Loading...
HomeMy WebLinkAboutSW8051203_Historical File_20080125� warF \O�O 9QG Michael F. Easley, Governor y William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources r Coleen H. Sullins Director Division of Water Quality January 25, 2008 Mr. Ken Balogh, Division President Centex Homes 2050 Corporate Center Drive, Suite 200 Myrtle Beach, SC 29577 Subject: Stormwater Permit No. SW8 051203 Modification Savannah Lakes at the Meadowlands High Density Subdivision Project Brunswick County Dear Mr. Balogh: The Wilmington Regional Office. received a complete Stormwater Management Permit Application for the modification of Savannah Lakes at the Meadowlands on January 11, 2008. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H.1000 and the NPDES Phase II Post Construction Requirements set forth in Session Law 206-246, as applicable. We are forwarding Permit No. SW8 051203 Modification., dated January 25, 2008, for the construction of the subject project. This permit modification revises Permit No. SW8 051203 for Savannah Lakes at the Meadowlands,_ issued November 7, 2006, as follows: (1) reduces the size of Pond #7, (2) changes Pond #7 to an amenity lake, (3) adds Pond #8A and Pond #813, and (4) removes a cul-de-sac and one lot in Phase 3C. Please replace the previously approved plans for Phase 3 of Savannah Lakes at the Meadowlands with the enclosed plans approved for this permit modification. This permit shall be effective from the date of issuance until November 7, 2016, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the Operation and Maintenance requirements in this permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within sixty (60) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, P.O. Drawer 27447, Raleigh, NC 27611-7447. Unless such demands are made this permit shall be final and binding. If uou haVe a questions, or need additional information concerning this matter, please contact Christine 61sbn, or me at 1910) 7906-7215. Since ly Edward Beck Regional Supervisor Surface Water Protection Section ENB/can: S:IWQSISTORMWATERIPERMIT1051203Mod.jan08 cc: David Gantt, P.E., Thomas and Hutton Engineering Town of Carolina Shores Building Inspections Christine Nelson Wilmington Regional Office Central Files NoAn Carolina )Vaturally North Carolina Division of Water Quality 127 Cardinal Drive Extension Wilmington, NC 28405 Phone (910) 796-7215 Customer Service Wilmington Regional Office Internet: www.ncwaterquality.org Fax (910) 350-2004 1-877-623-6748 An Equal Opportunity/Affirmative Action Employer— 50% Recycled110% Post Consumer Paper State Stormwater Management Systems Permit No. SW8 051203 Modification STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWA T ER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North- Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Ken Balogh and Centex Homes Savannah Lakes at the Meadowlands NCS'R 1303 & NCSR 1302, Carolina Shores, Brunswick County FOR THE construction, operation and maintenance of eight wet detention ponds in compliance with the provisions of 15A NCAC 2H .1000 and Session Law 2006-246, as applicable (hereafter referred to as the "stormwater rules and the NPDES Phase 11 Post Construction Requirements') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit modification revises Permit No. SW8 051203 for Savannah Lakes at the Meadowlands, issued November 7, 2006, as follows: (1) reduces the size of Pond #7, (2) changes Pond #7 to an amenity lake, (3) adds Pond #8A and Pond #813, and (4) removes a cul-de-sac and one lot in Phase 3C. This permit modification replaces the plans previously approved with Permit No. SW8 051203, issued November 7, 2006, for Phase 3 of Savannah Lakes at the Meadowlands with the enclosed Phase 3 plans approved on January 24, 2008. This permit shall be effective from the date of issuance until November 7, 2016 and shall be subject to the following specified conditions and limitations: 1. DESIGN STANDARDS This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.5 on page 3 of this permit. The subdivision is permitted for 92, 82, and 100 lots for Phases 1, 2, and 3, respectively, each allowed 4,000 square feet of built -upon area. There is no allotment for future built -upon area at the site. 3. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. Page 2 of 9 State Stormwater Management Systems Permit No. SW8 051203 Modification 4. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. 5. The following design elements have been permitted for the wet detention pond stormwater facilities, and must be provided in the systems at all times. Design Criteria Pond Pond Pond Pond Pond Pond Pond Pond #1 #2 #3 #4 #5 #6 #8A #813 a. Drainage Area, acres: 8.58 2.33 23.78 17.97 13.25 4.96 8.05 6.95 Onsite, ft2 Offsite, ft2 373,745 101,495 1,035,857 782,773 577,176 216,058 350,658 302,742 None None None None No None None None b. Total Impervious Surfaces, ft 145,719 23,405 264,947 358,063 209,523 97,203 127,396 135,972 (1) Buildings 110,000 16,000 185,232 205,000 164,000 69,760 86,896 95,472 (2) Roads/Parking 35,719 7,405 79,715 78,496 45,523 27,443 40,500 40,500 (3) Other 0 0 0 74,567 0 0 0 0 4 Offsite 0 0 0 0 0 0 0 0 c. Design Storm, inches 1.0 1.0 1.0 1.0 1.0 1.0 11.5 1.5 d.Pond Depth, feet 7.5 7.5 7.5 6.0 5.0 5.0 9 4,9 av 8 3.5 av e.TSS removal efficient 90 90 90 90 90 90 90 90 f. Permanent Pool Elev., FMSL 25.0 25.0 25.0 24.0 24.0 25.0 25.0 25.0 .Perm. Pool Surface Area, ft 20,216 23,659 30,492 140,787. 16,950 13,939 20,455 17,224 h.Permitted Storage Volume, ftJ 12,512 2,232 24,995 31,035 20,139 8,768 17,574 18,770 I. Temp. Storage Elev., FMSL 25.59 25.09 25.8 24.74 25.1 25.59 25.81 25.99 j. Controlling Weir, Ht. X L, in 7.1 x 2.0 1.1 x 3 9.6 x 3 8.84 x 3 12.96 x 7.13 x 10.0 x 2.0 12.0 x 2.0 2.16 1.5 k.Permitted Forebay Volume, ft 9,828 14,000 62,601 38,333 18,522 10,147 20,342 13,0 33 I. Receiving Stream/River Basin Shin letree Swam / Lumber m.Stream Index Number LBR57 15-23-2 n.Classification of Water Body C; SW o.Max. fountain horse ower, HP 1/6 1/4 1/2 1/2 1/8 1/6 1/3 1/4 Note: Pond #3 includes Pond #3A as a forebay to Pond #3. Pond #8A and Pond #813 are designed to meet the NPDES Phase II Post Construction Requirements. II. SCHEDULE OF COMPLIANCE 1. No homeowner/lot owner/developer shall fill in, alter, or pipe any drainage feature (such as swales) shown on the approved plans as part of the stormwater management system without submitting a revision to the permit and receiving approval from the Division. " 2. The permittee is responsible for verifying that the proposed built -upon area for the entire lot, including driveways and sidewalks, does not exceed the allowable built -upon area. Once the lot transfer is complete, the built -upon area may not be revised without approval from the Division of Water Quality, and responsibility for meeting the built -upon area limit is transferred to the individual property owner. 3. If an Architectural Review Board or Committee is required to review plans for compliance with the BUA limit, the plans reviewed must include all proposed built -upon area. Any approvals given by the Board do not relieve the homeowner of the responsibility to maintain compliance with the permitted BUA limit. Page 3 of 9 State Stormwater Management Systems Permit No. SW8 051203 Modification 4. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to the approved plans, regardless of size. b. Project name change. c. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area. e. Further subdivision, acquisition, or sale of all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 5. The Director may determine that other revisions to the project should require a modification to the permit. 6. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. 7. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. 8. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 9. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. 10. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 11. Permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. Page 4 of 9 State Stormwater Management Systems Permit No. SW8 051203 Modification 12. Prior to the sale of any lot, the following deed restrictions must be recorded: a. The following covenants are intended to ensure ongoing compliance with State Stormwater Management Permit Number SW8 051203 Modification, as issued on January 25, 2008, by the Division of Water Quality under NCAC 2H.1000. b. The State of North Carolina is made a beneficiary of these covenants to the extent necessary to maintain compliance with the Stormwater Management Permit. c. These covenants are to run with the land and be binding on all persons and parties claiming under them. d. The covenants pertaining to stormwater may not be altered or rescinded without the express written consent of the State of North Carolina, Division of Water Quality. e. Alteration of the drainage as shown on the approved plans may not take place without the concurrence of the Division of Water Quality. f. The maximum built -upon area per lot is 4,000 square feet. This allotted amount includes any built -upon area constructed within the lot property boundaries, and that portion of the right-of-way between the front lot line and the edge of the pavement. Built upon area includes, but is not limited to, structures, asphalt, concrete, gravel, brick, stone, slate, coquina and parking areas, but does not include raised, open wood decking, or the water surface of swimming pools. g. Lots within CAMA's Area of Environmental Concern may be subject to a reduction in their allowable built -upon area due to CAMA regulations. h. All runoff from' built upon area on the lot must drain into the permitted system. This may be accomplished through providing roof drain gutters which drain to the street, grading the lot to drain toward the street, or grading perimeter swales and directing them into the pond or street. Lots that will naturally drain into the system are not required to provide these measures. i. Built -upon area in excess of the permitted amount will require a permit modification. 13. A copy of the recorded deed restrictions must be submitted to the Division within 30 days of the date of recording the plat, and prior to selling lots. The recorded copy must contain all of the statements above, the signature of the Permittee, the deed book number and page, and the stamp/signature of the Register of Deeds. 14. Decorative spray fountains will be allowed in the wet detention pond stormlrJater treatment systems, subject to the following criteria: a. The fountain must draw its water from less than 2' below the permanent pool surface. b. Separated units, where the nozzle, pump and intake are connected by tubing, may be used only if they draw water from the surface in the deepest part of the pond. c. The falling water from the fountain must be centered in the pond, away from the shoreline. d. The maximum horsepower for the fountain's pump is based on the permanent pool volume. The maximum pump power for a fountain in the wet detention ponds is listed on page 3 of this permit in Section 1.5. Page 5 of 9 State Stormwater Management Systems Permit No. SW8 051203 Modification 15. Prior to transfer of the permit, the stormwater facilities will be inspected by DWQ personnel. The facility must be in compliance with all permit conditions. Any items not in compliance must be repaired or replaced to design condition prior to the transfer. Records of maintenance activities performed to date will be required. 16. The permittee shall at all times provide the operation and maintenance necessary to assure that all components of the permitted stormwater system function at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. c. Mowing and revegetation of side slopes. d. Immediate repair of eroded areas. e. Maintenance of side slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of structures, orifice, catch basins and piping. g. Access to all components of the system must be available at all times. 17. Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ. The records will indicate the date, activity, name of person performing the work and what actions were taken. 18. This permit shall become voidable unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 19. Built upon area includes, but is not limited to, structures, asphalt, concrete, gravel, brick, stone, slate, coquina and parking areas, but does not include raised, open wood decking, or the water surface of swimming pools. III. GENERAL. CONDITIONS 1. This permit is not transferable to any person or entity except after notice to and approval by the Director. In the event there is either a desire for the facilities to change ownership, or there is a name change of the Permittee, a "Name/Ownership Change Form" must be submitted to the Division of Water Quality accompanied by appropriate documentation from the parties involved. This may include, but is not limited to, a deed of trust, recorded deed restrictions, Designer's Certification and a signed Operation and Maintenance plan. The project must be in good standing with DWQ. The approval of this request will be considered on its merits and may or may not be approved. 2. The permittee is responsible for compliance with all of the terms and conditions of this permit until such time as the Director approves the transfer request. 3. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. 4. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. Page 6 of 9 M State Stormwater Management Systems Permit No. SW8 951203 modification 5. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 6. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and reissuance or termination does not stay any permit condition. 