376,151 cuft Q (cfs) — 15.00 12.00 M . 11 3.00 —1 0.00 3000 Time (min) Pond Report 21 Hydraflow Hydrographs by Intelisolve v9.2 Tuesday, Apr 4, 2017 Pond No. 2 - Main Pond + Forebay-7A Pond Data Contours - User -defined contour areas. Average end area method used for volume calculation. Begining Elevation = 17.00 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (cult) Total storage (cuft) 0.00 17.00 28,722 0 0 1.00 18.00 31,590 30,156 30,156 2.00 19.00 34,542 33,066 63,222 3.00 20.00 37,578 36,060 99,282 4.00 21.00 44,091 40,835 140,117 5.00 22.00 48,096 46,094 186,210 6.00 23.00 52,285 50,191 236,401 7.00 24.00 58,994 55,640 292,040 7.10 24.10 60,470 5,973 298,013 8.00 25.00 68,686 58,120 356,133 9.00 26.00 72,071 70,379 426,512 10.00 27.00 75,513 73,792 500,304 11.00 28.00 79,611 77,562 577,866 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrPRsr] [A] [B] [C] [D] Rise (in) = 36.00 3.00 0.00 0.00 Crest Len (ft) = 16.00 25.00 0.00 0.00 Span (in) = 36.00 3.00 0.00 0.00 Crest El. (ft) = 25.89 26.90 0.00 0.00 No. Barrels = 1 1 0 0 Weir Coeff. = 3.33 3.00 3.33 3.33 Invert El. (ft) = 22.00 24.10 0.00 0.00 Weir Type = Rect Broad -- -•- Length (ft) = 75.00 1.00 0.00 0.00 Multi -Stage = Yes No No No Slope (%) = 1.53 1.00 0.00 n/a N-Value = .011 .011 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000 (by Contour) Multi -Stage = n/a Yes No No TW Elev. (ft) = 24.00 Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). Stage (ft) Stage / Discharge Elev (ft) 12.00 10.00 8.00 6.00 4.00 2.00 000 29.00 27.00 25.00 23.00 21.00 19.00 17 00 0.0 900 40.0 sn n an n Inn n f 9n n 140.0 160.0 Total Q Discharge (cfs) 22 Hydrograph Summary Report HydraflowHydrographsbylntelisolvev9.2 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Hyd. volume (cult) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph description F21 SCS Runoff 7.368 1 730 29,674 -- — — Forebay-7A PreCon SCS Runoff 27.57 1 730 111,029 --- — — Forebay-713 PreCon 3 SCS Runoff 4.961 1 729 19,304 --- --- Main Pond PreCon 4 Combine 39.85 1 730 160,007 1, 2, 3 - — — — Site PreCon Discharge 6 SCS Runoff 13.31 1 731 55,026 ---- ------ Forebay-7A PostCon 7 SCS Runoff 48.65 1 732 206,474 -- ----- Forebay-76 PostCon 8 SCS Runoff 11.49 1 726 37,067 --- — — - -- Main Pond PostCon 9 Reservoir 39.83 1 741 194,224 7 27.49 75,866 Forebay-76 Discharge 10 Combine 56.94 1 733 286,317 6, 8, 9 --- ------ Main Pond Influent 11 Reservoir 12.01 1 782 188,445 10 26.25 445,094 Main Pond Discharge Wet Detetion Basin 7 Routing - 2017.gp I Return Period: 10 Year Tuesday, Apr 4, 2017 Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.2 Hyd. No. 1 Forebay-7A PreCon Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 1 min Drainage area = 3.910 ac Basin Slope = 0.0 % Tc method = TR55 Total precip. = 7.00 in Storm duration = 24 hrs 23 Tuesday, Apr 4, 2017 Peak discharge = 7.368 cfs Time to peak = 730 min Hyd. volume = 29,674 cuft Curve number = 55* Hydraulic length = 0 ft Time of conc. (Tc) = 11.90 min Distribution = Type III Shape factor = 484 *Composite (Area/CN) [(3.710 x 55) + (0.200 x 30)] / 3.910 Q (cfs) 8.00 4.00 r M 0.00 0 Forebay-7A PreCon Hyd. No. 1 -- 10 Year 1 120 240 360 480 600 720 840 Hyd No. 1 Q (cfs) 8.00 .,, 4.00 2.00 0.00 960 1080 1200 1320 1440 1560 Time (min) 24 Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.2 Hyd. No. 2 Forebay-713 PreCon Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 1 min Drainage area = 14.630 ac Basin Slope = 0.0 % Tc method = TR55 Total precip. = 7.00 in Storm duration = 24 hrs * Composite (Area/CN) = [(7.120 x 55) + (7.510 x 30)] / 14.630 Q (cfs) 28.00 24.00 20.00 16.00 12.00 M 4.00 M Forebay-71B PreCon Hyd. No. 2 -- 10 Year 120 240 360 480 600 720 • Hyd No. 2 Tuesday, Apr 4, 2017 Peak discharge = 27.57 cfs Time to peak = 730 min Hyd. volume = 111,029 cuft Curve number = 55* Hydraulic length = 0 ft Time of conc. (Tc) = 12.00 min Distribution = Type III Shape factor = 484 Q (cfs) 28.00 24.00 20.00 16.00 WA1111 ff 4.00 0.00 840 960 1080 1200 1320 1440 1560 Time (min) 25 Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.2 Hyd. No. 3 Main Pond PreCon Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 1 min Drainage area = 2.460 ac Basin Slope = 0.0 % Tc method = TR55 Total precip. = 7.00 in Storm duration = 24 hrs 4.00 3.00 2.00 1.00 M Main Pond PreCon Hyd. No. 3 — 10 Year 120 240 360 480 600 Hyd No. 3 Tuesday, Apr 4, 2017 Peak discharge = 4.961 cfs Time to peak = 729 min Hyd. volume = 19,304 tuft Curve number = 55 Hydraulic length = 0 ft Time of cons. (Tc) = 10.50 min Distribution = Type III Shape factor = 484 Q (cfs) 5.00 4.00 3.00 2.00 ii9elf, 0.00 720 840 960 1080 1200 1320 1440 1560 Time (min) Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.2 Hyd. No. 4 Site PreCon Discharge Hydrograph type = Combine Storm frequency = 10 yrs Time interval = 1 min Inflow hyds. = 1, 2, 3 Q (cfs) 40.00 30.00 20.00 10.00 0.00 0 120 240 360 480 600 •---• Hyd No. 4 - , Hyd No. 1 Site PreCon Discharge Hyd. No. 4 --10 Year 26 Tuesday, Apr 4, 2017 Peak discharge = 39.85 cfs Time to peak = 730 min Hyd. volume = 160,007 cuft Contrib. drain. area-- 21.000 ac Q (cfs) 40.00 10.00 0.00 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 2 e Hyd No. 3 Time (min) Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.2 Hyd. No. 6 Forebay-7A PostCon Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 1 min Drainage area = 3.910 ac Basin Slope = 0.0 % Tc method = TR55 Total precip. = 7.00 in Storm duration = 24 hrs 'Composite (Area/CN) [(0.980 x 98) + (0.450 x 98) + (2.500 x 61) + (0.130 x 39)] / 3.910 Q (cfs) 14.00 12.00 IDue 81 M M 4.00 2.00 M Forebay-7A PostCon Hyd. No. 6 -- 10 Year `A Tuesday, Apr 4, 2017 Peak discharge = 13.31 cfs Time to peak = 731 min Hyd. volume = 55,026 cuft Curve number = 72* Hydraulic length = 0 ft Time of conc. (Tc) = 16.70 min Distribution = Type III Shape factor = 484 Q (cfs) 14.00 12.00 10.00 IS 6.00 2.00 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 6 Time (min) Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.2 Hyd. No. 7 Forebay-713 PostCon Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 1 min Drainage area = 14.620 ac Basin Slope = 0.0 % Tc method = TR55 Total precip. = 7.00 in Storm duration = 24 hrs 28 Tuesday, Apr 4, 2017 Peak discharge = 48.65 cfs Time to peak = 732 min Hyd. volume = 206,474 cuft Curve number = 73* Hydraulic length = 0 ft Time of conc. (Tc) = 18.40 min Distribution = Type III Shape factor = 484 " Composite (Area/CN) = [(0.840 x 98) + (4.870 x 98) + (1.630 x 98) + (4.020 x 61) + (3.810 x 39)] / 14.620 40.00 30.00 20.00 11111iff M Forebay-713 PostCon Hyd. No. 7 --10 Year 120 240 360 480 600 Hyd No. 7 Q (cfs) 50.00 40.00 30.00 20.00 10.00 0.00 720 840 960 1080 1200 1320 1440 1560 Time (min) Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.2 Hyd. No. 8 Main Pond PostCon Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 1 min Drainage area = 2.460 ac Basin Slope = 0.0 % Tc method = TR55 Total precip. = 7.00 in Storm duration = 24 hrs * Composite (Area/CN) = [(0.630 x 98) + (0.180 x 61) + (0.700 x 39)] / 2.460 Q (cfs) 12.00 10.00 N. Me . 11 4.00 O4Z1 Main Pond PostCon Hyd. No. 8 — 10 Year 29 Tuesday, Apr 4, 2017 Peak discharge = 11.49 cfs Time to peak = 726 min Hyd. volume = 37,067 cuft Curve number = 76* Hydraulic length = 0 ft Time of conc. (Tc) = 7.80 min Distribution = Type III Shape factor = 484 Q (cfs) 12.00 10.00 MR We] 4.00 2.00 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 -- Hyd No. 8 Time (min) Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.2 Hyd. No. 9 Forebay-713 Discharge Hydrograph type = Reservoir Storm frequency = 10 yrs Time interval = 1 min Inflow hyd. No. = 7 - Forebay-76 PostCon Reservoir name = Forebay-7B Storage Indication method used. Wet pond routing start elevation = 25.00 ft. 40.00 30.00 20.00 10.00 0.00 0 120 240 Hyd No. 9 Forebay-713 Discharge Hyd. No. 9 — 10 Year 360 480 600 720 ..---. Hyd No. 7 Peak discharge Time to peak Hyd. volume Max. Elevation Max. Storage Tuesday, Apr 4, 2017 = 39.83 cfs = 741 min = 194,224 cult = 27.49 ft = 75,866 cuft Q (cfs) 50.00 40.00 41 11 10.00 0.00 840 960 1080 1200 1320 1440 1560 I ! Total storage used = 75,866 cuff Time (min) 31 Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.2 Hyd. No. 10 Main Pond Influent Hydrograph type = Combine Storm frequency = 10 yrs Time interval = 1 min Inflow hyds. = 6, 8, 9 Main Pond Influent Tuesday, Apr 4, 2017 Peak discharge = 56.94 cfs Time to peak = 733 min Hyd. volume = 286,317 cuft Contrib. drain. area-- 6.370 ac Q (cfs) Q (cfs) Hyd. No. 10 -- 10 Year 60.00 - 7--- 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 — 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 10 1 Hyd No. 6 Hyd No. 8 — Hyd No. 9 32 Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.2 Hyd. No. 11 Main Pond Discharge Hydrograph type = Reservoir Storm frequency = 10 yrs Time interval = 1 min Inflow hyd. No. = 10 - Main Pond Influent Reservoir name = Main Pond + Forebay-7A Storage Indication method used. Wet pond routing start elevation = 24.10 ft 50.00 40.00 30.00 20.00 10.00 0.00 0 300 • - Hyd No. 11 Main Pond Discharge Hyd. No. 11 --10 Year Tuesday, Apr 4, 2017 Peak discharge = 12.01 cfs Time to peak = 782 min Hyd. volume = 188,445 cuft Max. Elevation = 26.25 ft Max. Storage = 445,094 cuft 600 900 1200 1500 1800 2100 2400 2700 - Hyd No. 10 Total storage used = 445,094 cuft Q (cfs) 60.00 50.00 40.00 30.00 20.00 WillIll 0.00 3000 Time (min) 44 Hydraflow Rainfall Report Hydraflow Hydrographs by Intelisolve v9.2 Return Period Intensity -Duration -Frequency Equation Coefficients (FHA) (Yrs) d D E (NIA) 1 69.6992 12.1000 0.8722 2 89.3980 13.0000 0.8845 ------- 3 0.0000 0.0000 0.0000 -------- 5 86.1922 12.5000 0.8284 10 85.7989 12.1000 0.7942 ----- -- 25 77.6009 10.8000 0.7356 - 50 71.2072 9.8000 0.6903 -- - 100 67.3968 9.0000 0.6544 ----- File name: SLP3C NOAAAltas-14 PPE,IDF Intensity = B / (Tc + D)^E Tuesday, Apr 4, 2017 Return Period (Yrs) Intensity (in/hr) 5 min 10 15 20 25 30 35 40 45 50 55 I 60 1 5.86 4.68 3.92 3.38 2.98 2.67 2.42 2.22 2.05 1.90 1.78 1.67 2 6.93 5.58 4.69 4.06 3.58 3.21 2.91 2.67 2.46 2.29 2.14 2.01 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5 8.05 6.54 5.54 4.82 4.28 3.86 3.52 3.24 3.00 2.80 2.63 2.48 10 9.00 7.34 6.24 5.46 4.86 4.40 4.02 3.71 3.45 3.23 3.04 2.87 25 10.19 8.32 7.10 6.23 5.58 5.07 4.66 4.31 4.03 3.78 3.57 3.38 50 11.09 9.07 7.76 6.84 6.14 5.60 5.16 4.80 4.49 4.23 4.00 3.80 100 11.98 9.81 8.42 7.44 6.71 6.13 5.66 5.28 4.95 4.68 4.43 4.22 Tc = time in minutes. Values may exceed 60. Precio- file name- SLP3C NOAAAtlas-14 PPF Estimate-nco Storm Rainfall Precipitation Table (in) Distribution 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 60-yr 100-yr SCS 24-hour 3.70 4.31 0.00 5.57 7.00 8.27 9.67 11.20 SCS 6-Hr 2.58 3.13 0.00 3.97 4.73 5.81 6.76 7.80 Huff -1st 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-2nd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-3rd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-4th 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-Indy 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Custom 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Savannah Lakes Phase 3C Wet Detention Basin 7 Outlet Calculations Inlet Report Hydraflow Express by Intelisolve Forebay 713 Primary Spillway Riser -10 year Drop Curb Inlet Location = Sag Curb Length (ft) = 8.00 Throat Height (in) = 21.00 Grate Area (sgft) = -0- Grate Width (ft) = -0- Grate Length (ft) = -0- Gutter Slope, Sw (ft/ft) = 100.000 Slope, Sx (ft/ft) = 100.000 Local Depr (in) = -0- Gutter Width (ft) = -0- f%-3utter Slope (%) = -0- Gutter n-value = -0- AD dmemiux n F.k zoo Wednesday, Mar 8 2017, 10:51 AM Calculations Compute by: Known Q Q (cfs) = 38.20 Highlighted Q Total (cfs) = 38.20 Q Capt (cfs) = 38.20 Q Bypass (cfs) = -0- Depth at Inlet (in) = 16.38 Efficiency (%) = 100 Gutter Spread (ft) = 0.01 Gutter Vel (ft/s) = -0- Bypass Spread (ft) = -0- Bypass Depth (in) = -0- Culvert Report Hydraflow Express by Intelisolve Forebay 7B Primary Spillway Barrel -10 year Invert Elev Dn (ft) = 21.40 Pipe Length (ft) = 205.00 Slope (%) = 0.24 Invert Elev Up (ft) = 21.89 Rise (in) = 36.0 Shape = Cir Span (in) = 36.0 No. Barrels = 1 n-Value = 0.011 Inlet Edge = Sq Edge Coeff. K,M,c,Y,k = 0.0098, 2, 0.0398, 0.67, 0.5 Embankment Top Elevation (ft) = 27.70 Top Width (ft) = 4.00 Crest Width (ft) = 4.00 Wednesday, Mar 8 2017, 11:18 AM Calculations Qmin (cfs) Qmax (cfs) Tailwater Elev (ft) Highlighted Qtotal (cfs) Qpipe (cfs) Qovertop (cfs) Veloc Dn (ft/s) Veloc Up (ft/s) HGL Dn (ft) HGL Up (ft) Hw Eiev (i ) Hw/D (ft) Flow Regime i = 0.00 = 38.20 = 26.32 = 38.20 = 38.20 = 0.00 = 5.41 = 5.40 = 26.32 = 26.80 27. = 1.71 = Outlet Control Weir Report Hydraflow Express by Intelisolve Wednesday, Mar 8 2017, 11:00 AM Forebay 713 Emergency Spillway Nappe -100 year Trapezoidal Weir Highlighted Crest = Sharp Depth (ft) = 1.30 Bottom Length (ft) = 20.00 Q (cfs) = 98.10 Total Depth (ft) = 1.30 Area (sqft) = 29.38 Side Slope (z:1) = 2.00 Velocity (ft/s) = 3.34 Top Width (ft) = 25.20 Calculations Weir Coeff. Cw = 3.00 Compute by: Known Q Known Q (cfs) = 98.10 Depth (ft) 2.00 1.50 1.00 0.50 we -0.50 Forebay 713 Emergency Spillway Nappe -100 year 0 5 10 15 20 25 30 35 40 Weir W.S. Depth (ft) 2.00 1.50 1.00 0.50 J m -0.50 45 Length (ft) RIP RAP APRON DESIGN SHEET DATE: Merch 6, 2017 11:14 AM PROJECT: Savannah Lakes Phase 3C I.D. NO.: PROJECT NO.: 310-04 FILE: DESCRIPTION: Forebay 76 Emergency Spillway Nappe LOCATION: Rip Rap Zone Delineation 25 20 7 15 O 10 v 5 Brunswick County, Norlh Caro01a 0 I I I I I l0 I I I I l l I I I I I II 5 10 15 20 25 Do, Depth of Flow (ft.) Notes 1. Use next Naher mne for aradw>10%. 2. For pipe arch, arch, box wiverL pamd channel outlet, Ice Do=Croes sectional area or outlet fk w. Number of Culverts: 1 Design Velocity, Vd : 3.34 the Flow, 0: 98.10 ft. Pipe Diameter, Do: 5.42 R Slope, S.—= 0 am Using NCDOT Rip Rap Apron Design: Use: Zone 2 LI: 16.26 ft. L2: 32.52 ft. W: 11.9 ft. W: 18.4 ft. CLASS'B' RIP RAP USE MINIMUM 18" STONE THICKNESS TOTAL STONE VOLUME= 290.8 ft3 898.9 fe ■ Design Point eBaSed upon L1 "Based upon L2 SHEET 1 OF 1 DESIGN BY: JRC CHECKED BY: JBP MINIMUM CLASS L.l L, STONE NCDOTRIP OF Coefficient Coefficient THICKNESS ZONE RAP CLASS STONE ft) (ft.) fin. 1 'A' FINE 3 4 12 2 'B' LIGHT 3 8 16 9 1 MEDIUM 4 8 24 4 1 HEAW 4 8 36 5 2 HEAVY 5 10 1: 8 2 HEAW 5 10 38 7 De ' n s B d the 3w a aF TN. Method L1 -LBn0h to Protect CJveA L2 =LemM tc Prevent Scour Hale NAME WEIGHT SIZE SPECIFICATIONS I LB'I RIP -RAP CLASS 1 5-200 30% SHALL WEIGH AT LEAST SO LBS. EACH. NO MORE THAN. 10% SHALL WEIGH LESS THAN 15 LBS. EACH CLASS 2 25-250 60% SHALL WEIGH AT LEAST 60 LBS. EACH. NO MORE THAN 5% SHALL WEIGH LESS THAN 50 LBS. EACH EROSION CONTROL STONE CLASS A 28' 10% TOP & BOTTOM SIZES. NO GRADATION SPECIFIED CLASS B . 1"00_ 5-15. NO GRADATION SPECIFIED Channel Report Hydraflow Express by Intelisolve Wednesday, Mar 8 2017, 11:20 AM Forebay 7B Emergency Spillway Slope -100 year Trapezoidal Highlighted Botom Width (ft) = 20.00 Depth (ft) = 1.08 Side Slope (z:1) = 2.00 Q (cfs) = 98.10 Total Depth (ft) = 1.30 Area (sqft) = 23.93 Invert Elev (ft) = 27.70 Velocity (ft/s) = 4.10 Slope (%) = 1.00 Wetted Perim (ft) = 24.83 N-Value = 0.035 Crit Depth, Yc (ft) = 0.89 Top Width (ft) = 24.32 Calculations EGL (ft) = 1.34 Compute by: Known Q Known Q (cfs) = 98.10 Elev (ft) Section 30.00 29.50 28.50 F.111I11 27.50 27.00 5 10 15 20 Reach (ft) 25 30 35 40 Depth (ft) 2.30 1.80 1.30 1 :1 0.30 -0.20 -n 7n RIP RAP APRON DESIGN SHEET DATE: March 9, 2017 11:15 AM SHEET 1 OF 1 PROJECT: Savannah Lakes Phase X I.D. NO.: DESIGN BY: JRC PROJECT NO.: 310-D4 FILE: CHECKED BY: JBP DESCRIPTION: Forebay 7B Emergency SpilWay Slope LOCATION: Brunswick Courity, North C—Irt. Rip Rap Zone Delineation 25 20 N ZO qE N Z NE7 15 .r z N s ■ Design Point 3 O 10 yZONE ZONE 4 5 O E1 0 0 5 10 15 20 25 Do, Depth of Flow (ft.) Nobs 1. Use nod Npher =a far grades>10%. 2. For pipe arch, arch, box cuNerL paved channel outlets, use Dross seadohvl area or outlet flow. Number at Culverts: I Design Velocity, Vd : 4.1 fUs Flow, Q : 9B.10 R Pipe Diameter, Do: 4.119 ft Slope, segrm 0.01 ft-AL Using NCDOT Rip Rap Apron Design: USO: Zono 2 Lf: 14.67 ft. L2: 29.34 ft. W: 10.8 ft. W: 16.6 fi. CLASS'B' RIP RAP USE MINIMUM 18" STONE THICKNESS TOTAL STONE VOLUME= 23F.7 fi3 731.7 ft' 'Based upon Li 'Based upon L2 MINIMUM CLASS L1 L1 STONE NCDOT RIP OF Coefficient Coefficient THICKNESS ZONE RAP CLASS STONE R.) (fU in. 1 'A' FINE 3 4 12 2 S' LIGHT 3 6 1s 3 1 MEDIUM 4 B 24 4 1 HEAVY 4 B 36 5 2 HEAVY5 10 36 6 2 HEAVY 5 to 38 7 Dec o Be d the Seo a of This Msftd L1 =L.Am to Protect Culvert L2 -LenpM to Preverd Swur Hole NAME WEIGHT SIZE SPECIFICATIONS tLSSI RIP -RAP CLASS 1 5,2DD 3D%SHALL WEIGH AT LEAST 60 LBS. EACH. NO MORE THAN 10% SHALL WEIGH LESS THAN 15 LBS. EACH CLASS 2 25-250 SO%SHALL WEIGH AT LEAST 80 U.S. EACH. NO MORE THAN 5% SHALL WEIGH LESS THAN 50 LES. EACH EROSION CONTROL STONE CLASS A 2-e" 10%TOP 6 BOTTOM SIZES. NO GRADATION SPECIFIED CLASS B 15-300 5-15' NO GRADATION SPECIFIED Inlet Report Hydraflow Express by Intelisolve Pond 7 Primary Spillway Riser -10 year Drop Curb Inlet Location = Sag Curb Length (ft) = 16.00 Throat Height (in) = 12.00 Grate Area (sqft) = -0- Grate Width (ft) = -0- Grate Length (ft) = -0- Gutter Slope, Sw (ft/ft) = 100.000 Slope, Sx (ft/ft) = 100.000 Local Depr (in) = -0- Gutter Width (ft) = -0- Gutter Slope (%) = -0- Gutter n-value = -0- ainfek Wednesday, Mar 8 2017, 10:48 AM Calculations Compute by: Known Q Q (cfs) = 11.74 Highlighted Q Total (cfs) = 11.74 Q Capt (cfs) = 11.74 Q Bypass (cfs) = -0- Depth at Inlet (in) = 4.67 Efficiency (%) = 100 Gutter Spread (ft) = 0.00 Gutter Vel (ft/s) = -0- Bypass Spread (ft) = -0- Bypass Depth (in) _ -0- Culvert Report Hydraflow Express by Intelisolve Pond 7 Primary Spillway Barrel -10 year Invert Elev Dn (ft) = 20.85 Pipe Length (ft) = 75.00 Slope (%) = 1.53 Invert Elev Up (ft) = 22.00 Rise (in) = 36.0 Shape = Cir Span (in) = 36.0 No. Barrels = 1 n-Value = 0.011 Inlet Edge = Sq Edge Coeff. K,M,c,Y,k = 0.0098, 2, 0.0398, 0.67, 0.5 Embankment Top Elevation (ft) = 25.89 Top Width (ft) = 5.00 Crest Width (ft) = 5.00 Wednesday, Mar 8 2017, 10:41 AM Calculations Qmin (cfs) = 0.00 Qmax (cfs) = 11.74 Tailwater Elev (ft) = (dc+D)/2 Highlighted Qtotal (cfs) Qpipe (cfs) Qovertop (cfs) Veloc Dn (ft/s) Veloc Up (fUs) HGL Dn (ft) HGL Up (ft) Hw Elev (ft) Hw/D (ft) Flow Regime = 11.74 = 11.74 = 0.00 = 2.29 = 5.05 = 22.90 = 23.09 = 23.51 = 0.50 = Inlet Control RIP RAP APRON DESIGN SHEET DATE: March a, 2017 10:46 AM SHEET 1 PROJECT: Savannah Lakes Phase 3C I.D. NO.: DESIGN BY: JRC PROJECT NO.: 310-04 FILE CHECKED BY: JBP DESCRIPTION: Main Pond 7 Primary SpllMey Outlet LOCATION: Brunswick County, North Carolina Rip Rap Zone Delineation 25 20 ZO E Z NE 7 15 Z N 5 ■ Design Point O 10 y E 5 ZONE O ER 0 0 5 10 15 20 25 Do, Depth of Flow (ft.) Net.: 1. Use nextMaher mne fir prad-10%. 2 For pipe arch, arch, bm culvert, pawed chemel outlets, use Da=Crass aeedonal ame of out tllm Number of Culverts: 1 Design Velocity, Vd : 2.2e We Flow, Q : 11.74 It Pipe Diameter, Do : 3 R Slope, Smon= 0.0153 RflL Using NCDOT Rip Rap Apron Design: Use: Zone 1 L1: 9 ft. L2: 12 ft. W: 6.6 ft. W: 7.8 ft. CLASS'A' RIP RAP USE MINIMUM 12" STONE THICKNESS TOTAL STONE VOLUME= 59.4 ft3 'Based upon L1 93.6 ft" 'Based upon L2 MINIMUM CLASS Lt Lt STONE NCDOT RIP OF Coeftlerd Coefficient THICKNESS ZONE RAP CLASS STONE M.1 In. 1 'A' FINE 9 4 12 2 B, LIGHT 3 6 16 3 1 MEDIUM 4 a 24 4 1 HEAVY 4 8 38 5 2 HEAW 5 10 36 6 2 HEAW 5 10 38 7 1 Desim Is BevwAlhe Scope of This Method L7=Lenatlr to Protect Culvert L2 =LanAth to Prevent Scour Hale NAME I WEIGHT SIZE SPECIFlCATONS (Les RIP -RAP CLASS I 5-200 �3.- SHALL WEIGH AT LEAST.. IBS. EACH. NO MORE THAN 10%SHALL WEIGH LESS THAN 15 LBS. EACH CLASS 2 25-250 60% SHALL WEIGH AT LEAST SO LBS. EACH. NO MORE THAN 5% SHALL WEIGH LESS THAN 50 LBS. EACH EROSION CONTROLS ONE CLASS A 28' 1o%TOP a BOTTOM SIZES. NO GRADATION SPECIFIED CLASS B 1"00 5-15' NO GRADATION SPECIFIED Weir Report Hydraflow Express by Intelisolve Pond 7 Emergency Spillway Nappe -100 year Trapezoidal Weir Crest = Sharp Bottom Length (ft) = 25.00 Total Depth (ft) = 1.30 Side Slope (z:1) = 2.00 Calculations Weir Coeff. Cw = 3.00 Compute by: Known Q Known Q (cfs) = 116.00 Depth (ft) 2.00 1.50 1.00 0.50 AM -0.50 0 5 10 15 Weir I , W.S. Wednesday, Mar 8 2017, 10:28 AM Highlighted Depth (ft) = 1.27 Q (cfs) = 116.00 Area (sqft) = 34.98 Velocity (ft/s) = 3.32 Top Width (ft) = 30.08 Pond 7 Emergency Spillway Nappe -100 year 20 25 30 35 40 Depth (ft) 2.00 1.50 1.00 0.50 Ma -0.50 45 50 Length (ft) RIP RAP APRON DESIGN SHEET DATE March B. 2017 10:33 AM SHEET i OF 1 PROJECT: Savannah Lakes Phase 3C I.D. NO.: DESIGN BY: JRC PROJECT NO.: 310-04 FILE: CHECKED SY: JBP DESCRIPTION: Mein Pond 7 Emergency Spillway Nappe LOCATION: Bmusick County, North Carolina Rip Rap Zone Delineation 25 20 gZO ZONE 7 N 15 f z w 5 ■ Design Point C� O 10 'v OI E 5 JZC E4 �OJE 1 0 0 5 10 15 20 25 Do, Depth of Flow (ft.) Notes: 1. Use next Noher zone for wades>10%. 2. For pipe arch, arch, box alert, paved chmnel outlets, use De --Cross secdond area o1 oubsttlow. Number of Culverts: 1 Design Velocity, Vd : 3.32 ILra Flow, O : 116.00 R Pipe Diameter, Do: 5001 R Slope, se.—= 0 tLflL Using NCDOT Rip Rap Apron Design: Use: lone 2 Lt: 17.73 ft. 1-2: 35.46 ft. W: 13.0 ft. W: 20.1 ft. CLASS W RIP RAP USE MINIMUM 18" STONE THICKNESS TOTAL STONE VOLUME= 345.8 ft3 *Based upon Lt 1068.8 ft 'Based upon L2 MINIMUM CLASS Lt Lt STONE NCDOT RIP OF Coefficient CoerBolerlt THICKNESS ZONE RAP CLASS STONE ft. (in. 1 'A' FINE 3 4 12 2 .1 LIGHT 3 6 18 3 1 MEDIUM 4 S 24 4 1 HEAVY 4 8 38 5 2 HEAVY 5 10 36 8 2 HEAVY 5 10 3fi 7 Desin is Boyand the Scope of This Method LI =Lenpbi to Protect CMvart L2=lanplh to Preverd Scour Hole NAME I WEIGHT SIZE SPECIFICATIONS ILBSI RIP -RAP CLASS 1 5-2W 30% SHALLWEIGH AT LEAST e0 LBS. EACH. NO MORE THAN 10% SHALL WEIGH LESS THAN 15 LBS. EACH CLASS 2 2&250 00% SHALL WEIGH AT LEAST 80 LBS. EACH. NO MORE THAN 5%SHALL WEIGH LESS THAN 50 LBS. EACH EROSION CONTROL STONE GLASS A 2-e" 10%TOP & BOTTOM SIZES. NO GRADATION SPECIFIED CLA68 B 15-300 5_15" NO GRADATION SPECIFIED Channel Report Hydraflow Express by Intelisolve Pond 7 Emergency Spillway Slope -100 year Trapezoidal Botom Width (ft) = 25.00 Side Slope (z:1) = 2.00 Total Depth (ft) = 1.30 Invert Elev (ft) = 26.90 Slope (%) = 1.00 N-Value = 0.035 Calculations Compute by: Known Q Known Q (cfs) = 116.00 Elev (ft) Section 29.00 28.50 28.00 27.50 27.00 26.50 26.00 Wednesday, Mar 8 2017, 10:30 AM Highlighted Depth (ft) = 1.05 Q (cfs) = 116.00 Area (sqft) = 28.45 Velocity (fUs) = 4.08 Wetted Perim (ft) = 29.70 Crit Depth, Yc (ft) = 0.86 Top Width (ft) = 29.20 EGL (ft) = 1.31 t cy a SV 5 10 15 20 25 30 35 40 45 Reach (ft) Depth (ft) 2.10 1.60 1.10 we -0.40 RIP RAP APRON DESIGN SHEET DATE: March a, 2017 11:18 AM SHEET 1 OF 1 PROJECT: Savannah Lakes Phase X I.D. NO.: DESIGN BY: JRC PROJECT NO.: 310-04 FILE: CHECKED BY: JBP DESCRIPTION: Mein Pond 7 Emergency Spillway Slope LOCATION: Brunsvdok County, North Carolina Rip Rap Zone Delineation 25 20 ZO E 9 ZONE 7 15 ZONES ■Design Point C1 O 10 v O E ZCNE4 5 O E1 INI 0 0 5 10 15 20 25 Do. Depth of Flow (ft) Note. 1. Use nest higher zone for Grades >1D%. 2. For pipe arch, arch, box culvert, pawed channel uullels, use De --Cross sectonal area of outiet1m. Number of Culverts: 1 Design Velocity, Vd : 4.08 8Js Flow, Q : 11e.00 it Pipe Diameter, Do: 5.45 R Slope, seer,,,= 0.01 1tAt Using NCDOT Rip Rap Apron Design: Use: Zone 2 L7: 16.35 ft. L2: 32.7 ft. W: 12.0 ft. W: 18.5 ft. CLASS W RIP RAP USE MINIMUM 18" STONE THICKNESS TOTAL STONE VOLUME= 294.1 ft' 'Based upon L1 908.9 ft 'Based upon L2 MINIMUM CLASS L1 L1 STONE NCDOT RIP OF Coelflclent Coefficient THICKNESS ZONE RAP CLASS STONE ft. n. 1 'A FINE 3 4 12 2 'B' LIGHT 3 6 18 3 1 MEDIUM 4 e 24 4 1 HEAVY 4 B 3e 5 2 HEAVY 5 10 38 8 2 HEAVY 5 10 36 7 1 Desim is Beyond the Sco a of This Melhod L7 =Lenael to Protect Culvert L2 =.enpth tc Prevent Scow Hole NAME WEIGHT SIZE SPECIFICATIONS I LBS RIP -RAP CLASS 5-200 30%SHALL WEIGH AT LEAST So LBS. EACH. NO MORE THAN 10% SHALL WEIGH LESS THAN 15 LBS. EACH CLASS 2 25-250 BOY. SHALL WEIGH AT LEAST 60 LBS. EACH. NO MORE THAN 5% SHALLWEIGH LESS AW 50 LB THS. EACH OS O CO RO STONE CLASS A 2B' 10%TOP a BOTTOM SIZES. NO GRADATION SPECIFIED CLAS6 B 15-300 5.15'. NO GRADATION SPECIFIED Express Stormwater Design Narrative Modification to State Stormwater Permit: SW8 051203-MOD For Savannah lakes at the Meadowlands Phase 3B and 3C Calabash, Brunswick County, NC Prepared for: Meadowlands Golf Club, Inc. PO Box 4159 Calabash, NC 28467 Prepared by: Coastal Laud Deslan. PLLC Civil Engineering / Landscape Architecture Land Planning / Construction Management P.O. Box 1172 (910) 254 - 9333 Wilmington, NC 28402 (910) 254 - 0502 www.cidenq.com April 18, 2017 � .Pn s. CFI b ,=.EIVE APR 18 201? BY: Project Modification Preface Savannah Lakes Phase 3 is composed of three phases (3A, 313, and 3C) and was designed and permitted as by Thomas & Hutton Engineering Co. under State stormwater permit SW8 051203-MOD (permitted 1/28/2008). In 2015, Coastal Land Design, PLLC (CLD) was contracted by the Meadowlands Golf Course, Inc. to: • modify the road grades and piping infrastructure in Phase 3B to eliminate one of the two forebays in Pond 6 (formerly Lake 6); • adjust the site development plans for Phase 3C to eliminate excess piping and pond excavation after the declassification of an existing on -site borrow pit as Waters of the State; and, • apply for and update the State and County stormwater permits, accordingly. In late 2015 and through the middle of 2016, CLD issued several sets of submittals based upon the State's requests for additional information related to the proposed modifications. Since Phase 3B was already constructed at the time of the resubmittal, the State agreed to waive the new stormwater buffer setbacks if it could be proven that the stormwater ponds in the new submittal were not located any closer to surface waters (Shingletree Swamp Canal) than previously permitted. Through the review process, it was also noted that some of the rear drainage from the lots within Phase 1 that abuts Phase 3B was not being captured in Pond 6 (Phase 313) as previously permitted. This presented at challenge at the time since there was no stormwater drainage infrastructure was installed to capture this runoff. The wet detention basin in Phase 3C (Pond 7, previously permitted as Lakes 8A and 813), has two forebays with one significantly oversized for use as a rear -lot amenity feature. This oversizing resulted in a forebay volume that did not meet the State's requirement of 18-22% of the total pond volume. After several requests for additional information, the State issued a Project Return letter dated July 14, 2016 due some of the outstanding items not being able to be addressed. Those items identified in the letter are provided below: • Demonstration that the ponds are not located any closer to surface waters (Shingletree Swamp Canal) than previously permitted; • -I-op of bank and water levels for Shingletree Swamp Canal need to be delineated on the plans and the appropriate buffers illustrated in the vicinity of the lots and BMP features; • The common area between Phase 1 and Phase 3B was not shown to be include an easement granted in favor of the party responsibly for the operation and maintenance of the stormwater system; • The previously designed Swale Detention Area did not meet the minimum design requirements for sediment removal efficiency as the State compared it's functionality more to a dry detention basin than a wet detention basin; • An operation and maintenance agreement for the Swale Detention Area was not provided; • The forebay sizing for Pond 7 did not meet the State's requirements; and, • Additional grading information was requested. Current Project Modification This resubmittal is for Phase 3B and Phase 3C and addresses all of the aforementioned requests for additional information that were left unresolved in the previous review cycle. On December 12, 2016, Thompkins Land Surveying, PA (L-2851) surveyed the existing top of bank of Shingletree Swamp Canal along Phase 3B and Phase 3C, the top of pond and riser elevations for Pond 6 and Pond 7, and provided topographical information in the vicinity of the previously proposed Swale Detention Area. Thompkins Land Surveying, PA also provided CLD an updated as -built of Phase 3B. In January, 2017, CLD acquired digital copies of the