7. Permittee grants permission to staff of the DWQ to access the property for the purposes of inspecting the stormwater facilities during normal business hours. 8. The permittee shall notify the Division of any name, ownership or mailing address changes within 30 days. 9. A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of ten years from the date of the completion of construction. Permit issued this the 25th day of January 2008. NOR CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION for Coleen H. Sullins, Director Division of Water Quality By Authority of the Environmental Management Commission Permit Number SW8 051203 Modification Page 7of9 State Stormwater Management Systems Permit No. SW8 051203 Modification Savannah Lakes at the Meadowlands, Phase 3 Page 1 of 2 Stormwater Permit No. SW8 051203 Modification Brunswick County Designer's Certification I, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/weekly/full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form are a part of this Certification. Noted deviations from approved plans and specifications: Signature Registration Number Date SEAL Page 8 of 9 State Stormwater Management Systems Permit No. SW8 051203 Modification Certification Requirements: Page 2 of 2 The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built -upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. 5. The outlet/bypass structure elevations are per the approved plan. 6. The outlet structure is located per the approved plans. 7. Trash rack is provided on the outlet/bypass structure. 8. All slopes are grassed with permanent vegetation. 9. Vegetated slopes are no steeper than 3:1. 10. The inlets are located per the approved plans and do not cause short- circuiting of the system. 11. The permitted amounts of surface area and/or volume have been provided. 12. Required drawdown devices are correctly sized per the approved plans. 13. All required design depths are provided. ,14. All required parts of the system are provided, such as a vegetated shelf, a forebay, and the vegetated filter. 15. The required dimensions of the system are provided, per the approved plan. cc: NCDENR-DWQ Regional Office Town of Carolina Shores Building Inspections Page 9 of 9 DI,VQ USE ONLY Date Rece ed Fee Paid Permit Number Z n7 5 S w S zo o.p State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form may be photocopied for use as an original I. GENERAL INFORMATION 1. Applicants name (specify the name of the corporation, individual, etc. who owns the project): Centex Homes 2. Print Owner/Signing Official's name and title (person legally responsible for facility and compliance): Ken Balogh - Division President - Centex Homes 3. Mailing Address for person listed in item 2 above: 2050 Corporate Center Drive, Suite 200 City: Myrtle Beach State:SC Zip:29577 Phone: (843 ) 839-2200 Fax: (843 ) 839-2208 Email:kbalogh@centexhomes.com 4. Project Name (subdivision, facility, or establishment name - should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): Savannah Lakes at the Meadowland, Phase 3 5. Location of Project (street address): Intersection of SR 1303 and SR 1302 City:Carolina Shores County:Brunswick b. Directions to project (from nearest major intersection): Intersection of SR 1303 and SR 1302 7. Latitude:33° 55' 37" Longitude:78' 35' 38" of project 8. Contact person who can answer questions about the project: Name:David Gantt, P.E. Telephone Number: (843 ) 839-3545 Email: gantt.d@thomas-hutton.com II. PERMIT INFORMATION: 1. Specify whether project is (check one): ❑New ❑Renewal ®Modification Form SWU-101 Version 8.07 Page I of 2. If this application is being submitted as the result of a renewal or modification to an existing per -nit, list the existing permit number SW8051203 and its issue date (if known) 3/8/06 3. Specify the type of project (check one): ❑Low Density ®High Density ❑Redevelop ❑General Permit ❑Universal SMP ❑Other 4. Additional Project Requirements (check applicable blanks): ❑CAMA Major ®Sedimentation/Erosion Control Z404 /401 Permit ❑NPDES Stormwater Information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748. III. PROJECT INFORMATION 1. In the space provided below, summarize how stormwater will be treated. Also attach a detailed narrative (one to two pages) describing stormwater management for the project. Stormwater will be treated on -site via wet detention basins. 2. Stormwater runoff from this project drains to the Lumber River basin. 3. Total Site Area: 110.27 acres 4. Total Wetlands Area: 9.91 acres 5. 100' Wide Strip of Wetland Area: 7.00 acres (not applicable if no wetlands exist on site) 6. Total Project Area**: 107.36 acres 7. Project Built Upon Area: 28.36 8. How many drainage areas does the project have? 8 9. Complete the following information for each drainage area. If there are more than two drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. Bn n Informat%on a Area 1 Dr Area 2 Receiving Stream Name Stream Class & Index No. Drainage Area (sf) Existing Impervious* Area (sf) See attached Sheet See attached Sheet Proposed Impervious*Area (sf) % Impervious* Area (total) 6pern6a Surface Ar+ a l rairr Ares 1 Dr U e Area 2 On -site Buildings (sf) On -site Streets (st) On -site Parking (sf) On -site Sidewalks (sf) See attached Sheet See attached Sheet Other on -site (sf) Off -site (sf) Total (sf): * Impervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sidewalks, gravel areas, etc. **Total project area shall be calculated based on the current policy regarding inclusion of wetlands in the built upon area percentage calculation. Form SWU-101 Version 8.07 Page 2 of 4 c k u CL CL � CD Lui § � �\ c� & Co �$ k� s Ul cc zk © c� C�■0co o CV m t%% % �g2CDoCD .fF G� 000 oa 77§0000§ } R 0 cn w Gt- 0000 t. � m co § ) §°©■�§ �« 2 2 � ckcm c)3 %©f 12a.7,© $$ _d3dJg§ « !®t �)§%%%#■ % _ k «0000- § e -Sn%%%%C � �/0000� co mw �|| � . 0 n C, In cn � 9 Rn I.. n « 2 | |2 « � k CM I � � !$ M l® � i fa) 3�a33oe 10. How was the off -site impervious area listed above derived? Using average impervious area per lot and adding the proposed roadway. IV. DEED RESTRICTIONS AND PROTECTIVL COVENANTS One of the following deed restrictions and protective covenants are required to be recorded for all subdivisions, outparcels and future development prior to the sale of any lot. If lot sizes vary significantly, a table listing each lot number, size and the allowable built -upon area for each lot must be provided as an attachment. Form DRPC-1 High Density Commercial Subdivisions Form DRPC-2 High Density Developments with Outparcels Form DRPC-3 High Density Residential Subdivisions Form DRPC-4 Low Density Commercial Subdivisions Form DRPC-5 Low Density Residential Subdivisions Form DRPC-6 Low Density Residential Subdivisions with Curb Outlets By your signature below, you certify that the recorded deed restrictions and protective covenants for this project shall include all the applicable items required in the above form, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the State, and that they will be recorded prior to the sale of any lot. V. SUPPLEMENT FORMS The applicable state stormwater management permit supplement form(s) listed below must be submitted for each BMP specified for this project. Contact the Stormwater and General Permits Unit at (919) 733-5083 for the status and availability of these forms. Form SW401-Low Density Form SW401-Curb Outlet System Form SW401-Off-Site System Form S101401-Wet Detention Basin Form S`dV401-Infiltration Basin Form SW401-Infiltration Trench Form SW401-Bioretention Cell Form SW401-Level Spreader Form SW401-Wetland Form SW401-Grassed Swale Form SW401-Sand Filter Low Density Supplement Curb Outlet System Supplement Off -Site System Supplement Wet Detention Basin Supplement Infiltration Basin Supplement Underground Infiltration Trench Supplement Bioretention Cell Supplement Level Spreader/Filter Strip/Restored Riparian Buffer Supplement Constructed Wetland Supplement Grassed Swale Supplement Sand Filter Supplement Form SWU-101 Version 8.07 Page 3 of 4 VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below. The complete application package should be submitted to the appropriate DWQ Office. (Appropriate office may be found by locating project on the interactive online map at httr)://h2o.enr.state.nc.us/su/msi maps.htm) 1. Please indicate that you have provided the following required information by initialing in the space provided next to each item. • Original and one copy of the Stormwater Management Permit Application Form • Original and one copy of the Deed Restrictions & Protective Covenants Form • Original of the applicable Supplement Form(s) and O&M agreement(s) for each BMP • Permit application processing fee of $505 ($4,000 for Express) payable to NCDENR • Calculations & detailed narrative description of stormwater treatment/management • Copy of any applicable soil report • Three copies of plans and specifications (sealed, signed & dated), including: - Development/ Project name - Engineer and firm -Legend - North arrow - Scale - Revision number & date - Mean high water line - Dimensioned property/project boundary - Location map with named streets or NCSR numbers - Original contours, proposed contours, spot elevations, finished floor elevations - Details of roads, drainage features, collection systems, and stormwater control measures - Wetlands delineated, or a note on plans that none exist - Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations - Drainage areas delineated - Vegetated buffers (where required) VII. AGENT AUTHORIZATION If you wish to designate authority to another individual or firm so that they may provide information on your behalf, please complete this section. Designated agent (individual or firm):Thomas & Hutton Engineering Co. - David Gantt, P.E. Mailing Address:P.O. Box 8000 City: MXrtle Beach State: SC Phone: (843 ) 839-3545 Email: gantt.d@thomas-hutton.com VIII. APPLICANT'S CERTIFICATION Zip: 29577 Fax: (843 ) 839-3565 I, (print or type name of person listed in General Information, item 2)-Frwtk-1t* ee 4 Ic Gj certify that the information included on this permit application form is, to the best of my kn wledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants will be recorded, and that the proposed NCAC 2H .1000. 7 Signature: project complies with the requirements of 15A Date: ` 0 2 d Form SWU-101 Version 8.07 Page 4 of 4 r • , Permit No. (to be provided by DWQ) State of North Carolina Department of Environment and Natural Resources Division of Water Quality S T ORNI WATER MANAGEMENT PERMIT APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form may be photocopied for use as an original DWO Stormwater Management Plan Review: A complete stormwater management plan submittal includes -an application form, a wet detention basin supplement for each basin, design calculations, and plans and specifications showing all basin and outlet structure details. I. PROJECT INFORMATION Project Name: Meadowlands Phase 3 (Savannah Lakes) Contact Person: David Gantt, P.E. Phone Number: (843 ) 839-3545 For projects with multiple basins, specify which basin this worksheet applies to: Basin 6 elevations Basin Bottom Elevation 20 Permanent Pool Elevation 25.00 Temporary Pool Elevation 25.59 areas Permanent Pool Surface Area 13,939 Drainage Area 4.96 Impervious Area 2.23 volumes 014. k'bl * ft. (door of Ae basin) ft. (elevation of the orifice) ft. (elevation of the discharge structure overflow) sq. ft. (water surface area at the orifice elevation) ac. (on -site and off -site drainage to the basin) ac. (on -site and off -site drainage to the basin) Permanent Pool Volume 47,908 cu. ft. (combined volume of main basin and forebay) Temporary Pool Volume cu. ft. (volume detained above the permanent pool) Forebay Volume 10,147 cu. ft. (approximately 20% of total volume) Other parameters SA/DA1 1.5 (surface area to drainage area ratio from DWQ table) Diameter of Orifice 1.5x7.13 in. (2 to 5 day temporary pool draw -down required) Design Rainfall 1 Design TSS Removal 2 90 in. % (minimum 85% required) Form SWU-102 Rev 3.99 ' Pagel of 4 Footnotes: When using the Division SA/DA tables, the correct SA/DA ratio for permanent pool sizing should be computed based upon the actual impervious % and permanent pool depth. Linear interpolation should be employed to determine the correct value for non- standard table entries. In the 20 coastal counties, the requirement for a vegetative filter may be waived if the wet detention basin is designed to provide 90% TSS removal. The NCDEN'R BMP manual provides design tables for both 85% T SS removal and 90% TSS removal. II. REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Management Practices Manual (N.C. Department of Environment, Health and Natural Resources, February 1999) and Administrative Code Section: 15 A NCAC 2H .1008. Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If the applicant has designated an agent in the Stormwater Management Permit Application Form, the agent may initial below. If a requirement has not been met, attach justification. i. The permanent pool depth is between 3 and 6 feet (required minimum of 3 feet). �. The forebay volume is approximately equal to 20% of the basin volume. The temporary pool controls runoff from the design storm event. J. The temporary pool draws down in 2 to 5 days. e. If required, a 30-foot vegetative filter is provided at the outlet (include non -erosive flow calculations) f. The basin length to width ratio is greater than 3:1. g. The basin side slopes above the permanent pool are no steeper than 3:1. h. A submerged and vegetated perimeter shelf with a slope of 6:1 or less (show detail). i. Vegetative cover above the permanent pool elevation is specified. j. A trash rack or similar device is provided for both the overflow and orifice. k. A recorded drainage easement is provided for each basin including access to nearest right- of-way. i. If the basin is used for sediment and erosion control during construction, clean out of the basin is specified prior to use as a wet detention basin. m. A mechanism is specified which will drain the basin for maintenance or an emergency. III. WET DETENTION BASIN OPERATION AND MAINTENANCE AGREEMENT The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. This system (check one) 0 does 16 does not incorporate a vegetated filter at the outlet. This system (check one) 0 does Voes not incorporate pretreatment other than a forebay. Form SWU-102 Rev 3.99 Page 2 of 4 Maintenance activities shall be performed as follows: 1. After every significant runoff producing rainfall event and at least monthly: a. Inspect the wet detention basin system for sediment accumulation, erosion, trash accumulation, vegetated cover, and general condition. b. Check and clear the orifice of any obstructions such that drawdown of the temporary pool occurs within 2 to 5 days as designed. 2. Repair eroded areas immediately, re -seed as necessary to maintain good vegetative cover, mow vegetative cover to maintain a maximum height of six inches, and remove trash as needed. 3. Inspect and repair the collection system (i.e. catch basins, piping, swales, riprap, etc.) quarterly to maintain proper functioning. 4. Remove accumulated sediment from the wet detention basin system semi-annually or when depth is reduced to 75% of the original design depth (see diagram below). Removed sediment shall be disposed of in an appropriate manner and shall be handled in a manner that will not adversely impact water quality (i.e. stockpiling near a wet detention basin or stream, etc.). The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool .depth reads 4.5 feet in the main pond, the sediment shall be removed. When the permanent pool depth reads 4.5 feet in the forebay, the sediment shall be removed. BASIN DIAGRAM (fill in the blanks) Permanent Pool Elevation 25 Sediment Re oval El. 21.25 75 o -------------- - \ Sediment Removal Elevation 21.25 75% Bottom Ele ation 20 % ---------------------------------------------125%. ------ Bottom Elevation 20 , IFO REBAY MAIN POND 5. Remove cattails and other indigenous wetland plants when they cover 50% of the basin surface. These plants shall be encouraged to grow along the vegetated shelf and forebay berm. 6. If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain shall be minimized to the maximum extent practical. Form SWU-102 Rev 3.99 Page 3 of 4 7. All components of the wet detention basin system shall be maintained in good working order. I acknowledge and agree by my signature below that I am responsible for the performance of the seven maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Print name: Centex Homes Title: Ken Ba Address: 2050 Corporate Center Drive, Suite 200, Myrtle Beach, SC 29577 Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I, , a Notary Public or the State of County of o r r , do hereby certify that e rl Li personally appeared before me this i day of T , c;Ua , and acknowledge the due execution of the forgoing wet detention basin maintenance requirements. Witness my hand and official sea!, SEAL My commission expires ? /%$ Form SWU-102 Rev 3.99 Page 4 of 4 1 Permit No. 4J%4 % Q rY0{) (to be provided by DWQ) F WAT�c,9 - o EMR - STORMWATER MANAGEMENT PERMIT APPLICATION FORM,wr'` 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part Ill) must be printed, filled out and submitted along with all of the required information. .P110JECT INE It4ATIN-----�-- --- ::. .. Project name Savannah Lakes Phase 3 Contact person David C. Gantt, P.E. Phone number 843-839-3545 Date 1/7/2008 Drainage area number Lake 8A _-DES l+tl�j-illi�lAT10tV � Site Characteristics _ - Drainage area 350,658 ft2 Impervious area 127,369 ft2 % impervious 36.32285589 % Design rainfall depth 1.5 in Storage Volume: Non -SR Waters Minimum volume required Volume provided Storage Volume: SR Waters i-yr, 24-hr runoff depth Pre -development 1-yr, 24-hr runoff Post -development 1-yr, 24-hr runoff Minimum volume required Volume provided Peak Flow Calculations Is pre/post control of the 1-yr 24-hr peak flow required? 1-yr, 24-hr rainfall depth Rational C, pre -development Rational C, post -development Rainfall intensity: 1 -yr, 24-hr storm Pre -development 1-yr, 24-hr peak flow Post -development 1-yr, 24-hr peak flow Pre/Post 1-yr, 24-hr peak flow control Basin Elevations Basin bottom elevation Sediment cleanout elevation Bottom of shelf elevation Permanent pool elevation Top of shelf elevation Temporary pool elevation Volume and Surface Area Calculations SAIDA ratio Surface area at the bottom of shelf Volume at the bottom of shelf Permanent pool, surface area required Permanent pool, surface area provided Permanent pool volume Average depth for SA/DA tables Surface area at the top of shelf Volume at the top of shelf Forebay volume Forebay % of permanent pool volume Temporary pool, surface area provided 16,553 —ft' W 17 5-1q CtJ in fe fe fe ft3 Y (Y or N) 3.7 in 0.2 (unitless) 0.5 (unitless) 0.2 in/hr 13.1 ft3/sec 12.6 ft3/sec .0.5 fts/sec 15.00 it 16.00 ft 24.50 ft 25.00 ft 25.50 It 25.81 ft 2.60 (unitless) 15698.00 ft2 89759.00 ft3 9,325 ft2 20,455 ft2 OK 99,610 ft3 4.869714006 ft OK 22232 ft2 q 110132 ft3 JAN 9 ®� 20,342 ft3 20 % OK DWO 22,980 ft2 PROJ Form SW401-Wet Detention Basin-Rev.3 Parts I. & II. Design Summary, Page 1 of 3 Permit No. IV4 015 1Q'O M-00 ' r (to be providy DWC)7 ltVUI9ry1Fi;11Vn1 _ _ _ __. Drawdown Calculations Treatment volume drawdown time 3.7 days OK Treatment volume discharge rate 0.05 ft3/s Pre -development 1-yr, 24-hr discharge 13.09 ft3/s OK Post -development 1-yr, 24-hr discharge 12.66 ft3/s OK Additional Information Diameter of orifice 2.00 in Design TSS removal 90 % Basin side slopes 3 :1 OK Vegetated shelf slope 10 :1 OK Vegetated shelf width 10 It OK Length of flowpath to width ratio 3 :1 OK Length to width ratio 1.97 :1 OK Trash rack for overflow & orifice? Y (Y or N) OK Freeboard provided j t ft OK Vegetated filter provided? N (Y or N) Design must be based on 90% TSS removal Recorded drainage easement provided? Y (Y or N) OK Capures all runoff at ultimate build -out? Y (Y or N) OK Drain mechanism for maintenance or emergencies RipRap Overflow Outfalls E C E I V ED JAN 11 2008 DWQ PROD # Form SW401-Wet Detention Basin-Rev.3 Parts I. & il. Design Summary, Page 2 of 3 L'c.1�A �A Permit No. 'V�4' 611 Vn MOD (to be provided by DWC) Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. SWR = STORMWATER REPORT SDP= SITE DEVELOPMENT PLANS AWTP= ATTACHED WITH THIS PACKAGE Initials Page/ Plan Sheet No. 1. Plans (1 " - 50' or larger) of the entire site showing: .OV SDP 6-13 Design at ultimate build -out 16V SWR Section 3 Off -site drainage (if applicable) 'LN SWR Section 3 Delineated drainage basins (include Rational C coefficient per basin) Xy SWR Section 3 Basin dimensions XV SDP 5A-5D Pretreatment system .HIV N/A High flow bypass system E'y SDP 6-13 Maintenance access W SDP 6-13 Recorded drainage easement and public right of way (ROW) f:y SDP 6-13, 25 Overflow device �JV SDP 6-13 Boundaries of drainage easement 2. Partial plan (1 " = 30' or larger) and details for the wet detention basin showing: �V SDP 25 Outlet structure with trash rack or similar XW SDP 6-13 - Maintenance access M SWR Section 3 Permanent pool dimensions M SDP 6-13, SWR Section 3, SDP 25 Forebay and main pond with hardened emergency spillway r.Al SDP 24A Basin cross-section X/V SDP 24A Vegetation specification for planting shelf Xv N/A • Filter strip 3. Section view of the dry detention basin (1" = 20' or larger) showing: XA/ . SDP 24A - Side slopes, 3:1 or lower Xy SDP 24A Pretreatment and treatment areas .0V SDP 23-25 Inlet and Outlet structures. 4. If the basin is used for sediment and erosion control during construction, clean out of the basin is .KM SDP 5A-5D, 25 specified on the plans prior to use as a wet detention basin. 5. A table of elevations, areas, incremental volumes & accumulated volumes for overall pond and ,oV SWR Section 10-11 for forebay, to verify volume provided. 6. An assurance that the installed system will meet design specifications upon initial operation once .0V SDP 3 the project is complete and the entire drainage area is stabilized. 7. A construction sequence that shows how the wet detention basin will be protected from sediment _0V _ SDP 5A-5D until the entire drainage area is stabilized, .xV SWR Section 10-11 8. The supporting calculations. _0V AWPT 9. A copy of the signed and notarized inspection and maintenance (I&M) agreement. „ N AWPT 10. A copy of the deed restriction. D E C E I V ED JAN 1 S 2008 DWQ PROD # - , Form SW401-Wet Detention Basin-Rev.3 Part III. Required Items Checklist, Page 3 of 3 'Jlw 0 05 w ub (nOA Wet Detention Basin Inspection and Maintenance Agreement for Lake BA I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. This system (check one): ❑ does ® does not incorporate a vegetated filter at the outlet. This system (check one): ❑ does ® does not incorporate pretreatment other than a forebay. Important maintenance procedures: - Immediately after the wet detention basin is established, the plants on the vegetated shelf and perimeter of the basin should be watered twice weekly if needed, until the plants become established (commonly six weeks). - No portion of the wet detention pond should be fertilized after the first initial fertilization that is required to establish the plants on the vegetated shelf. - Stable groundcover should be maintained in the drainage area to reduce the sediment load to the wet detention basin. - If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain should be minimized to the maximum extent practical. - Once a year, a dam safety expert should inspect the embankment. After the wet detention pond is established, it should be inspected once a month and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of inspection and maintenance should be kept in a known set location and must be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potentialproblem: How I will remediate theproblem: The entire BMP Trash/debris is present. Remove the trash/debris. The perimeter of the wet detention basin Areas of bare soil and/or erosive gullies have formed. Regrade the soil if necessary to remove the gully, and then plant a ground cover and water until it is established. Provide lime and a _ one-time fertilizer application. Vegetation is too short or too Maintain vegetation at a height of long. approximately six inches. ,5\-4I aP) a'03 moa Lck A OQ A oI%g BMP element: Potentialproblem: How I will remediate theproblem: The inlet device: pipe or swale The pipe is clogged. Unclog the pipe. Dispose of the sediment off -site. The pipe is cracked or Replace the pipe. otherwise damaged. Erosion is occurring in the Regrade the swale if necessary to Swale. smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. The forebay Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design depth for possible. Remove the sediment and sediment storage. dispose of it in a location where it will not cause impacts to streams or the BMP. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. The vegetated shelf Best professional practices Prune according to best professional show that pruning is needed practices to maintain optimal plant health. Plants are dead, diseased or Determine the source of the dying. problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if a soil test indicates it is necessary. Weeds are present. Remove the weeds, preferably by hand. if pesticide is used, wipe it on the plants rather than spraying. The main treatment area Sediment hasaccumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design sediment possible. Remove the sediment and storage depth. dispose of it in a location where it will not cause impacts to streams or the BMP. Algal growth covers over Consult a professional to remove 50% of the area. and control the al aI growth. Cattails, phragmites or other Remove the plants by wiping them invasive plants cover 50% of with pesticide (do not spray). the basin surface. rckDb MOD c V 11 /0-8 LaL M, BMP element: Potentialproblem: How I will remediate theproblem: The embankment Shrubs have started to grow Remove shrubs immediately. on the embankment. Evidence of muskrat or Use traps to remove muskrats and beaver activity is present. consult a professional to remove beavers. A tree has started to grow on Consult a dam safety specialist to the embankment. remove the tree. An annual inspection by an Make all needed repairs. appropriate professional shows that the embankment needs repair. The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off -site. The outlet device is damaged Repair or replace the outlet device. The receiving water Erosion or other signs of -Contact the local NC Division of damage have occurred at the Water Quality Regional Office, or outlet. the 401 Oversight Unit at 919-733- 1786. The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads 9.00 feet in the main pond, the sediment shall be removed. When the permanent pool depth reads 9.00 feet in the forebay, the sediment shall be removed. Sediment Removal 16.00 Bottom Elevatio 15.00 I FOREBAY C 'E BASIN DIAGRAM (fill in the blanks) Permanent Pool Elevation 25.00 'e anen Pool Volume - - - - - -Sediment Removal Elevation-16.00: - - - - - - - - - Volume -ft Min. ------ Sediment Bottom Elevation 15.00 1-ft n Storage Sedimet MAIN POND Storage FROJ # _ _ . L-c,6 A kc, d I I(I /C)z I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Print name:Centex Homes Address:2050 Corporate Center Drive, Suite 200, Myrtle Beach, SC 29577 Phone: 843-83 9-2200, Signature: Date: Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I, a Notary Public for the State of K'019 %'ll? OL, , County of , do hereby certify that -"We personally appeared before me this OIN day of 0 d c,"700 -7 , and acknowledge the due execution of the forgoing wet detention basin maintenance requirements. Witness my hand and official seal, SEAL My commission expires ?