previously permitted design plans by Thomas & Hutton Engineering Co. for use as an underlay to compare top of pond locations. Based upon these two additional sources of information the following actions were taken: • Savannah Lakes Phase 313 (Pond 6, formerly Lake 6 by others) o The previously permitted land plan for Phase 313 and Lake 6 was overlaid on top of the proposed land plan for Phase 3B and Pond 6. As shown on Sheet SW-D1 of the revised plan set, the existing top of bank for Pond 6 is not located any closer to surface waters than previously permitted. o There is sufficient hydraulic grade and access within the Common Space to pipe the former Swale Detention Area along the rear and side of lot 259 into the forebay of Pond 6. The Swale Detention Area was removed from this plan. The Common Space is in ownership. by Meadowlands Golf Club which is also the responsible party for operation and maintenance of Pond #6. The common space directly abuts the right of way for Chickweed Court and provides sufficient access width to perform maintenance on the new pipe system. • Savannah Lakes Phase 3C (Pond 7, formerly Lake 8A and 8B by others) o The existing top of pond (former borrow pit) was located closer to surface waters than the previously permitted Lake 8A so grading activities are proposed to push in the north side of the existing pond to be outside of the setback (equal to the same distance away from Shingletree Swamp Canal the previously permitted Lake 8A). Please refer to Sheet SW-D2 in the revised plan set. o The size of the main pond section was expanded to provide additional site fill and to allow the combination of the attached forebay (Forebay 7A) and the oversized detached forebay (Forebay 71311 to be within 18-22% of the total pond volume. Each forebay is also proportionally sized to their respective drainage basins. o The buildable area footprints for the Lots that abut the Shingletree Swamp Canal have been moved back to ensure no built upon area is within the 50' surface water setback. The BUA from the bridge crossing over Shingletree Swamp Canal is captured in the curb and gutter and directed to the.stormwater system. o Additional grading contours are provided on the plan, similar to as shown for Phase 3B. A full submittal with the revised application, supplemental forms, and other pertinent documentation for this modification is provided with this modification. Project Modification Overview The permit modifications to Phase 36 are summarized below: Design Criteria Existing Permit Modification Lake #6 Pond #i6 a. Drainage Area, acres Onsite, ft2 Offsite, ft2 4.96 216,058 None 6.022 262,300 None b. Total Impervious Surfaces, ft2 (1) Buildings, ft2 (2) Roads/Parking, ft2 (3) Other (Sidewalk), ft2 (4) Other (Phase 1), ft2 (5)Future (6) Offsite, ft2 97,203 69,760 27,443 0 0 0 0 130,840 80,000 27,450 6,580 9,810 7,000 0 c. Design Storm, inches 1.0 1.5 d. Pond Depth, feet 5.0 4.15 e. TSS Removal Efficiency 90 _ 90 f. Permanent Pool Elev., FMSL 25.00 24.00 g. Perm. Pool Surface Area, ft2 13,939 12,375 h. Permitted Storage Volume, ft3 8,768 16,462 i. *Temp. Storage Elevation, FMSL 25.59 25.15 j. Controlling Weir, Ht x L, in 7.13 x 1.5 2" Diameter k. Permitted Forebay Volume, ft3 10,147 8,073 I. Receiving Stream/River Basin Shingletree Swamp Shingletree Swamp m. Stream Index Number Lumber Lumber n. Classification of Waterbody LBR57 15-23-2 LBR5715-23-2 o. Max. Fountain Horsepower, HP 1/6 1/6 * Additional storage volume is provided to meet Brunswick County's pre- and post -development discharge requirements. The permit modifications to Phase 3C are summarized below: Design Criteria Existing Permit Modification * Lake #8A *Lake #8 B Pond #7 a. Drainage Area, acres Onsite, ft2 Offsite, ft2 8.05 350,658 None 6.95 302,742 None 20.989 914,300 None b. Total Impervious Surfaces, ft2 (1) Buildings, ft2 (2) Roads/Parking, ft2 (3) Other, ft2 (4) Future, ft2 (5) Offsite, ft2 127,396 86,896 40,500 0 0 0 135,972 95,472 40,500 0 0 0 368,655 248,000 90,655 0 30,000 0 c. Design Storm, inches 1.5 1.5 1.5 d. Pond Depth, feet 9 (4.9 avg) 8 (3.5 avg) 4.64 e. TSS Removal Efficiency 90 90 90 f. Permanent Pool Elev., FMSL 25.0 25.0 24.10 g. Perm. Pool Surface Area, ft2 20,455 17,224 73,394 h. Permitted Storage Volume, ft3 17,574 18,770 120,757 i. **Temp. Storage Elevation, fmsl 25.81 25.99 25.89 j. Controlling Weir, Ht x L, in 10.0 x 2.0 12.0 x 2.0 3" Diameter k. Permitted Forebay Volume, ft3 20,342 13,063 61,850 I. Receiving Stream/River Basin Shingletree Swamp Shingletree Swamp m. Stream Index Number LBR5715-23-2 LBR5715-23-2 n. Classification of Waterbody C; Sw C; SW o. Max. Fountain Horsepower, HP 1/3 1/4 1/4 * In the existing permit, the Lake 7 area (interconnection lake) was combined with the lake areas for Pond #8A and Pond #86 since there were designed as outfalling ponds. ** Additional storage volume is provided to meet Brunswick County's pre- and post -development discharge requirements. Phase 3B Stormwater System Drainage System This section uses a combination of reinforced concrete and corrugated plastic pipe to convey stormwater drainage to wet detention basin 6 (Pond 6). Reinforced concrete pipe is planned to be used under the roadways and corrugated plastic pipe is planned to be used elsewhere. The proposed drainage systems were analyzed using Hydraflow Storm Sewers-2008 by InteliSOLVE modeling software. The system was designed for the 10-year design storm event according to the NOAA Atlas-14 rainfall estimates for this area. A tailwater elevation of 25.15 fmsl (temporary pool) was assumed and the pipes were designed such that the hydraulic grade line remained within the curb inlets for the 10-year storm event. The curb inlets were located per NCDOT guidelines such that the gutter spread does not cover half of the lane width (5.5ft) for the 4 inch per hour (in/hr) storm event. Wet Detention Basin 6 Water Quality The treatment system for this Phase is a wet detention basin designed to store over 1.5 inches of rainfall from a 6.022 acre drainage basin and provide a 90% reduction in total suspended solids with an average depth of 4.15 feet. The drainage area is designed to have 130,840 sf of total impervious surface subdivided into 20 lots at 4,000 sf/lot (80,000 sf), 27,450 sf of roadway, and 6,580 sf of sidewalk, 7,000 sf of future impervious, and 9,810 sf of impervious drainage from the rear of the lots in Phase 1 that abut Phase 3B. There are no changes to the previously approved and permitted deed restrictions of 4,000 sf / lot (by others). Water Quantity Wet Detention Basin 6 was modeled using "Hydraflow-Hydragragh" modeling software and incorporated the Type -III rainfall distribution for the 1-year 24-hour duration storm event and the 10- year 24-hour duration storm event as 3.7 inches and 7.0 inches, respectively (per Brunswick County design standards). The NOAA Atlas-14 rainfall estimate for the 100-year 24-hour storm event is 11.2 in/hr. The pre- and post -development discharges for the drainage area are provided below: Wet Detention Basin 6 1-year 24-hour 10-year 24-hour 100-yr 24-hour Pre -Development Discharge 3.73 cfs 14.7 cfs_ 31.4 cfs Post -Development Discharge 0.74 cfs 14.7 cfs _ 30.3 cfs Water Surface Elevation 25.22 fmsl 25.73 fmsl 26.02 fmsl Wet Detention Basin 6 reduces the post -development discharge for the 1-year 24-hour storm event and discharges less than a 5% increase in the 10-year 24-hour storm events. The wet detention basin meets the NCDENR stormwater requirements as well as Brunswick County's pre- and post -development requirements. Phase 3C Stormwater System Drainage System This section uses a combination of reinforced concrete and corrugated plastic pipe to convey stormwater drainage to wet detention basin 7. Reinforced concrete pipe is planned to be used under the roadways and corrugated plastic pipe is planned to be used elsewhere. The proposed drainage system was analyzed using Hydraflow Storm Sewers-2008 by InteliSOLVE modeling software. The system was designed for the 10-year storm designevent according to the NOAA Atlas-14 rainfall estimates for this area. A tailwater elevation of 25.89 fmsl (temporary pool) was assumed and the pipes were designed such that the hydraulic grade line remained within the curb inlets for the 10-year storm event. The curb inlets were located per NCDOT guidelines such that the gutter spread does not cover half of the lane width (5.5ft) for the 4 inch per hour (in/hr) storm event. Wet Detention Basin 7 Water Quality The treatment system for this Phase is a wet detention basin designed to store over 1.5 inches of rainfall from a 20.989 acre drainage basin and provide a 90% reduction in total suspended solids with an average depth of 4.64 feet. The drainage area is designed to have 368,655 sf of total impervious surface subdivided into 62 lots at 4,000 sf/lot (248,000 sf), 90,655 sf of roadway, and 30,000 sf of future allocation. Wet Detention Basin 7 has two forebays (7A and 713) that have been designed to be between 18-22% of the total pond volume and proportionally sized based upon their respective drainage basins. There are no changes to the previously approved and permitted deed restrictions of 4,000 sf / lot (by others). Water Quantity Wet Detention Basin 7 was modeled using "Hydraflow-Hydragragh" modeling software and incorporated the Type -III rainfall distribution for the 1-year 24-hour duration storm event and the 10- year 24-hour duration storm event as 3.7 inches and 7.0 inches, respectively (per Brunswick County design standards). The NOAA Atlas-14 rainfall estimate for the 100-year 24-hour storm event is 11.2 in/hr. The pre- and post -development discharges for the drainage area are provided below: Wet Detention Basin 7 1-year 24-hour 10-year 24-hour 100-yr 24-hour Pre -Development Discharge 4.59 cfs 39.8 cfs 103 cfs Post -Development Discharge 0.24 cfs 12.0 cfs 68.0 cfs Forebay 7B Water Surface Elev. 26.53 fmsl 27.49 fmsl 28.72 fmsl Main Pond Water Surface Elev. 25.28 fmsl 26.25 fmsl 27.18 fmsl Wet Detention Basin 7 reduces the post -development discharge for the 1-year 24-hour storm event and discharges less than a 5% increase in the 10-year 24-hour storm events. The wet detention basin meets the NCDENR stormwater requirements as well as Brunswick County's pre- and post -development requirements. Request for Additional Information Stormwater Project No. SW8 051203 Savannah Lakes at the Meadowlands Brunswick County 18-April-2017 Dear Christine Hall, ECEIVE APR 18 20V BY: On March 3, 2017, we had a scoping meeting for this project to ensure that we have addressed the outstanding requests for additional information for this project. After we walked through each request for additional information and we demonstrated how they were being addressed adequately, we were allowed to permit this project within the express stormwater system. Nothing has changed since our scoping meeting and we have progressed the plans and calculations accordingly. More details on the specifics of the Scope of Work for this project are provided in the Design Narrative, Design Calculations, and Design Plans included with this resubmittal. To aid in the review, we have included this supplemental letter that lists the return letter comments and how the each comment was addressed or satisfied. We discussed these steps and actions in our scoping meeting and we generalized the comments/actions below for simplicity. For ease, your request are repeated in normal font, and our responses are in bold font below each comment. 1. 15A NCAC 02H.1005(h)(5) and . 1 005(e): The location of the stormwater control measures in relation to the surface waters remains unresolved. As noted in Item 1 of the previous two requests for additional information, the proposed changes to the stormwater treatment system are considered a major modification to the stormwater permit. A major modification requires the site and the associated BMPs to be designed in accordance with the current State Stormwater requirements listed in 15A NCAC 02H.1005(a), which includes additional requirements for providing vegetated buffers along surface waters. As noted in the previous two requests for additional information, it was agreed that instead of requiring the proposed wet detention ponds to meet the requirements for the vegetated buffer, it may be demonstrated that this modification does not relocate the two ponds any closer to the surface waters than previously approved. Please note that the pond area is considered to be the water surface up to the top of the embankment. After the review of the response to Item 1 submitted on ?une 7, 2016. The following will need to be addressed in order for any future submittals to be approved: a. Pond 6 has been adequately demonstrated to have been designed within substantial intent of the previously approved distance to surface waters. Thank you. Please refer to plan sheet SW-D1 included with this resubmittal. b. Pond 7 and the provided justification regarding its relocation is not sufficient to approve its current configuration. The justification is based on the location of the previously approved outlet structure. However, the location of the outlet structure is clearly an error as the previously approved permanent pool area and pond area (up to the top of the embankment) arc shown to be setback from the canal casement. Pond 7 will either need to be reconfigured such that it is no closer than previously approved or it will need to be demonstrated that the existing pond area is not being expanded any closer to the surface waters. 310-05 NCDENR RFI Response 04182017 Page 1 of 4 The north bank of Pond 7 will be "pushed in" to ensure that it is not located any closer to surface waters than previously approved. Please refer to plan sheet SW-D2 included with this resubmittal. c. The newly proposed swale detention area appears to be located within 50-foot buffer. Based on the provided calculations, it appears this device is being compared to a wet detention pond. As noted above, wet detention ponds may not be located within 50-foot vegetated buffer. The design of this stormwater control measure will need to be reconsidered (please also refer to Items 4 and 6.b of this letter for additional concerns regarding this proposed measure). The "Swale Detention Area" has been removed from this project. The subject area will be piped directly into the Pond 6 forebay. Please refer to plan sheets SW-01, SW-02, and SW-D1 included with this resubmittal. 2. 15A NCAC 02H.1003(g)(5): The top of bank, normal pool elevation, or mean high water line of the surface waters and the corresponding 50-foot vegetated buffer does not appear to have been delineated on the plans. As requested in Item I of the previous two requests for additional information, the top of bank, normal pool elevation, or mean high water line of the surface waters must be delineated on the plans. Due to the additional lots along Road A within Phase 3C as well as the additional swale detention area stormwater control measure and the fact that these areas are considered a major modification and are subject to the new rules, the 50-foot vegetated buffer must be delineated with the vicinity of these new features. On December 12, 2016, we had the top of bank for Shingletree Swamp Canal along Phase 36 and 3C. Shingletree Canal Swamp is a drainage ditch and does not have a normal water level. The depth of drainage fluctuates based upon storm events and ranges from dry to an elevation two feet from the top of bank. We have included the top of bank and 30' and 50' offsets for the existing Phase 313 section, and the 50' offset for Phase 3C. The Phase 313 houses and roadway are constructed and the existing Pond 6 is not located any closer to surface waters than previously approved. We feel that the existing/permitted/approved 30' offset from the top of bank is applicable to Phase 313 since it is complete and constructed. We have moved all impervious drainage for Phase 3C out of the 50' top of bank offset since this section has not been built. Please refer to the plan set included with this response. 3. 15A NCAC 02H. I 003(g)(5) and 1008(c)(3): Upon review of the revised plans, the stormwater system behind lots 47 to 253 are only partially within a common area while the remaining area is not located within an easement. This common area does not appear to have an access casement to the nearest public right-of-way. In response to Item 4 of the previous request for additional information, it was noted that recording easements on already recorded lots would not be practical. The response also implies that this problem was discussed in our conversation and meeting on April 10, 2016. However, the discussions I recall from that meeting surrounded grading concerns and the ability to direct the water to Pond 6. Per the referenced sections in the rules, all stormwater features must be located within a recorded access casement to the nearest public right-of-way or common area. The easement shall be granted in favor of the party responsible for operation and maintaining the stormwater system. The common area between Phase 1 and Phase 313 is owned and operated by Meadowlands Golf Club which is also the responsible party for operation and maintenance of the stormwater system and Pond #6. The common space directly abuts the right of way for Chickweed Court and provides sufficient access width to perform maintenance activities on the pond and new piping system. 4. 15A NCAC 02H.1005(a)(3)(B) and .1008(h): During the meeting on April 10, 2016, it was discussed that the runoff from all impervious areas from a high density project must be collected and treated. During that 310-05 NCDENR RFI Response 04182017 Page 2 of 4 meeting it was also discussed that the grading along the rear of the lots within Phase I may not allow the runoff to be directed to Pond 6 as originally approved. During that discussion, it was agreed that if the runoff could not be directed to Pond 6, that an alternative design could be proposed, however that design had to meet the requirements of 15A NCAC 02H.1008(h). The previously submitted plans showed the area between Phase I and Phase 3B as being directed to a swale that would be directed to the collection system for Pond 6. Instead of directing the runoff to the stormwater collection system, the recently submitted and revised plans propose a "swale detention area", which would be considered an alternative stormwater control measure subject to I5A NCAC 02H.1008(h). In order for alternative designs to be approved the following must be provided: equal or better stormwater control, equal or better protection of waters of the state, and result in no increased potential for nuisance conditions. Per 15A NCAC 02H.I008(h), the following criteria must be provided in order to approve an alternative design: a. The stormwater management system shall provide 85% average annual removal of total suspended solids. b. The discharge rate from the system must either: i. The discharge rate following the 1.5-inch storm event shall be such that the runoff volume draws down to the pre -development design state within 2 to 5 days. ii. T he post -development discharge rate shall be no greater than the pre -development discharge rate for the one-year, 24-hour storm. As noted in Item Lc of this letter, it appears this device is being compared to a wet detention pond. However, upon review of the proposed "swale detention area", it appears that this feature more closely resembles a dry detention basin than a wet detention pond since several key features of a wet detention pond have not been provided. Please not that dry detention basins only achieve 50% average annual removal of total suspended solids. The stormwater management system proposed for this area must be reconsidered. If an alternative design is desired, it must be demonstrated that it achieves an 85% TSS removal rate either by a single measure or a series of measures as described in Section 3.9 of the NC BMP manual and that they outlet structure will continue to meet the two criteria listed above. The "Swale Detention Area" has been removed from this project. The subject area will be piped directly into the Pond 6 forebay. Please refer to plan sheets SW-01, SW-02, and SW-D1 included with this resubmittal. s. 15A NCAC 02H.1003(g)(8): The operation and maintenance agreement specific to the stormwater management system proposed for the additional drainage area discussed I Item Lc and 4 of this letter was not provided with the recently submitted items. Operation and maintenance agreements must be provided for all proposed stormwater control measures. The "Swale Detention Area" has been removed from this project. The subject area will be piped directly into the Pond 6 forebay. Please refer to plan sheets SW-01, SW-02, and SW-D1 included with this resubmittal. 6. 15A NCAC 02H.1003(g)(7): a. Upon review of the information presented in response to Item 3 of the previous request for additional information and consultation with other stormwater staff, it was determined that the entire total permanent pool volume must be used for sizing the forebays associated with Pond 7. As requested in Item 5.b of the request for additional information dated January 13, 2016, the permeant pool volume to be contained in Forebay 1 for Pond 7 must be based on the three areas contributing to the permanent pool surface area and volume (main pond, forebay 1 and forebay 2). 310-05 NCDENR RA Response 04182017 Page 3 of 4 The size of the main pond for Pond 7 was expanded to provide additional site fill and to allow the combination of the attached forebay (Forebay 7A) and the detached forebay (Forebay 713) to be within 18-22% of the total pond volume. Please refer to plan sheets SW-03, SW-04, SW - OS, and SW-D2, and the wet detention basin calculations for Pond 7 that are included with this resubmittal. b. For the additional drainage area currently being treated by the swale detention area, the following information must be provided. i. The additional drainage area and associated impervious area by be identified in the supplemental drainage area table provided in lieu of Section IV.10 of the application. ii. Calculations must be provided to support the provided storage volume of 1,473 cf. It is recommended to include this elevation in the provided stage / storage table. iii. The supplement(s) that most closely relates to the proposed stormwater control measure must be provided. The "Swale Detention Area" has been removed from this project. The subject area will be piped directly into the Pond 6 forebay. Please refer to plan sheets SW-01, SW-02, and SW-D1 included with this resubmittal. The revised calculations indicate that the driving head and drawdown time for Pond 6 has been revised. An updated Page 2 of the supplement for Pond 6 must be provided. Revised wet detention basin supplements for both ponds have been included with this resubmittal. 15A NCAC 02H.1003(g)(4): As previously discussed on a separate project, drainage area arrows are not sufficient to demonstrate the proposed grading. Existing and proposed topographic contours or spot elevations must be provided for all drainage features. If the contour intervals are too large to adequately reflect the identified drainage patters, spot elevations must be provided. Proposed grading contours have been added to Phase 3C as requested. Please refer to plan sheets SW-03, SW-04, SW-05, and SW-132 included with this resubmittal. We appreciate your cooperation with the time extension and hopefully have satisfied the requests regarding this project. Should you have any questions or concerns, please feel free to contact our office. Thank Coastal Land Design, PLLC PO Box 1172 Wilmington, NC 28402 (910) 254-9333 x 1001 310-05 NCDENR RFI Response 04182017 Page 4of4 Supplemental Soils Investigation Phase 3C (Previously Submitted) EIV� APR 18 101? BY. SOIL AND SEASONAL HIGH WATER TABLE EVALUATION FOR STORMWATER DISPOSAL DESIGN PROJECT: PROPOSED SAVANNAH LAKES, PHASE 3 SITE TREE ACRES CIRCLE NW AND WILLIAMS TRAIL NW CAROLINA SHORES, NORTH CAROLINA PREPARED FOR: MR. JEFF PETROFF, P.E. COASTAL LAND DESIGN, PLLC WILMINGTON, NORTH CAROLINA DULY 28, 2015 PREPARED BY: �zr ATLANTIC GEOSCIENCE INTERNATIONAL, Ltd. 8633 VINTAGE CLUB DRIVE WILMINGTON, NORTH CAROLINA 28411 (910) 612-4853 - Soil and Season High Water Table Evaluation for Stormwater Disposal Design Proposed Savannah Lakes, Phase 3 Site Tree Acres Circle NW and Williams Trail NW Carolina Shores, North Carolina TABLE OF CONTENTS PAGE 1.0 PROJECT DESCRIPTION 1 2.0 OBJECTIVE 1 3.0 FIELD METHODS 2 3.1 Augering and Borehole Advancement 2 3.2 Soil Classification 2 3.3 Piezometer Installation 3 3.4 Surveying 3 4.0 RESULTS OF SITE EVALUATION 3 4.1 Soil Classification/Boring Logs 4 4.2 Soil Types/Conditions at Boring Locations 5 4.3 Groundwater and SHWT Conditions 6 5.0 LIMITATIONS 8 6.0 PROFESSIONAL SEALS AND SIGNATURES 9 FIGURES FIGURE 1 — SITE MAP WITH SOIL BORING/PIEZOMETER LOCATIONS FIGURE 2 — SOIL SURVEY MAP-USDA-BRUNSWICK COUNTY FIGURE 3 — PZ-1 WA T ER TABLE SUBSURFACE PROFILE FIGURE 4 — PZ-2 WATER TABLE SUBSURFACE PROFILE FIGURE 5 — PZ-3 WATER TABLE SUBSURFACE PROFILE APPENDICIES APPENDIX I- FIELD SURVEY DATA (1 sheet) Soil and Season High Water Table Evaluation for Stormwater Pond Design Proposed Savannah Lakes, Phase 3 Adjacent to Tree Acres Circle NW and Williams Trail NW Carolina Shores, North Carolina July 28, 2016 1.0 PROJECT DESCRIPTION Atlantic Geoscience International, Ltd. (Atlantic Geoscience) was contacted by the project design firm, Coastal Land Design, PLLC (CLD), to discuss site development plans for a parcel located on approximately 30.0 acres in Carolina Shores, NC. The partially cleared site is located adjacent to Tree Acre Circle NW, Williams Trail NW, and Stanley Trail SW in Carolina Shores, NC. Significant site/civil improvements are underway on the parcel including grading, cutting, and filling throughout much of the site. The site developer is preparing the parcel for the construction of a residential development and subdivision. Site development also includes lot layout, roadways, drainage, and stormwater retention pond construction. It is our understanding that the present development plan proposes a total of three independent stormwater retention ponds be constructed to manage stormwater for the completed project. Stormwater Pond No. 1 has been partially completed on the northeast portion of the site adjacent to Tree Acres Circle NW and Shingle Tree Swamp. Along the northern boundary of the parcel, the site is bordered by Shingletree Swamp which is an unlined drainage tributary that conveys significant volumes of stormwater drainage from nearby existing developments, neighborhoods, NCDOT roadways, and adjacent golf courses. The location of the site including soil borings (13-1, 2, and 3) and piezometer locations (PZ-1, 2, and 3) is shown in Figure 1. Field work for the project was performed on July 22, 2015 by two NC Licensed Geologist. A number of soil borings were advanced across the site for soils evaluation and for installing temporary piezometers to assess site sub -grade hydraulic conditions with respect to determining the SHWT. Groundwater level measurements were gauged from piezometers at the time borings were advanced to determine shallow groundwater table conditions. Soil types encountered in each boring locations are discussed extensively in Seciion 4.0 of this report. 2.0 OBJECTIVE Atlantic GeoScience, Ltd was retained to evaluate soil conditions on the subject site for the CLD project engineer with respect to facilitating design of the proposed stormwater retention structures. This evaluation included a determination of general site soil morphology, hydraulic conditions, soil types, redoximorphic conditions, and an estimate of the present-day seasonal high water table (SHVM. The following methods describe the methods, protocols, test methods, and findings from our evaluation. 