�/C) to, F Permit No. 4)w7 Q61'a0 ) (to be provided by DWQ) of WAre, QG NCDENR s ; STORMWATER MANAGEMENT PERMIT APPLICATION FORM +�;�. 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part 111) must be printed, filled out and submitted along with all of the required information. Project name Savannah Lakes Phase 3 Contact person David C. Gantt, P.E. Phone number 843-839-3545 Date 1/7/2008 Drainage area number Lake 8B Site Characteristics Drainage area 302,742 ft Impervious area 135,972 1? % impervious 44.9134907 % Design rainfall depth 1.5 in Storage Volume: Non -SR Waters Minimum volume required 16,988 It, Volume provided 18,770 1t3 Storage Volume: SR Waters f-yr, 24-hr runoff depth in Pre -development 1-yr, 24-hr runoff ft, Post -development 1-yr, 24-hr runoff Minimum volume required —fe ft, Volume provided ft, Peak Flow Calculations Is prelpost control of the 1-yr 24-hr peak flow required? Y (Y or N) 1-yr, 24-hr rainfall depth 3.7 in Rational C, pre -development 0.2 (unitless) Rational C, post -development 0.5 (unitless) Rainfall intensity: 1 -yr, 24-hr storm 0.2 in/hr Pre -development 1-yr, 24-hr peak flow 13.1 fta/sec Post -development 1-yr, 24-hr peak flow 12.6 fta/sec Pre/Post 1-yr, 24-hr peak flow control -0.5 fe/sec Basin Elevations Basin bottom elevation 16.00 ft Sediment cleanout elevation 17.00 ft Bottom of shelf elevation 24.50 It Permanent pool elevation 25.00 ft Top of shelf elevation 25.50 it Temporary pool elevation 25.99 ft Volume and Surface Area Calculations SAIDA ratio 4.49 (unitless) Surface area at the bottom of shelf 14788.00 ff2 Volume at the bottom of shelf 51988.00 fta Permanent pool, surface area required 13,597 fe Permanent pool, surface area provided 17,224 fe OK Permanent pool volume 60,225 fe E C Average depth for SAIDA tables 3.496574547 it OK Surface area at the top of shelf 19041 fe D Volume at the top of shelf 68902 —,,e R JAN ' 2008 Forebay volume 13,063 fta Forebay % of permanent pool volume 22 % OK ©1NQ Temporary pool, surface area provided 20,836 f? PROJ # Form SW401-Wet Detention Basin-Rev.3 Parts I. & II. Design Summary, Page 1 of 3 14,0 C Q q l 1/ vb�^�� �t� MsZK) PermitNo.,� o "��a` (to be provided by DWQ) 1^Cr-Ir NIIATION Drawdown Calculations Treatment volume drawdown time 3.2 days OK Treatment volume discharge rate 0.06 ft3/s Pre -development 1-yr, 24-hr discharge 13.09 ft3/s OK Post -development 1-yr, 24-hr discharge 12.66 ft3/s OK Additional Information Diameter of orifice 2.00 in Design TSS removal 90 % Basin side slopes 3 :1 OK Vegetated shelf slope 10 :1 OK Vegetated shelf width 10 ft OK Length of flowpath to width ratio 3 :1 OK Length to width ratio 7.73 :1 OK Trash rack for overflow & orifice? Y (Y or N) OK Freeboard provided 9:91— ft OK Vegetated filter provided? N (Y or N) Design must be based on 90% TSS removal Recorded drainage easement provided? Y (Y or N) OK Capures all runoff at ultimate build -out? Y (Y or N) OK Drain mechanism for maintenance or emergencies RipRap Overflow Outfalls RE C E IdED JAN 9 1 2008 DWQ PfROJ # Form SW401-Wet Detention Basin-Rev.3 Parts I. & II. Design Summary, Page 2 of 3 Permit No. t\_4l q051 a03 (noo (to be provided by DWQ) AfA Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. SWR = STORMWATER REPORT SDP= SITE DEVELOPMENT PLANS AWTP= ATTACHED WITH THIS PACKAGE Initials Page/ Plan Sheet No. 1. Plans (1" - 50' or larger) of the entire site showing: �E.IV SDP 6-13 Design at ultimate build -out _ Xy SWR Section 3 Off -site drainage (if applicable) SWR Section 3 Delineated drainage basins (include Rational C coefficient per basin) Xy SWR Section 3 Basin dimensions _M SDP 5A-5D Pretreatment system 1/V N/A High flow bypass system Jov SDP 6-13 Maintenance access -M SDP 6-13 Recorded drainage easement and public right of way (ROW) xN SDP 6-13, 25 - Overflow device _Joy SDP 6-13 Boundaries of drainage easement 2. Partial plan (1 " = 30' or larger) and details for the wet detention basin showing: X/V SDP 25 Outlet structure with trash rack or similar .aV SDP 6-13 Maintenance access .KiV SWR Section 3 - Permanent pool dimensions JW SDP 6-13, SWR Section 3, SDP 25 Forebay and main pond with hardened emergency spillway SDP 24A Basin cross-section SDP 24A Vegetation specification for planting shelf XAI N/A Filter strip 3. Section view of the dry detention basin (1 " = 20' or larger) showing: _0V SDP 24A Side slopes, 3:1 or lower XN SDP 24A - Pretreatment and treatment areas .QV SDP 23-25 Inlet and Outlet structures. 4. If the basin is used for sediment and erosion control during construction, clean out of the basin is .ay SDP 5A-5D, 25 specified on the plans prior to use as a wet detention basin. 5. A table of elevations, areas, incremental volumes & accumulated volumes for overall pond and 0V SWR Section 10-11 for forebay, to verify volume provided. 6. An assurance that the installed system will meet design specifications upon initial operation once / SDP 3 the project is complete and the entire drainage area is stabilized. 7. A construction sequence that shows how the wet detention basin will be protected from sediment C/V SDP 5A-5D until the entire drainage area is stabilized. XN SWR Section 10-11 8. The supporting calculations. xV AWPT 9. A copy of the signed and notarized inspection and maintenance (I&M) agreement. 6N AWPT 10. A copy of the deed restriction. ® E O E I V Form SW401-Wet Detention Basin-Rev.3 Part III. Required Items Checklist, Page 3 of 3 Wet Detention Basin Inspection and Maintenance Agreement for Lake 8B I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. This system (check one): ❑ does ® does not incorporate a vegetated filter at the outlet. This system (check one): ❑ does ® does not incorporate pretreatment other than a forebay. Important maintenance procedures: - Immediately after the wet detention basin is established, the plants on the vegetated shelf and perimeter of the basin should be watered twice weekly if needed, until the plants become established (commonly six weeks). - No portion of the wet detention pond should be fertilized after the first initial fertilization that is required to establish the plants on the vegetated shelf. --- Stable groundcover should be maintained in the drainage area to reduce the sediment load to the wet detention basin. - If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain should be minimized to the maximum extent practical. - Once a year, a dam safety expert should inspect the embankment. After the wet detention pond is established, it should be inspected once a month and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of inspection and maintenance should be kept in a known set location and must be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potentialproblem: How I will remediate theproblem: The entire BMP Trash/debris is present Remove the trash/debris. The perimeter of the wet detention basin Areas of bare soil and/or erosive gullies have formed. Regrade the soil if necessary to remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. Vegetation is too short or too long. Maintain vegetation at a height of I approximately six inches. kc_' � IN/0-9 BMP element: The inlet device: swale The forebay Potentialproblem:_ pipe or I The pipe is clogged. The vegetated shelf The main treatment area The pipe is cracked or otherwise damaged. Erosion is occurring in the swale. Sediment has accumulated to a depth greater than the original design depth for sediment storage. Erosion has occurred. Weeds are present. Best professional practices show that pruning is needed to maintain optimal plant health. Plants are dead, diseased or dying. Weeds are present. Sediment has accumulated to a depth greater than the original design sediment storage depth. Algal growth covers over 50% of the area. Cattails, phragmites or other invasive plants cover 50% of the basin surface. LO'6- �5 How I will remediate the problem: Unclog the pipe. Dispose of the sediment off -site. Replace the pipe. Regrade the swale if necessary to smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. Search for the source of the sediment and remedy the problem if possible. Remove the sediment and dispose of it in a location where it will not cause impacts to streams or the BMP. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. Prune according to best professional practices Determine the source of the problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if a soil test indicates it is necessary. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. Search for the source of the sediment and remedy the problem if possible. Remove the sediment and dispose of it in a location where it will not cause impacts to streams or the BMP. Consult a professional to remove and control the algal growth. Remove the plants by wiping them with pesticide (do not spray). `:)W i or) 1'� -03 mRq_d� i c A \r,l /�s LGIV_ 9 Ab BMP element: Potentialproblem: How I will remediate the roblem: The embankment Shrubs have started to grow Remove shrubs immediately. on the embankment. Evidence of muskrat or Use traps to remove muskrats and beaver activity is present. consult a professional to remove beavers. A tree has started to grow on Consult a dam safety specialist to the embankment. remove the tree. An annual inspection by an Make all needed repairs. appropriate professional shows that the embankment needs repair. The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off -site. The outlet device is damaged Repair or replace the outlet device. The receiving water Erosion or other signs of Contact the local NC Division of damage have occurred at the Water Quality Regional Office, or outlet. the 401 Oversight Unit at 919-733- 1786. The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads 8.00 feet in the main pond, the sediment shall be removed. When the permanent pool depth reads 7.00 feet in the forebay, the sediment shall be removed. Sediment Removal Ft. 18.00 1 ] Bottom Elevatio 17.00 { FOREBAY ® E G E N E 1" D BASIN DIAGRAM (fill in the blanks) Permanent Pool Elevation 25.00 r'�( anon Pool lume - - - - Sediment Removal Elevation-17.00- - - - - - - - - Volume Min - ------ Sediment Bottom Elevation 16.00 1-ft n Storage Sedimei Storage MAIN POND DWQ 1PROJ ## --- -- - mo-A I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Print name:Centex Homes Title:Ken Balogh Address:2050 Corporate Center Drive, Suite 200, Myrtle Beach, SC 29577 Phone Signa Date: Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. Fol I, a Notary Public for the State of County of , do hereby certify that )I personally appeared before me this 4 �f day of ,•and acknowledge the due execution of the forgoing wet detention basin maintenance requirements. Witness my hand and official seal, ``�oA��e JUS�- �% ' .rrrrr°� Ll h b ��% cn ; NOTARY N : � = SEAL PUBLIC % Z = � � • My commission expires si �i�` °•• C�P�� High Density Residential Subdivisions Deed Restrictions & Protective Covenances In accordance with Title 15 NCAC 2H.1000, the Stormwater Management Regulations, deed restrictions and protective covenants are required for High Density Residential Subdivisions where lots will be subdivided and sold and runoff will be treated in an engineered stormwater control facility. Deed restrictions and protective covenants are necessary to ensure that the development maintains a "built -upon" area consistent with the design criteria used to size the stormwater control facility. I, Ken Balogh , acknowledge, affirm and agree by my signature below, that I will cause the following deed restrictions and covenants to be recorded prior to the sale of any lot: 1. The following covenants are intended to ensure ongoing compliance with State Stormwater Management Permit Number SW8 0 512 03 , as issued by the Division of Water Quality under NCAC 2H.1000. 2. The State of North Carolina is made a beneficiary of these covenants to the extent necessary to maintain compliance with the stormwater management permit. 3. These covenants are to run with the land and be binding on all persons and parties claiming under them. 4. The covenants pertaining to stormwater may not be altered or rescinded without the express written consent of the State of North Carolina, Division of Water Quality. 5. Alteration of the drainage as shown on the approved plan may not take place without the concurrence of the Division of Water Quality. 6. The maximum allowable built -upon area per lot is 4 0 0 0 square feet. This allotted amount includes any built -upon area constructed within the lot property boundaries, and that portion .of the right-of-way between the front lot line and the edge of the pavement. Built upon area includes, but is not limited to, structures, asphalt, concrete, gravel, brick, stone, slate, coquina and parking areas, but does not include raised, open wood decking, or the water surface of swimming pools. OR, if the proposed built -upon areas per lot will vary, please REPLACE #6 above with the following: 6. The maximum built -upon area per lot, in square feet, is as listed below: Lot # BUA Lot # BUA Lot # BUA Lot # BUA NfA N/A This allotted amount includes any built -upon area constructed within the lot property boundaries, and that portion of the right-of-way between the front lot line and the edge of the pavement. Built upon area includes, but is not limited to, structures, asphalt, concrete, gravel, brick, stone, slate, coquina and parking areas, but does not include raised, open wood decking, or the water surface of swimming pools. 