3.0 FIELD METHODS 3.1 Augering and Borehole Advancement To access soil types and morphology on this site, field work included advancing a series of augered test borings, pilot holes, and supplemental shallow borings. Primary borings used for soil classification are denoted as (B-1, B-2, and B-3) and water level piezometers corresponding to these borings are denoted as PZ-1, PZ-2, and PZ-3. Borings were advanced into the subsurface using a 5.0 centimeter (cm) diameter dove -tail auger. The borings were advanced in general accordance with the American Society of Testing and Materials (ASTM) Method D-1586, "Soil Investigation By Auger Borings". Soil samples were collected and logged by a Field Geologist as the auger was advanced in six inch intervals. The samples were visually observed for mineralogy, evidence of oxidation or reduction, structural and relic features, moisture content, mineralization, and other indicators used for estimating the depth of the SHWT. Boring (B-1) was advanced adjacent to existing Stormwater Pond No 1 located in the northeast quadrant of the site adjacent to Shingletree Swamp. The stormwater pond is not completed at present, however is functioning as a temporary sediment basin. The existing pool in this pond appears sporadic and does not appear to be greater than 12" to 18" at any particuiar location of the pond. Boring B-1 was advanced to a total depth of approximately 80.0 inches below grade. In the west-northwest quadrant of the site, a second boring B-2 was advanced to a depth of approximately 54.0 inches below grade. This location is an upland that sits immediately adjacent to a delineated Corps 404 wetland area and a shallow sparse vegetative lined drainage ditch bordering the western property boundary. This area of the site is being considered for a second stormwater retention pond and therefore, soils in this location were evaluated for design criteria suitability. In the center -southern section of the site, a third location is proposed for a stormwater retention pond to accommodate drainage off residential lots proposed in the center and southern portion of the site. A narrow dog -legged pond is proposed to be constructed in the center of Lots 12 through 27 and situated at the back property line of those lots. At least four drainage easements are shown in the proposed subdivision plan to handle sheetflow from these lots as well as runoff from Meadowbrook Lane. Boring B-3 was advanced in this location adjacent to the back (northwest) comer of Lot 21. The back slope of Lot 21 consist of a six to seven -foot high denuded cut slope with an exposed 1.5 H:1.0 V soil face forming the backslope of lot. The exposed soil profile was ! sed to evaluate soils in this location. Below is a description of the soil types and soil condition noted at the time of our evaluation, 3.2 Soil Classification Soil samples were collected from auger -cuttings and visually classified/described in the field in accordance with ASTM-D 2488-84, "Description and Identification of Soils (Visual Procedure)" and in accordance with the Unified Soil Classification System (USCS). The predominant soils encountered were classified and described as discussed below. Site soils appear to range in gradation from fine grained sands to silts to clays. Both non -cohesive and cohesive soils are present in the sub -grade. Specifically, the following soils were identified: fine-grained clean sands (SP). fine-grained dirty sands (SM), clayey -sands (SC), semi -plastic silts, (ML), lean clays (CL), fat clay (CH) and laminated layering of combinations of these soils. Where dual soil types are denoted, they well be described by use of double symbols i.e. SP/SC. The SHWT determination is based on soil type, color/chroma, redoxi-morphic features and soil wetness, Atlantic Geoscience also considered the hydraulic affects that may be caused by localized changes in areal drainage patterns, event flooding regimes, and drainage from adjacent/nearby sites. For the purposes of this report, the SHWT table is being defined as the highest level of the saturated zone, persisting in the soil continuously for at least 2 weeks within 2 meters of the natural soil surface. A comparison of soils encountered from the boring advancement regime was made with relevant literature contained in Brunswick County USDA-SCS mapping and published literature. A depiction of site soils according to USD-SCS mapping is shown in Figure 2. 3.3 Piezometer Installation Piezometers were installed in each of the key boring locations on the project site to enable evaluation of present groundwater hydraulic conditions. The piezometers are denoted as PZ-1, PZ-2, and PZ-3 which correspond to B-1, B-2, and B-3. Upon completion of each auger hole used for describing soils, slotted PVC wellpoints and casing were inserted into the boring annular space to enable groundwater level measurements. Each small diameter piezometer was constructed with 1.5" diameter PVC casing provided with threaded 3.0 ft. long x 1.5" diameter 0.01 slotted PVC wellpoint screens. The 8.0 ft. long piezometers were inserted into the boreholes and pushed firmly into the saturated sands until a water column of least 8"-12" was maintained. A sand pack media was not introduced to boring as we allowed native sands to form the sand pack around the wellpoints. The wellpoints enabled groundwater elevation measurements in the shallow subsurface soils. The depths of the piezometers were typically 6.0 in length but varied slightly from location to location. Groundwater measurements were collected at the time the piezometer was installed and up to four hours later after equilibration had occurred. 3.4 Surveying Elevation of the temporary piezometers and adjacent relevant features used in this evaluation were field surveyed by Atlantic Geoscience. An existing temporary benchmark (TBM) located onsite was used when surveying B-1/PZ-1 and B-3/PZ-3 on the eastside of the site. The TBM is a wooden hub located on the far east side of the project near the entrance/exit to Tree Acres Circle NW. This hub is reported by CLD to have a known elevation of 29.17 ft. above mean sea level (AMSL). Atlantic Geoscience established a second temporary benchmark (TBM-2) on the west side of the site for determining elevations at B-2 and PZ-2. The TBM-2 benchmark is the top of a metal silt fence stake marked with orange and pink flagging. The assumed elevation for TBM-2 v6ms set at 32.16 ft. AMSL. Site surveyinn and leveling was performed using a Bosch CST/Berger SAL24N autolevel. The accuracy of this survey was not performed to comply with horizontal and vertical control standards specified by NC Geodetic Survey or NAD 831NSRS2007, or NAVD 88. surveying standards. The leveling operation was performed in general accordance with the general surveying methods described in "Construction Measurements", 2`d Edition, B.A. Barry. A copy of the field survey notes are included in Appendix I of this report. 4.0 RESULTS OF SITE EVALUATION The findings of the July 22, 2015 auger -boring evaluation used to determine site soils and SHWT conditions beneath the subject site are presented below. 4.1 Soil Descriptions/Boring Logs Below are boring log records showing each soil type and prominent zone encountered in our soil borings advanced beneath the site. The zones and depths indicated below by grey shading of the row represent the estimated depth of the SHWT for each boring location: Boring No.1 (B-1) Adjacent to Stormwater Pond No.1 BORING DESCRIPTION MOISTURE *OXIDATION/ USCS SHWT USDA DEPTH in CONTENT REDUCTION CLASS ASSOCIATION 0 to 12.0" Dark brown/grey fine silty None N SIP N Baymeade SAND Bab 12.0" to 20.0" Dark grey fine silty SAND None N SP N Baymeade BaB 20.0" to 35.0" Dark grey fine SAND w/ None N SWSP N Baymeade 1 silt BaB U JI 66.di-_r)c Srs , 0401,11A W/ dist at W Y_ SPIW, : al- I aytneas . flea , rba les; k>lock-y Very Malai , 60.0" to 80.0" Grey lean to fat CLAY w/ silty SAND, tan heavy Wet Y CUCH, SM Baymeade (BaB) mottles, blocky, some —Shaded area--SHWT estimated at 35..0" below existing grade. Boring No. 2 (B-2) NW Quadrant of Site Adjacent to Wetland BORING DESCRIPTION MOISTURE *OXIDATION/ USCS SHWT USDA DEPTH(in) CONTENT REDUCTION CLASS 0 to 6.0" Dark light grey fine silty None N SP N Grifton SAND Gt 6.0" to 15.0" Yellow -grey fine clayey None N SC N Grifton SAND Gt 15.0" to 18.0" Dark grey lean CLAY w/ None N CUSM N Grifton fine grey SAND w/ silt Gt 18.0" to 24.0" Orange -grey lean CLAY, None Y CUSM N Grifton w/ fine SAND Faint orange (Gt) mottles, slightly block 24.0" to 36.0" Grange grey fine SANG w/ None Y SM/CL N Griffon lean CLAY heavy grey- (Gt) orange mottles, blocky, fissure tubes 36.0" =to 42.,Q". Oranp grey clayey Moist Y_ Y Griffon . - = SANflifalnt orange -Bray {+fit) 42.0" to 45.0" Fine -medium SAND, Very Moist Y SM/SC Gditon clayey SAND w/ grey (Gt) mottling 45.0" to 50.0" Light grey/green SAND w/ Wet Y SM Griffon faint orange mottles _T Gt 50.0" to 54.) Light grey fine SAND Wet N SP Griffon w/man anese specs I "*Shaded area=SHWT estimated at 36.0" below existing grace. 4 Boring No. 3 (B-3) Center of Site Adm. to Lots 10 — 27, (Proposed Pond No. 2) BORING DESCRIPTION MOISTURE "OXIDATION/ USCS SHWT USDA DEPTH(in)_CONTENT REDUCTION CLASS ASSOCIATION 0 to 75.0"" Orange grey fine clayey None -Moist Y SC/CL, N Baymeade SAND w/ lean CLAY w/ SP (BaB) fine clayey SAND 75 0" to 89:0' Bane s* �A�10 . Wet ::, N:. Y *"Shaded area=SHWT estimated at 78.6' below existing grade. The SG/GL, SP material from u- to 75- appears disturbed. 4.2 Soil Types/Conditions at Boring Locations Field data collected during our soils evaluation was compared to the United States Department of Agriculture (USDA) Soil Conservation Service (SCS), Soil Survey of Brunswick County, North Carolina, revised/published in 1982. The USDA survey indicates that three distinct soil types exist on this site. The soils are categorized as the Baymeade Series, (BaB), Grifton Series, (Gt) and the Leon series (Lo). It should be noted that Baymeade was the prominent soil type on the eastern half of the site while Grifton soils largely covered the western side of the site. Leon soils were not encountered in our boring locations but are shown by USDA-SCS mapping to exist on the southwestem corner of the site. Excavated soils stockpiled on that portion of the site did appear consistent with Leon soils. Because much of this site appears disturbed by historic and/or present re -working of soils from construction, excavation, and flit activities some location exhibit the absence of soil horizons and/or altered horizons. As stated previously, soil horizons observed in locations, did not display "classic" resemblance to either the Baymeade or Grifton soils from the top of boring profiles to the bottom. In our opinion, due to apparent re -working, excavation, cutting, filling of site soils that has occurred, some borings may have only evaluated segments of native soil profiles. The A Horizon appears to be missing in locations of the site. The elevation of portions of the east side of the site seem to have been cut or lowered. Therefore, we opine that some borings could have been placed in the mid -sequence (or even lower) of the B Horizon. The Baymeade series matched relatively well with our field findings, however soils in the B-3 location, also identified as Baymeade did not correspond well with USDA mapping. In the B-3 location. It appear the site elevation has been increased by the addition of fill. Soils in the B-2 location also did not correspond well with Griffon soil descriptions mapped by USDA-SCS for that segment of the property. In addition, it is our opinion that the adjacent Shingietree Swamp channel has 11ad a profound affect changing the site hydrology and particularly redoximorphic indicators. Additionally, the drainage alterations from the adjacent Crow Creek Golf Club has also likely impacted site hydrology on the Savannah Lakes site. Shingletree Swamp is a deep earthen channel that conveys a significant volume of regional drainage into Cawcaw Swamp, eventually discharging to the Waccamaw River. When Shingletree Swamp Branch is not conveying stormwater runoff during the wet season from upland sources and watercourses, it likely serves as a hydrauiic relief outlet under -draining the Savannah Lakes site. The Shingletree Swamp watercourse runs along the northern perimeter of the Savannah Lakes site which is greater than 1400 linear feet. Due to it's depth, the channel is presently intercepting shallow groundwater from the Savannah Lakes site (and adjoining sites). Regional groundwater discharge to this channelized creek likely provides a substantial portion of the base flow during April through October timeframe. The result of this flow condition appears to reveal itself in the soil profile as observed by the faint to prominent mottling that occurs in the B Horizon in certain locations within the Baymeade soils complex on the site. Where these indicators are seen in the soil profile, they are not in direct contact with either an apparent or perched water table. This suggest that regionsll drainage patterns have changed over time and that the SHWT may now be lower today than historically. The use of piezometers on the site to evaluate static groundwater levels aided in confirming that on some locations of the site, the water table is greater than 6.5 ft. below the first indications of redoxi- morphic indicators. The project site's southwest and western boundary is also bordered by a 1,500 long perimeter shallow drainage ditch. In this case, the ditch does not appear to intercept shallow groundwater flow from the subject site. This finding is evidenced by the water table measurements collected from PZ-2 installed the adjacent ditch. There is no base flow observed to exist in this shallow ditch at this time which is significantly different than Shingletree Swamp. To assess this, a boring was advanced through the ditch -bottom into soils to a depth of 18" deep below the dry -ditch bottom. The borehole filled and equilibrated after approximately 30 to 60 minutes. Measurements of the water table at adjacent PZ-2 and the water level of the ditch were collected and suggest that the water table is perched in this location of PZ-2. The measurement also indicates the ditch is not acting as a discharge boundary or intercepting the water table at this time of the year as the measure water level was below the bottom of the ditch. It is also probable that during seasonal wet periods such as the winter months, when a surplus of base flow exist in the ditch, it back -floods adjacent properties to some degree including the subject site. In general, soils observed on the site in upper zones of the soil profile (A Horizon) typically consisted of fine grained sands with low to no moisture content, no organic matter, no redoximorphic indications, and no cementation. Conditions in the B Horizon varied across the site depending on localized conditions and elevation. Clayey soils consisting of lean and fat marine clays and clayey loams that existed in the B Horizon exhibited redoximorphic indicators ranging from faint to heavy oxidation and reduction. 4.3 Groundwater Table and SHWT Conditions From the borings advanced at this site, the apparent groundwater table was observed at depths ranging from approximately 2.20 to 6.38 ft. below grade. The apparent water table elevations in most Coastal Plain shallow surficial aquifers tend to fluctuate seasonally. They are typically at their highest level between the time of December through mid -April and lower from mid -April through November. Our field observations of actua! measured water table elevations are shown in the below table in the right column. This empirica! data collected during our evaluation of the shows a range of variation and differs somewhat from elevation data generically reported by USDA-SCS published data for these soil types. Piezometer Soil Type by USDA SHWT Observed Water Table USDA and USCS Estimate (ft.) Elevation ft.) PZ-1 Baymeade/ 4.0 to 5.0 3.76 SP.SM.and CL PZ-2 Grifton/ 0.5 to 1..0 2.20 SP, SC, and CL -T PZ-3 Baymeade/ 4.0 to 5.0 6.38 SP.SM.and CL Based on the observed water table values shown above, the actual piezometer measurement from PZ-1 correlates well with USDA-SCS published data. The boring log data from PZ-1 shows an unconfined shallow sand water table aquifer indicative of the apparent SHWT. This data correlates more closely with USDA pubiished data than SHWT data from other locations on the site (see Figure 3). Atlantic Geoscience opines that the soil types mapped by USDA across the site are not entirely consistent with field observations and classifications determined by our onsite borings. There are several reasons that a discrepancy may exist: First the USDA mapping can be a useful source but a host of published hydrogeologic data shows that regional hydrology changes. It changes occur subsequent to the time of USDA's mapping, this can often negate the value of the USDA data. The last revision to the Brunswick County USDA-SCS Soils Maps was 1982. This 33 year old groundwater elevation data has limited value today. Significant changes to county -wide hydrology since the time the USDA data was produced has been due to a surge of private and public sector development experienced in the last 15 years in Brunswick County. The second reason for differences in USDA mapping from our classification of soils for this site is due to the disturbance, re -working, and alterations of site soils. This is due in part to present excavation and earth moving operations underway, as well as historic disturbance including borrow pit excavation. From the survey elevations performed by Atlantic Geoscience, Ltd. it appears that up to 2.5 feet of cut may have occurred over the eastern and northeastern portion of this site. In places, the depth of cut and fill -removal appears to be possibly greater, such as in the area of PZ-1 and PZ-3. In the northwest quadrant of the site, near PZ-2, clearing and land disturbance has occurred to some degree. Pre -construction topography is not available, so we can accurately estimate the elevation change that may have occurred in that location. In all, any elevation reduction of the site has a direct affect on the depth to the SHWT, reducing the observed depth. The western and southern borders of the site are bound by a shallow drainage ditch traversing over 1500 linear feet along those borders. This ditch is not nearly as deep as the channel of Shingletree Swamp/Branch. At the time of our site evaluation, there was no observed baseflow in this ditch. To recharge the ditch via groundwater, the water table must increase in elevation at least another 0.5 to 1.0 feet higher than present in order for this ditch to intercept groundwater beneath the site. This finding was confirmed by the boring that was constructed in the bottom of the subject ditch (B-2).. A water elevation measurement in the ditch at that location was measured being 1.05 ft. lower than the water table elevation from adjacent piezometer PZ-2. The water table was determined to be below the floor of the ditch and no base flow is observed throughout the ditch. In this case, it is obvious the ditch is not acting as intercaptor and is apparently not influencing water table conditions in this portion of the site. The elevation reading from the piezometer suggest that the watertable is confined in this area of the site, since the soil boring in that location did not encounter moist/wet soils until a depth of 36' to 42 below existing grade. The water table in this location appear confined (under pressure head) since the subgrade is a cap of cohesive -plastic clayey sands (SC) and lean clays (CL) in the upper several feet of the soil column. The thick plastic clays and clayey sands inter -bedded in the B Horizon appear to be mostly impermeable which is preventing downward infiltration of recharge. In these locations, the SHWT appears confined (under pressure) and to only exist trapped beneath the thick clayey soils. (see Figure 4) In the vicinity of Lot 21 and PZ-3, the present top bank elevation was surveyed and determined to be 31.84 ft. AMSL. This is elevation when compared to the TBM (which appears undisturbed) is 2.67 feet higher than the TBM used to establish site elevation and nearby to PZ-1, Therefore, based on the soil types observed to be present and elevation differences, it is appears this section of the Meadowbrook road and the adjacent embankment has been filled at least 2.67 feet. This would account for the SHWT appearing to be much greater than expected in this area of the site. By applying a correction factor, if the 2.67 ft. difference is subtracted from the top of bank elevation, a corrected estimate of the depth to the water table would be 3.71 feet which is within the range of the USDA's published data for Baymeade soils which is 4.0 to 5.0 below grade. The corrected elevation of 3.71 ft. AMSL for PZ-3 correlates closely with the elevation from nearby PZ-1 which is 3.76 ft. AMSL. According to USDA-SCS mapping, both PZ-1 and PZ-3 are situated within the Baymeade soil series so it is reasonable that the water table elevations would be similar. The key point is, this site has been re -worked and elevation has been altered by stripping, borrow removal, as well as filling in some locations. The altered site elevations also impact the observed depths to the SHWT. (see Figure 5) In addition, it is our opinion that Shingletree Swamp has had a profound affect on the overall site hydrology as well as drainage changes in relation to construction the adjacent Crow Creek Golf Club. Shingletree Swamp is a deep earthen channel that conveys a significant volume of regional drainage into Cawcaw Swamp and eventually discharging to the Waccamaw River. During periods of high rainfall and high recharge, Shingletree Swamp Branch conveys excessive volumes of surface runoff from upland sheetflow and other contributing channelized watercourses. When base flow diminishes and during the periods of low season rainfall, it provides hydraulic relief essentially under -draining adjacent properties that it traverses such as the Savannah Lakes site. The Shingletree Swamp watercourse runs along the entire northern perimeter of the Savannah Lakes site which is greater than 1400 linear feet. The channel serves as an interceptor of shallow groundwater discharging from the Savannah Lakes site and adjoining sites. Shallow groundwater is greatly influenced by nearby topographic changes. Because this creek is a deep -cut channel, groundwater discharge provides a substantial portion of the seasonal base flow observed during April through October timeframe. At the time of our field investigation, Shingletree Swamp/Branch was observed to have a steady volume of base flow (estimated >10 cubic feet second) running westward to Cawcaw Swamp despite little to no rainfall in the past few weeks. Conversely, during annual periods high recharge in winter and early spring, it is probable that the Shingletree Swamp/Branch can not convey all stormwater it receives during such periods and therefore, likely creates periods of seasonal flooding. Episodic flooding to adjacent lands and property will also occur when rainfall events exceed the design flow of the channel. Flooding events will alter site hydrology and redoximorphic conditions. We believe this is confirmed by the faint to prominent mottling that is observed in certain locations within the Baymeade soils complex on the site where these indicators are noted, yet they are not in close proximity to either the apparent or perched water tables observed. This suggest that regional drainage patterns have drastically change~ over time and are now lower than USDA's mapping of soils on this site, but may still experience event flooding due to surplus stream base flow in Shingletree Swamp.. The use of piezometers on the site to evaluate static groundwater levels aided in confirming that in some locations of the site, the water table is greater than 6.0 ft. below the first indications of redoxi- morphic indicators. Based on soil morphology, redox indicators, organic composition, and soil wetness observed in the field we feel the SHWT elevations stated in the above Section 4.0 "Results of Site Evaluation," represent the site SHWT conditions at this time. 6.0 LIMITATIONS This report has been prepared for exclusive use by Coastal Land Design, PLLC. The report should not be relied upon by other third parties. The exploratory and evaluative methods implemented by Atlantic GeoScience, Ltd. in performing this limited evaluation are consistent with geo-scientific, geologic, and geo-engineering standards routinely used in performing limited subsurface exploratory investigations. The subsurface exploration data presented in this report include geotechnical, hydrogeological, and geological conditions encountered during test drilling on the subject site. Use of this data is interpretive by nature and requires estimations, inferences, assumptions and interpolation between known data points. Cross -sections and drill logs illustrating subsurface conditions are for information purposes and should not be relied upon for site development, construction, or subsurface excavation purposes. Subsurface conditions represented in the report are subject to vary laterally and vertically across the site. The test results and data presented in this report represent conditions that were discovered during the time borings were advanced at this site. Site conditions described in this report may vary in the future or be altered due to man-made activities or occurrences. This includes soil types, bedding thickness, and the elevation of groundwater. Additional drilling, analyses, testing, modeling, and surveying may be necessary to refine the accuracy of the data provided in this report. The user of this data should do so with caution as subsurface conditions at the site may vary from the findings contained in this report. 6.0 PROFESSIONAL SEALS AND SIGNATURES The below parties certify that this the work performed and this report has been conducted under the direct supervision of a Professional Geologist registered with over 30 years of experience performing subsurface investigations in the State of North Carolina. The authors of this report also are Stormwater BMP Inspection & Maintenance Certified and are knowledgeable in stormwater management. The Professional Geologist in -responsible -charge has verified the work performed and reported during completion of this project including planning, drilling, test pit excavation, field data collection, classification of soils, and technical report preparation. The data, information, assertions, interpolations, inferences, and statements describing site conditions are believed to be true and accurate. The report has been prepared in accordance with the current standards of accepted practice for geology and geo-sciences by the NC Board for Licensing of Geologist. J' -t. ` 7 Rudy A. Smithwick, P.G. Stephen A. Tyler, P.G. Principal Geologist Senior Geologist NC Stormwater BMP Cert. No. 1871 NC Stormwater BMP Cert. No. 1875 FIGURES I THROUGH 5 Figure 1 - Site Map wl Soil Boring and Piezometer Locations Figure 2 - Soil Survey Map -USDA Brunswick County Figure 3 - PZ-1 Water Table/Subsurface Profile Figure 4 - PZ-2 Water Table/Subsurface Profile Figure 5 - PZ-3 Water Table/Subsurface Profile --- Tom~`\\\\ { 1 1 \ .4 '4' 4 % SAVANNAH LAKES, PHASE 3 Soil Survey Map AT Source:USDA-SCS-1982 and MEADOWLANDS Brunswick Co. GIS 1c GeoScience, Ltd CAROLINA SHORES, NC ar AR7 Jul Wilmington, North Carolina Job No.: I Date: Ibcale: Drawn By: I Ckd. By: 08/21/15 1"--200 ft. R. Smithwick 3 ST , Fwww.AtlanticGeoscienceorg 8212015-01 1 2 k � q 21 \ G \ k /3 wk §k ~ E k 2 A 0 2 \ E m § v ƒ > 22 �U cc U co m I / M iA rQ tn .0 f \ _ m / - _ ; � � co . .\ \ 2 . 5j § _ \ \ m - ■� E 2 G ELin 2 2 kz / 0 k as \ _ > C a \ \ 5 k 2 \ai k ai \ w d \ k � \ in \ \ / \ \ - - m # § ai / 4D - / k %m 0 w F- = § LA (D @�� FIGURE:eeeeeeeum S VANAH LAKES,P A E3 PZ 1 WATER TABLE/ I krnaflewd,&td, A ME DOw LAND SUBSURFACE PROFILE Wdmingt% && CAROLINASHORES, NC 3 m__ Df. raWder. 2150702 7 24 2015 ST R I • c o (u > a ' -ts w 0 � H O N v 3 o I .0 °0 L O :u O 0 Q LD Y � N m � M to u 0 C m > LL tV ar uW in -p N OJ E Ln to F u m Y o m 4' 0 N t a c L U Q. O N a 9 1-. Fes— coo L m 45 N O tV N c @ d N > 00 N O_ C7 ti3 m M N tm 0) o �II t N ++ N 0 � N O C7 C O U c c 0 'y W to m O t— Q1 Z u w 0 N Project: Title: AtlanticGeoSclence SAVANAH LAKES, PHASE 3 PZ_2 WATER TABLE/ Intentatlonal,ltd. AT MEADOW LAND SUBSURFACE PROFILE Wilmington, NC CAROLINA SHORES, NC rrojed No: Dais: - Dmm w. cnatoa eY *t,;,,j„�, ti&n*1 d-1m*ru,�,n,w- 2150702 1 7/24/2015 ST RS nL APPENDIX 1- FILED SURVEY DATA Page f of / SITE SUaVEY DATA SHEET r/-I- Temperature: -.. • �.iF3.:1LL'3:i19i'� InslTument Hei � T ■�■■■��■■■■■■■■■■■■■■�■■■ Supplemental USGS Map Phase 3B and Phase 3C ECEIVE APR 18 2017 BY: TOPOI map prtnted on 04/04/17 from "North CaroNna.tW and "Untided.tpg" 78037.000' W 78038.000' W 78035.000' W WGS84 78034,000' W i• ,. �. ]0 W :. � � 1 of • � � r.. ..;F o — a ��4 x>. Phase 38 � �':ur= . - � r t !