7. All runoff from the built -upon areas. on the lot must drain into the permitted system. This may be accomplished through a variety of means including roof drain gutters which drain to the street, grading the lot to drain toward the street, or grading perimeter swales to collect the lot runoff and directing them into a component of the stormwater collection system. Lots that will naturally drain into the system are not required tZpr,e these additional measures. ,� Signatu P: Date: ! f 116�, ! 1 --, lr , a Notary Public in the State of� ,County of 1 do hereby certify that personally appeared before me this the day of 20fl-, and acknowledge the d e xecution of the foregoing instrument. Witness VINj9 i and official seal, SEAL_ Si ture ����ssioNo . �' dV My Commission expires d q �QYp,�Y �' Z Form DRPC-3 Rev.1 Page 1 of 1 a g�t4C e S 0A� sseeN 20 % �siA11eS0U Y\ State of North Carolina Depattrent f Environment and Natural Resources Vlrningtoz: Regional Office Michael F. Easley, Governor William G. Ross Jr., Secretary FAX COVER SHEET Date: January 2j, 2008 // No. of Pages: (excluding ewer) To: David Gantt, P.E/�dGZ �iU�C From: Azita 5ar ip# Co. Thomas and Button Euginecr ng O ' Co: Express Permitting Fax No. 1-843-839-3565 Tel No. 1-843-839-3545 Tel No.: 910-796-7500 ext. 7377 FAX No. 910-350-2004 9-mA#1: gam ts.s>nti @_ LQmail.net REMARKS: Permit No. SWBQS129 Mr. Gantt. I will mail you a hard copy of the following pages. Please do not hesitate to contact me if you have any questions. Best regards, Azlta 127 Cmd31tY1 Ddvc I3 =9ic% W IlmhubD . TLC. 28405.3M5 telephone (910) 796.7215 Fox (910) 3504004 An Egtml opporh mitt' Affamadve Action gmploYw )X �c 91 : S30Vd S99 Wp IV101 >x � %K ££9 ('m) NO X1 xy) 91 1,991V 999£6£8£ti816 WV M01 HAW do R 31.0N 3dAl SSOVd HWII XI HAI303N INVIS 31VO � �c GMS �K P00E09£016 NN300N MA �c Wd 9£ ; 0 i 3ni BoomE—wr MEN NOI NSWU 10 'd F ENGINEERING, ENVIRONMENTAL & CONSTRUCTION SERVICES January 8, 2008 Mr. Nickey Lewis, E.I.T. Designer II Thomas & Hutton Engineering Company Subject: Savannah Lakes Phase 3 -- Seasonal High Water Table Mr. Lewis: Available information indicates ground surface elevations at the site range from approximately 24 feet to 35 feet above mean sea level. A review of soil descriptions from one boring (B-1) and 17 test pits excavated at the subject site in September 2004, indicate depth to groundwater beneath the site ranges from approximately 3 to 10 feet below ground surface (bgs). Based on the available information regarding measured and surveyed water elevations above mean sea level in adjacent wetland areas (23 feet), the abandoned borrow pit (24 feet), and Shingletree Creek (21 feet), it appears that each of these surface features may act as a discharge point for shallow groundwater at the site. After reviewing the provided site development plan information, historical water table data, and site geomorphology, it appears that the average seasonal high water table (SHWT) elevation in the area would range between an elevation of approximately 21 to 24 feet above mean sea level (msl), or approximately 3 to 7 feet below ground surface (be,. Should you have any further questions regarding this, please feel free to contact me at anytime at 843-286-2500. Respectfully Submitted, WPC, Inc. S' 4-- Mark S. Holmes Project Geologist fo E C E I V JAN 1 1 2.000 DWU PROD # - #;��Z Anthony T. Stockman Branch Manager 246 Howard Avenue, Myrtle Beack SC 29577 tei 843.286.2500 fax 843.296.2504 www_wp=&.com October 13, 2004 Mr. Jim Green Centex Homes 2050 Corporate Center Drive, Suite 200 Myrtle Beach, South Carolina 29577 Geotechnical Report Proposed Meadowlands Development Brunswick County, NC WPC Project MYR2-04-075 Dear Mr. Green: WPC has completed the geotechnical investigation for the proposed Meadowlands development located in Brunswick County, North Carolina. This report provides a general discussion of the planned development, the exploration procedures used, subsurface conditions encountered, site preparation, pavement design recommendations for proposed roadways, seismic analysis and foundation recommendations for the proposed bridge, and recommendations regarding the suitability of material excavated from proposed stormwater pond areas for use as fill material. PROJECT DESCRIPTION The project site is located at the intersection of State Road (SR) 1302 and SR 1303 in Brunswick County near Calabash, North Carolina. Please refer to the Site Vicinity Plan enclosed in the Appendix for the approximate site location. The project site is bounded by SR 1302 to the north, undeveloped wooded lands and single-family residential properties to the east and south, and a golf course to the west. The site is currently undeveloped and partially cleared and partially wooded. We understand that Centex Homes is planning development of the 120-acre site for single-family residential uses. We have been provided Planned Urban Development (PUD) plans for the proposed project, prepared by Thomas & Hutton Engineering Company, showing a layout for the proposed development. Based on this drawing, the proposed development will consist of 275 single-family lots, an amenity area, approximately 11,700 linear feet of roadways, a new bridge on Privet Drive over Shingletree Canal, and nine stormwater ponds. Based on the topographic information on the Storm Drainage Master Plan, the ground surface elevations range from approximately 24 to 35 feet above mean sea level across the site. The land surface slopes locally toward Shingletree Canal and isolated low areas within the site. WPC understands that Centex wishes to determine the suitability of proposed lake excavation soils for use as structural fill on building lots and roadways. In addition, Centex has requested conclusions and recommendations regarding site preparation and pavements for the proposed roadways, and foundations for the proposed bridge. Conclusions and recommendations regarding the foundations for the proposed single- family residence structures are not part of this scope of work. In addition, at the time 926 Wesley Street Suite 703 Myrtle Beach, SC 29579 tel 843. 6.1288 fax 843.236.1291 www.wpceng.com of this report, structural details for the proposed bridge were not available; therefore, the conclusions and recommendations for the proposed bridge will be provided at a later date under separate cover after the structural details become available. Traffic data has not been provided; therefore, our roadway design is based on the following assumptions. Once traffic data is available, WPC should be given the opportunity to revise our recommendations with respect to this information. Our design for the roadways of the development is largely based on the anticipated traffic from the proposed single-family dwelling units utilizing the roadways. Based on this, we assumed an average daily traffic (ADT) volume of 2,500 vehicles and that truck traffic will not exceed 4% of the ADT for our pavement analysis. EXPLORATION PROCEDURES Our field investigation at the site consisted of one (1) soil test boring (STB), designated B-1, at the location of the proposed bridge where Privet Drive crosses Shingietree Canal. The STB was performed using an ATV -mounted drill rig and mud -rotary drilling procedures. Split -spoon samples and Standard Penetration Test resistance (N) values were obtained in accordance with American Society for Testing and Materials (ASTM) D-1586 at regular intervals. The STB was advanced to a depth of approximately 40 feet below the existing ground surface. After visual examination of the split spoon samples obtained from the STB during our field exploration, representative samples were transported to our laboratory for visual examination and classification of the soils according to the Unified Soil Classification System (USCS) in accordance with ASTM D 2488 by the project geotechnical engineer. The STB was left open for a period of at least 24 hours to measure the groundwater table level at this location. The subsurface conditions in the proposed stormwater pond and roadway locations at the site were explored by excavating a total of seventeen (17) shallow test pits (TPs). The TPs within the stormwater ponds, designated TP-3, TP-4, TP-8, TP-11, and TP- 13 through TP-15, were excavated to depths of approximately 10 feet below existing ground surface. The TPs within the roadways, designated TP-2, TP-5, TP-b, TP-7, TP-9, TP-10, TP-12, and TP-16 through TP-18, were excavated to depths of approximately 5 feet. The TPs allow for physical sampling of the in -situ soils for classification purposes. Representative portions of the TP soil samples obtained during our field exploration were transported to our laboratory for visual examination and classification of the soils according to the USCS in accordance with ASTM D 2488. The TPs were backfilled the same day following completion of the TP excavation. The number and locations of borings and TPs were selected by WPC based on the project information provided. The Test Location Plan presented in the report I 0:1EA1GR120041MYR2-04-075(Meadowlands)1MYR2-04-075repori.dce Page 2 of 10 Appendix shows the subsurface test locations. Latitude and longitude coordinates for ,the test locations were provided by the project civil engineer, Thomas &. Hutton Engineering Company. The test locations shown were established in the field using a hand-held Global Positioning System (GPS) locator. The STB Log in the Appendix of this report graphically illustrates the relative strength of the soils encountered and provides an approximate soil stratigraphy. Stratification lines on the STB Log represent approximate boundaries between soil types. The TPs allow for physical sampling of the in -situ soils for classification purposes. The TP Logs are also presented in the report Appendix. GEOTECHNICAL FINDINGS Subsurface Soil Details of the subsurface conditions encountered by the STB and TPs are shown in Conditions the Appendix. These subsurface exploration records represent an interpretation of subsurface conditions at the test locations. Please note that the soil conditions between test locations may vary. In general, the subsurface conditions are relatively uniform across the site. Below a surficial layer of topsoil and roots approximately 6 to 12 inches thick, the boring generally encountered very loose to loose, fine to medium clayey sands (USCS Classification SC) to a depth of approximately 8 feet below existing ground surface. Standard penetration resistance values (N-values) obtained in these clayey sands ranged from 2 to 7 blows per foot (bpf). The clayey sands were underlain by loose to medium dense, fine to medium sands (USCS Classification SP) with N-values ranging from approximately 6 to 15 bpf which extend to a depth of approximately 32 feet. Loose clayey sands (USCS Classification SC) with an N-value of 8 were encountered below the sands and extend to a depth of approximately 37 feet below the ground surface. Hard clays with an N-value of 100 were encountered below the clayey sands and extend to termination of the boring at a depth of approximately 40 feet below the ground surface. In the proposed stormwater pond and roadway locations, the soils encountered were generally consistent with those encountered within the STB. Soils encountered within the TP excavations for the roadways in the northern portion of the site consisted generally of sandy clays (CL). Soils encountered within the TP excavations for the roadways in the southern and western portions of the site consisted generally of sands (SP) and clayey sands (SC) underlain by sandy clays and clays (CL/CH), except TP-12, TP-17, and TP-18 where clays were not encountered to termination of the TPs. Soils encountered within the TP excavations for the stormwater ponds consisted generally of sands (SP), clayey sands (SC), and clays (CUCH), except TP-13 and TP-15 where clays were not encountered. 