•. - -- - -.-�_ `� .Ia :•.! �.. r Phase 3C ,.✓`�' .I o , t, ,_ z fiki Ova VIC In (•1 K L '7 Y/-' h{j 'y/ �a " is o it x Y4 s• ::.: • _ 78037.000' W a 78036.000' W s 7�8�035.0O0' W WGS84 78034.000' W Imo FEEr a sm ,00a }GIs Ptesud imm TOPo} �.ac::v xo}aw�,t�x+3 �G J For DEQ Use ONLYl North Carolina Department of Environmental Quality Reviewer: � Request for Express Permit Review I r l Time: 1 Govv� Confirm: FILL-IN all the information below and CHECK the Pennit(s) you are requesting for express review. Call and Email the completed form to the Permit Coordinator along with a completed DETAILED narrative site plan (PDF file) and vicinity map (same items expected in the application package of the project location. Please include this form in the application package. • Asheville Region Alison Davidson 828-296-4698;alison.davidson(alncdenr_gov • Fayetteville or Raleigh Region -David Lee 919-791-4203; david.112 cdenr. ov • Mooresville or Winston Salem -Marcia Allocco 704-235-2107; marcia.allocco ncdenr.aJv • Washington Region -Lyn Hardison 252-948-3842 or ILn.hardison ncderr.gov • Wilmington Region -Cameron Weaver910-796-7303 or cameron.weavep&cderr.clov NOTE: Project application received after 12 noon will be stamped in the following work day S. 6_1 S11.1 Project Name: SAVANNAH LAKES PHASE 3B AND 3C County: BRUNSWICK Applicant: MEADOWLANDS POA, INC Company: Address: 1031 MEADOWLANDS TRAIL NW City: CALABASH, State: NC Zip: 28467-_ Phone: _ _ Fax:' _ Email: @ Ota: �r — Physical Location:SAME AS ABOVE Project Drains into SHINGLETREE CREEK waters — Water classification C;SW `4.R %grface Water C assi ic9tions G.4a Project Located in LUMBER River Basin. Is project draining to class ORW waters? N, within A mile and draining to class SA waters N, or within 1 mile and draining to class HQW waters? N Engineer/Consultant: JAY CARMINE, PE Company: COASTAL LAND DESIGN, PLLC Address: PO BOX 1172 City: WILMINGTON , State: NC Zip: 28402-_ Phone: 910-752-4000, Fax: 910-254-0502, Email: JCARMINE@CLDENG.COM PLEASE PROVIDE ESTIMATED INVESTMENT AND EXPECTED EMPLOYMENT, IF AVAILABLE RECT FE19 092017 $0.00 #N/A JOBS SECTION ONE: REQUESTING A SCOPING MEETING ONLY ❑ Scoping Meeting ONLY ❑ DWR, ❑ DCM, ❑ DEMLR, ❑ OTHER: SECTION TWO: CHECK ONLY THE PROGRAM (S) YOU ARE REQUESTING FOR EXPRESS PERMITTING ❑ 401 Unit ❑ Stream Origin Determination: _ # of stream calls — Please attach TOPO map marking the areas in questions ❑ Intermittent/Perennial Determination: _ # of stream calls — Please attach TOPO map marking the areas in questions ❑ 401 Water Quality Certification ❑ Isolated Wetland (_linear ft or _acres) ❑ Riparian Buffer Authorization ❑ Minor Variance ❑ Major General Variance ® State Stormwater ❑ General ❑ SFR, ❑ SFR < 1 ac. ❑ Bkhd & Bt Rmp, ❑ Clear & Grub, ❑ Utility ❑ Other ❑ Low Density ❑ Low Density -Curb & Gutter _ # Curb Outlet Swales ElOff-site[SW (Provide permit #)] ® High Density -Detention Pond 2 # Treatment Systems ❑ High Density -Infiltration _ #Treatment Systems ElHigh Density -Bio-Retention _ # Treatment Systems ElIiigh Density —SW Wetlands _ # Treatment Systems ❑ High Density Other _ #Treatment Systems / ❑ A":OD: j ",ajor ❑ Minor F Plan rRevision ❑ Red-v. Exclusion SW 051203 (Provide pe:-n;: #) ❑ Coastal Management ❑ Excavation & Fill ❑ Bridges & Culverts ❑ Structures Information ❑ Upland Development ❑ Marina Development ❑ Urban Waterfront ❑ Land Quality ❑ Erosion and Sedimentation Control Plan with acres to be disturbed. (CK # & Amt. (for DEQ use)) SECTION THREE —.PLEASE CHECK ALL THAT IS APPLICABLE TO YOUR PROJECT (for both scoping and express meeting request) Wetlands on Site ® Yes ❑ No Wetlands Delineation has been completed: ® Yes ❑ No US ACOE Approval of Delineation completed: ® Yes ❑ No Received from US ACOE ® Yes ❑ No DEQ use oiily Fee Split for multiple permits: Check # Buffer Impacts: ® No ❑ YES: _acre(s) Isolated wetland on Property ® Yes ❑ No 404 Application in Process wl US ACOE: ❑ Yes ® No Permit Total Fee Amount $ SUBMITTAL DATES Fee SUBMITTAL DATES Fee CAMA $ Variance (❑ Maj; ❑ Min) $ SW (❑ HD, ❑ LID, ❑ Gen) $ 401: $ LQS $ Stream Deter,_ $ NCDEQ EXPRESS March 2016 4 NORTH 3 SITE , � J LOCATION MAP CALABASH, NORTH CAROLINA NOT TO SCALE Express Stormwater Review Design Narrative for the Modification to Phase 3B and 3C of Savannah Lakes at the Meadowlands (SW8 051203 Modification) Calabash, Brunswick County, NC Prepared for: Meadowlands Golf Club, Inc. PO Box 4159 Calabash, NC 28467 Prepared by - Coastal Land Design, PLLC Civil Engineering / Landscape Architecture Land Planning / Construction Management P.O. Box 1172 (910) 254 - 9333 Wilmington, NC 28402 (910) 254 - 0502 www.cideng.com 9-February-2016 Modifications to Phase 3C include: a new road layout and lot subdivision based upon the Army Corps of Engineers' declassification of the two former borrow pits as jurisdictional wetlands. This revision is intended to replace the permitted Phase 3C section of the Savannah Lakes at the Meadowlands (Pond #7, Pond #BA., and Pond #86 in the former permit) in its entirety. This modification provides treatment in the form of one wet detention basin (Pond #7). The existing, and permitted, deed restriction of 4,000sf/lot is not modified in this revision. The permit modifications to Phase 3C are summarized below: Design Criteria Existing Permit Modification *Pond #8A *Pond #86 Pond #7 a. Drainage Area, acres Onsite, ft2 Offsite, ft2 8.05 350,658 None 6.95 302,742 None 20.0 871,000 None b. Total Impervious Surfaces, ft2 (1) Buildings, ft2 (2) Roads/Parking, ft2 (3) Other, ft2 (4) Offsite, ft2 127,396 86,896 40,500 0 0 135,972 95,472 40,500 0 0 338,655 248,000 90,655 0 0 c. Design Storm, inches 1.5 1.5 TBD d. Pond Depth, feet 9 (4.9 avg) 8 (3.5 avg) TBD e. TSS Removal Efficiency 90 90 MDC f. Permanent Pool Elev., FMSL 25.0 25.0 TBD g. Perm. Pool Surface Area, ft2 20,455 17,224 TBD h. Permitted Storage Volume, ft3 17,574 18,770 TBD L **Temp. Storage Elevation, fmsl 25.81 25.99 TBD j. Controlling Weir, Ht x L, in 10.0 x 2.0 12.0 x 2.0 TBD k. Permitted Forebay Volume, ft3 20,342 13,063 TBD I. Receiving Stream/River Basin Shingletree Swamp / Lumber No Change m. Stream Index Number LBR57 15-23-2 No Change in. Classification of Waterbody C; SW No Change o. Max. Fountain Horsepower, HP 1/3 1/4 TBD - in the existing permit, the Lake / area (interconnection lake) was combined with the lake areas for Pond #8A and Pond #8B since there were designed as outfalling ponds. " Additional storage volume is provided to meet Brunswick County's pre- and post -development discharge requirements. 61I6ina �: cE N � L � �va'iZo o�F cn O a 0 a LM M L IVNY�dWVM533lLL3lONIHS-- —� �- -- s Hall, Christine From: Hall, Christine Sent: Monday, February 13, 2017 3:17 PM To: 'Jay Carmine' Cc: Weaver, Cameron Subject: express request for Savannah Lakes - SW8 051203 Jay, Cameron just approached me with the express request for Savannah Lakes. When this project was returned last year, there was quite a few items that needed to be addressed, one of which was an alternative design. The narrative doesn't discuss what is happening in this alternative designed area. There also doesn't appear to be a site plan for Phase 3B. The Express program is designed for projects that meet the current requirements and are not seeking alternative designs. Can you please provide a site plan for Phase 3B and provide more details describing the changes to the design since last year? Thanks, Christine Christine Hall Environmental Engineer Division of Energy, Mineral and Land Resources - State Stormwater Program Department of Environmental Quality 910 796 7215 office 910 796 7335 direct christine.hall@ncdenr.gov 127 Cardinal Drive Ext. Wilmington, NC 28405 L-1ti ., �.. �F`�: o.... .. ... t n"�ti�ii� ...� �,, +7 -�:.c �_� :�1� �•rrv_ ill I. ri L'y. .. :: a:. 'C�•_`.'ir«� �..'s ..,r.Y r r,. i�r,.r��c.0 .a ar'... ^1�`v.:r. Hall, Christine From: Jay Carmine <jcarmine@cldeng.com> Sent: Friday, February 17, 2017 12:16 PM To: Hall, Christine Cc: Weaver, Cameron; Scott, Georgette Subject: RE: express request for Savannah Lakes - SW8 051203 Thanks for touching base back with me. I anticipated that the alternative design vrith the swale, while ultimately cheaper and easier to construct, would likely not fit within the express stormwater permitting system. After discussing this possibility with the client, and the time delay and opportunity cost of going through the lengthy normal stormwater review cycle, he wanted to go ahead and take the necessary actions to satisfy the previous requests for information outright. We received topographic survey information for this area (and Phase IIIC) in the time between my last correspondence and now. Based upon this new survey information, we now know that there is enough hydraulic grade and room to pipe that area to the forebay for Pond 6 — as in the previously approved plans. It roquires a bit of extra pipe, but it's constructible and will work and will remain within the common -space for this development (requiring no additional easements across the lots). In fact, we can capture a little more than was previously permitted. We are going to run a pipe system from this area and direct stormwater from this area into the forebay of Pond 6. This will ensure there is no untreated BUA leaving the site. We also have topographic survey data to prove that the existing top of pond bank for Pond 6 is located no closer to surface waters than previously permitted. If I recall correctly, these were the "hanging chads" that we were not able to fully address for Phase IIIB last time. We hope that the State is willing to uphold its previous position that the new vegetated buffer requirements would be waived if we could prove that the pond is not located any closer to surface waters than previously permitted. We also received survey information on the top of bank and pond for Phase IIIC. As it would be, this pond as designed would have been located closer to surface waters than previously permitted. So, we are pushing in that pond bank to provide the necessary 50 vegetated buffer off of Shingletree Swamp Canal. We are also modifying the forebays to be compliant with the new rules and based upon the previous requests for information. I feel that the modifications we have designed will adequately satisfy the previous issues with this project and hopefully will still fit within the express system. There is nothing austere or unique about these designs and we would like to permit this project under the express system. I would be happy to come in and meet with both of you and show you how we are addressing the outstanding issues with the pervious submittal; i.e. scoping meeting. Please let me know if this is something that you would like, and whether we can keep this project in the express system. Thank you, and please feel free to contact me at your convenience. Very Respectfully, JayCarmine, PE, PMP Coastal Land Design, PLLC PO Box 1172 Wilmington, NC 28402 Hall, Christine From: Hall, Christine Sent: Friday, February 17, 2017 11:39 AM To: 'Jay Carmine' Cc: Weaver, Cameron; Scott, Georgette Subject: RE: express request for Savannah Lakes SW8 051203 Jay, I have had the opportunity to digest the information you provided. We can certainly go in to more detail on the merits of your proposal during a scoping meeting. However, the alternative design of providing a vegetated swale instead of a forebay is not something that can be submitted under the express program. The express time frames are not conducive to reviewing alternative designs and is intended for standard designs that meet the established requirements. Please advise if you wish to continue with the scoping meeting. Thanks. Christine Hall Environmental Engineer Division of Energy, Mineral and Land Resources — State Stormwater Program Department of Environmental Quality 910 796 7215 office 910 796 7335 direct christine.hall@ncdenr.gov 127 Cardinal Drive Ext. Wilmington, NC 28405 F''n ail :crmsocrde;?:^e to and fmm dii.3 ^ddrLss is subJ60_' io rile ,ib'f RE--' rds L3v Pi !;7 I ay i5G' di :`iO:i-Ud ii? :ii>: Co r«. From: Jay Carmine [mailto:jcarmine@cldeng.com] Sent: Tuesday, February 14, 2017 12:28 PM To: Hall, Christine <Christine. Hall @ncdenr.gov> Cc: Weaver, Cameron <cameron.weaver@ncdenr.gov> Subject: RE: express request for Savannah I ekes - SW8 051203 Christine/Cameron; Can we please schedule a scoping meeting for this project? I think that with the history of this project that it will likely be the best course of action for permitting. I want to make sure our express submittal will be good -to -go and address all the previous concerns. Thanks and I look forward to hearing from you. Very Respectfully, ]a Carmine, PE, PMP Coastal Land Design, PLLC PO Box 1172 Wilmington, NC 28402 Telephone: 910.254.9333 ext. 1001 Cell: 910.742.4000 www.CoastalLandDesign.net From: Jay Carmine Sent: Monday, February 13, 2017 4:28 PM To:'Hall, Christine' <Christine. Kall@ ncdenr.gov> Cc: Weaver, Cameron <cameron.weaver@ncdenr.gov> Subject: RE: express request for Savannah Lakes - SW8 051203 I'm sorry for not providing enough information in the express application narrative. I will flesh it out a little more and email it over to you tomorrow. Phase-3C Since this phase is not finalized, we are updating the Pond for Phase 3C to the current standards (and pushing the north bank in to be 50 feet from the top of bank for the Shingletree Swamp Canal) and will be able to adequately address all of the concerns from the previous reviews. Phase-3B As you recall, Phase 313 is complete so our solutions had to be retrofitted into areas that were common space. Instead of a retrofitted design element within the common space, we are proposing piping that small area directly into the Main Pond for Phase 313. This is essentially what the original plan had with the exception that we feel the vegetated conveyance provided within the common space will provide an acceptable sediment removal (analogous to a forebay). This area would be treated in the main pond of Pond 6; just as previously permitted. That one area in Phase 36 is the one area that I wanted to run by you first and get your input before we invested too much time to finalizing the design. It will work hydraulically. Would you be willing to look at what we are proposing and give us a go/no-go as far as our solution — to see if this will meet the intent of the State's previous concerns with this area? I understand that it wouldn't be a full review, but I wanted to get your input before we too far down the design route. Thank you very much and please let me know should you have any questions or concerns. I look forward to hearing from you — and hopefully getting this project off all of our books once and for all. Very Respectfully, Jay Carmine, PE, PMP Coastal Land Design, PLLC PO Box 1172 Wilmington, NC 28402 Telephone: 910.254.9333 ext. f001 Cell: 910.742.4000 www.CoastalLandDesign.net From: Hall, Christine[mailto:Christine.Hall@ncdenr.eovl Sent: Monday, February 13, 2017 3:17 PM To: Jay Carmine <icarmineC�cl.dEne.com> Cc: Weaver, Cameron <cameron.weaver -ecdenr.,ov> Subject: express request for Savannah Lakes - SW8 051203 Jay, Cameron just approached me with the express request for Savannah Lakes. When this project was returned last year, there was quite a few items that needed to be addressed, one of which was an alternative design. The narrative doesn't discuss what is happening in this alternative designed area. There also doesn't appearto be a site plan for Phase 3B. The Express program is designed for projects that meet the current requirements and are not seeking alternative designs. Can you please provide a site plan for Phase 3B and provide more details describing the changes to the design since last year? Thanks, Christine Christine Hall Environmental Engineer Division of Energy, Mineral and Land Resources — State Stormwater Program Department of Environmental Quality 910 796 7215 office 910 796 7335 direct christine.hall(c)-ncdenr.gov 127 Cardinal Drive Ext. Wilmington, NC 28405 :=yoth-ro Compares 01. to :zr;c �rcr, ties i �u:.., ; �# .c ma be_ n -- a,.'-'�•yE�•.. Cap C a�cs ` a-,eA G,S \V0A Scott, Georgette From: Jeff Petroff <jpetroff@cldeng.com> Sent: Thursday, December 08, 2016 11:31 AM To: Scott, Georgette Cc: Hall, Christine Subject: RE: Quick Sit-down to review a previous project submittal Hi Georgette, Thanks for the response. I'm unable to meet on either the 15th or 16". Let me get with our folks and see if we can generate an email detailing our proposed approach and go from there. Thanks, Jeff Petroff, P. E ?r0ojec't Engincor Coastal Lend Dssign, PLLC PO Box 1172 Wilmington, NC 28402 Telephone: 910.254.9333 ext. 1002 Fax: 910.254, 0502 www.CLDen-g.com From: Scott, Georgette[mailto:georgette.scott@ncdenr.gov] Sent: Wednesday, December 7, 2016 2:54 PM To: Jeff Petroff <jpetroff@cldeng.com> Cc: Hall, Christine <Christine.Hall@ncdenr.gov> Subject: RE: Quick Sit-down to review a previous project submittal Jeff, Both Christine and I sat in a meeting with you a while ago and offered various ways to fix this project. But we did not see the changes in any of the responses during the review. If you want to meet again than go through the return letter I have attached to this email and tell me how you want to address the issues in an email so we can move forward on this project. If we meet again we need proposals from you based on all the things we have offered on this project from the last meeting and from what Christine has noted in her letters. Maybe the new MDCs can solve the problem or by way of an alternative design, (which I think we offered the last time we met). The only time we have available to meet is the afternoon of the 151h or the morning of the 16th. Let rnie know. Georgette Scott State Stormwater Program Supervisor Department of Environmental Quality Office (910) 796 7215 Fax (910) 350-2004 Georgette. Scott(Qncden r. gov 127 Cardinal Drive Ext. Wilmington, NC 28405 Scott, Georgette From: Scott, Georgette Sent: Wednesday, December 07, 2016 2:54 PM To: 'Jeff Petroff Cc: Hall, Christine Subject: RE: Quick Sit-down to review a previous proiect submittal Attachments: 2016 07 return_project 051203.docx Jeff, Both Christine and I sat in a meeting with you a while ago and offered various ways to fix this project. But we did not see the changes in any of the responses during the review. If you want to meet again than go through the return letter I have attached to this email and tell me how you want to address the issues in an email so we can move forward on this project. If we meet again we need proposals from you based on all the things we have offered on this project from the last meeting and from what Christine has noted in her letters. Maybe the new MDCs can solve the problem or by way of an alternative design, (which I think we offered the last time we met). The only time we have available to meet is the afternoon of the 15th or the morning of the 16th. Let me know. Georgette Scott State Stormwater Program Supervisor Department of Environmental Quality Office (910) 796 7215 Fax (910) 350-2004 Georgefte.ScottCa ncdenr.gov 127 Cardinal Drive Ext. Wilmington, NC 28405 Nothing Compares --r el to -and horn lhis ,ut-V(_?cuoth'e rv�, rr �;ar;�liria f uralic; Records Lau? al"d ;n1dy rjt� disOosed to third padies From: Jeff Petroff [mailto:jpetroff@cldeng.com] Sent: Wednesday, December 07, 201610:42 A.M. To: Scott, Georgette <georgette.scott@ncdenr.gov> Subject: RE: Quick Sit-down to review a previous project submittal Thanks! Je i V Reit.afif, Ra Project Engineer T r L J Coastal Lind nasiLn, PLLC PO Box 1172 Wilmington, iJC 28402 Telephone: 910.254.9333 ext. 1002 Fax: 910.254.0502 www.CLDeng.com w From: Scott, Georgette[mailto:eeoreette.scott@ncdenr.gov] Sent: Tuesday, December 6, 2016 4:52 PM To: Jeff Petroff <ipetroff@cldeng.com> Subject: RE: Quick Sit-down to review a previous project submittal Ok let me take a look at it first. This week is pretty full, I will get back to you on a time. Georgette Scott State Stormwater Program Supervisor Department of Environmental Quality Office (910) 796 7215 Fax (910) 350-2004 Georgette.ScottCa_ncdenr. ov 127 Cardinal Drive Ext. Wilmington, NC 28405 N' :' � 'Nothing Compares. to and Frow !lii - aelickes is subject to ifie .;rYis Law and may be disclosed to third parlies, S TAIZ OF NORTH CAROU A Department of Environmental and Natural Resources 127 Cardinal Drive Extension Wilmington, North Carolina 2W5 (910) 796-7215 E .ACCESS RECORD SBCTION TJMEIDATE NAME REPRESENTING Ga 1 1-1 Guidelines for Access: The staff of W'j,,,iug on Regional Office is dedicated to malting public records in our custody readily available to the public for review and copying. We also have the responsibility to the public to safeguard these records and to ma7 out our day -today program abligatio:ns. Please read carefully the following guidelines signing the form: 1. Due to the large public demand for file access, we request thatyou caE at least a day 'u advance to schedule an appointment to review the files. Ay]pO dments 'evil be scheduled baween 9:00am and 3:00pm. Viewing time ends at 4:45pm. Attune KIMtur wrthout an a7pointmerii may vier the fileto e went that time and staff suuer vision is available. 2. You must specify files you want to review by faggy name. The number of files chat you may review at one time will be limited to five. 3. Yon may make copies of a file when the copier is not in use by the staff and if time Permits. Cost per copy is $.05 cents. Payment may be made by check, honey order, or cash at the recentioA desk. Conies totaling $5 00 or more can be invoiced for your convenience. 4. FI LFS WRTS'T $E KEPT IN ORDEAL YOU POUND THEM.' Files may not be taken from the office. To remove, alter, deface, mutilate, or destroy material in one of these files is a misdemeanor for which you can be fined up to $500.00. No briefcases, large totes, etc• ate pemvtted in the file review area. 5. In accordance with General Statue 25-3-512, a $25.00 processing fee will be charged and collected -for checks on which payment has been refused FACILITY NAME 2. �jGar f 4S/ZD i tore and Name of Fum/Business Date Please attach a business =d to dds form COPIES MADE PAID S:Admin.file access COUNTY 0s5,T cogs Time In Time Out INVOICE 1 VA , ` c1 N vv�v-e- v O�1 _ 7/ RV( � A)V�\Ivu, 40 s�� PAT McCRORY Governor DONALD R. VAN DER VAART Secretary Energy, Mineral & Land -Resources ENVIRONMENTAL QUALITY July 14, 2016 Mr. Carl Ruopp, President Meadowlands Property Owners Association, Inc. c/o Atalaya Property Management 525 6' Ave. South North Myrtle Beach, SC 29582 Subject: PROJECT RETURN Stormwater Project No. SW8 051203 Savannah Lakes at the Meadowlands Brunswick County Dear Mr. Ruopp: TRACY DAVIS Director The Wilmington Regional Office received and accented a modified State Stormwater Management Permit Application for Savannah Lakes at the Meadowlands on November 2, 2015 with requested additional information received on February 26, 2016 and again on June 7, 2016. A review of the information recently submitted on June 7, 2016 has determined that the supporting information is not complete and the permit cannot be issued for the project as proposed. As noted in the second request for additional information dated March 30, 2016, only two rounds of requesting additional information are allowed. Per the requirements of Section .1009 (c) of the Stormwater Management Rules, this Office is hereby returning the subject application as incomplete. The $505.00 application fee has been forfeited and a new fee will need to be provided if you choose to resubmit this application in the future. During the review of the information recently submitted on June 7, 2016, it was found that several of the issues identified in both letters requesting additional information remain unresolved. The project is being returned as incomplete for the following reasons: 15A NCAC 02H.1005(h)(5) and .1005(e): The location of the stormwater control measures in relation to the surface waters .remains unresolved. As noted in Iteml of the previous two requests for additional information, the proposed changes to the stormwater treatment system are considered a major modification to the stormwater permit. A major modification requires the site and the associated BMPs to be designed in accordance with the current State Stormwater requirements listed in 15A NCAC 02H.1005(a), which includes additional requirements for Providing vegetated buffers along surface waters. As noted in the previous two requests for additional information, it was agreed that instead of requiring the proposed wet detention ponds to meet the requirements for the vegetated buffer, it may be demonstrated that this modification does not relocate the two ponds any closer to the surface waters than previously approved. Please note that the pond area is considered to be the water surface up to the top of the embankment. After the review of the response to Item 1 submitted on June 7, 2016, the following will need to be addressed in order for any future submittals to be approved: a. Pond 6 has been adequately demonstrated to have been designed within substantial intent of the previously approved distance to surface waters. b. Pond 7 and the provided justification regarding its relocation is not sufficient to approve its current configuration. The justification is based on the location of the previously approved outlet structure. However, the location of the outlet structure is clearly an error as the previously approved permanent pool area and pond area (up to the top of the embankment) are shown to be setback from the canal easement. Pond 7 will either need to be reconfigured such that it is no closer than previously approved or it will need to be demonstrated that the existing pond area is not being expanded any closer to the surface waters. State of North Carolina I Environmental Quality I Energy, Mineral and Land Resources Wilmingtm Regional Office 1 127 Cardinal Drive Extension I Wilmington, NC 28405 910 7% 7215 State Stormwater Permit No. SW8 051203 Page 2 of 3 c. The newly proposed swale detention area appears to be located within 50-foot buffer. + Based on the provided calculations, it appears this device is being compared to a wet detention pond. As noted above, wet detention ponds may not be located within 50-foot vegetated buffer. The design of this stormwater control measure will need to be reconsidered. (please also refer to Items 4 and 6.b of this letter for additional concerns regarding this proposed measure) 2. 15A .NCAC 02H.1003(g)(5): The top of bank, normal pool elevation, or mean high water line of the surface waters and the corresponding 50-foot vegetated buffer does not appear to have been delineated on the plans. As requested in Item 1 of the previous two requests for additional information, the top of bank, normal pool elevation, or mean high water line of the surface waters must be delineated on the plans. Due to the additional lots along Road A within Phase 3C as well as the additional Swale detention area stormwater control measure and the fact that these areas are considered a major modification and are subject to the new rules, the 50-foot vegetated buffer must be delineated within the vicinity of these new features. 15A NCAC 02H.1003(g)(5) and .1008(c)(3): Upon review of the revised plans, the stormwater system behind lots 247 to 253 are only partially within a common area while the remaining area is not located within an easement. This common area also does not appear to have an access easement to the nearest public right-of-way. In response to Item 4 of the previous request for additional information, it was noted that recording easements on already recorded lots would not be practical. The response also implies that this problem was discussed in our conversation and meeting on April 10, 2016. However, the discussions I recall from that meeting surrounded grading concerns and the ability to direct the water to Pond 6. Per the referenced sections in the rules, all stormwater features must be located within a recorded access easement to the nearest public right-of-way or common area. The easement shall be granted in favor of the party responsible for operation and maintaining the stormwater system. 4. 15A NCAC 02H. 100 5 (a)(3)(B) and .1008(h): During the meeting on April 10, 2016, it was discussed that the runoff from all impervious areas from a high density project must be collected and treated. During that meeting it was also discussed that the grading along the rear of the lots within Phase 1 may not allow the runoff to be directed to Pond 6 as originally approved. During that discussion, it was agreed that if the runoff could not be directed to Pond 6, that an alternative design could be proposed, however that design had to meet the requirements of 15A NCAC 0211.1008(h). The previously submitted plans showed the area between Phase 1 and Phase 3B as being directed to a Swale that would be directed to the collection system for Pond 6. Instead of directing the runoff to the stormwater collection system, the recently. submitted and revised plans propose a "swale detention area", which would be considered an alternative stormwater control measure subject to 15A NCAC 0211.1008(h). In order for alternative designs to be approved the following must be provided: equal or better stormwater control, equal or better protection of waters of the state, and result in no increased potential for nuisance conditions. Per 15A NCAC 02H.1008(h), the following criteria must be provided in order to approve an alternative design: a. The stormwater management system shall provide 85% average annual removal of total suspended solids. b. The discharge rate form the system must either: i. The discharge rate following the 1.5-inch storm event shall be such that the runoff volume draws down to the pre -development design stage within 2 to 5 days. ii. The post development discharge rate shall be no larger than the pre -development discharge rate for the one-year, 24-hour storm. As noted in Item Lc of this letter, it appears this device is being compared to a wet detention pond. However, upon review of the proposed "swale detention area", it appears that this feature more closely resembles a dry detention basin than a wet detention pond since several key features of a wet detention pond have not been provided. Please note that dry detention basins only achieve 50% average annual removal of total suspended solids. The stormwater management system proposed for this drainage area must be reconsidered. If an alternative design is desired, it must be demonstrated that it achieves an 85% TSS removal rate either by a single measure or a State of North Carolina I Environmental Quality I Energy, Mineraland Land Resources Wilmington Regional Office 1 127 Cardinal Drive Extension i Wilmington, NC 28405 910 796 7215 State Stormwater Permit No. SW8 051203 Page 3 of 3 series of measures as described in Section 3.9 of the NC BMP manual and that the outlet structure will continue to meet one of the two criteria listed above. 5. 15A NCAC 02H.1003(g)(8): The operation and maintenance agreement specific to the stormwater management system proposed for the additional drainage area discussed in Items Lc and 4 of this letter was not provided with the recently submitted items. Operation and maintenance agreements must be provided for all proposed stormwater control measures. 6. 15A NCAC 02H.1003(g)(7): a. Upon review of the information presented in response to Item 3 of the previous request for additional information and consultation with other stormwater staff, it was determined that the entire total permanent pool volume must be used for sizing the forebays associated with Pond 7. As requested in Item 5.b of the request for additional information dated January 13, 2016, the permanent pool volume to be contained in forebay 1 for Pond 7 must be based on the three areas contributing to the permanent pool surface area and volume (main pond, forebay 1, and forebay 2). b. For the additional drainage area currently being treated by the Swale detention area, the following information must be provided: i. The additional drainage area and associated impervious area must be identified in the supplemental drainage area table provided in lieu of Section IV.10 of the application. ii. Calculations must be provided to support the provided storage volume of 1,473 cf. It is recommended to include this elevation in the provided stage / storage table. iii. The supplement(s) that most closely relates to the proposed stormwater control measure must be provided. c. The revised calculations indicate that the driving head and drawdown time for Pond 6 has been revised. An updated page 2 of the supplement for Pond 6 must be provided. 7. 15A NCAC 02H.1003(g)(4): As previously discussed on a separate project, drainage arrows are not sufficient to demonstrate the proposed grading. Existing and proposed topographic contours or spot elevations must be provided for all drainage features. If the contour intervals are too large to adequately reflect the identified drainage patterns, spot elevations must be provided. If you wish to pursue construction of this project, you must reapply for a permit to the Division. Your application package must include a completed and signed application form; supplement forms; signed 0&M agreements; application fee; signed, sealed and dated calculations; and 2 sets of signed, sealed and dated site layout and grading plans with details. Additionally, it is recommended that the items identified above be resolved prior to resubmittal. The construction of any impervious surfaces that are not consistent with the originally approved plans prior to receipt of the stormwater permit, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143-215.6A. If you have any questions concerning this matter, please contact Christine Hall at (910) 796-7215 or via e- mail at christine.hall@ncdenr.gov. Sincerely, (;) azv AT-racy=P.E.,,irector Division of Energy, Mineral and Land Resources GDS/cash: %Stormwater\Permits & Projects\2005\051203 HD\2016 07 return_project 051203 cc: Meadowlands Golf Club, Inc., PO Box 4159, Calabash, NC 28467 Jay Carmine, Coastal Land Design PLLC Brunswick County Inspections Wilmington Regional Office State of North Carolina I Environmental Quality I Energy, Mineral and Land Resources Wilmington Regional Office j 127 Cardinal Drive Extension I Wilinington,NC 28405 910 796 7215 Hall, Christine From: Hall, Christine Sent: Thursday, July 14, 2016 4:52 PM To: 'Jay Carmine'; Jeff Petroff Opetroff@cldeng.com) Cc: Scott, Georgette Subject: return of Savannah Lakes - SW8 051203 Attachments: 2016 07 project return 051203.pdf Jay / Jeff, I just wanted to give you two a heads up that the information submitted on June 7tn in response to the second request for additional information dated March 30, 2016 was found to be insufficient. As noted on the last page of the March 30" request for additional information, only two requests for additional information are allowed. After careful consideration, it was decided to return the project application. A pdf of the return letter is attached for your reference. Copies of the signed letter will also be sent in the mail. Please let me know if you wish to discuss any of the items. Thanks, Christine Christine Hall Environmental Engineer Division of Energy, Mineral and Land Resources — State Stormwater Program Department of Environmental Quality 910 796 7215 office 910 796 7335 direct christine.hall@ncdenr.gov 127 Cardinal Drive Ext. Wilmington, NC 28405 F;nail corrasporide+rce to and fro this address is subject to rite North Carolina Public Records Law and may be disclosed to third panties. Stormwater Management Plan Design Narrative for the Modification to Phase 3B and 3C of Savannah lakes at the Meadowlands (SW8 051203 Modification) Calabash, Brunswick County, NC Prepared for: Meadowlands Golf Club, Inc. PO Box 4159 Calabash, NC 28467 C IVE Prepared by: FEB 2 6 2016 BY. Coastal Land Design, PLLC Civil Engineering / Landscape Architecture Land Planning / Construction Management P.O. Box 1172 (910) 254 - 9333 Wilmington, NC 28402 (910) 254 - 0502L : ; www.cidenq.com NN�NN�py �., ►�� CA/4?0 .� Q�OtrEsS/C ��Q yy s 22-February-2016 ¢ SEAL g 028858 ct a KQ Preface This project incorporates revisions to the Phase 36 and Phase 3C sections of the Savannah Lakes Phase at the Meadowlands only. The remaining portion of the overall permit for Savannah Lakes at the Meadowlands (SW8 051203-Modification) is unchanged and remains as permitted. Modifications to Phase 313 include: an increase of the total drainage area slightly to 250,000 square feet (sf) and an increase to the overall impervious to 122,030 sf. The increase in impervious comes from the inclusion of a couple lots to the stormwater pond drainage area, an increase of lot BUA to the maximum allowable BUA of 4,000 sf/lot based upon the existing deed restrictions, and the addition of a 4-foot wide sidewalk along the roadway. The general shape of the pond remains the same in this modification, but in order to meet new stormwater regulations and the updated hydrology of the area, the pond elevations were modified accordingly. The permit modifications to Phase 36 are summarized below: Design Criteria Existing Permit Modification Pond #6 Pond #6 a; nrainage Area, acres Onsite, ft2 Offsite, ft2 4.96 216,058 None 5.74 250,000 None b. Total Impervious Surfaces, ft2 (1) Buildings, ft2 (2) Roads/Parking, ft2 (3) Other (Sidewalk), ft2 (4) Future (5) Offsite, ft2 97,203 69,760 27,443 0 0 0 122,030 80,000 27,450 6,580 8,000 0 c. Design Storm, inches 1.0 1.5 d. Pond Depth, feet 5.0 7 (3.4 avg) e. TSS Removal Efficiency 90 90 f. Permanent Pool Elev., FMSL 25.00 24.00 g. Perm. Pool Surface Area, ft2 13,939 13,894 h. Permitted Storage Volume, ft3 _ 8,768 17,975 i. *Temp. Storage Elevation, FMSL 25.59 25.15 j. Controlling Weir, Ht x L, in 7.13 x 1.5 2" Diameter k. Permitted Forebay Volume, ft3 10,147 9,069 I. Receiving Stream/River Basin Shingletree Swamp Shingletree Swamp m. Stream Index Number Lumber Lumber n. Classification of Waterbody LBR57 15-23-2 LBR5715-23-2 o. Max. Fountain Horsepower, HP 1/6 1/6 - Aaaitionai storage volume is provided to meet Brunswick County's pre- and post -development discharge requirements. Modifications to Phase 3C include: a new road layout and lot subdivision based upon the Army Corps of Engineers' declassification of the two former borrow pits as jurisdictional wetlands. This revision is intended to replace the permitted Phase 3C section of the Savannah Lakes at the Meadowlands (Pond #7, Pond #8A, and Pond #813 in the former permit) in its entirety. This modification provides treatment in the form of one wet detention basin (Pond #7). The existing, and permitted, deed restriction of 4,000sf/lot is not modified in this revision. The permit modifications to Phase 3C are summarized below: Design Criteria Existing Permit Modification *Pond #8A _ *Pond #86 Pond #7 a. Drainage Area, acres Onsite, ft2 Offsite, ft2 8.05 350,658 None 6.95 302,742 None 20.0 871,000 None b. Total Impervious Surfaces, ft2 (6) Buildings, ft2 (7) Roads/Parking, ft2 (8) Other, ft` (9) Offsite, ft2 127,396 86,896 40,500 0 0 135,972 95,472 40,500 0 0 338,655 248,000 90,655 0 0 c. Design Storm, inches 1.5 1.5 1.5 d. Pond Depth, feet 9 (4.9 avg) 8 (3.5 avg) 5.1(3.1 avg) e. TSS Removal Efficiency 90 90 90 f. Permanent Pool Elev., FMSL 25.0 25.0 24.10 g. Perm. Pool Surface Area, ft2 20,455 17,224 40,525 h. Permitted Storage Volume, ft3 17,574 18,770 65,159 i. **Temp. Storage Elevation, fmsl 25.81 25.99 26.00 j. Controlling Weir, Ht x L, in 10.0 x 2.0 12.0 x 2.0 4" Diameter k. Permitted Forebay Volume, ft3 20,342 13,063 44,621 I. Receiving Stream/River Basin Shingletree Swamp / Lumber No Change m. Stream Index Number LBR57 15-23-2 No Change n. Classification of Waterbody C; Sw No Change o. Max. Fountain Horsepower, HP 1/3 1/4 1/3 MP, 1/6 FB2 � in the existing permit, the Lake 7 area (interconnection lake) was combined with the lake areas for Pond #8A and Pond #8B sine there were designed as outfalling ponds. ** Additional storage volume is provided to meet Brunswick County's pre- and post -development discharge requirements. Phase 3B Stormwater System Drainage System This section uses a combination of reinforced concrete and corrugated plastic pipe to convey stormwater drainage to wet detention basin 6. Reinforced concrete pipe is planned to be used under the roadways and corrugated plastic pipe is planned to be used elsewhere. The proposed drainage system was analyzed using Hydraflow Storm Sewers-2008 by InteliSOLVE modeling software. The system was designed for the 25-year storm event according to the NOAA Atlas-14 rainfall estimates for this area. A tailwater elevation of 25.15fmsl (temporary pool) was assumed and the pipes were designed such that the hydraulic grade line remained within the curb inlets for the 25-year storm event. The curb inlets were located per NCDOT guidelines such that the gutter spread does not cover half of the lane width (5.5ft) for the 4 inch per hour (in/hr) storm event. The valley curb is two feet wide, so the allowable inlet spread is 7.5ft for the 4 in/hr storm event. Wet Detention Basin 6 Water Quality The treatment system for this Phase is a wet detention basin designed to store over 1.5 inches of rainfall from a 5.74 acre drainage basin and provide a 90% reduction in total suspended solids with an average depth of 3.4 feet. The drainage area is designed to have 122,030 sf of total impervious surface subdivided into 20 lots at 4,000 sf/lot (80,000 sf), 27,450 sf of roadway, and 6,580 sf of sidewalk, and 8,000 sf of future impervious. Water Quantity Wet Detention Basin 6 was modeled using "Hydraflow-Hydragragh" modeling software and incorporated the Type -III rainfall distribution for the 1-year 24-hour duration storm event and the 10-year 24-hour duration storm event as 3.7 inches and 7.0 inches, respectively (per Brunswick County design standards). The NOAA Atlas-14 rainfall estimate for the 100-year 24- hour storm event is 11.2 in/hr. The pre- and post -development discharges for the drainage area are nrnvidari halnw- Wet Detention Basin 6 1-year 24-hour 10-year 24-hour 100-yr 24-hour Pre -Development Discharge 3.6 cfs 14.0 cfs 29.8 cfs Past -Development Discharge 1.0 cfs 14.9 cfs 30.6 cfs Wet Detention Basin 6 reduces the post -development discharge for the 1-year 24-hour storm event and discharges less than a 5% increase in the 10-year 24-hour storm events. The wet detention basin meets the NCDENR stormwater requirements as well as Brunswick County's pre- and post -development requirements. Phase 3C Stormwater System Drainage System This section uses a combination of reinforced concrete and corrugated plastic pipe to convey stormwater drainage to wet detention basin 7. Reinforced concrete pipe is planned to be used under the roadways and corrugated plastic pipe is planned to be used elsewhere. The proposed drainage system was analyzed using Hydraflow Storm Sewers-2008 by InteliSOLVE modeling software. The system was designed for the 25-year storm event according to the NOAA Atlas-14 rainfall estimates for this area. A tailwater elevation of 25.15fmsl (temporary pool) was assumed and the pipes were designed such that the hydraulic grade line remained within the curb inlets for the 25-year storm event. The curb inlets were located per NCDOT guidelines such that the gutter spread does not cover half of the lane width (5.5ft) for the 4 inch per hour (in/hr) storm event. The valley curb is two feet wide, so the allowable inlet spread is 7.5ft for the 4 in/hr storm event. Wet Detention Basin 7 Water Quality The treatment system for this Phase is a wet detention basin designed to store over 1.5 inches of rainfall from a 20.0 acre drainage basin and provide a 90% reduction in total suspended solids with an average depth of 3.1 feet. The drainage area is designed to have 338,655 sf of total impervious surface subdivided into 62 lots at 4,000 sf/lot (248,000 sf), and 90,655 sf of roadway. Forebay-2 is oversized on purpose to provide additional attenuation of the post -development discharge for this Phase. The total forebay volume is greater than the recommended ratio of 22% of the total pond volume. However, Forebay-2 is staged above the main pond which will provide a greater sediment and nutrient reduction than if connected. Water Quantity Wet Detention Basin 7 was modeled using "Hydraflow-Hydragragh" modeling software and incorporated the Type -III rainfall distribution for the 1-year 24-hour duration storm event and the 10-year 24-hour duration storm event as 3.7 inches and 7.0 inches, respectively (per Brunswick County design standards). The NOAA Atlas-14 rainfall estimate for the 100-year 24- hour storm event is 11.2 in/hr. The ore- and Dost-develonment disrharaas fnr tha drainaca nraa ara nrnvirlarl halmar Wet Detention Basin 7 1-year 24-hour 10-year 24-hour 100-yr 24-hour Pre -Development Discharge 0.9 cfs 27.4 cfs 98.9 cfs Post -Development Discharge 0.7 cfs 28.5 cfs 99.8 cfs Wet Detention Basin 7 reduces the post -development discharge for the 1-year 24-hour storm event and discharges less than a 5% increase in the 10-year 24-hour storm events. The wet detention basin meets the NCDENR stormwater requirements as well as Brunswick County's pre- and post -development requirements. Request for Additional Information Stormwater Project No. SW8 051203 Savannah Lakes at the Meadowlands Brunswick County 07-June-2016 Christine Hall: Your request for additional information has been reviewed and commented upon in this letter. Your requests are repeated in bold, and our responses are in normal font. 1) 15A NCAC 02H.1005(h)(5): As noted in item 1 of the previous request for additional information, the proposed changes to the stormwater treatment system are considered a major modification to the stormwater permit. A major modification requires the site and the associated BMPs to be designed in accordance with the current State Stormwater requirements listed in 15A NCAC 02H.1005(a), which includes additional requirements for providing vegetated buffers along surface waters. As noted in the previous request for additional information, it was agreed that instead of meeting the requirements for the vegetated buffer, it may be demonstrated that this modification does not relocated Pond 6 or 7 any closer to the surface waters than previously approved. Please note that the pond area is considered to be water surface up to the top of the embankment. The response received on February 26, 2016 indicated that the ponds remain within the previously permitted footprint. However upon review of the pond areas, as defined above, appears to have been moved closer to surface waters. For instance, the top of pond embankment for Pond 6 was originally approved to be 20 feet from the property boundary and currently appears to be less than 15 feet from the property boundary. For Pond 7, the top of the embankment on the originally approved plans as 12 feet from the canal right-of-way and appears to be currently proposed approximately 3 feet within the right of way. Please re-evaluate the location of the ponds, as defined above, to confirm they are no closer to the surface waters than previously approved. Also, per 15A NCAC 02H.1003(g)(5), please delineate the 50-foot vegetated buffer as well as the top of bank, normal pool, or mean high water line of the surface water on the plans. Please note that decisions and approvals are made on a case -by -case basis. Future modifications to this or other permits will be considered under the associated merits. We have invested a significant amount of work and time into analyzing the Thomas and Hutton exhibit plans and our construction plans. We would be pleased to come in and discuss our findings with you and compare plans side by side if needed. Pond 6: One of the challenges with comparing our updated construction plans for the Phase-38 Pond 6 and the previously permitted Thomas and Hutton (T&H) drawings is that their permitted submittal to the State appeared to be exhibit drawings rather than construction drawings. The previously permitted exhibits for Pond 6 do not include a vegetated shelf or a top of pond that is able to be constructed. Their details indicate the installation of a vegetated shelf, however, the contours to which our drawings are being compared against do not have them and are not accurate depictions of how that system would have been installed. The only straight comparison between the drawings is comparing the permanent pool distances from the Shingletree Canal easement. Their permanent pool elevation is approximately 21 feet from top of the Shingletree Canal easement. The permanent pool elevation for our design is located 22.5.5 f et from the Shingletree Canal easement. The pond is not located any closer to surface waters than what would have been constructed based upon the previously permitted plans. 310-05 NCDENR RFI Response 06062016 Page 1 of 3 Pond 7: Without trying to justify the T&H drawings, they set the riser structures for both Pond 8A and 88 on the canal easement indicating a water surface at least at, if not within, the Shingletree Canal easement. Pond elevations rise until discharged through riser structures, so regardless of what the exhibits appear to indicate as the top of pon-; the result of a riser structure on the easement is a pond boundary at least on the easement. As with Pond 6, the approved exhibits do not appear to tie to grade and are not accurate comparisons to our provided construction drawings. Our top of pond is located approximately in the some location as their effective top of pond. Their effective top of pond would have to be minimum of 3 feet within the Shingletree Canal easement. As you mentioned, our top of pond is also 3 feet within the Shingletree Canal easement. The pond is not located any closer to surface waters than what would have been constructed based upon the previously permitted plans. 2) 15A NCAC 02H.1005(c)(2) and .1008(e)(2): a. The revised calculations appear to base the average head on a minimum temporary pool elevation instead of the elevation of the next available outlet. Please re-evaluate the average head for both ponds based upon the elevation of the next available outlet. Also, the average head equation presented for Pond 7 appears to yield a different result than presented. Please confirm that both the equation and the result for the average head are formulated correctly. Please refer to the revised calculations included with this response as well as the responses to Questions 2(b) and 2(c). b. For Pond 6: The drawdown time is reported as being 3.6 days; however, the equation presented yields a different result: 15,291 cf / 0.058 cfs / 86,400 sec/d = 3.05 days. Please confirm that the equation used to determine the drawdown time is formulated correctly. This was a calculation oversight. The calculation for the average head has been updated accordingly. The numerical change is: 15,291 cf / 0.063 cfs / 86,400 sec/d = 2.8 days. Please refer to the revised calculations included with this response. c. For Pond 7: As noted in Item 4 of the previous request for additional information, the drawdown time is based on the minimum required storage volume. The drawdown calculations for Pond 7 appear to still use the provided volume instead of the minimum required volume. Please provide calculations confirming that the selected orifice allows the minimum required storage volume to drawdown within 2 to 5 days. The orifice for the Pond 7 has been modified to be 3 inches diameter. This provides a drawdown of 2.8 days based upon conformance with the aforementioned comments. Please refer to the revised calculations and the revised Sheet SW-4 included with this response. 3) 15A NCAC 02H.1003(g)(7): In response to item 5.b of the previous request for additional information, it was requested that the 18-22% range in volume for forebay 1 on Pond 7 be waived. However, no documentation was provided to demonstrate the extent of the discrepancy for which the waiver was requested. Please provide calculations demonstrating that the percent of the forebay volume when compared to the entire 125,294 ft3 permanent pool volume and justification that Forebay 1 is still sized appropriately to continue functioning as intended. Please note that decisions and approvals are made on a case -by -case basis. Future modifications to this or other permits will be considered under the associated merits. As you request, based upon a total pond volume of 125,294 cf, Forebay 1 (3,555 cf) would consist of 2.83% of the total volume. Approximately 19.5% of the total drainage basin is directed to Forebay 1 which reduces the minimum size of the forebay to be 19.5% of the minimum 18% of the total volume; hence, (0.195)x(0.18)x(125,294 cf) = 4,397 cf (3.51%). With the same general approach, 81.5% of the total drainage basin is directed to Forebay 2 which reduces the maximum size of the forebay to be 81.5% of 22% of the total volume; hence, (0.815)x(0.22)x(125,294 cf) = 22,465 cf (17.93%). 310-05 NCDENR RFI Response 06062016 Page 2 of 3 For the minimum required storage (1.5") the temporary pool (25.41 fmsl) is approximately 7-inches below the riser (26.00 fmsl) and thus not using any of the available storage in Forebay 2 — which starts at elevation 26.00 and is essentially hydraulically disconnected from the main pond for the first flush. Since Forebay 1 is hydraulically disconnected from Forebay 2 for events that cause stages below the riser elevation in the main pond, we fee! that the required size of Forebay 1 is more accurately determined based upon the total connected pond volume of 84,228 cf. Based upon the connected volume of 84,228 cf, Forebay 1 is approximately 4.22% of the pond (within the allowable range between 3.51% and 4.29% (18%-22%1). We feel that forebay 1 is appropriately sized for its attributing drainage area and will function properly. Should the State still prefer the calculation based upon the total pond volume anyway, we kindly request a variance for Forebay 1 to be at 2.83% of the total pond volume — rather than the numerical minimum of 3.51% of the total pond volume. Please note in your consideration that the Pond 7 is oversized to meet the Brunswick County pre- and post -development discharge requirements. The minimum forebay size is based upon a fixed percentage of the minimum pond size, not necessarily a fixed percentage of the upsized pond size. We respectfully request the aforementioned numerical, not performance, variance. 4) 15A NCAC 02H.1003(g)(5) and .1008(c)(3): The note on Sheet SW-01 indicates that "a 20' drainage easement to be across lots 254 through 259 and is to be directed to the Phase-3B stormwater pond (pond 6)." Please clarify that a drainage easement will also be provided between lots 257 and 258 for the remainder of the swale directing water to the stormwater collection system for Pond 6. Based upon our conversation with you on April 11, 2016, the recordation of easements on already recorded lots would not be practical so an alternate option was required. During that discussion, a course of action was agreed upon to obtain a seasonal high water table and infiltration test taken at the rear of the lots in the hopes of providing as much treatment as practical for the impervious that is capable of draining from Phase-1 lots 249 through 253. The soils tests performed indicated that the soils are not capable of infiltration. Thus, a modified detention device was designed. There is not sufficient space to install a conventional detention BMP in the open space between the phases, however, we have designed a best fit swale detention area that will capture the first flush (1.5") and discharge it between 2 and 5 days. The average depth is lower than the SAIDA tables provide so a linear extrapolation was calculated (R-squared value of 0.9945) to estimate the required SAIDA at the provided depth. Based upon the 9VDA requirements and drawdown requirements, this best fit detention area should provide sufficient treatment for this situation. We upsized the Swale detention area to capture the runoff from lots 247 and 248 (originally not included) in an effort to provide as much practical treatment as possible with this area. Please refer the supplemental soils report, revised Sheets SW-1 and SW-2, and the provided calculations for the swale detention area included with this response. We appreciate your cooperation with the time extensions and hopefully have satisfied the requests regarding this project. Should you have any questions or concerns, please feel free to contact our office. Thank you, y Carmine, PE, PMP Coastal Land Design, PLLC PO Box 1172 Wilmington, NC 28402 (910) 254-9333 x 1001 310-05 NCDENR RFI Response 06062016 Page 3 of 3 Coastal Land Desian. PLLC Civil Engineering/Landscape Architecture Land Planning/Construction Management P.O. Box 1172 Phone: 910-254-9333 Wilmington, NC 28402 Fax: 910-254-0502 www.cideng.com To: NCDENR — Wilmington Regional Office 127 Cardinal Drive Extension Wilmington, NC 28405 (910) 796 — 7215 Attn: Christine Hall ❑ As Requested ❑ Sent via Mail JUN a ems_ Date: I June 7, 2016 File: 310-04 I Subject: Modification to Existine Permit SW8 051203 for Savannah Lakes at the Meadowlands for Stormwater Ponds #6 and #7 ❑ For Your Files ❑ For Distribution ® For your Review / Action / Approval ❑ Sent via Courier Quantity Drawing No. Description 1 Original Response Letter to Request for Additional Information 1 Copy Revised Wet Detention Basin Supplement for Wet Detention Basin #7 (Page 2, only) 1 Copy Revised Stormwater Calculations (Wet Detention Basin #6, #7, and Swale Detention Area, only) Z Copies Revised Stormwater Management Design Plans (Sheets SW-1, SW-2, and SW-4, only) i Copy Supplemental Soils Investigation for Swale Detention Area JUN 0 7 Remarks Please contact our office should you have any questions or concerns. Thank you. CLD Transmittal 06072016 Hall, Christine From: Hall, Christine Sent: Monday, June 06, 2016 12:52 PM To: 'Jeff Petroff' Subject: RE: Savannah Lakes - SW8 051203 Jeff, Only one 30 day extension can be granted. If the requested additional information is not submitted by COB tomorrow, the project will have to be returned. Christine Christine (Nelson) Hall Environmental Engineer Division of Energy, Mineral and Land Resources — State Stormwater Program Department of Environmental Quality 910 796 7215 office 910 796 7335 direct christine.hall@ncdenr.gov 127 Cardinal Drive Ext. Wilmington, NC 28405 waw.va,l��'•-7.'