0:1ENGR12004\MYR24WO75(Meadowlands)\MYR2-04-075report.doe Page 3 of 10 Groundwater The groundwater table depth was measured in the STB at a period of at least 24 hours alter boring completion. The 24-hour groundwater table was measured at a depth of approximately 3.0 feet below the existing ground surface. In addition, groundwater levels were measured in four of the TP locations that were allowed to remain open for a period of several hours during the day of TP excavation. Groundwater level depths measured in these TP locations ranged from approximately 5 to 10 feet below existing ground surface, with an average of 7 feet. Although the groundwater level depths measured in the TPs are an indication of the normal groundwater table elevations, 24-hour groundwater table measurements are more accurate because time has elapsed allowing the groundwater levels to stabilize. Rainfall events, drainage constraints, and seasonal weather patterns can vary with time and influence the level of the groundwater table. Based on the measured groundwater elevations, there is the potential for groundwater to tend to pond in areas of proposed cuts. The presence of near surface clayey sands and sandy clays across the site may lead to "perched" groundwater conditions. A perched groundwater table occurs when water cannot drain quickly through the lower permeability fine-grained soils. Subsequently, the trapped water moves laterally across the site to pond in low areas before it slowly descends to the true groundwater level (phreatic surface) or evaporates. Liquefaction Due to the potential seismicity of the subject site, we performed a liquefaction Potential potential analysis to be used in design of the proposed bridge. Ground shaking at the Evaluation foundation of structures and liquefaction of the soil under the foundation are the principle seismic hazards to be considered in design of earthquake -resistant structures. Liquefaction occurs when a rapid buildup in water pressure, caused by the ground motion, pushes sand particles apart, resulting in a loss of strength and later densification as the water pressure dissipates. This loss of strength can cause bearing capacity failure while the densification can cause excessive settlement. Potential earthquake damage can be mitigated by structural and/or geotechnical measures or procedures common to earthquake resistant design. The State of North Carolina has adopted the _International Building Code, 2000 Edition (IBC 2000). According to IBC 2000, proposed structures are required to be designed for an earthquake from a 50 year exposure period with a 2% Probability of Exceedance (PE) (i.e. a 2475-year design earthquake). Therefore, we used the 2% PE in 50 year earthquake as the design earthquake for our liquefaction analysis. The 2% PE in 50 year design earthquake has a Moment Magnitude (Mw) of 7.25 and a Peak Ground Acceleration (PGA) of 0.17g, as determined from data provided by the IBC 2000. The seismic design portions of the IBC 2000 are based on the 1997 National Earthquake Hazards Reduction Program (NEHRP) Recommended 0:1ENGR12004)uMYR2-04-075(Meadowlands)1MYR2-04-075repon.dce Page 4 of W Provisions for Seismic Regulations for New Building and Other Structures (FEMA 302 and 303) and the USGS National Seismic Hazard Mapping Project. Our analysis indicated that loose to medium dense sandy soils below the water table have the potential to liquefy during this magnitude earthquake. According to the IBC 2000, this potential for liquefaction classifies the site as Site Class F. Recently, the 2000 Edition of the NEHRP was published (FEMA 368 and 369), which provides an exception to the Site Class recommendation for a structure with a fundamental period equal to or less than 0.5 second. NEHRP 2000 states that a site can be classified as whatever Site Class it would be without considering liquefaction to determine spectral accelerations for structural design. Using these criteria, this site would classify as Site Class D. The determination for Site Class D was based on the N-values from the STB data and the procedures outlined in IBC 2000. We have provided a Design Response Curve (Figure 1) for your use based on this site classification (Note - This is not a site -specific curve). If the fundamental period of the structure is greater than 0.5 second, WPC can perform a site specific study in accordance with IBC 2000 and generate a Site Specific Response Spectrum. Design Response Curve am ............._ 12 OAO - - --_--_ — - — - --- ................ 0.10 too 0 1 3 3 Period, T (seeends) Figure 1— Design Response Spectrum for Meadowlands 0:\ENGR0004WYR2-04-075(Meadowlands)WYR2-04-075report.doc Page 5 of 10 While the amount of the settlement is dependent on the magnitude and distance from the seismic event, we estimate that total settlements from the design earthquake will be up to approximately 5 inches with differential settlement between 50% and 100% of total settlement. The project structural engineer should verify that the anticipated settlements as a result of the seismic event are acceptable. If design settlements are not acceptable, options to mitigate the liquefaction settlement can be considered. RECOMMENDATIONS Initial Site Drainage With the potential for perched and shallow groundwater conditions, significant consideration should be given to site drainage. Before site clearing begins, the installation of additional or temporary drainage ditches will help control shallow groundwater conditions. These ditches can outfall into proposed drainage areas. During the construction of these ditches, temporary pipe culverts may be needed to provide access across the ditches. A detailed design for this temporary drainage system can be completed once the civil design work is completed in conjunction with the help of the site grading contractor. Clearing and initial Proposed construction areas should be cleared and stripped of topsoil, trees, stumps, Site Preparation and other organic debris. Clearing techniques that minimize subgrade soil disturbance, such as the use of track -mounted equipment, should be employed. Stripping should extend at least three (3) feet beyond the building, roadway and parking area limits. Topsoil should be removed from the site or stored on -site away from Controlled Fill (subsequently described) if reuse for landscaping purposes is desired. A root rake should be utilized in conjunction with clearing operations to ensure the removal of the majority of the roots from subgrade soils. The depth of organic material can be expected to vary across the site and will likely be more significant within the more heavily wooded portions of the site. Topsoil depths encountered during our field investigation were approximately 6 to 12 inches. Roadway Grading and site design has not been completed for this proposed development; Subgrades therefore, finished subgrade elevations across the site for the roadways are not known at this time. As discussed above, the majority of the neat surface soils in the proposed roadway arcas of the site consist generally of clayey sands (SC) and sandy clays (CL), with the exception of a few areas in the southern and southwestern portions of the site where sands (SP) were encountered near ground surface. The near surface SP soils are considered suitable for use as subgrade material. The SC and CL soils are considered marginal for use as roadway subgrade. While stable near optimum moisture content, the stability of the clayey soils will deteriorate rapidly 0:IENGRU0041MYR2-04-075(Meadowlands)1MYR2-04-075report.doe Page 6 of 10 when exposed to excessive moisture. Depending on weather and drainage conditions at the time earthwork is in progress as well as construction time constraints, these soils may be difficult or impractical to compact in -place. Therefore, undercutting of these soils should be expected in areas of the site where clayey soils are encountered at the ground surface or where roadways are "cut" below existing grades and the clayey soils are exposed. The potential for undercutting these soils should be accounted for in the project budget. The existing subgrade of the roadway areas should be proofrolled with a loaded dump truck or other similar rubber -tired, heavy construction equipment. A geotechnical engineer should monitor the proofrolling operations. Areas that pump, rut, or perform poorly during the proofrolling operations should be undercut to stable soil conditions and backfilled with Controlled Fill as described below. The extent of the undercutting will be dependent on weather conditions and the effectiveness of site drainage in place at the time earthwork is in progress. We anticipate that undercut depths will not exceed 18 to 24 inches. Undercut soils could be utilized as non- structural fill in landscaped and grassed areas. Providing proper drainage on site will help to minimize the amount of undercutting. if the near surface clayey soils are exposed to rubber -tired traffic during wet periods, they may lose their strength leading to nitting and increase undercutting depths. The ability to maintain competent bearing soils will affect pavement design and overall performance. Placement of base course materials as soon as possible in parking and roadway areas would provide protection for the subgrade as other construction takes place. Soil conditions indicate underdrains will be required to adequately drain the roadway subgrade areas. Underdrains should consist of a 4 to 6-inch diameter perforated pipe wrapped with filter fabric and covered with #57 stone. Underdrains typically extend from the catch basins in both directions. The configuration of the underdrains would be dependent upon the project grading and drainage plans which can be reviewed to finalize underdrain placement. The underdrain plan should be coordinated with the site civil engineer. WPC can provide additional design criteria and input for underdrains as required. Suitability of Stormwater WPC observed excavation of seven (7) test pits (TP-3, TP-4, TP-8, TP-11, and TP-13 Pond Excavation for through TP-15) within the proposed stormwater pond areas to determine the Structural Fill suitability of these soils for use as structural fill material. As previously discussed in the Section on "Subsurface Soil Conditions," the majority of the soils encountered consisted of sands, clayey sands, and sandy clays (USCS Classification SP, SC, and CL). The SP soils are considered suitable for use as fill within roadway and O.TNOR12004%4YR2-04-075(Meadowlands)1MYR2-04-075reportdoc Page 7 of 10 residential lot areas. The SC/CL/CH soils can be utilized for residential lot fill; however, the SC/CL/CH soils are not considered suitable for use within roadways. Should on -site SC/CL/CH soils be utilized to elevate the building pad to final grade, several guidelines should be followed. Soils should be placed in thin lifts (approximately 6 inches), aerated and dried to within t3% of their optimum moisture content, and compacted to at least 95% of the Maximum Dry Density as determined by ASTM D 1557 prior to placing the next lift. Soils should be rolled smooth and crowned to prevent water from ponding. Additional time will be required for drying SC/CL/CH type soils relative to the time required for sandier soils typically utilized as fill material in this area. Drying time will be weather dependent and will increase with lift thickness. Should the construction schedule permit, thicker lifts of the clayey soils can placed and allowed to dry for longer periods of time. Controlled Fill Controlled Fill material should be free of organics and debris. Fill soils should be as approved by the project geotechnicai engineer and should generally consist of sands classified as SP, SP-SC, SC, SP-SM, or SM soils according, to the Unified Soil Classification System. In addition, fill soils should have a Maximum Dry Density of at least 100 pounds per cubic foot (pcf) as per a Modified Proctor Compaction Test (ASTM D 1557) and fines content (i.e. the amount passing a #200 sieve) no greater than 20%. Controlled Fill should be. placed in uniform lifts and compacted to at least 95% of its Maximum Dry Density as determined by ASTM D 1557. The upper 1- foot of floor slab areas should be compacted to 100% of its Maximum Dry Density as determined by ASTM D1557. Pavement Design Site preparation for the roadway and parking areas should follow the recommendations discussed above in this report. Traffic patterns are assumed to consist of light vehicular traffic with occasional truck traffic. For the new paved areas, we have assumed typical design traffic loading 18-kip equivalent single axle load (ESAL) over a 20-year pavement design life to be 160,000. The pavement design considers an initial serviceability of 4.2, a terminal serviceability of 2.0, and a reliability of 90%. The flexible pavement 'iection is designed using the American Association of Sfate Highway and Transportation Officials (AASHTO) "structural number" (SN) system. The SN used for design is based on a subgrade California Bearing Ratio (CBR) of 10 for properly compacted in -situ SP soils or locally available select fill soils (SP and SM soils). WPC recommends a light -duty pavement section consisting of a minimum of 18 inches of compacted subgrade, 6 inches of Graded Aggregate Base Course (GABC), and 2 inches of Type I Asphalt Concrete Surface Course meeting the minimum requirements of the South Carolina Department of Transportation (SCDOT) "Standard Specifications for Highway Construction," 2000 Edition. 0:\ENGR\2004\MYR2.04-075(Meadowlands)1MYR2-04-075reporkdoc Page 8 of 10 The GABC should be compacted to at least 100% of its Modified Proctor Maximum Dry Density as determined by ASTM D1557. The hot laid asphalt concrete should be compacted to at least 95% of its maximum unit weight, as determined by the Marshall Mix Design procedure. All subgrade, base and pavement construction operations and materials should meet SCDOT requirements. As discussed previously, due to the presence of sandy soils above less permeable clayey soils, underdrains are recommended to establish positive subgrade drainage. If underdrains are not implemented, it is likely that perched water conditions will develop beneath the pavement sections. Qualifications of Report We have prepared this report according to generally accepted geotechnical engineering practices. No warranty, express or implied, is made as to the professional advice included in this report The analyses and recommendations submitted in this report were based, in part, on data obtained from the subsurface exploration. The nature and extent of variations between the borings may not become evident until construction. if the above - described project conditions are incorrect or changed after the issuing of this report, or subsurface conditions encountered during construction are different from those reported, WPC should be notified and these recommendations should be re-evaluated based on the changed conditions to make appropriate revisions. O:1EWGR00041MYR2-04-075(Meadowlands)IMYR2-04-075reportdoc Page 9 of 10 This report is for the sole use of this project and should not be relied upon otherwise. WPC appreciates the opportunity to provide this report. Should the project change significantly, we can review and modify our recommendations as needed. If you have questions concerning the contents herein, please contact us. Respectfully submitted, WPC tit Ronald R. Austin, P.E. Geotechnical Engineer WendyZh s, P.E. Geotechnical Engineer Attachments: Site Vicinity Plan Test Location Plan Soil Test Boring Logs Summary of Test Pits O:IENGR520041MYR2-04-075(Meadowlands)IMYR2-04-075report.doc Page 10 of 10 E ENGINEERING, ENVIRONMENTAL ac WNSTRUGTION SERVICES Site Vicinity Plan I p f pot'. N 9 ENGINEERING. ENVIRONMENTAL & CONSTRUCTION SERVICES Test Location Plan r TP —15 IT-P-11 Y T E— E jNrD "M SDil Test B-,)r;p2 'Incaicm ( ) - ho-Ilus d. tiLm.c.n. TES" 'OC.