��Vy '�..:?d ����v��e:a. x. Email correspondence to and this z dress is subject to 'he North Carolina Public Records Lsiv and may be disc'o,=ed to ihitd par 'os. From: Jeff Petroff [mailto:jpetroff@cldeng.comj Sent: Tuesday, May 31, 2016 3:31 PM To: Hall, Christine <Christine.Hall@ncdenr.gov> Subject: RE: Savannah Lakes - SW8 051203 Hi Christine, We are trying to finalize a response to the March 30th request for additional information on the Savannah Lakes at Meadowlands project. We have all the questions answered and were awaiting the geotechnical report for the area bordered by phase 1 and phase 3b. We had a calculation ready to submit, but needed the infiltration rate. The testing was conducted, and although we have not yet received the final report, we did receive an email from the geotechnical engineer giving us an infiltration rate of <0.002 in/hr. This low rate obviously prevents us from using infiltration for the treatment of this small area. We will have to design a small weir to provide some detention. I know we've had several extensions while trying to resolve the discrepancies between the 2008 approval and what was installed in the field, but can we have a two week extension to finalize the weir/detention design? Thanks, Jeff Petroff, P.E. Project Engineer T Coastal Land Design, PLLC PO Box 1172 Wilmington, NC 28402 Telephone: 910.254.9333 ext. 1002 Fax: 910.254.0502 www.CLDeng.com From: Jeff Petroff Sent: Tuesday, May 3, 2016 1:19 PM To: 'Hall, Christine' <Christine. Hall@ ncdenr.gov> Subject: RE: Savannah Lakes - SW8 051203 You Rock, thanks! Jeff Petroff, P.E. Project Engineer Coastal Land Design, PLLC PO Box 1172 Wilmington, NC 28402 Telephone: 910.254.9333 ext. 1002 Fax: 910.254.0502 www.CLDeng.com From: Hall, Christine[mailto:Christine.Hall@ncdenr.gov] Sent: Tuesday, May 3, 20161:18 PM To: Jeff Petroff <ipetroff@cldeng.com> Subject: RE: Savannah Lakes - SW8 051203 Jeff, The 30 day extension is granted. The requested items are now due back prior to June 1. Thanks, Christine Christine (Nelson) Hall Environmental Engineer Division of Energy, Mineral and Land Resources — State Stormwater Program Department of Environmental Quality 910 796 7215 office 910 796 7335 direct christine. hallOncdenr. aov 127 Cardinal Drive Ext. Wilmington, NC 28405 2 Hall, Christine From: Hall, Christine Sent: Tuesday, May 03, 2016 1:18 PM To: 'Jeff Petroff Subject: RE: Savannah Lakes - SW8 051203 Jeff, The 30 day extension is granted. The requested items are now due back prior to June 1. Thanks, Christine Christine (Nelson) Hall Environmental Engineer Division of Energy, Mineral and Land Resources — State Stormwater Program Department of Environmental Quality 910 796 7215 office 910 796 7335 direct christine.hall@ncdenr.gov 127 Cardinal Drive Ext. Wilmington, NC 28405 _._;:•Ir Cam. � .Sp0t7CIE",E Pub,ic F-i.:rrds Li:il''i' .. _ ,-7& / .;,o � 1.� �'^5'%..' t i ih -t ., From: Jeff Petroff [mailto:jpetroff@cldeng.com] Sent: Monday, May 02, 201610:55 PM To: Hall, Christine <Christine.Hall@ncdenr.gov> Subject: RE: Savannah Lakes - SW8 051203 Hi Christine, Thanks for your email. Please find the attached request for additional time. Thanks again, Jeff Petroff. P.E. Protect Engineer Coastal Land Design, PLLC PO Box 1172 Wilmington, NC 28402 Telephone: 91 G.254.93-,3 ext. 1002 Fax: 910.254.0502 www.CLDeng.com From: Hall, Christine[:nailto:Christine.Hall@ncdenr.govl Sent: Friday, April 29, 2016 4:57 PM To: Jay Carmine <icarmine@cldeng.conv; Jeff Petroff <ipetro f@cldeng.com> Subject: RE: Savannah Lakes - SW8 051203 Jeff, I received your message, but trill need something, in writing with a specific date you wish to extend the deadline to (no more than 30 days). Thanks, Christine Christine (Nelson) Hall Environmental Engineer Division of Energy, Mineral and Land Resources — State Stormwater Program Department of Environmental Quality 910 796 7215 office 910 796 7335 direct christine.hallCcifncdenr.gov 127 Cardinal Drive Ext. Wilmington, NC 28405 From: Jay Carmine [mailto:icarmine@cldeng.com] Sent: Friday, April 29, 2016 3:46 PM To: Hall, Christine <Christine.Hall@ncdenr.gov> Subject: RE: Savannah Lakes - SW8 051203 I'm sorry Christine, I just go this email. I have not been in the office for a couple weeks due to my class load. Jeff Petroff in our office should be in contact with you shortly about this project. If you do not hear anything back from him, please feel free to contact me directly. Sincerely, Jay Carmine, PE, PMP Coastal Land Design, PLLC PO Box 1172 Wilmington, NC 28402 Telephone: 910.254.9333 ext. 1001 Cell: 910.547.4000 www.CoastalLandDesign.net From: Hall, Christine[Mai lto:Christine.Hall@ncdenr.g.ov] Sent: Thursday, April 28, 20161:15 PM To: Jay Carmine <lcarmine c:ldeng.com> Subject: Savannah Lakes - SW8 051203 Jay, Just checking in to make sure you didn't have any last minute questions on the request for additional information dated March 30 for the subject project. I believe the requested information is due back tomorrow. Thanks, Christine Christine (Nelson) Hall Environmental Engineer Division of Energy, Mineral and Land Resources — State Stormwater Program Department of Environmental Quality 910 796 7215 office 910 796 7335 direct christine.hallancdenr.gov 127 Cardinal Drive Ext. Wilmington, NC 28405 `-Nothing Compares Us.. ' •tilJt?ff_'f i f:, i�1G N: ig7i? {,,,•[+,i[)dr '.�1'1; : 1`i', ::�. ._ c .:� "Y.., - c. '�...r��, r (l ?t.. ....,:K'. Coastal Land Design, PLLC Civil Engineering/Landscape Architecture Land Planning/Construction Management NCDEQ — Wilmington Regional Office 127 Cardinal Drive Extension April 29, 2016 Wilmington, NC 28405 Attn: Ms. Christine Hall Re: Savannah Lakes at the Meadowlands SW8 051203 Dear Ms. Hall: Coastal Land Design, PLLC cordially requests a 30-day extension for the response to NCDEQ stormwater comments on the Savannah Lakes at the Meadowlands SW8 051203 project. Additional time is needed to finalize the geotechnical testing to address the historical drainage basin layout. Thank you for your consideration, please let me know if you need anything further for this extension request. Sincerely, Jeffrey B. Petroff, P.E. Coastal Land Design, PLLC cc: File P.O. Box 1172 Wilmington, NC 28402 P h o n e : 9 1 0 - 2 5 4 - 9 3 3 3 F a x : 9 1 0 - 2 5 4 - 0 5 0 2 www.CLDeng.com PAT MCCRORY Governor DONALD R. VAN DER VAART Energy, Mineral and Land Resources ENVIRONMENTAL QUALITY March 30, 2016 Mr. Carl Ruopp, President Meadowlands Property Owners Association, Inc. c/o Atalaya Property Management 525 61 Ave. South North Myrtle Beach, SC 29582 Subject: Request for Additional Information Stormwater Project No. SW8 051203 Savannah Lakes at the Meadowlands Brunswick County Dear Mr. Ruopp: Secretory TRACY DAVIS Director The Wilmington Regional Office received and accepted a modified State Stormwater Management Permit Application for Savannah Lakes at the Meadowlands on November 2, 2105 with additional information received on February 26, 2016. A preliminary in-depth review of that information has determined that the application is not complete. The following information is needed to continue the stormwater review: 1. 15A NCAC 02H.1005(h)(5): As noted in item 1 of the previous request for additional oti< information, the proposed changes to the stormwater treatment system are considered a major ► : �^ ` modification to the stormwater permit. A major modification requires the site and the associated BMPs to be designed in accordance with the current State Stormwater requirements listed in 15A NCAC 02H.1005(a), which includes additional requirements_ for providing vegetated buffers along surface waters. As noted in the previous request for additional information, it was agreed that instead of meeting the requirements for the vegetated buffer, it may be demonstrated that this modification does not relocate Ponds 6 or 7 any closer to the surface waters than previously approved. Please note that the pond area is considered to be the water surface up to the top of the embankment. The response received on February 26, 2016 indicated that the ponds remain within the previously permitted footpritit. However, upon review of the location of the ponds, the pond areas, as defined above, appear to have been moved closer to the surface waters. For instance, the top of the pond embankment for Pond 6 was originally approved to be 20 feet from the property boundary and currently appears to be proposed less than 15 feet from the prop", boundary. For Pond 7, the top of the embankment on the originally approved plans was 12 feet from the canal right-of-way and appears to be currently proposed approximately 3 feet within the right -of way. Please re-evaluate the location of the ponds, as defined above, to confirm they are no closer to the surface waters than previously approved. Also, per 15A NCAC 02H.1003(gx5), please delineate the 50-foot vegetated buffer as well as the top of bank, normal pool, or mean high water line of the surface waters on the plans. Please note that decisions and approvals are made on a case -by -case basis. Future modifications to this or other permits will be considered under the associated merits. 2. 15A NCAC 02H.1005(c)(2) and .1008(e)(2): a. The revised calculations appear to base the average head on a minimum temporary pool a elevation instead of the elevation of the next available outlet. Please re-evaluate the average head for both ponds based on the elevation of the next available outlet. Also, the average head equation presented for Pond 7 appears to yield a different result than ,__,,presented. Please confirm that both the equation and the result for the average head. are formulated correctly. State ofNordi Carolina I EavironmenW Quality I Energy, Mineral and Land Resources 127 Cardinal Drive Extension I Vrilmington. NC 28405 910 796 7215 T 1910 350 2004 F I bftJ/oortal.ncdenrDraL abfrl State Stormwater Permit No. SW8 051203 / Page 2 of 2 For Pond 6: The drawdown time is reported as being 3.6 days; however, the equation presented yields a different result: 15,291 cf / 0.058 cfs / 86,400 sec/d = 3.05 days. Please confirm that the equation used to determine the drawdown time is formulated correctly. /. For Pond 7: As noted in Item 4 of the previous request for additional information, the drawdown time is based on the minimum required storage volume. The drawdown calculations for Pond 7 appear to still use the provided volume instead of the minimum required volume. Please provide calculations confirming that the selected orifice allows the minimum required storage volume to drawdown in 2 to 5 days. k 3. 15A NCAC 02H.1003(g)(7): In response to item 5.b of the previous request for additional IJ"LIC V(T�- information, it was requested that the 18-22% range in volume for forebay 1 of Pond 7 be waived. However, no documentation was provided to demonstrate the extent of the .4'0 discrepancy for which the waiver was requested. Please provide calculations demonstrating the percent of the forebay volume when compared to the entire 125,294 ft permanent pool volume and justification that Forebay 1 is still sized appropriately to continue to function as intended. Please note that decisions and approvals are made on a case -by -case basis. Future modifications to this or other permits will be considered under the associated merits. DQ — 4. 15A NCAC 02H.1003(g)(5) and .1008(c)(3): The note on sheet SW-01 indicates that "a 20' drainage easement to be across lots 254 through 259 and is to be directed to the Phase-3B stormwater pond (Pond 6)." Please clarify that a drainage easement will also be provided between lots 257 and 258 for the remainder of the Swale directing water to the stormwater collection system for Pond 6. Please remember that a change to one number may have a domino effect on other numbers. Please check all plans, calculations and forms to ensure that the numbers are consistent throughout. Please note that this request for additional information is in response to a preliminary review. The requested information should be received in this Office prior to May a, 2016, or the application will be returned as incomplete. Please note that only two letters requesting additional information will be allowed. If the information provided after the second request is not sufficient to issue the permit, the project will be returned. The return of a project will necessitate resubmission of all required items, including the application fee. If you need additional time to submit the information, please mail, email or fax your request for a time extension to the Division at the address and fax number at the bottom of this letter. The request must indicate the date by which you expect to submit the required information, which shall be no later than 30 days past the original due date. The Division is allowed 90 days from the receipt of a completed application to issue the permit. The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143-215.6A. Please reference the State assigned project number on all correspondence. If you have any questions concerning this matter please feel free to call me at (910) 796-7215 or email me at christine.hall@ncdenr.gov. Sincerely, 71'. Christine Hall Environmental Engineer GDS/canh: \\\Stormwater\Permits & Projects\2005\051203 HD\2016 03 addinfo 051203 cc: Meadowlands Golf Club, Inc., PO Box 4159, Calabash, NC 28467 Jay Carmine, Coastal Land Design PLLC Wilmington Regional Office Stormwater File State of North Carolina I Environmental Quality I Energy, Mineral and Land Resources 127 Cardinal Drive Extension I Wilmington, NC 28405 910 796 7215 T 1 910 350 2004 F I http://bortal.nodenr.org/webnL/ STATE. QP NORTH Cei1iOLINA Departwnt of Envit'otuaental and Nataral Resomms 127 Cardinal Drive l gaasion Wigton, Norih Cmoliv.a 28405 (910) 796-7215 RLE Ag SS RE Q01R D SECT -TON r),u- -,t R 45j TUVaDATP L, q -0 Nam 44f Croidelines for Access: The staff of Wam gtm Ragimd offices is dedimted to making public records in om custodym4lc r avaiXahle tD&Opublic farrcview and capymg. We also Rave the respo0sfbility to the public to s6gwd these records and to c°ar y out our day-m-day program obligatians. Please read carefully the following g"Imas 4pmgt o form: . Do to the large public demm d for Me ac=, we requesttat pou call at Ieast a dq is ache to schedule an. appointmentto reviewthe files. A.gghd meats wM W sckedn heiween9:0Lamand 3:0bm. Viewingtuneendsat4:45pm. A.rivonearftzwxfhS 2. Ymmztstspeczfy files youwant to review by fa ' .name. The number offiles 1zatpau. mayreview at one t vq-U be ]muted to five. 3. You mayma&e copies ofafile wheathe copier is not it usaTj f staffand iftho pemtts• Cost per copy is $.05 cents Pave* MU be matte by &ack money order or cask at ate Lamban desk toy' ing $5 4Q or mare M be fozvaiead for You eanyenbume. 4. MM M1.`TST RE UZI IN ORDER YOU JFQM TUM011% mayWtbe WW from to off I=- To rmove, altar, deface, mutilate, or destroy mdedd m one of tese files is a mistlemeamrforwhich yo'a can be fated up to $500.00. No brie large, totes, ke mkod.in the f�Is rt wiew arga. $. In wmrdancs wife. Umleral Statue 25 3-5I2, a W.00•processing fee wM be urged and pollectedfor ahaab on whichpay3nesthas beau refused. RA.= N.AM 2. 't Jill 4 7 3ignatrrre aBdNsme of ' Da% Please attach a briskness caul to thts fom COPIES MA.DB 4 I PAD w c� S:A n Ee, access 0 J Time in R rVOICE Tone out Request for Additional Information Stormwater Project No. SW8 051203 Savannah Lakes at the Meadowlands Brunswick County 26-February-2016 Christine Hall: 1G s4 FEB 2620 L3 BY: Your request for additional information has been reviewed and commented upon in this letter. Your requests are repeated in bold, and our responses are in normal font. 1) 15A NCAC 02H.1005(h)(5): The proposed changes to the stormwater treatment system are considered a major modification to the stormwater permit. A major modification requires the site and the associated BMPs to be designed in accordance with the current State Stormwater requirements listed in 15A NCAC 02H.1005(a), which includes additional requires for providing vegetated buffers along surface waters. Instead of meeting this requirement for the vegetated buffer, it may be demonstrated that this modification does not relocate the built -upon or Pond 6 or 7 any closer to the surface waters than previously approved. If either the built -upon area or the ponds have been redistributed or relocated closer to the surface waters than previously approved, then the vegetated buffer requirements must be applied. If a vegetated buffer is needed, please ensure to delineate the top of bank, normal pool, or mean high water line of the surface waters on the plan. Please note that decisions and approvals are made on a case -by -case basis. Future modifications to this or other permits will be considered under the associated merits. Neither Ponds 6 and 7, nor the proposed impervious with this modification to Phase 3, is located any closer to surface waters than originally permitted. The intent of this modification is to maintain as much similarity with the original design as possible while incorporating the necessary hydraulic changes associated with this modification. The Phase 3B pond remains with the permitted footprint and the lot layouts have not changed from the previous permitted plans. The Phase 3C pond system has been changed, but is not located any closer to surface waters than previously permitted. Please refer to the Thomas and Hutton Engineering Company plan. The lot configuration (and the location of proposed built -upon area) has not been altered to be located any closer to surface waters. 2) 15A NCAC 02H.1002(23) and .1005(a)(3)(B)(iii): The plans previously approved on January 24, 2008 shows the drainage from the rear of the adjacent Phase 1 section of lots was to be directed to the pond associated with Phase 3, Pond 6. However, it appears that a new swale is proposed to re -direct the runoff from the rear of these lots directly to the surface waters. By definition, all stormwater discharges into the surface water buffer must be accomplished in a diffuse manner. Additionally, according to aerial photography available online, it appears that some built -upon area has been constructed behind the home for patios and other uses. Please demonstrate that all built -upon areas are directed to a stormwater collection system and that this new discharge will enter the surface waters in a diffuse manner. The drainage from the rear of the lots has been designed to be directed to the Phase 3B Pond #6 via a lot -side swale. This swale preserves the same drainage patterns as originally permitted. Please refer to the revised plan set and supplement included with this response. 3) 15A NCAC 02H.1003(5) and (6): For Pond 6, the revised documents indicate that the drainage area and lot area are both increasing from previously approved. The modified supplemental drainage exhibit provided in lieu of Section IV .10 of the application indicates that the lots within drainage area 6 have been allocated a total of 88,000 square feet or enough for 22 lots. However, the site plan shown on sheet SW-01 appears to delineate only 20 lots within this drainage area. Also, this exhibit indicates that the drainage area is increasing, however comparing the drainage area map approved on January 24, 2008 with the revised 310-05 NCDENR RFI Response 01132016.doc Page 1 of 3 drainage area shown in sheet SW-01. It appears that the drainage area is decreasing (also noted in item 2 above). Please confirm the intended design, drainage area, and associated built -upon area for Pond 6. We are unable to speak for the calculations or supplemental drawings provided by the previous engineering company that originally permitted the pond. Our design provided for Pond 6 is based upon design elements calculated from true -space measurements made in AutoCAO and field reconnaissance. The design configuration and calculations have been checked and verified to be accurate. The original design calculations include the area identified in Question 2. Please refer to the updated submittal included with this response. As a note, the lots have been allocated a maximum total of 80,000 squarefeet of impervious for the 20 lots being directed to this Pond. And, the excess 8,000 square feet of impervious has been allocated as 'future impervious" should the impervious in this phase need to increase. 4) 15A NCAC 02H.1005(c)(2) and .1008(e)(2): The minimum required storage volume is required to drawdown in two to five days. The calculations appear to determine the drawdown time for the provided volume instead of the minimum required volume. Please provide calculations confirming that the provided orifice allows the minimum required volume to drawdown in 2 to 5 days. The drawdown calculations have been updated to reflect drainage of the required first flush volume. Please refer to the revised calculations and the revised supplement for Pond 6 included with this response. 5) 15A NCAC 02H.1003(g)(7): Provide technical information showing final numbers, calculations, assumptions, drawings and procedures associated with the stormwater management measures including: a. For Pond 7, please confirm the surface areas for the top of the sediment cleanout elevation / bottom of the pond and the bottom of the 20-ft vegetated shelf presented on page 2 of the supplement. The combined area for at the sediment cleanout elevations (22 fmsJ for Forebay-1 and Forebay-2; and, 20 fmsl for the Main Pond) is 23,416 square feet. The surface area at the bottom of the 10 ft vegetated shelf (23.6 fmsJ) is 23,677 square feet. Please refer to the revised calculations and supplement included with this response. b. For Pond 7, please re -consider the volume contained in forebay 1. Since the minimum required surface area is being provided by all three areas (main pond, forebay 1, and forebay 2), the total permanent pool volume should be used to determine the range in forebay volumes. The total forebay volume is 44,620 cubic feet and the total permanent volume is 125,294 cubic feet. The State'.s recommended 18-22Y forebay volume ranges are 22,553 cubic feet to 27,565 cubic feet. Forebay 2 is considerably larger than the suggested range but will provide a greater sediment reduction than a directly connected forebay due to the connection to the lower pond by a riser structure. The additional size is also necessary in order to the Brunswick County's pre- and post -discharge requirements. In consideration of this hydraulic improvement, we respectfully request that this requirement be waived. c. Please confirm the pond cross-section provided for Pond 7. The forebay detail appears to be missing. Also, the main pond bottom and sediment remove elevations are listed as 21 and 22 ft, respectively, however, the operation and maintenance agreement lists these elevations as 19 and 20 ft, respectively. The main pond cross-section detail has been updated to include the connected forebay and the bottom and sediment cleanout elevations of 19 ft and 20 ft, respectively. Forebay-2 cross-section detail has also been added to the plan set. Please refer to the revised plan set included with this response. 6) 15A NCAC 02H.1008(e)(9): Please specify the native vegetation types to be planned on the vegetated shelf of a wet pond. Recommended. The landscape plan should specify the type of vegetation for the side slopes and should include a calculation of the square footage of the wet pond area and the minimum number of wetland plants — 50 plants for every 200 square feet of shelf area. The vegetated shelf specification has been added to the main pond of Pond 7. Based upon our conversation regarding the fact that Pond 6 is already existing and stabilized, a planting schedule for the vegetated shelf is not required. This is because of the disturbance and additional hardship necessary to install and establish the vegetated species. We greatly appreciate the State's cooperation with this existing pond. 310-05 NCDENR RFI Response 01132016 Page 2 of 3 We appreciate your cooperation with the time extension and hopefully have satisfied the requests regarding this project. Should you have any questions or concerns, please feel free to contact our office. Thank you, ay Carmine, PE, PMP Coastal Land Design, PLLC PO Box 1172 Wilmington, NC 28402 (910) 254-9333 x 1001 310-05 NCDENR RFI Response 01132016 Page 3 of 3 Coastal Land Design, PLLC Civil Engineering/Landscape Architecture Land Planning/Construction Management P.O. Box 1172 Phone: 910-254-9333 Wilmington, NC 28402 Fax: 910-254-0502 6i AriW www.cideng.com To: NCDENR — Wilmington Regional Office 127 Cardinal Drive Extension Wilmington, NC 28405 (910) 796 — 7215 Attn: Christine Hall ❑ As Requested ❑ Sent via Mail RECEIVED FEB 2 6 2016 Date: February 26, 2016 File: 310-04 Subject: Modification to Existing Permit SW8 051203 for Savannah Lakes at the Meadowlands for Stormwater Ponds #6 and #7 ❑ For Your Files ❑ For Distribution ® For your Review / Action / Approval ❑ Sent via Courier Quantity Drawing No. Description 1 Copy Revised Stormwater Management Application Form (Page 3A of 6) 1 Original Revised Wet Detention Basin Supplement for Wet Detention Basin #6 (Pages 1-2) 1 Original Revised Wet Detention Basin Supplement for Wet Detention Basin #7 (Pages 1-2) 1 Copy Revised Stormwater Management Plan Design Narrative 1 Copy Revised Stormwater Management Plan Calculations (Wet Detention Basin #6 and #7 only) 2 Copies Revised Stormwater Management Design Plans 'aFEB 2 6 2016 , Remarks Please contact our office should you have any questions or concerns. Thank you. CC: File Client Jav R. PLLC PE CLD Transmittal 02222016 Hall, Christine From: Don Heaton <dmheaton@atmc.net> Sent: Friday, February 26, 2016 11:03 AM To: Hall, Christine Subject: Re: Stormwater Permit SW8 051203 Christine, Thank you for the information on the Permit Modification Request! I also have some concerns & questions about permit SW8970631 as well as SW8051203 which I have listed below. Is it possible you or someone else could address these? Hope to see you on the 7th. Permit SW8051203: • This permit allows 100 lots in Phase III. Phase IIIA has 17 lots, Phase 1116 has 22, which leaves 61 for Phase IIIC. Is this correct? • Is there anything in the permit that addresses construction methods or specifications to be used to connect stormwater pipes to junction boxes or for ground compaction or materials to be used prior to laying of stormwater pipes? • Will an inspection by the State be performed on Phase IIIC prior to completion? • Who makes sure any permit modifications requested and approved by the State are completed? Permit SW8970631: • Does this permit or the related drawings indicate the location and directional flow of drainage swales parallel to the roadways and behind the lots? Are these swales an integral part of the system? If the swales are no longer functioning properly isn't it the responsibility of the permit holder to fix them? • Is there a way to determine what percentage of the anticipated stormwater runoff is from the Golf Course versus the lots in this development? The problem is the system served both the Golf Course and the POA which are two different entities and there is some question about who will be responsible for maintenance in the future. • Should this or will this permit be transferred to the POA? • If the permit is transferred to the POA will the State inspect the system to make sure the "as built" is in compliance with the permit? • Are the culverts and drainage pipes under the road on Meadowlands Trail, Wild Oak Lane, and Marsh Road Path part of the permitted system? Do repairs or replacement of these require approval by the State? Don Heaton ----- Original Message ----- From: Hall ChrU hrie To: Don Heaton Cc: Ruopp, Carl; Johnson, Don; Weaver, Cameron Sent: Wednesday, February 24, 2016 12:11 PM Subject: RE: Stormwater Permit SW8 051203 Don, The consultants requested an extension to submit the requested items. The requested information is now due by this Friday, February 26". If you'd like to look at their reply, the submitted information will likely be included as part of the file For your file review. However, please note that the information_ that is submitted in response to the reauest will likely not be reviewed by the 71h and will not be considered approved until it is reviewed and evervthinR is found to be in order. What kind of concerns do ycu have regarding SW8 051203? 1 can try to be available for a few minutes on the 711 but if I know what the concerns are, it can sometimes be addressed ahead of time and/or help to make for a more productive discussioill. Thanks, Christine Christine (Nelson) Hall Environmental Engineer Division of Energy, Mineral and Land Resources — State Stormwater Program Department of Environmental Quality 910 796 7215 office 910 796 7335 direct christine.hall@ncdenr.gov 127 Cardinal Drive Ext. Wilmington, NC 28405 From: Don Heaton [mailto:dmheaton@atmc.net] Sent: Tuesday, February 23, 2016 11:15 AM To: Hall, Christine <Christine.Hall@ncdenr.gov> Cc: Ruopp, Carl <larchrl@atmc.net>; Johnson, Don <msp-0153@atmc.net> Subject: Stormwater Permit SW8 051203 Christine, Have you received the information you requested on January 13, 2016 from Coastal Land Design? If so, would it be possible to get a copy of their reply? Coastal Land Design is working directly for Meadowlands Golf Inc. (the developer) and we are not in the loop for this information even though we are the owner of this permit. Two of us from the POA will be at your facility on Monday March 7, 2016 at 9:00 am. We are performing a file review of this and permit # SW8 970631 with Cameron Weaver. Would it be possible to meet with you for a few minutes that morning to discuss issues with SW8 051203? Thank you! Don Heaton Chairman, Grounds & Facilities Committee Meadowlands Property Owners Association Hall, Christine From: Hall, Christine Sent: Wednesday, February 17, 2016 9:45 AM To: 'Jeff Petroff' Cc: Jay Carmine Subject: RE: Savannah Lakes at Meadowlands SW8 051203 Jeff, Technically, this information was due prior to 2/15/16 and since I didn't get a response or request for an extension by that date, I should have returned the application. However, I will grant an extension this time. The information is now due on February 26, 2016. Please be more cognizant of the due dates in the future and be sure to request any necessary extensions before that due date. Thanks, Christine Christine (Nelson) Hall Environmental Engineer Division of Energy, Mineral and Land Resources — State Stormwater Program Department of Environmental Quality 910 790 7215 office 910 796 7335 direct chdstine.hall@ncdenr.gov ve Ext. 28405 "Nol hi.n,g t'c=rnpar s -._ Ernail correspondence to and from this address is subfEct to The North Carolina Public Re ords Law and may be discloss: io third parties. From: Jeff Petroff [mailto:jpetroff@cldeng.com] Sent: Wednesday, February 17, 2016 9:30 AM To: Hall, Christine <Christine.Hall@ncdenr.gov> Cc: Jay Carmine <jcarmine@cldeng.com> Subject: Savannah Lakes at Meadowlands SW8 051203 Hi Christine, I know you've been working with Jay Carmine on Savannah Lakes at Meadowlands SW8 051203, and we are wrapping up our response but need a little additional time. Can you please extend our deadline by two weeks? Thanks for your help! Jeff Petroff, P.E. Project Engineer Coastal Land Design, PLLC PO Box 1172 Wilmington, NC 28402 Telephone: 910.254.9333 ext. 1002 Fax: 910254.0502 www.CLDeng.com PAT MCCRORY Governor DONALD R. VAN DER VAART Energy, Mineral and Land Resources ENVIRONMENTAL QUALITY January 13, 2016 Mr. Carl Ruopp, President Meadowlands Property Owners Association, Inc. c/o Atalaya Property Management 525 61 Ave. South North Myrtle Beach, SC 29582 Subject: Request for Additional Information Stormwater Project No. SW8 051203 Savannah Lakes at the Meadowlands Brunswick County Dear Mr. Ruopp: Secretary TRACY DAVIS Director The Wilmington Regional Office received and accepted a modified State Stormwater Management Permit Application for Savannah Lakes at the Meadowlands on November 2, 2105. A preliminary in-depth review of that information has determined that the application is not complete. The following information is needed to continue the stormwater review: ­40 1. 15A NCAC 02H.1005(h)(5): The proposed changes to the stormwater treatment system are considered a major modification to the stormwater permit. A major modification requires the site and the associated BMPs to be designed in accordance with the current State Stormwater requirements listed in 15A NCAC 02H.1005(a), which includes additional requirements for providing vegetated buffers along surface waters. Instead of meeting the requirements for the vegetated buffer, .it may be demonstrated that this modification does not relocate the built- upon area or Ponds 6 or 7 any closer to the surface waters than previously approved. If either `-the built -upon area or the ponds have been re -distributed or relocated closer to the surface G� ,a waters than previously approved, then the vegetated buffer requirements must be applied. If ye 01` a vegetated buffer is needed, please ensure to delineate the top of bank, normal pool, or mean �. "c high water line of the surface waters on the plans. Please note that decisions and approvals are made on a ease -by -case basis. Future modifications to this or other permits will be considered under the associated merits. k 2. 15A NCAC 02H.1002(23) and .1005(a)(3)(B)(iii): The plans previously approved on January 24, 2008 shows the drainage from the rear of the adjacent Phase l section of lots was to be directed to the pond associated with. Phase 3, Pond 6. However, it appears that a. new swale is proposed to re -direct the runoff from the rear of these lots directly to the surface waters. By definition, all stormwater discharges into the surface water buffer must be accomplished in a diffuse manner. Additionally, according to aerial photography available online, it appears that some built -upon area has been constructed behindthe home for patios and other uses. Please demonstrate that all built -upon areas are directed to a stormwater collection system and that this new discharge will enter the surface waters in a diffuse manner. Stabs of North Carolina I EmiroameaW Quality I Energy, Mmend and Land Resources 127 Cardinal Drive 1 tensian I Wilmington, NC 29405 910 796 7215 T 1910 350 2004 F I httn://nortal.nodenr.nralweb/lr/ State Stormwater Permit No. SW8 051203 Page 2 of 3 �. 15A NCAC 02H.1003(5) and (6): For Pond 6, the revised documents indicate that the drainage area and lot area are both increasing from previously approved. The modified supplemental drainage exhibit provided in lieu of Section IV.10 of the application indicates that the lots within drainage area 6 have been allocated a total of 88,000 square feet or enough for 22 lots. However, the site plan shown on plan sheet SW-01 appears to delineate only 20 lots within this drainage area. Also, this exhibit indicates that the drainage area is increasing, however comparing the drainage area map approved on January 24, 2008 with the revised drainage area shown in plan sheet SW-0 1, it appears that the drainage area is decreasing (also noted in item 2 above). Please confirm the intended design, drainage area, and associated built -upon area for Pond 6. 4. 15A NCAC 02H.1005(c)(2) and .1008(e)(2): The minimum required storage volume is required to drawdown in two to five days. The calculations appear to determine the drawdown time for the provided volume instead of the minimum required volume. Please provide calculations confirming that the provided orifice allows the minimum required volume to drawdown in 2 to 5 days. 5. 15A NCAC 02H. 1003 (g)(7): Provide technical information showing final numbers, calculations, assumptions, drawings and procedures associated with the stormwater management measures including: Va. For Pond 7, please confirm the surface areas for the top of the sediment cleanout elevation / bottom of the pond and the bottom of the 10 ft vegetated shelf presented on page 2 of the supplement. o b. For Pond 7, please re -consider the volume contained in forebay 1. Since the minimum required surface area is being provided by all three areas (main pond, forebay 1, and forebay 2), the total permanent pool volume should be used to determine the range in the forebay volumes. ,�. Please confirm the pond cross-section provided for Pond 7. The forebay detail appears to be missing. Also, the main pond bottom and sediment removal elevations are listed as 21 and 22 ft, respectively; however the operation and maintenance agreement lists these elevations as 19 and 20 ft, respectively. Z. 15A NCAC 02H.1008(e)(9): Please specify the native vegetation types to be planted on the vegetated shelf of a wet pond. Recommended. The landscape plan should specify the type of vegetation for the side slopes and should include a calculation of the square footage of the wet pond shelf area and the minimum number of wetlands plants - 50 plants for every 200 square feet of shelf area. Please remember that a change to one number may have a domino effect on other numbers. Please check all plans, calculations and forms to ensure that the numbers are consistent throughout. . Please note that this request for additional information is in response to a preliminary review. The requested information should be received in this Office prior to February 15, 2016, or the application will be returned as incomplete. The return of a project will necessitate resubmission of all required items, including the application fee. If you need additional time to submit the information, please mail, email or fax your request for a time extension to the Division at the address and fax number at the bottom of this letter. The request must indicate the date by which you expect to. submit the required information, which shall be no later than 30 days past the original due date. The Division is allowed 90 days from the receipt of a completed application to issue the permit. The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143-215.6A. State of North Carolina I Environmental Quality I Energy, Mineral and Land Resources 127 Cardinal Drive Extension I Wilmington, NC 28405 910 796 7215 T 1 910 350 2004 F I htto:NnortaImcdennore/web/Ir/ State Stormwater Permit No. SW8 051203 Page 3 of 3 Please reference the State assigned project number on all correspondence. If you have any questions concerning this matter please feel free to call me at (910) 796-7215 or email me at christine.hall@ncdenr.gov.. Sincerely,C"-"& w A Christine Hall Environmental Engineer GDS/canh: \\\Stormwater\Permits & Projects\2005\051203 HD\2016 01 addinfo 051203 cc: Jay Carmine, Coastal Land Design PLLC Wilmington Regional Office Stormwater File state of North Carolina I Environmental Quality I Energy, Mineral and Land Resoumes 127 Cardinal Drive Extension I Wilmington, NC 29405 910 796 7215 T 1 910 350 2004 F I bttoWportal.ncdem.ore/web/tr/ STATE OF NORTH CAROLINA Department of Environmental and Natural Resources 127 Cardinal Drive Extension Wilmington, North Carolina 28405 (910) 796-7215 FILE ACCESS RECORD SECTION T1ME/DATE NAME REPRESENTING Guidelines for Access: The staff of Wilmington Regional Office is dedicated to making public records in our custody readily available to the public for review and copying. We also have the responsibility to the public to safeguard these records and to carry out our day-to-day program obligations. Please read carefully the following guidelines signing the form: 1. Due to the large public demand for file access, we request that you call at least a day in advance to schedule an appointment to review the files. Appointments will be scheduled between 9:00am and 3:00pm. Viewing time ends at 4:45pm. Anyone arriving without an appointment may view the files to the extent that time and staff supervision is available 2. You must specify files you want to review by facility name. The number of files that you may review at one time will be limited to five. 3. You may make copies of a file when the copier is not in use by the staff and if time permits. Cost per copy is $.05 cents. Payment may be made by check, money order, or cash at the reception desk. Copies totaling $5.00 or more can be invoiced for your convenience. 4. FILES MUST BE KEPT IN ORDER YOU FOUND THEM. Files may not be taken from the office. To remove, alter, deface, mutilate, or destroy material in one of these files is a misdemeanor for which you can be fined up to $500.00. No briefcases, large totes, etc. are permitted in the file review area. 5. In accordance with General Statue 25-3-512, a $25.00 processing fee will be charged and collected for checks on which payment has been refused. FACILITY NAME COUNTY 1. 15\,.A J5I'J'D3 �& 2. 3. ature and Name of Firm/Business Date Please attach a business card to this form COPIES MADE --- 0 — PAID S:Admin.file access a1�sz 6CM0 Time In Time Out INVOICE Supplemental Jurisdictional Wetland Determination ECEIVE IBY SEP 2 5 2015 ; U.S. ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Action Id. SAW-200640566 County: Brunswick U.S.G.S. Quad: Calabash NOTIFICATION OF JURISDICTIONAL DETERMINATION Property Owner: W. J. McLamb Agent: Mr. Wes Frvar Land Management Group, Inc. Address: P.O. Box 4159 Post Office Box 2522 Calabash, NC 28467 Wihnington..NC 28402 Telephone: 910-452-0001 Property description: Size (acres) Nearest Waterway USGS HUC Location description: 28.5 Shinaletree Swamp 030402060701 Indicate Which of the Following Apply: A. Preliminary Determination, Nearest Town Carolina. Shores River Basin Cape Fear Coordinates N 33.92391 W—7859172 Based on preliminary information, there may be wetlands on the above described property. We strongly suggest you have this property inspected to determine theextent of Department of the Army (DA) jurisdiction. To be considered final, a jurisdictional determination must be verified by the Corps. This preliminary determination is not an appealable action under the Regulatory Program Administrative Appeal Process ( Reference 33 CFR Part 331). B. Approved Determination There are Navigable Waters of the United States within the above described project area subject to the permit requirements of Section 10 of the Rivers and Harbors Act and- Section 404 of the Clean Water Act. Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. our nnblished regulations. this determination may be relied upon for a period not to exceed five Years from the date of this notification. _ We strongly suggest you have the waters of the U.S. on your property delineated. Due to the size of your -property and/or our present workload, the Corps may not be able to accomplish this wetland delineation in a timely manner. For a more timely delineation, you may wish to obtain a consultant. To be considered final, any delineation must be verified by the Corps. X The waters of the U.S. including wetland on Your property have been delineated and the delineation has been _ The waters of the U.S. including wetlands have been delineated and surveyed and are accurately depicted on the plat signed by the Corps Regulatory Official identified below on February 22, 2010. Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. There are no waters of the U.S., to include wetlands, present on the above described property which are subject to the permit requirements of Section: 404 of the Clean Water Act (33 USC 1344). Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. X The property Is located in one of the 20 Coastal Counties subject to regulation under the Coastal Area Management Act (CAMA). You should contact the Division of Coastal Management in Wilminaton, NC at (910) 395 3900 to determine their reauirements. Placement of dredged or fill material within waters of the US and/or wetlands without a Department of the Army permit may constitute a violation of Section 301. of the Clean Water Act (33 USC § 1311). If you have any questions regarding this determination and/or the Corps regulatory program, please contact Ronnie Smith at 910-251-4829. C. Basis For Determination D. Remarks: E. Appeals Information (This Information applies only to approved lurjsdietional determinations as indicated in B. above) This correspondence constitutes an approved jurisdictional determination for the above described site. If you obj ect to this determination, you may request an administrative appeal under Corps regulations at 33 CFR part 331. Enclosed you will find a Notification of Appeal Process (NAP) fact sheet and request for appeal (RFA) form. If you request to appeal this determination you must submit a completed RFA form to the following address: District Engineer, Wilmington Regulatory Division Attn: Ronnie Smith, Project Manager, Wilmington Regulatory Field Office PO Box 1890 Wilmington, North Carolina 28402 In order for an RFA to be accepted by the Corps, the Corps must determine that it is complete, that it meets the criteria for appeal under 33 CFR part 331.5, and that it has been received by the District Office within 60 days of the date of the NAP. Should you decide to submit an RFA form, it must be received at the above address by June 7.2010. **It is not necessary.to submit an RFA form to the District Office if you do not object to the determination in this correspondence.** Corps Regulatory Official: Date: April 6, 2010 Expiration Date: April 6. 2015- The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at our website at http://per2.nwp.usace.army.mi1/survey.html to complete the survey online. r Applicant W.J. McLamb File Number: SAW-2006-40566 Date: Aril 6, .2010 Attached is: wetland boon drawing See Section below LJ INITIAL PROFFERED PERMIT (Standard Permit or Letter ofpermission) A B PROFFERED PERMIT Standard. Permit or Letter ofpermission) PERMIT DENIAL C APPROVED JURISDICTIONAL DETERI WATION D PRELIMINARY JURISDICTIONAL DETERMINATION E A: INITIAL PROFFERED PERMIT: You may accept or object to the permit. ACCEPT. If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the permit. OBJECT: If you object to the permit (Standard or LOP) because of certain terms and conditions therein, you may request that the permit be modified accordingly. You must complete Section H of this form and return the form to the district engineer. Your objections must be received by the district engineer within 60 days of the date of tbus notice, or you will forfeit your right to appeal the permit in the future. Upon receipt of your letter, the district engineer will evaluate your objections and may: (a) modify the permit to address all of your concems,.(b) modify the permit to address some of your objections, or (c) not modify the permit having determined that the permit should be issued as previously written. After evaluating your objections, the district engineer will send you a proffered permit far your reconsideration, as indicated in Section B below. B: PROFFERED PERMIT: You may accept or appeal the permit • ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the permit. APPEAL: If you choose to decline the proffered permit (Standard or LOP) because of certain terms and conditions therein, you may appeal the declined permit under the Corps of Engineers Administrative Appeal Process by completing Section Il of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. C: PERMIT DENIAL: You may appeal the denial of a permit under the Corps of Engineers Administrative Appeal Process by completing Section H of this form and sending the form to the division engineer. This form -must be received by the division engineer within 60 days of the date of this notice. D: APPROVED JURISDICTIONAL DETERMINATION: You may accept or appeal the approved JD or provide new information. • ACCEPT: You do not need to notify the Corps to accept an approved JD. Failure to notify the Corps within 60 days of the date of this notice, means that you accept the approved JD in its entirety, and waive all rights to appeal the approved JD. • APPEAL: If you disagree with the approved JD, you may appeal the approved JD under the Corps of Engineers Administrative Appeal Process by completing Section lI of this form and sending the form to the district engineer. This form must be received by the division engineer within 60 days of the date of this notice. E: PRELEMINARY JURISDICTIONAL DETERMINATION: You do not need to respond to the Corps regarding the preliminary JD. The Preliminary JD is not appealable. If you wish, you may request an approved JD (which may be appealed), by contacting the Corps district for further instruction. Also you may provide new information for further consideration by the Corps to reevaluate the JD. REASONS FOR APPEAL OR OBJECTIONS: (Describe your reasons for appealing the decision or your objections to an initial proffered permit in clear concise statements. You may attach additional information to this form to clarify where your reasons or objections are addressed in -the administrative record.) ADDITIONAL INFORMATION: The appeal is limited to a review of the administrative record, the Corps memorandum for the record of the appeal conference or meeting, and any supplemental information that the review officer has determined is needed to -clarify the administrative record. Neither the appellant nor the Corps may add new information or analyses to the record. however, you may provide additional information to clarify the location of information that is already in the administrative record. If you have questions regarding this decision and/or the If you only have questions regarding the appeal process you may appeal process you may contact_ also contact: Ronnie Smith Mr. Mike Bell, Administrative Appeal Review Officer USAED-RG CESAD-ET-CO R 69 Darlington Avenue U.S: Army Corps of Engineers, South Atlantic Division Wilmington, NC 28403 60 Forsyth Street, Room 9M15 Atlanta,Georgia 30303-8801 RIGHT OF ENTRY: Your signature below grants the right of entry to Corps of Engineers personnel, and any government consultants, to conduct investigations of the project site during the course of the appeal process. You will be provided a 15 -day notice of any site investigation, and will have the op ortuni to participate in all site investigations. Date: Telephone number: Signature of appellant or agent. For appeals on Initial Proffered. Permits and approved Jurisdictional Determinations send this form to: District Engineer, Wilmington Regulatory Division, Attn: Ronnie Smith, Project Manager, Wilmington Regulatory Field Office, 69 Darlington Avenue, Wilmington, North Carolina 28403 - NOTE; All boundaries and distances are considered approximate. This represents a preliminary map prepared from field sketches. These wetland boundaries have been verbally approved by Ronnie Smith of the COE. W.J. McLamb Meadowlands Golf Course Brunswick County, NC 03-09-221 Areas sldered to be uplands rmed disturbance and areas of Impervious surface may require stormwater and sedimentlerosion control measures) - - Areas considered to be jurisdictional wetlands as regulated bythe U.S. Army t Corps of Engineers (no development, soil disturbance or fill activities without prior 4041401 certification) a RPW (Relatively Permanent waters t LMG W-M ALWAGLM ENT www.LMGroup.net Phone: 910.452.0001.1.8661MG.1078 Fax 910.452.0060 P.O. Box 2522, Wilmington, NC 28402 SCALE 1" = 200' Section 404 Jurisdictional Wetlands (post-COE meeting 1112/10) DOWN / U5 U5 �1. ' U5 ' , / 110.277 AC.f N/F y MEFANDSOLF CLUB,INCO.& 1N'46YC 17. I'6. t06AMENITIES AREA 0.798 AC.* LES H. BOOM N KILL NO. 14182 ga1t�lk►' N ZJ TECHNORVEYL 2 MC0121 P-� 3 UPLANDS Ut 0.004 AC,t U2 0.076 AC.t U3 0.001 AC.t U4 59.317 AI U5 15.759 AC.t UB 25.202 AC.t U7 SA A f TOTAL AREA 100.363 AC.t WETLANDS t TO AL AREA 55,. 0 AC.t WATERS OF THE UNITED STATES X1 0.070 AC.t X2 0.009 AC:f X3 1.503 AC.* X4 0.471 AC.i X5 0.229 ACA: X6 1.673 AC.t X7 "I'll AC, TOTAL AREA 4,861 AC.t UPLANDS 100.363 AC.f WETLANDS 5.053 AC.t WATERS OF THE U.S. 4.861 AC.t TOTAL TRACT AREA 110.277 AC.t OM Of PELO SURVEY: 11MCH. 2004. 2 OAX MAP 1404 225009& 2250003007 t 2250000501. ALL BEARINGS AND COORO6414M SHOW ARE BASED ON THE NORO1 CAROUNA ONO SYSTEM MAD 93(1985). THE CODIDHILIE VALUES SN01W, WERE EST 0 BY OPS YRRCN ORICIMA7ED ON NC45 TRA2Y 1988' AND NC05 LSON 1806•. Q ALL STANCES m10Y1N ARC GROUND IEVEL ONTANCE& NOT ORAL OISTAIRES TO CONVERT o67ANC[8 TO GRID DISTANCES, WJLTWLY BY COMBINED FAC709 tAN13403. 61 wEI 4 OEMEATEO BY LAND NAN4SO011 011100P. eI wM1t6 PBOPWl B PARE OF THE PROMM CLAIM W && 1342. P& 1429 AND O.& 1791. P0. 567. 7) %7RLE SEARCH WAS PERFORMED BY THIS OFFICE I. -w U5 5-1 161i 16- N/F MEADOWLANDS GOLF C111B. 225WDOG12 D.B. 106'. PO. 460 LIC 17. PG. 312 SEANIIO N 76.54'Sr E N 76.54a3• E N 7w54'Sr E N 4901'41r E N 4WM'4r E N 4C01'4r E N 3.Tbr ' E N 30S032' W N 305032' w N 70`27'111' E N 79.2719• E N 72'27'19' E S 51.25'40' E s 6c13`Sr E 9 6013%r E 9 19.3723' w 3 Or4WW E 5 0740'N• E S BriS'4r E S 1939'31r w 5 tw39'36• w S 7515w w N 07.38'W E N 1027'29• E N 53.41'37' w N 18.20'O7' W 5 11•N'38' E 5 1 V"38• E N 5w03'29' [ N 6003'29' E N 0755'44' w N 0735'44' W N 0235'44' N S 03&Y25' E S OPN'Or E N 7041'SI' w S 04'35'8r w S OW35'33' w S 8026'46' w N 704035' w N &713'40• w 6 75'NYNI' W 5 B749Y9' W S 13'OB'17 E S 18N'17' E S 1w09'17' E N I r41'or w N 2r30'ar w N 3W39'13' w S 5a20'4r W S 602041• w s 5w10'11' W S SC13'N' w S 31Tw3r IF S 7429'5r E N S917'3r E N 2955.31' E N 4953.10' E N 8713'3W E N B713'39' E N B7t3'3r E N 86.19'41r E N 7Y49'13' E N 61.04154' E N 35.43128' E N 14.00'30' E N 5522'44' W N71'46'09' W N 1640`59' W N 0 729 29' E N 2S35103' E N 3949.4e' E N 71.34'16' w N 8922`11' W N 2120`20' E N 2W15'O1• E N 41'34'39' E N 6531'3B' E N 69.12'1P E N 6022'51' E N 5750'22' E N or16'S4' w N 702O'24' 1Y 5 3713ar E S 4u17'26• W 5 11'15'23' W N 6246.08• w SHEET 1 JOB 1 SITE N/F BOBBIE B. WHITE WCNOY MAP D.& 813. POD 065 N01 TO SCALE 14&88 30.00 15AS •::::.:: �:•::•::: Sca, •: =: X6::;;:•::•:::; 1&77 2.03 2.59 ................ . ::::........ .37 62. 2 37.17.:::::::::. 12.a3 ::•:::::::::::•::: 3&OD ::. �:::::.::.::•: •:. 10.27 .... :...:.. 49.73.:.:' ::X6 65.96 43.35 1--33 IGIAl 37JS 2.50 11.50 37.35 13.74 57.10 9&51 151.51 71.24 42.35 127.54 102.68 57.00 24.41 39.9a 61.90 U6 53.74 1721 1NA7 171.53 126.71 71.70 43.30 101.24 U6 X7 A ?:.. U6 U7 :.W7 Lis NT INSET SCALE lE NOT TO S' INSET C LE N/F BOBBIE It WHITE 2awODe9 O3L 813, Po. 065 U6 ....:•.:::::.:. q : 1 PQ 1N / �1 • NC P. P0. 