-k'"TCtN3-, PLAINT qt� A BRUNY.-VICK COUNTY.IN-ORTH CAR,0-',rNA s CA E: N.T.S. fj-Da-fr; Ull (JIFIROJECT NO. -MYP.2-0?4-075 l r1c. No: ENGINEERING, ENVIRONMENTAL I' CONSTRUCTION SERVICES Soil Test Boring Log ----Meadovi-lands Tract - — I Brunswick County, `ortb Carolina 1 MYR2-0�-07� II DATE: 9.•'25 2004 1 + 1ccEa L : Cos D.t[LLIG \4Z Hor: N4ud Rotary I E'.i.\ MER 7Y11 Matlual 1..0(:OF BORING NO. B-1 1 { DRILL Ii\G RIG: D-25 I DRILLER: Mid :Atiamic Drilling I 54'.4TER EN--U. r& T OB• riot h asu :d I R�AT=R LEVfL 24 Im. 3 { _ = ._, _ STANDARD PE1ETIRA'i`10'� TEST DATA I� 'N4ATERTAL DESCRIPTION , �I (blows/foot) U 1Q ?0 30 60 8U ' �Rootmat/Topsoil - _ ' Very Loose to Loose Brown Clayey Fine to ',\,1edium SA,'D (SC) I �``�J y 11 5—Jr. S-3 1 I 7) \p S_4 , { � Loose to Medium Dense Bmv,,n a-nd Gray Fine to 10 Medium SAND (SP) With Shell Fragments from S 5 \ t2.0'-32.0' 15 S-6 I I 1 20 S-7 I 14 ` e � 2` 3 S-8 i I I i� 30 g_o _ I I 15 + Loose Grey Clayey Fine to Medium SAN-1) (SC) OZ 35� I I - S-10 Hard Gray Sandy CLAY (CL) �i I i �--�— Baling Terminated >' rGl'.3ti11,^,tlrJil,.J._: 1.Ce f Page 9 of 1 ENGINEERING, EN'VIRONIMENTAL & CONSTRUCTION SERVICES Summary of Test Pits M, a U 3 W 0 d- O z H U 9 A4 U i C O � p R � U X Q] V �( y CL CL m u i 0 0 O O E J ca j _a o W td LC A A 03 > CCL*�� G 'O a N v y Q 3 Q v u Y 0 0 0 �.0 o o Cf) o a w a 1 is N o Cf)� O Q Y z O z LL V U Can C Q C6 0 CRI �Q+ O �¢+ �Q+ p tQ� F p O N �,� 0y2-' � 3 �,�F' 0 ;d 30 ti >1 a� � 30�U f N� [wC � Q 'C'3 c� 0 a ;t CI. ]iA� 0 OA aOp,„Uv cv co 3 onarn �A�cn�, !VD =f- 0 o FO- 0 n0 ORf OLoCwo0m.0O �a F-0a C0 7Oul-07E•OCF770 E-0- 0ae.n ao G moo M kn Li v 1 0 Q 00 Cn � V1�n 00 OU I �n I OOry I �n I OOr; I Op V 1 O OOM Z� a f o - N �,n w � E.r O a � ca ,, m ►.a UQT xa Iz zzo a�z H QVO ova f o I o > > U A � � 0 0 C �Y �Y zo z 0 000F o0 O� 3 O2 3 p v o A? i 3 — 4D 0.�� � OSwe w w co ' N 0 W O � LU . • 1 gym,, cO ;r THWAS & % = Ham s; z n ENGINEERING �" • 01011iPANY e o /t #C00285 eeAU� SAVANNAH LAKES PHASE 3 BRuNSWICK CouNTY, NORTH CAROLINA STORMWATER MANAGEMENT REPORT PREPARED FOR CENTEx BIOMES JULY 26, 2006 REVISED; JANUARY 89 2008 18660.406 THOMAS & i-IUTTON ENGINEERING CO. SAVANNAH, GEORGIA CHARLESTON, SOUTH CAROLINA MYRTLE BEACH, SOUTH CAROLINA BRUNSWIW CK, GEORGIA PROJECT NARRATIVE FOR SAVANNAH LAKES AT MEADOWLANDS PHASE 3 PREPARED FOR CENTEX HOMES Savannah Lakes at the Meadowlands, Phase 3 is the final phase of the proposed planned unit development adjacent to the Meadowlands Golf Club in southern Brunswick County. The proposed residential development ultimately consists of 275 combined lots for phases 1 through 3. Phase 3 consists of 100 residential lots, water system, sewer system, drainage system, and roads. This project was previously approved through the Express Permit Review on 3/8/06 and is identified under the existing permit number SW8051203 which is now being submitted for a modification due to the latest changes to the Phase 3C layout. Phase 3A and Phase 3B have not been modified. Sediment and erosion control devices will consist of temporary silt fencing, grassing and sodding, stone check dams, rip -rap stabilization at drainage outlets and ditch intersections, curb inlet protection, and grate inlet protection. All drainage from this project will flow into the Shingletree Canal. The drainage system : and detention, facilities will be privately owned and maintained. The drainage outfalls to the wet detention ponds have been provided with rip rap stabilization. All sediment and erosion control devices will be in -place prior to construction or constructed as necessary. The project engineer and designated agents for the owner will monitor all sediment and erosion control devices during construction. The sediment and erosion devices will be removed after permanent stabilization of the site has been accomplished. The changes to the previously approved plans are isolated to Phase 3C and include the preservation of the abandoned borrow pit/wetland and the large existing wetland. The previous Phase 3C included one large lake by the name of Proposed Lake 7. There are now 3 separate lakes contained in the Phase 3 by the name of Lake 7, Lake 8A, and Lake 8B. Lake 7 provides an interconnection link to Lake 8A and Lake 8B which discharge to the Shingletree Canal through a weir system designed to meet or exceed the BMP standards. NOTE: Please reference the Stormwater Report for sediment and drainage calculations. _CONSTRUCTION SEQUENCE 1. SILT FENCE/TEMP. SEDIMENT BASINS 2. CLEARING AND GRUBBING/TEMPORARY DIVERSIONS 3. ROUGH GRADING 4. SEWER SYSTEM 5. DRAINAGE SYSTEM 6. OTHER EROSION CONTROL DEVICES INSTALLED 7. WATER SYSTEM 8. ROADS 9. FINAL GRASSING *Construction plans show actual construction sequence, the above sequence is general. N:\18660\Docs\Applications\DENER Stormwater Revisions 10-3-07\Narrative 10-03-07.doc TAIRSOWTIM PkOjGdNmIf me NNMfffNNffffM.MN�ffNNY1H11fNNffNNNNfMfMMMMNfYfwMfNMfNMNNfNffNfMN!lNINfNM1 ���lfffflf+�pfNlNWfffNH*fNfflflMNfNNfNfN�INfWfNfff�NNfa;fff/fNfNWflflffMWffIMMM;iM Dnhmp / Sift d YNrW fsNWfNwfN/NfNNNM�pfNNffyNfNNYNf�NNfNpfNfWMfWfNNfWNMf�1NN�MY 3 11�� offNWM/N\ffNfNHMwfffNMflfffNNfNNNMffNNfNNNNfMfffNfNffNfpfNfffMNffffwNN ��' S � WaMNffNNffWNWfMffNNfNNNNfwWf�NNfNfNNfffl�MlfNNwNfNfNfMWNMwff .Pta-' bpot NNpfNMpIfN�NNNNNMNfYffNfflNfNfffMlfffMMMMNNfMH'fNfffff Pfe-Dwdopmaid NNNIflf�lMNfNsfONffw.ffNfNM/NiNNIIiNfNIMNNfNNWNNWffwf{� PmDwdopmw C fNfffffffNffaYpy�NyNffNMfNweOeNW!'lfNMfNHpffffNfffNMNNffM FmDffnlopw" K Y! Model ffNpNMMMNNMfNNNMNffMfNfWNNfMYfNffNIMMNMffNwNN 9 Dasip �T�fou far I bab� NNNMf4....ffWNfNwNfNMffNWNf-NNNMNlINNNfNfffffNNMNMNHMSadke +® HOL `rdos&RdmwNN._Sudom I RE BAN 11, 112MV8D PROJ # DWQ F I � 0a Siramb t.e N Pb= 3 CNIU i►smm� t i�mon Ca ;ok ;—low Die /gepemv� lA�t10�1 DID Bavf" f/16�7 BY J4I�1l�il�iNit[. Savmd LaIm Phase 3 is a 472 an saddened subdivision commisft of Ito AW@hmiJYI B is baled. new the %ftsoction ofSR 1302 and SR 1303 in B nmmidc Clo vaty sad b an a domdmn oftbe pmevioou dy Sppnmed V q)- u tided MeadoWinds Pbm I aid Savannah Lakes Phase 2. The mqa* of the rite mints of woods aid mmmdow. It omrsady dmoaiaa via dout Soar and ditches u do Sh inglolum CmnmL Sofia pream an rite an in hydiologlo soil V oups A. B, C aid D. Phase 3A is a shalt anlde-sec roadway wide, as adiftg anm" pond 3A) that Is to be anheped m port of Pbm 3. rao editing L A m 3A was booth is Phm l and outlie b iota Lie 3. which was previcw�y appmvved in Phase 1. Ilse to die ietereammaeotiurm of LWku 3 A 3A dds dmnw m model includes the pcWoody Phase 1 sofa fae ft into Lalme I As aboeodm in the port sip tmtim of d& mpwL the added impwvw u ams, within Phase 3A dineody sit dw acistiag war in Labe 3. A sore to aouskm time cbsopein weir bu ban Wad in dw aomutcnotion plans. Phase 38 & Phase 3C are staff domokkeikalumpaj and u* sot directly eSb cu it by any pmevioos phases a To define the limits of ie dmimp bashes at Wdu dW coomn flris pmoJect. • To doammmt drat mmajoe dainape � suoch as sad lake job s$ gad oldmis me WogWoe for di Ofift proposed, and des+ all wbbin the drainage bmdn(s), at dot i>a h tnmctmmt+e consaudw m be phased fa ---A— musedevelopment c To dogmmmeat oboe with regalstoty � of � wi a'"�lime► sand Bruomswi* Cownty, amunmseized as Mom mar • 1ViURMCA11VD1.MDEdlJr' W#W QwEty sMU bo nmmadned by r gmffiW wnomu ofmmoUin a 48bans period. A Sedinment shall be povemted ftmn laming the sire daft coon doam. a MU11SW=COUN" Post Dndopament peak tvmff isaes AsU be deftined far time 1 and ld yasr storms. > Perk dages in lm eball be beloa+l6e amamimum Pmiahed, lbs . r Sav8nnah L"Pha9e3 J04, 3-a$s,6Q I Hoemea. Dote Appr yW: 1'14 07 Thom . & Hutton E�ngineering.Co:: DM.Rev%dt SII6le7 as Stormwater Managament Rep vt. By, ICN/149,i"HL �1 TIx components of the proposed system are roads, ditches, culverts, lakes.- and outfMlls.. lure rearyard swales, provide posid-ft chainago from lots, ► pipedslrainage syst n con a ronpff die'roads°t ..a system of 5 proposed lakes; Lake 3A, Lake 6, Lake 7f Lake BA, Lake $B. Lake3A was previously constucted in .Phase 1 of conduction and. has now -bow exp sided in Please I %apes BA., O dt ! outfall directly into $hingleave Canal. Lake M is interconnected to a downstream Like ,3, constucted.in Phase 1, which then outfalls, into an existing l0leadowland Golf Couse'Lake. Vachlaimcollects it certain atea.through runoff, eulrb inlets, yard inlets and grate Wets. To clarify which lake collects what area a table has been generated: showing the lake nmbcr and which lots are draining to-wh ch_lake: Nate .that many lots are °divided in such a wny that the portions of the lot we divided into multiply lakes. To. minimize confusion. the -front lotrunoff is what .determines which,leke the lot will be included. Seethe table below:. Tle_.lakes +ndWs consist done culvert draining through :an a aitWIstructure; consisting. of a large concrete box which includes weirs sized Ito pravide the necessary detention of runo#i All road runoff drains through these lakes prior to. discharging off -site. Times of °concentration and curve numbers are generated.accordingto procedures. set fOk&' in SCS Technical Release S5. A computer .POSM ealTed� Advanced InterconnedW Maonel & Pond Routing" (ICPR) is used tq model rainfall and Na�86b18mn�+a�tepo�41�64ostan�w•ca M.a.atsw�rr �te�me �.�e-oa.aoe SWAB" Ld" Phne 3 1* Mom CommH3 I -I DMANnnot IAMW ?bailee i ibllae spabl eft C06 now itrAlodt MW poet xxWomm Theaompoosubofdkpeopoaedsyaaemstye oudhOL Roads, and In some cues rar yud swakk p w &la pod& e du&pp Dow lots. A piped a sysim oonvieys rmafffmm the ram& to a system of 3 prof b&M Ldw 3A. Labe 6i. Ldm 7, LdN K Ldm 8B. IAw 3A v= p mvioudy consp eW in Phase 1 of mosteuodon sad hro now been mpMW im Phsss 3. Ldms SA, 8H A 6 omM dhdctly Jew Shlagaum Csael. Ldw 3A is m1�o�ueeoted to a duvmsw m Ldw 3, commkw d is Phua 1, wft than aetblb hft sn maift Modavwl=d Golf Couse Ldoe. Ewh WO aallecb a axtala am tb h MMM emb yard bla sad prate mleb. To **M Wo collects what wn a table bar Wm po=W die Idto number sat ahidt lab on &vWng to wIdch ldcm Note drat mmw lots use divldod'b smh a ws9 dodo porticos of daa lot mdivlm face mWN* Llms. To mbdmm oosdwm the *M lot nmffu what dommom %fth ]she do lot will be mod. Sou dw ubla bdosw. The lobes auddls moancvti c tim+oa as ou�alt *mom cam of s Jteda aosele box wldeh bwb dos wdrai sized 1W provide the ry dela don of rundt, AN rood runoff d mim dffooph these bk o prise to Times of aoaoe - - sad c um manbers are spoof ft tQ pp set f * in SCS Te b*d Rdase SS.A compnoWplop= ealted rAdvowed Iadbet�ccon�ecIN Chsm d & PcW Rom' 0CPV is uW Wmodd =WM and Now er.�..e�ws..ywges.m.o�soe SWAWnsb Ldn PMw 3 tweoleocs IUM&IN 8 Ca sb=WMWKWAPMWRqm b* I-lu 0 D&Apprsw t IJ04W DNM Pjvbet vidln'/ or, ionoomm mnoffand perm 4*=Hc rates RMff %*OFVU m MwWd by iCM singtoo fire WA U* Hyduwqh Madm& mm V, alp mi tbyftvm&foir cob sub ward. Theca 4*osm& we m user spec" variable.. V" ve bMa iwjm a nmolf`cwm mmbq rab M Sian pNtt, pb peeing f$cw= d *0 oft. 1 7U spaci& klaolM ftM ie dnotdW into o Sob Cmmwvmim SwibuWadomai Handbook ftan4 affy&awV." Tba invata„ lames, aadDn vsluas forallpipes �tlba L�oaris sae hft 2w model.. le addition to pipe iofbC x*% all s mp-ow e and do reactive outfill stnluae hifoemadft is ooneideaed MW 4*Dlogia and k*xoHc imdror =dm fa dm ©mftwti. IU results d ow lagoon diseba p rMs end sop hifimadw dwbg de dWpp storm, Iran the aMe i`soility, m mmimmmw wevaion lagoon is set to amvre uo dmmwdw pond in tea amm uft amL In sdd d m, tU vldmfe dbdWpnu fiem tie sp c m cmtawaedt o p 046,reloped nmoff ram. Knovft tbeae ttwo hctom dw dmim p, symm is deri�ad by trial and error. NAA lffxwmNoFAwfjmqpmws••••rM 146M N 8sMme&IA"Ph=3 COMM Howes IUM A ROM BOOMft Cm SkMWnr Abe MMQ Del AW*vst tl0lld'f DMRe IWL- a118107 air. Mw peak ion afAomwMwmwff(cWc fee per wooed) for Piave 2 are a dcubod by tmaeaea ofdw iCPR wft to Wombs unapdioom I. Mw 24 bom1,1% 23 and l00 year fi+egoeoay dm (d itm of pe asin24 bam) bzuaed hrdw oftod= dupe WOOL 2. A Type Bllnteoedeua Moia = C.omdb;M (AMCR Is wed. This des mlw dw depza atwow softhe wares W at dw b of a slam. AMC It isle ataWnd used b vrabacsbed stWft and it = fl=% au avenge caodM= (dsaadl isnxidwdcy 3. A Type M al Rd" DbenbAm b uni TbkdW*xdoupst m is detamained by to Soil Comm"dw SwAaa conVuiop agioud rein- pp 4` A 323 E ph PUNK FMoar i n used b0 ad clda 3j►p d SM 40 P bag Fac m. 79M 323 Faolor to bead an stdtattaal nelph of a ted nb" eod " t- SMAh§M=hailed SlML S. Mw hydmps& for u& 1goaca we ped witbio Kft PnV= v" aaodeb iM � � of the aonoBpuo� a fi�Iq►. 2'he as b�dAra 1 t� id y� ats� . TM aebiRrainb Ind* upon seae earnr ire dr Peat i3ev+ekapment aw report end is repacaenoed tabubr thcie nrmnave. Dr�e basins aua algwn au in- exbi�it:at t>ss eod o!'ddn uepoat. 7La aompoedte carve nu®bo= (Cid)`we ulbd ted by combift concaptud awaw plan bAxwMoa vft soib bh=Wm in- tine 1be re=h can be seeu iu dMe St Msp Saod= eMptbia TMplveckvanta ndidcnett wpgmtyeowwofwoodiandendow The Oulu is dw S ee CML Pre - elopct pak floor rates* *are cd=bftd by "SO TR»S3' &m ft d by dame SooH caret nradacct Savdoe nd U Stares D of A�ianl�ce. VM .FR %"" h" vWft almia to Map vdame rued by am and !local ormm Cd*Mm aed remft m holudd in Sin L ram Ofh'or iopcaM®t sue ddm=tmd ssaordi g tQ tlae ionpest aodedp0ed moved pads v Okeed baaia. MuW�..