352 cur. / A, are / CAr. U6 #IV % 4j Z17AF. U6 3 sErV 7Ba5 ;fr 321.31 UK 4&87 37.61 ;3 �ry 63,02iF • �(�`7 8• IFFIN 70.05 PC. 496 N; TO WALE 12&70 Q• f m CI 132.80 W7.35 r 11.89 43.41 2.4 32.6 32.2929 � 6&N 3&22 / 22.74 100.74 4a.f6 56.11 99.86 47.00 4. .......... :.: ............. Lie U6 g••X6:.G INSET 'P NOT TO SCALE wETuaDS DELINEATION SURVEY OF A PORTION OF MEADOWLANDS GOLF CLUB FOR CENTEX HOMES SHALOTPE TOWNSHIP SRUNSWICK COUNTY SOUTH CAROLINA SCALE V- 1DO FEET MAY 6, 20D4 100 50 D t00 200 orsnm+v µlest �Y )A►c MEADOWLANDS PROPERTY OWNERS' ASSOCIATION, INC. 2015 ORGANIZATIONAL MEETING OF THE BOARD OF DIRECTORS MAY 16, 2015 ------------------------------------------------------------------------------------------------------------------- MINUTES An Organizational Meeting of the Meadowlands POA Board of Directors was held immediately following the Annual Members Meeting. The Organizational Meeting was convened at 4:00 p.m. The purpose of the meeting was to elect Officers. Upon a motion made, seconded (Johnson/Faust) and unanimously approved, it was: Moved: the officer positions for the coming year are as follows: Title Name Term Expires Committee Liaison President � arl Ruopp 2016 Communications Vice President Don Johnson 2017 Grounds & Facilities Treasurer George Stencel 2017 Budget & Finance Secretary Christine Faust 2016 Covenants Director at Large Ray Faires 2016 Lifestyles President Ruopp noted the next meeting is a Special Meeting of the Board scheduled for June 24, 2015 at 2:00 p.m., which is not advertised, however owners may attend. President Ruopp also noted the next Regular Meeting of the Board is scheduled for July 22, 201.5 at 2:00 p.m. Upon a motion made, seconded (Johnson/Faust) and unanimously approved, it was: Moved: to adjourn the Organizational Meeting at 4:09 p.m. OCT 21 205 BY: 2015 �t II ��{J Ir�1�11t1t�11 II 0B361 0117 09:32 li.0 02 Brenda . Clemons: PROP O o 106 NC Register of Deeds page 1 of 6 �O Presenter r an Eft. This docutrentist� tfmmthe T4'I jp — P , r,�_� Cush S re is of N.C. Gen. Star. ' Ck Finance — �p l:W tT:::ai �f i;rca d �� iL"1012 due to condifion OQl:1 o r; ;•:n 1. �A Ili e�lA.do^n drd or/ inquentlaxAsst. 0 reproduced otcoe. DEED OF DEDICATION STATE OF NORTH CAROLINA OC/- �L COUNTY OF BRUNSWI,_i� oaT�1 !�1 g@ on o OUT OPINION OF E lJ T@G Prepared By: Sheila K. McLamb THIS DEED OF DEDICATION, made and entered into this the Al day of 2015, by and between MEADOWLANDS PROPERTY OWNERS ASSOCIATION, INC., with an officUann6itt hf Brunswick County, North Xo � o 0 Carolina, party of the first hereinafter referred to as "Grantor", c% Atalaya Property Management, PO Box 769, North Myrtle Beach, South Carolina 29597, and BRUNSWICK COUNTY, a governmental entity created and existing under the laws of the State of North Carolina party of the second gabre" ferred to as "Grantee P.O. Box 249, Bolivia, N"06 �° T �� TNESSETH Whereas Meadowlands Golf Club, Inc. hereinafter referred to as "Developer" is the developer of a Brunswick County subdivision known as lowlands Golf Club; (� U o Whereas Developer%eu8*teWQ ied water and sewer lines under and along the road rights -of -way of Meadowlands Golf Club; and Whereas Developer has conveyed the road right-of-way described in Exhibit A to the Grantor for the Grantor's use as common area; and ((� Whereas Grantee has ado tccj��dte`iesolution stated policy ©oom regarding water and sewer Tystems under the terms of which, among other things, in order to obtain water and sewer for said project, Grantor must convey title to the water and sewer distribution system to Grantee through an instrument of dedication acceptable to Grantee; g6@ o Nk� � NOW, TIIEREFO o 5** m consideration of Grantee accepting said water and sewer lines and making water and sewer available to said subdivision, has lam® ° ast hod°b� Brunswick C{{�{���Register B3610 P0118 m ,of DeOds page 2 of sP� conveyed and by these presents does hereby convey to Grantee, its lawful successors and assigns, the following described property: SEE E3=rr A �O TO HAVE AND T? D IWwater and sewer lines and equipment above described together with the privileges and appurtenances thereto belonging to Grantee forever. Nonexclusive easement over, along and upon the entir ea of the streets no depicted on the maps and servi to y above for purposes of entry into TO the property for maintenance, repair and upkeep of the water and sewer distribution systems and for connecting the same to additional portions of the Developer's property developed or to be developed lying adjacent to said streets and reserving unto Developer, its successors and assigns, equal rigl}�s ofUff cb&& over -in -along and upon said streets for purposes ooO s and maintaining such utilities as may be required for the development of said property, including, but not limited to electric, gas, telephone, cable, water and sewer. And Grantor does hereby covenant that it water and sewer lines and equipment descri ATI simple and has the right to convey the same in fee simple, that the same are free and clear of encumbrances, and that it will warrant and defend the title to the same against all persons whomsoever. Developer warrants to Grantee that the system hereinveyed is of good quality and free from faults and deffeec ia°dbe' 9 as -built drawings. Developer warrants said system for a period of one year from the date of recording this Deed of Dedication in the office of the Brunswick County Register of Deeds. IN WITNESS WHEREOF, the Grantor has caused this instrument to be duly executed, the day and -year first abov�VT (A@@ ° jngt ��((o��° o MEADOWI;A1�lDS PROPERTY OWNERS ASSOCIATION, INC. By: <2-Z 0-==77-d CARL RUOPP PRESIDENT OVA T©t°a�aCr� g�oo�Q� IlIIIIIIIu�IIIIIIIIIIIIIIIIIIIIIIII gL11011STATE OF NORTH CAROLINA Brunsulak County, page 3of s COUNTY OF BRUNSWICK I, DoNN Pp' e Lbw G- , allo Public, of the County and State aforesaid, certify that CART RUOPEOWLEANDS - Wally known to me or proven by satisfactory evidence, me this day and acknowledged that he is P f PROPERTY OWNERS ASSOCIATION. INC. a RTH CAROLINA corporation, and that he, as PRESIDENT being authorized to do so, voluntarily executed the foregoing on behalf of the corporation and I have seen satisfactory evidence of the principal's identity, by current state or federal identification with the principal's photograph in the form of a North Carolina Driver License; each acknowledging to me that he voluntarily signed the foregoing docwment for the purposes stated therein. ���� Witness my hand and o i, ,*Qjys `- day�of 2015. r - - 0 DONNA P. L Notary's Signature _ wARY PUKM Bnmewidc C,av+tY. Norm camw�a My „ Notary's Printed Name: CyvN A P L6r3 G (NOTARY SEAL) My commission expires: podo°bo Tang@O ° *Qt god° �Drang@oo�Q� �n%@0 ° ndy� pod° U � VVD§@@ ° 5Qt god ° State & County Documents Required — Permit SW8O51203 • Permit Modification Request— 10/21/15 (Coastal Land Design) o Copy of original request & related drawings o Purpose of request (supposed to change Pond #6 to reflect as built and combine pond 8A & 8B into one pond and fore bay called pond V. o Responses to questions from Christine Hall on 1/13/16 — due 2/15/16. o Copies of any changes to the permit or drawings in response to the questions. • Overall Site plan and Stormwater System Construction Details for Phase 3A (Thistle Trail) • Certifications from the engineering firm for each Phase: o Phase 1- signed by Walter Warren on 10/17/06 o Phase 2 — signed by David Gantt on 1/10/18 o Phase 3A o Phase 36 — signed by Coastal land Design on 6/2/15 o Phase 3C - TBD • Compliance Inspection Reports from the State for each Phase: o Phase 1 & 2 - inspected by David Cox on 5/29/12 o Phase 3A o Phase 3B o Phase 3C - TBD • Inspection reports from the County for each Phase: o Phase 1 & 2 — inspected by Brigit Flora on 1/19/12 o Phase 3A o Phase 3B o Phase 3C - TBD County Documents Required — Phase 3 • Construction Details for Phase 3A—Thistle Trail & Meadowlands Lots 1-7? • Construction Details for Phase 313 — Pasturage & Chickweed • Permit for construction for Phase 3C • Construction Details for Phase 3C (Lot Plan, Water & Sewer, Stormwater, Roads & Bridge) • Is there any geotechnical data concerning the soils and need for underdrains in Phase 3A, 3B, or 30 Casmer, Jo From: Casmer, Jo Sent: Wednesday, November 04, 2015 1:14 PM To: 'jcarmine@cldeng.com' Subject: Savannah Lakes at the Meadowlands; Stormwater Permit SW8 051203 The Wilmington Regional Office of the Division of Energy, Mineral, and Land Resources (Stormwater Section) received the Stormwater Permit Application and $505.00 fee on November 2, 2015. The project has been assigned to Christine Hall and you will be notified if additional information is needed. Please be advised that the construction of built -upon area may not commence until the Stormwater Permit is issued. The application did not reflect an email address for the applicant, so we ask you please notify them of the status of the application. Jo Casrner Administrative Assistant for DEMLIR/Stormwater Section North Carolina Department of Environmental Quality Department of Environmental Assistance & Customer Service 910 796-7336 office 910 350-2004 fax io.casmerY_ncdenr.uu. 127 Cardinal Drive Extension Wilmington, NC 28405 s �/ a •� a: �l Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Project Name: Project Location Rule(s)17-1 2008 Coastal Type of Permit: New or %: (% OK?) Subdivided?: Subdivisi Paperwo Ir upplement(s) (1 or �l with correct/t �=� � '� pplication with co rporLLC:��� 505 (within 6mo) D-Soi' Report mr3f "A// a(culations (signet 11 No obvious errc ElDensity include. i eed Restrictions, o "f Completeness Review Checklist y'Lchy�a� Received Date: o� Accepted Date: 1995 Coastal Phase 11 (WIRO.) Li Universal 1988 Coastal Mo or PR Existing Permit # (Mod or PR): PE Cert on File? Type: Commercial or Residential NCG: lid.^ "A^^ MOffsite to SW8 igned & Notar ct Templa A� retrf Plans ets �B cinity Map 1Y-J ' d' Bend Infiltration Soils Report SHWT: Bottom: Visited: Additional Information: Permitted BUA (sf) DA (sf) PP (el) SHWT (el) Depth (ft) SA {sf) 11 PP: BUA Permitted (Master): BUA Proposed (Offsite): Proposed: (em Tress: Design Engineer Iress: Owner viewer: iildings, etc) oundaries Lot #: ®Lot # Matches Master sf sf Completeness Review Checklist Project Name: +—q - Received Date: —a� Project Location: Accepted Date: Rule(s) 1:12008 Coastal 1:11995 Coastal 0Phase II (WiRO.) LiUniversal 1988 Coastal 'type of Permit: New or ,60—CP or PR Existing Permit # (Mod or PR): PE Cert on File? Density: HD or LD Type: Commercial or Resiclential-/'NCG: %: (% OK?) Stream Class: ®SA Map Offsite to SW8 Subdivided?: Subdivision or Single Lot I MORW Map MExempt Paperwo k Emalled Engineer on: upplement(s) (1 original per BMP) BMP Type(s): with correct/original signatures (1 original per BMP except LS/VFS and swales) pplication with correct/original signatures eed p or LLC: Sig. Auth. per SoS or letterffln-a-i"I"Address: 505 (within 6mo) ��ss� ail Address: Design Engineer Owner ,S0its Report V4*�T 3, - Note to Reviewer: culations (signed/sealed) -o No obvious errors ®Density includes common areas, etc eed Restrictions, if subdivided: Sig ed & Notarized Plans ets i s (roads, cut -de -sacs, curbs, sidewalks, BMPs, Buildings, etc) 7-1 rading and(�2elineated ,dr No Wetlands unity Map out (proposed BUA dimensions) Bend Maps P 9''ect Boundaries Infiltration Wet Pond Offs'ate Soils Report Soils Report PE Cert for Master Lot #: SHWT: ll SHWT: ®Deed Rest for Master ®Lot # Matches Master Bottom: 11 1PP: BUA Permitted (Master): sf Visited: BUA Proposed (Offsite): sf Additional Information: Permitted Proposed: Proposed: BUA (sf) DA (sf) PP (el) SHWT (el) Depth (ft) SA (sf) Coastal Land Design, PLLC Civil Engineering/Landscape ^- Land Planning/Constrl, tj a-L9. 2~ ZZIS'. P.O. Box 1172 P J _ Wilmington, NC 28402 F� . www.cideng.c To: NCDENR - Wilmington Regional Office 127 Cardinal Drive Extension Wilmington, NC 28405 (910) 796 - 7215 Attn: I Georgette Scott ❑ As Requested ❑ For Your Files ❑ Sent via Mail ❑ Sent via Courier II Quantity I Drawing No. 1 Original Stormwater Management Apl 1 Copy Stormwater Management Apr 1 Original Wet Detention Basin Operatio 1 Original Wet Detention Basin Operatioi 1 Minutes from POA meeting sh. 1 Recent Deed of Dedication to E IL0 - . cut, Remarks Hi Georgette, please find the revised signature pages for the POA as the permittee. I attached meeting minutes showing the new president and a recorded document from Brunswick County. Let me know if you need anything else on this. Thanks for your help on getting this straight! CC: File RE IV Coastal Land Design, PLLC Client OCT Z 7 2015 Signed Jeff Pe off, PE CLD Transmittal 10262015.docx Coastal Land Design, PLLC Civil Engineering/Landscape Architecture Land Planning/Construction Management P.O. Box 1172 Phone: 910-254-9333 Wilmington, NC 28402 Fax: 910-254-0502 www.cideng.com To: NCDENR — Wilmington Regional Office 127 Cardinal Drive Extension Wilmington, NC 28405 (910) 796 — 7215 Attn: I Georgette Scott ❑ As Requested ❑ Sent via Mail Date: October 26, 2015 File: 310-04 Subject: Modification to Existing Permit SW8 051203 for Savannah Lakes at the Meadowlands for Stormwater Ponds #6 and #7 ❑ For Your Files ❑ For Distribution ® For your Review / Action / Approval ❑ Sent via Courier Quantity Drawing No. Description 1 Original Stormwater Management Application Form (revised permittee) 1 Copy Stormwater Management Application Form (revised permittee) 1 Original Wet Detention Basin Operation and Maintenance Agreement for Wet Detention Basin #6 (revised) 1 Original Wet Detention Basin Operation and Maintenance Agreement for Wet Detention Basin #7 (revised) 1 Minutes from POA meeting showing Carl Ruopp as President 1 Recent Deed of Dedication to Brunswick County showing Carl Ruopp as President BY: AV Remarks Hi Georgette, please find the revised signature pages for the POA as the permittee. I attached meeting minutes showing the new president and a recorded document from Brunswick County. Let me know if you need anything else on this. Thanks for your help on getting this straight! CC: File Client OCT �I 7 2015 Coastal Land Design, PLLC PE CLD Transmittal 10262015.docx Scott, Georgette From: Scott, Georgette Sent: Monday, October 26, 2015 3:45 PM To: 'Jay Carmine' Cc: Casmer, Jo Co.casmer@ncdenr.gov) Subject: RE: Savannah Lakes at Meadowlands State Stormwater Permit# SW8 051203 Ok. Since I will be out the rest of the week you have till next Tuesday. If you drop this off please make sure it is addressed to me or Jo casmer. Georgette From: Jay Carmine [mailto:jcarmine@cldeng.com] Sent: Monday, October 26, 2015 2:57 PM To: Scott, Georgette <georgette.scott@ncdenr.gov> Subject: RE: Savannah Lakes at Meadowlands State Stormwater Permit# SW8 051203 I'm sorry Georgette. I forwarded that email over to another person in my office to handle while I've been out. I think that they are still in the process of obtaining a new application form. Thank you for the head's up. I'll talk with them today and verify. Jay Carmine, PE Coastal Land Design, PLLC (910) 742-4000 From: Scott, Georgette[mailto:georgette.scott@ncdenr.gov] Sent: Friday, October 23, 2015 4:00 PM To: Jay Carmine <icarmine@cldeng.com> Cc: Casmer, Jo <io.casmer@ncdenr.gov> Subject: RE: Savannah Lakes at Meadowlands State Stormwater Permit# SW8 051203 Jason, We discussed this on the phone several weeks ago and you told me you were sending in a new application. We can only hold these for a short time due to dated checks etc. I will have to return the package to you next Wednesday if we do not get an application by Mondav or Tuesday. Georgette From: Scott, Georgette Sent: Thursday, October 08, 2015 2:05 PM To:'jcarmine@cldeng.com' <jcarmine@cldeng.com> Subject: FW: Savannah Lakes at Meadowlands State Stormwater Permit# SW8 051203 Resent to correct email address From: Scott, Georgette Sent: Thursday, October 08, 2015 2:03 PM To: 'jcarmine@cld.eng' <icarmine@cld.eng> Cc: 'WJMcLamb@gmail.com' <WJMcLamb@gmail.com> Subject: Savannah Lakes at Meadowlands State Stormwater Permit# SW8 051203 Jason, We were about to process this modification when we realized that this permit is not in Meadowlands Golf Course, Inc. name. This permit was transferred to the POA in 2012. If you wish to continue with this modification you will have to send in a new application with the POA's signature allowing the modification. Meadowlands Golf Course, Inc. will then be 'Listed as the developer. If I do not hear from you we will have to send the package back to you. The current president for the POA is Stephen Cosgrove and the registered agent is Lisa P. Watts. Georgette Scott Stormwater Program Supervisor State Stormwater Program NC Division of Energy, Mineral and Land Resources 127 Cardinal Drive Ext. Wilmington, NC 28405 (.;corh,x:t.le.Scott@iicdeiir.gov Phone (910) 796-7339 Fax (910) 350-2004 E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. Scott, Georgette From: Scott, Georgette Sent: Friday, October 23, 2015 4:00 PM To: 'jcarmine@cldeng.com' Cc: Casmer, Jo Qo.casmer@ncdenr.gov) Subject: RE: Savannah Lakes at Meadowlands State Stormwater Permit# SW8 051203 Jason, We discussed this on the phone several weeks ago and you told me you were sending in a new application. We can only hold these for a short time due to dated checks etc. I will have to return the package to you next Wednesday if we do not get an application by Monday or Tuesday. Georgette From: Scott, Georgette Sent: Thursday, October 08, 2015 2:05 PM To: 'jcarmine@cldeng.com' <jcarmine@cldeng.com> Subject: FW: Savannah Lakes at Meadowlands State Stormwater Permit# SW8 051203 Resent to correct email address From; Scutt, Georgette Sent: Thursday, October 08, 2015 2:03 PM To:'jcarmine@cld.eng' <icarmine2cld.eng> Cc: 'WJMcLamb@gmail.com' <WJMcLamb gmail.com> Subject: Savannah Lakes at Meadowlands State Stormwater Permit# SW8 051203 Jason, We were about to process this modification when we realized that this permit is not in Meadowlands Golf Course, Inc. name. This permit was transferred to the POA in 2012. If you wish to continue with this modification you will have to send in a new application with the POA's signature allowing the modification. Meadowlands Golf Course, Inc. will then be listed as the developer. If I do not hear from you we will have to send the package back to you. The current president for the POA is Stephen Cosgrove and the registered agent is Lisa P. Watts. Georgette Scott Stormwater Program Supervisor State Stormwater Program NC Division of Energy, Mineral and Land Resources 127 Cardinal Drive Ext. Wilmington, NC 28405 George.tte.Scoty@ncdetn gov Phone (910) 796-7339 Fax (910) 350-2004 E-mail correspondence to and from this address maybe subject to the North Carolina Public Records Law and may be disclosed to third parties. Scott, Georgette From: Scott, Georgette Sent: Thursday, October 08, 2015 2:05 PM To: 'jcarmine@cldeng.com' Subject: FW: Savannah Lakes at Meadowlands State Stormwater Permit# SW8 051203 Resent to correct email address From: Scott, Georgette Sent: Thursday, October 08, 2015 2:03 PM To:'jcarmine@cld.eng' <jcarmine@cld.eng> Cc:'WJMcLamb@gmail.com' <WJMcLamb@gmail.com> Subject: Savannah Lakes at Meadowlands State Stormwater Permit# SW8 051203 Jason, We were about to process this modification when we realized that this permit is not in Meadowlands Golf Course, Inc. name. This permit was transferred to the POA in 2012. If you wish to continue with this modification you will have to send in a new application with the POA's signature allowing the modification. Meadowlands Golf Course, Inc. will then be listed as the developer. If I do not hear from you we will have to send the package back to you. The current president for the POA is Stephen Cosgrove and the registered agent is Lisa P. Watts. Georgette Scott Stormwater Program Supervisor State Stormwater Program NC Division of Energy, Mineral and Land Resources 127 Cardinal Drive Ext. Wilmington, NC 28405 Georgn:t te. Scottc(p i iccleiu-.gov Phone (910) 796-7339 Fax (910) 350-2004 E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. r Y'• �}i t AaA.ma .� . _ . •r• � _ �' . --� ��__�___ . �..a _ , _ .....E—�;��x;�, � �. _� - _ - — i _.� r ,� � _ }Jl7rlryli?c:ii'Ftt .,- r �..•- ..... .. ;'IYas�nt+'3tn:ua rtx.. a r 4h'1. '9eui � r � S�Ly '� I Ci•SVGF� � ... _^ _J i j �'�d.r 1 "�� ;'- i'�}C�4[11iE1`i6 . i-•Hek+sl i . fs�• _� _ _ � +:. : j k 17 PkA .s�w:��,.T�s�rc>'alt�3• � i rvhi_•���• � yr •Iw:` .. .- 1 _�...._�� �.�__._�. l .,..-.�...... _ �'_�. f PHASE 3 +Ui► .ld I I �•;, ' "r` 4 •-] _ - 1. ,., , . • yam- . ' .-.,; - ! � .... -'' --�:3- � � •: . •'», �1 I ' • ' x� - , VICINITY MAP FOR SAVANNAH LAKES (PHASE 3) AT MEADOWLANDS LATITUDE: 33-55-37 LONGITUDE:—78-35-38 USGS QUADRANGLE MAP: CALABASH DATE: July 27, 2006 PROPOSED ACTIVITY: SAVANNAH LAKES (PHASE 3) COUNTY: BRUNSWICK APPLICANT: CENTEX HOMES Corporations Division Page 1 of 1 Haft careve r j """ _'75 5FZ.R.,1}�,�I' 1!41 T tL i;. 'I _I IL! Seomiery ,,� „• POI-:» 7:: 4' RKUvi jp, I`•d 27QK.-fv,-- n (919)07-2U[If1 Account Login Click Here To: Register View Document Filings Corporate names Legal: Meadowlands Property Owners Association, Inc. Non -Profit Corporation information Sosld: 0415500 Status: Current -Active Annual Report Status: Not Applicable Citizenship: Domestic Date Formed: V13/1997 Fiscal Month: December State of Incorporation: NC Registered Agent: Watts, Lisa P. Corporate Addresses Mailing: 1031 Meadowlands Trail NW Calabash, NC 28467 Principal Office: 1031 Meadowlands Trail NW Calabash, NC 28467 Reg Office: 1031 Meadowlands Trail NW Calabash, NC 28467 Reg Mailing: 1031 Meadowlands Trail NW Calabash, NC 28467 http://www.secretary.state.ne.us/Search/profcorp/4738341 10/8/2015 C201508301418 SOSID: 0415500 Date Filed: 3/31/2015 3:59:00 PM Elaine R Marshall State of North Carolina North Carolina Secretary of State Department of the Secretary of State C2015 083 01418 NONPROFIT CORPORATION'S STATEMENT OF CHANGE OF PRINCIPAL OFFICE Pursuant to §55A-16-23(b) of the General Statutes of North Carolina, the undersigned nonprofit corporation does hereby submit the following for the purpose of changing its principal office address currently on file with the Secretary of State. RaPlIMATION CURRENTLY ON FILE The name of the corporation is: Meadowlands Property Owners Association, Inc. The street address and county of the principal office of the corporation currently on file is: Number and Street: 2284 Ocean Highway West Hwy 17 N City, State, Zip Code: Shaliotte, NC 26459 County: Brunswick The mailing address if dii erentfrom the street address of the principal office currently on file is: PO Box 338, Shailotte, NC 28459 NEW EVF_„QRMATION The street address and county of the new principal office of the corporation is: Number and SUeet:1031 Meadowlands Trail NW City, State, Zip Code: Calabash, NC 28467 County_ Brunswick 2. The mailing address if dii erem from the street address of the new principal office is: This statement will be effective upon filing, unless a later date and/or time is This is the 11 th 'day of March , 2015 Property tners Ass ration, Inc. e of Corporation or Print Name and(y e� Mvli NOTES: 1. Filing fee is $5. This statement and one exact or conformed copy of it must be filed with the Secretary of State. Revised January 2000 Form N-12 CORPORATIONS DIVISION P. O. BOX 29622 RALEIGH, NC 27626- 0622 SOSID: 0415500 Date Fled: 4/24/2014 8:18:00 AM Elaine R Marshall North Carolina Secretary of State STATE OF NORTH CAROLINA C2013 343 00172 DEPARTMENT OF THE SECRETARY -OF STATE' STATEMENT OF CHANGE OF REGLSTERED OFFICE ANDIOR REGISTERED AGENT Pursuant to §5513-31 of the General Statutes of North Carolina, the undersigned entity submits the following for the purpose of changing its registered office and/or registered agent in the State ofNorth Carolina !ik : The name of the entity is: MeadowAnds Property Owners Associalm. Inc. Entity Type: OCaparatien, oFamp Cmpwwon, ElNenptu& QMor Wa,, QFomiga Nonpto5t Corporatism, Limited Liability Company, OForelp Limited Liability Company OLimited Partnership, []Foreign Limited Partaerskp, 0L1miftd Liability Parts m&p,131imaign LimitedualubtyPartnerwip The street address and county of the entity's registered office currently on file is: Number and Street: 1030 Meadowanda Trap NW City, Sire, Zip Code: Wi4ain. NO 2i 4F Cody. earuneMck The 6A9alftg a rsif N C bash. N�64reet �°W of the office currently on file is: '1!±e name of the current registered sgertt ia: Kellle K Mold n1' •Lb' .. � I� 1. The street address and county of the new registered office of the entity'is: (complete this item only (]the adds ofow registered opce is being changed} Number and Street: 1031 Meadowlands Trail NW City, State, Zip Code: Calabash, NC 26467 County. Brunswick 2. The mailing address j'di fereat f m the stntst address of the new registered office is: (complete this item only Me address of the registered of ce is being changed] 1031 Meadowlands Trail NW, Calabash, NC 28467 3. The name of the new registered agent and the new agent's consent to appointment appears below: (complete this item only ifthe name of the registered agent is bein Chan so � l LIN P. Wa t , Bjge or FW1a1Jaree of NeWAgent ! • Slgnatrere A nde 4. The address of the entity's registered office and the address of the business office of its registered agent, as changed, will be ideaticatl. S. This statement will be effective upon filirng, aatea a date and/or time is specified: Upon Receipt This is the day of _ , 20_ MsadoWNRIS Property Owners AseoCMw, Ina �Cla V1 �naryxev`�—��rl or print.Arame and Title Hates: F6Wg roe !e SS.ea. 'r9b dacaareae moot be t>tert writ <tie 6eeretaq araete, IIaetead ateigalag hers, the am rq&kerea agent map alga a mpnate wrttao moot to tie appotatmat, wakt mmt be atacw to thus anteaaat. CORPORATIONS DMSION P. 0. BOX 29622 RALEIGH, NC 27626-0622 Revised Jamtary 2002 Form BE-06 Coastal Land Desian. PLLC Civil Engineering/Landscape Architecture Land Planning/Construction Management P.O. Box 1172 Phone: 910-254-9333 Wilmington, NC 28402 Fax: 910-254-0502 www.cideng.com To: NCDENR— Wilmington Regional Office 127 Cardinal Drive Extension Wilmington, NC 28405 (910) 796 — 7215 Attn: Stormwater Review ❑ As Requested ❑ Sent via Mail Date: I September 23, 2015 File: 310-04 Subject: Modification to Existing Permit SW8 051203 for Savannah Lakes at the Meadowlands for Stormwater Ponds #6 and #7 ❑ For Your Files ❑ For Distribution ® For your Review / Action / Approval ❑ Sent via Courier Quantity Drawing No. Description 1 Check In the Amount of $505.00 1 Original Stormwater Management Application Form 1 Copy Stormwater Management Application Form i Original Wet retention Basin Supplement for Wet Detention Basin #6 1 Original Wet Detention Basin Supplement for Wet Detention Basin #7 1 Original Wet Detention Basin Operation and Maintenance Agreement for Wet Detention Basin #6 1 Original Wet Detention Basin Operation and Maintenance Agreement for Wet Detention Basin #7 1 Original Stormwater Management Plan Design Narrative 1 Original Stormwater Management Plan Calculations 1 Copy Supplemental Soils Report 1 Copy Supplemental Deed Restrictions 1_ Copy Supplemental Property Deed 1 Copy Supplemental Business Corporation Annual Report EP 's tm5 1 Copy Supplemental Jurisdictional Wetland Determination 2 Copies Stormwater Management Design Plans Remarks Please contact our office should you have any questions or concerns. Thank you. CLD Transmittal 09232015 STATE OY NOWM CAR012iA Department of Environmental and Natural Resources 127 Cardinal Drive Extension Wilmington, North Carolina 28405 (910) 796-7215 ME ACCESS RECORD SECTION TIMEMATE NAME REPRESENTING Guidelines for Access: The staff of Wilmington Feegional Office is dedicated to making public records in our custody readily available to the public for review and copying. We also have the responsibility to the public to safeguard these records and to cagy out our day-to-day program obligations. Please read carefully the following guidelines signing the form: 1. Due to the large public demand for Me access, we request that you call at least a day in advance to schedule an appointment to review the files..AbpoWtments will be scheduled between 9:00am and.3:00pm. Viewing time ends at 4:45pm. Anyone arriving without an appointmen# may view the files to the extent that time and staff supervision is available. 2. You must specify files you want to review by facility name. The number of files that you may review at one tune will be limited to five. 3. You may make copies of a file when the copier is not in use by the staff and if time permits. Cost per copy is $.05 cents. Payment may be made by chekk, money order, or cash at the reception desk. Copies totaling $5 00 or more can be invoiced for your eonyenience. 4. FjLES MUST BE KERT IN ORDER YOU FOUND THEM. Files may not be taken from the office. To remove, alter, deface, mutilate, or destroy material in one of these files is a misdemeanor for which you can be fined up to $500.00. No briefcases. Iarae totes, etc. are Muted in the file review area. 5. In accordance w5 General. Statue 25--3-512, a $25.00 processing fee will be charged and collected.for checks on which payment has been refused. FACILITY NAME COUNTY i.cze 2 3. 4. ignature and Name of FEofhk�fbm ss Da Please attach a business ca COPIES MADE i 5 PAID S:Admi Lfde. access I ZkZ 0 Time In RITVOICE IS-, ZS Time Out