�r�aw�.MrJt��ucs-�aac� Section 2 SUMMARY of RESULTS SAVANNAH LAKES PHASE 3 Storm Frequency Pea- Post Development (do) Qitbsr® Development 1-year 13.09 12.84 0.45 10-Year 85.224 8388 1.34 25•Year 122.459 120.91 1.55 100-Year 197.004 16353 3.48 Lake Top of Bank Elevation 25 Year Storm Elevation 100 Year Storm Elevation Lake 3 31 28.03 28-49 Lake 3A 32 30.50 30.57 Lake 8 28 26.84 27.08 Lake 7 29 27.28 27.88 Lake GA 29 27.15 27.39 Lake 88 28 27.01 27.20 Wetland (Large) 28 23.91 23.98 Weiland K 7 28 25.30 25.52 w* ray � t V C iirySiiy 'o ~ q 14 r � r :r�.r • F J L�I • • r "•Y,,x 1 l .� Cap VICINITY MAP FOR SAVANNAH LAKES PROPOSED ACTIVITY., SAVANNAH (PHASE 3) AT MEADOWLANDS ! LAKES (PHASE 3) LATITUDE: 33-55-37 COUNTY: BRUNSWICK LONGITUDE:—78-35-311 rUSGS OUADRANGLE MAP, CALABASH s; DATE: July 27 2006 ` ` APPLICANT: CENTEX HOMES ! tF h� at -- � ! •- of F C� •�\ �w1t `fir ^i 1 If 1 I \oRm t �7 A a \`� r-y♦ f� �}lrrt Y ♦` ^ t " _I♦ya.,�rBNAMADE TYPE A ju♦ f gill +� i �' yJ ► +O - TOE 8 ♦ ,yt6ly FOREFM - ZVPE C MM �i S` ILI i~L - sa L�s FF %I- `` ,' PRE -DEVELOPMENT DRAINAGE BASIN EXHIBIT •\\`` t •,,;; FOR SAVANNAH LAKES PHASE 3A `:•°, (THE MEADOWLANDS) PINIPNM PM CENTEX HOMES on coi vmm Comm awe MYRRH MUK SWJM COMM MY I URN 6804MM i0•i� AM•GMA� THOMAS lk HIJTTON ENdNEI RING CO. 1144 SH04 AVENUE MYRU BEACH, SC 2295577 SCALE 839-3545 CRAPHFC SCALE f �sFlw� lIM•M a R + ` `�•� + fit', tq\ } 1 � t PHASE 11, \ zlcz ILL �r r i rri � , y r r(- ✓ +J .•^ _ ��-� � � ; '�I" >' / i !' f e �j��; �� I'•'' ``may ., � \` � � ' 1' r!~ L J ✓1`�,e--�. r i � •f � � {i. r I t5 � 1� 1 , Y� t V3 i tt, 1 �`�\ • J .�' y \ try ,y '- ��\r - Y `�1 1\,1� r g ® 9AY DIX - 1YK A COLDSOM - TYPE 8 ® FMIUM - TYPE C LYMC COM - TYPE C LEMON - TYPE 0 PRE -DEVELOPMENT DRAINAGE BASIN EXHIBIT FOR SAVANNAH LAKES PHASE 3B (THE MEADOWLANDS) CENTEX HOMES on m ilYiIM SACK SOUM CANUM 2UV Aril! !L l00� THOMAS & HUTTON ENGINEERING CO 1144 SIYVE AVENUE MYRTLE BEACH. SC 2077 (643) 839-3545 CRAPR C SCA1a NMI rrr-® r< IZ .` + i— — ,n`•`yVls sy -'--+srpli- -- ti3- -- � -C:,.� _---�- >r r—•--'fi T! lti r • ! _ i t 01. ! R i y .� 84"ff" - TYPE A oa \ coummm - ?WE B y x ! LEON -TYPE 0 r =car r,� . ,,,r" ,y' a! / „� •. r . r {L'i�.' .] .may `t� ` ' !. +"� . !' f ."`T•S '� ` 1 1. ' , sar` � p{..• I - ^f s' ,� �.e,`;�` S )� .�. rr�Ir ! !I� f R._ ! �.aCr rr I;�y.�; '�.+{ �•' GE LO�JPMEN OAINAGE :" f' .�--�' SAVAI�II1 LAKES Jw" (T"t MEADOWLANDS) iel mmFm s ! IF EX HOMES ■faA K •om CAROLM a"" + 1 �r•�• ff :7�.�..,•s* .02 i 141. THOMAS 8t HUTTON ENGINEERING CO. ' 1144 SHE A WON/ t '-.� MYRiCi BE/Idi, SC 29377 (843) 839-3S45 IF IF 1p BA Of � � ai ! !IW •r R s { t 4 7 G 6 a f a R t b �f .� j•F � i ' PHASE gir J r• / �\ f ' ! NATPMAIM MR N �. its s �`A r 30 r `•, � _ op _ A_ LAW a raw 21—am an = m 711 aM To ■ N.T To a SGA AMU w 4AW AGM ARM a 4" AOIMOM I� N wr -qwok..- • I •MR1 N 11 Is 12 MYMEJ4DE - TYPE A ODLD mm - TYPE 8 raRaf..m — nw C "f4cmem — TYP! Y 0 Lwo - TYPE D POST -DEVELOPMENT DRAINAGE BASIN EXHIBIT FOR SAVANNAH LAKES PHASE 39 (THE MEADOWLANDS) pm CENTEX HOMES mvxm map^ aowm Unoum 2"" Am 2% mm THOMAS S M rTON Eta MERINB CO. 11" S M AAME I WIE 9EACM, SC M77 ( M-3US CRAPlOIC sCIILE (t awl l ...a a NEOOW MOS COIF =W fj(; EOMMM ML% JR l i Nam �cYLRmjm !I QQ - 3 CN . es To s 41.3 APZA r %&GO ACRES lellff"NA WETLANID C!! . 83 To + OLI A 3,77 ACW �1 Ar , t \ LB4'iBPID BAYMEADE - TYPE A ,$OUNDARY NODE 1 GOLDSBORO - TYPE B ol LEON - TYPE D WETLAND X-7 t�l •� 48 \ �0 Tc 2LT r I Jr JJ OWTSOTBANK _ ONol \, .t. Tc. / ti ,, � r - ... _... ` ' /O/ �'_ �` 'a�."�`� �•�� ,fit /E191ELLFR f / I-.• AV w4mN N/� � Kry m \ 1\ POST -DEVELOPMENT DRAINAGE, BASIN EXHIBIT FOR SAVANNAH LAKES PHASE 3C (THE MEADOWLANDS) PREPARED FOR CENTEX HOMES 2080 CORPORATE CENTER DRIVE MYRTLE BEACH, SOUTH CAROLINA 99577 (843) 88$-noo DECEMBER It 2007 THOMAS & HUTTON ENGINEERING CO. 1350 FARROW PARKWAY MYRTLE BEACH, SC 29577 (843) 839-3545 GRAPFIIC SCALE s r r qo w (>11 RR) 1 imbAM R r J-111660.00 ?bw= & Run= Dome* oL x:w STORMWATER DESIGN CONSIDERATIONS FOR SAVANNAH LAKES PRASE 3 PMAM FOR: CENM HOMES DATE- JULY 13, We !taus! linen Concept Overt ud Plow: t _ (a00RpMlX(M•S:' WOA)) TR 55 Eq 3-3 ubaa t = Tv" tune ibr Overleod Flaw (s ) n = Maeeeho ooalWw- fenm TIG55 T&le 3-1 I-Lmq haflba►(M P2= 2 yrmb&l dW& (b) "s= Hy*macarm" (NI o= O,AO Woods:L4wundeem& 1- lO0 tt P2 = 4.5 b s Mod *a t Slis aft shakes co<♦oeNrared pow:1=M60v where•. PTrml line %r 81rdlowConeaemMed Flow (eel KABSO O`fiM(0) 2-'A"np waWcorerne sbpe Qft e Wduky (m). Fmm 7R-55 k 467 R lm O.005 Uaprtved r= 1.14 Ne tw 6.iz aio Flpe pew: t=1t60v wlrem t: r awl !lane ow Pipe lbi (sin) of ll w (f) s=Vdooity (R4e}Aaerrre 2 W, k 1351 R w 2.00 M In ILL rain Te = 49A mim IQ/IFar. 1s660-pm&po -7'"kt Pap 104 Un Trarel'1" m cwampt Owrhni Fhw: t = (gA"Goft&B f(p2"03)'(V%A)) TR45 6q 3.3 whoa` t = Tmvel time lbr Ovwltmd Floor (mb) a = NWwdn& audlieied - feaa TR-63 Table 3-1 1= Lmob offim (ti) P2=2-W=hd11d*&(bt) Sr-Hy*mftd**(Ift a = 0.15 Chm: Shot Qe Petrie 1= 100 it P2= 45 in 9= 0005 OM t = 14.39 i 8balbw Comeswtealsd Now. rv6ov ! Wbw: PTnvd *m hr3hailow CAaoeetraled nm (wJn) OfAow(R) ( S=►vmp dop (A" w-Voiooitlr (ft)-From R M l3 320 R s= OAN Unpaved VC 1.14 Ms on 7A rah TOMM Te = Me Mb f t tdl9ll1006 Put 1 Teats JcN Pa0e 3 of4 -1866g.Ab Tboom & Hufto Lr Wwbig Co. 1CN I Jn Tawl Tam Convert i PAW.t=(oAQ7(aIY*W(P_W"f(SAOA)) 72-ss sq 9-3 om: t= Travel tiara for Ovwbnd Fbw ( ,) n = Mao lr ooditiest - *m 71t ss Tabis 3-1 I = Leh of raw (ft) P2=2.yr=fiM (fn) S a Hy&sWk dope (WM an 0615 (tans: Sbort Farm rime I= 100 a P2 = 4.3 in S= LOOS fkf t t= 14jo mi halaiFbwo r-Mv arMm: laT avd time for Sblfow Co noa*obd Fbw (auk) Kanob offlow (fo v=Velodiy (oar} Fl ii-Z 1-- 240 ft S= a005 Unpaved v- 1.14 ftls to Si/ min j mad raw. 6=1/60v J WbE wra"I time for Chmo l Fbw (p" KAmg&affivw(lk) v='Valoeiiy (rd*A� 2 flra P 1244 ft v= 2.00 No to 11.20 ads Tt-= 29.2 ta& 1 Ljollo p0 Fft I Wo-Pr*Uto*TTeads PaSe 2 at4 1 J-1966000 IWI94006 Tbmm & Hallos Bqomaft Ca tha Trare! Time com" t Owrdad rwm t = (0 007(nQAG MP2AU)'(9^") TR ss Bq 3.3 who t= Tmd time lbr Omfs d Raw (nda) a = Ma■nbO wdfid mt- 0 M TR Ss Table 3-1 1= Lao of Aow (11) P2= 2 jr=hMl depd (in) 3 - HAmk eep(NM a = 024 Gi Dane 1= 1J0 R P2 = 4.s b s= 000s its t= WIN mb open amad Plaer: Pl/60v r-Vdo ft (M) Anume 2 M 1r 304 V= 1.80 Wls w 2m a� Tbwdw*oTes 31A dr RIC i po -Taxle 0 hp4d4 3.1aftoo ltn m&livwongoal -bC06 jcm STORMWATER DESIGN CONSIDERATIONS FOR SAVANNAH I.AKES PHASE 3 MOAMPOR: CMrr HCBM MWAM BY: nb A Ban B fig CO. DATM ALLY 12.2W6 REVIUD DATA RWY 3W 2W7 th@ Tmd Time Concept Owelm d Lbw t TR4514 3,3 shww t- Thud Was Wr OMmWd Ploy (W" n = Msmkosostlf l 1 •* mTR45 Tdb3-1 Z- LwAo ditw oo S = dope " as 0624 Omc Ds 1= 72 :4 n- 4.3 in S- OAM S2 t- 1R73 sb ilAOM cowm&aftd NW. PN0v ■►hwc PTmd *W lbr 11 Amw c=mm wd 1 (r" btebol'8mr(!q fl=Avw&a.RE w 11w Ok" depoll r (W} Arom TR-33 1= 200 R dim Paved e� IA fib to Us sb llae LRm t=imv WbKC t= iti" Was Jbr Pip. MW W* kLmw&offtw(9) vmvdodjr(W*AM lft Um as R wr 2m ft to Lit mb TC = 23.9 WE 7ea►200r MK 1 7b Wsd=d Rw (746WJ7 xb pop 1 Grit 3.1F6OAQ Tbomet & *Ala ll4loeefiad Co, XN tbo7tewl'MrCoaeept OVWlead Flew: t= TIt W Hq 3-3 wMee t= TMd d w farOYedmd RM (ado) a= MA~ oodlidoo-fk=71-9 TWhb3-t l= toyd,of low" P2= 2wpadoM dq* (k) B= Mphodb dope(fbly a = 0.24 Oise: Deese 1= 137 l P2= 43 la S- CLM AM to 3IL" aft Tie = 27.0 E Un T vd rW Caaoept Ckwhod nm t = (Oro07Qd," IX9 2MUNS"OAp T" B4 3� �m'ii ¢ = TWM t 'm albr OYwlwd Flow (md0 B=K~po lfkient- it�tm 1R-33 YallN 3.1 1=1wvboffbw M P2- 2-yr=WWdW& am M GONE D� I ■ 75 l P2 45 is B= O:fiO3 lift t ■ If." oft P%M Flaws t=UW %does t' rMM d= hr Pipe Plow OWO ImLM et od&w 0 1= 012 0 Mw 240 ft ti M7 nk Ten nA ; 7136"Aff Fft l Re WWIs dRaw(7 x1e hp3 d It J-186im 1larar & 800lio11-1twI I C,6 xN 1JNTmw lbw c=Olpt Onrlttl ■ m t 0 Mt-M � 33 libm t= 7km iiat farovmwd 19mr Ono t = OOWz w - fiom TR-9iST" 3-1 1=1ARb a[ftMOD PI=2-7reolmdgOpq) S' HY&MU dwi0 a= Om Qe -Down 1= 130 a p2z 45 is a= OM " to an ad ®PM cb ■ d raw s tmv v ?Vdadly P*Aoruas 2 !db Ir am f! ve LN fib is Lf ala Te a 31A sh *3wjw Oft IWG)4hm&1ml47b Wdkmd Rear (74G7)sb tie 3 o[ 1 i I l-186ma Tho # EW w Bgplmvedga Oa JcN I Uoo 7bmd 7b*c+mlm" ow umd Rm t= 77t M Bq 3.3 whm t= Tmd dmolbrOvaind Pbw @do) s=1►e ao' 9k.00dWm-ftmTRM7mbl93.1 l 1=14modBar(1q 8= HydmAs dop a= U4 0�Do 1= 77 R P2= Ors In s= as fm t• i%AS uk .shame �favatim.lor�owc0000sasi.aPloo►(i� � �t.eo� dBomr pp & VWW wa61oomve dopm (A" E 1= 218 R sin was 1bw we IM 6i in US i i l4e Aew: �1/6�► mme PTnvd dw farpip lbw On" v= 2AD ft a ass mb 7I9pvM pow I Towwo d ar p"7pa Pys4 at i l J-111am Zits s R1 K Ht*onft m xx { ut.n�tl�.at�r o --bW am: t = ass Hq 3-3 hi t=Tmvo1Imo!beowtlwodPlow►(w* n= ooNeol��t-som 7'RrOS � �1 �= to�di'bw�1p i«t= �n�sna� (1q1 s=14�atd�orlopo(�D 1= 100 A rz= 4.b an s= OM " t• WE .r mr b Ihdww oomwawa fon *ft r r-Aw* otf pq I=Avmp dep wrvwloottlr (11h�- PYaoo t'Jt�is l to loll a :e=um Uqwmd 1.14 xlft IN ts79 td. Te = W7 TM2007 1ft 11i6D-lwlPal�a weand am (7447)Ab !p s otl i 3.1 r=etiw t ibaooa Oa >cN Um7ww 7b acnompk Owdmi ROm t= M55 Bq 34 wb u c la TWwi tow brOwdmdPlow WO as C ffbiW- ftm TR45libb 3-1 1= Lago o[Sow M P2 = 2grmhM d*& an} S=vopM" a= 044 Om cDmw 1- 100 a P31, 43 in S- am M t• MA ode lbdkvw Qomembabd Rmt WMSOv wlmrc P. mvd dm dor 9mlbw OomovWrMd Plow (mk) 1=1,a40 ofAow (1) SKAvrmpawIemom m depo wV ►(&*PromTA-55 0 130 a 8a 0405 Pared vn IM M In Lu ob rip vows p1mv mmossoffbwp) �r a ft 1= 261 a v= zco sub P in i Tea 24A lda 6 1209 PJbc 1 0-Pie -'H'e WMYodRa+r (7-944xb P%s 6 of 1 l J-18d6m TbowwaBeen awbombg Ca JcK UnTwaelTlmrCan*t OF~ ROM t= ))TM Bq 3-3 rwbm t= Tmd dw lbrOvrdmd Flow GmW u = hbmhOov@ lld@m-ftw TRP9 Tibb l-1 1= IAWboffiew (1) n=I-P mmm ft&0* 8= Hydnaft deptftq S x OAO Woods lJ0 a adubmh 1= 100 !t !2 = 4J in !a - "05 1111! tw 3IJ3 wb ibdlww Cueo■tralod l0tws 049*V i bNec IdTmd *n far 8lallow Cm aoatrr wl rl w (MM. lr.Lmu & of flo r pg 9--AvwW voeweaAND dope ptstj vewooily pth} 19os TJL45 � a00s [Topswd v= 1.14 ;oiia a am mb Ow chend mm P1/60v wim ""dm»fbr rww" ) 1=1o'flow vcVobot (!db), 6. 2 ffJb k 342 ft vc In M On 4JI win TO ® 41.3 = 7MA07 TOM 11e860 POAPod TC Wood 1Row (y."7) b FrOe 7 of 11 J•116" Thomas & Room Eat Ca Jcm Owrlsad PiM t = (Q 4)) TR-W Eq M �-he m t=VauddmetbrOwdmdPkwo*) a - MsambO •sdlloia+ - -*w 3RSS T*b P-1 l=I4104fftw(fa a= 024 Oa Ds 1= 100 R P2 = 0 is 8 = OAS to to am ob lPleNt t=IA60v PTowddmshrMWbwCawmUaelr, (pd,} ' rLaa�th dsow � B=AswwdWOM v=Vitosl�r (N�• Pbom TR$3 49 K li= am Pared v� 1rI4 M � 0►!i ai rip PAM t=1/60v a� �'IL�va1 �ftrPlpsPb�r �Lsa�deow(i� %mVdo ft (d*Ama 2 M v� Z00 !1llt IN 7.10 ada Te a: 2" 7l l47 Pft Imago-ftwoslp-'h WtdmdR4,V(YJj47p& PNPI d11 3.106" 7bo &Hmomft*NftcL JCm i VnTmd7bwcmq* nwel� am t = �0.90rr(a�"0,6y�+osYl�ATIM R9 3-3 whm t=Tmd dmefbromindFlow(m" a = Ye~ aoeilla M- fiom TRr3S Tmbb 34 1= L4%* affbw(fo P2=2-yr LIIdR000 w= O.S4 Cim�Deep 1= 90 A F2- M b ` S = OAS fdit t: an ob � flielMlw � �1160r w11 velWW dms fbr Sbdbw C7ommm&dmd Flow W* >�AI� oribw (!q WAS dopi" I �vdood�r(Ms} ihom4'[ft-a3 I 1= 62 ft vw f.4 fly a an wk "Praw. .rMm: dmbfarPipe i9o,�►� v�YebaigrQlk}Amm�ns2 frr` M flf` N3A►300? Pft t - wwkd mw (%947),w hr 9 atfi i J61i6OOM '1"itoe4ee A i1a10os11el*rnlescL RM UWTN iT=Coeerpt Owdwd RM t= Al T&H Bg3-3 wlrm t='tmdderfhrOryNedlibvwOW a= Mnm eaeilide.i -fees ZR-6S TM93-1 1 w Iae�of'!le*►�p n��x��GrJ g dopHN4 2 = UO Qesx Deems 1= 100 e PZ = 45 1n ` S m QAOS WR to ILU Ob ablewcancubmwrmn SeW Ube m lRTnv 1 der hr Sidbw Oeeeemnrbd f m (mW mAqOGffiDwm 1 wqkmmp r_ti►►l'11hF 1Arem'1'ifrS6 1= m fE 01= am fired vr IM fVa OR 4A eds 1 O a 7434~ m cM & WsdndRa(1407)mb Pyet0at1I J-38"m Tb�alfmmme amr )m UnTfftd rl Cmmpt O"dMd PMwa t= A 7E43 Eg3.3 rrl w t= Tmvddm brOvulwdrAwod* Bull eon - lkmmt 7ftM T bb 3-1 1=LANO otlbw(1q P2=2-)Tdq&G41 8=dop an armors: Dare 1= 100 f! M v 45 to 0 = GAS WR t= ILII osb sbdbwC*nsm■artmdmm 94019OV whe - vTmW dims fbr lli A*w C7onaemMbd plow (ndm) 1--Loo k mf flow (ro �wwr�a�•l�►i v�vvoafp (flle} r�om,nss R t= 300 ft vw 1.14 to so 13m sb ` Tc= W mb l 7f3 lffm I Femf i+e W timed pAV (74 47)Ab PI/ 1 l of 11 Cww Nmnbe+r CdcWmtim STORMWATER DESIGN CONSIDERATIONS FOR SAVANNAH LAKES ]PHASE 3 »ARM FOI: C NM llOjM P1tWMW BY Mmm & HMon Boomwing Co, DAM M.Y 12, --- M-NRM i - 1 Li uw,,a �^SLR' �, 'k a - AM mokamom Woods hood Cora" B O.S3 3% $5 Woods hoed CoodiRbe C 1 A2 1% 70 Womb GoW CoodWm D 3.16 19% 77 om"ba Good Comadw B 1.60 9% 61 Ordnb d Good CondW= C 1 a6 9% 74 CMu shad Sid CadMm D 1."M n% Too & 16U 10% 1�1 Woods Good Condition C 639 WA 35 WOO&CI odCoaditian D LN 16% 77 cwmww d GOod coor iae D us 4% N Tetsls an 100% WoodoA0n6 R&CONfiff e A 2.0 M 43 WaO& G nm Fdr Cm%wioa B 119 W% 63 Opal %W= Ptw Cmdil9 m A 131 13% .61 Open Opm Poor amudon B 2.51 3096 79 to& IN% 1 � Woody Oood Condition A 172 17% 32 Woo&FdrCoadMm B 9r14 2VA 60 WOO&GOWCOOMM D 3.66 11% 79 Open 9pOas F r Couftm A 4.10 12% 49 Opm 9psoe Fair COodillon B 10.30 31% 69 Opm'0pamFh c D 0.17 1% 14 TO%Is 33JO 106% on 0 sy STORMWATER DESIGN CONSIDERATIONS FOR SAVANNAH LAKES PHASE 3 MWAM FM- CMn= HOME pww"m BY.. Thomas A Rue= Fmbmiog Co. DATE AMY 18, 2006 LI1 m S A9 �.'1% CIE lim"otcoh) NA an 14% 90 Ldm 3A NA @-M- 9% 100 lA Ada Lot plodh") C 1.01 15% 83 114A�Lot(lksdh id) D 4609 62% 87 Tmk d311 100% mu 114 Aces WVdidmdd) C w76 76'r . 03 U4A$MLot(RaMul d) D 0.24 24% $1 T"b Lee it 11 p GT'S1 114AamIt 41) c 0.96 Ills 83 114 Add Lot (RMldWd) D am WA 07 woodlowd(buillim H 638 a% SS TWO an ll m 61 bgmm a otmh) NA 091 10% OR L11co3 NA IAS 11% loll 114 Aa Lot OLUM001) B 130 14% 75 U4 Ao Lot otoido dd) C 0.94 101G 23 114 Am Lot(lWdditdd) D so 54K 97 A lmft- ad Woft d ftv (/4o7)ab SAVANNAH RAKES PHASE 3 P WMW mot: C CM ROME DAM AMY 18, 2006 RBVED DATE: AXY 30.2007 frm bwavimomah) NA GA 13% 96 Ld *6 NA OA7 9% f0d 1114 Aa Lot f 4SldWW) A Z17 44% 61 94Aa Loth) 9 1.69 34% 75 To& 4m Am __, 7 IM Aa Lot f Wdit") A 1.13 23% 61 F4AMLA-tQtotMwdd) e" 3m TM 73 WAa Lat(1lvoWwAd) C GAO orb 13 7obb 4A6 iN 6 fr""u ldprvio� ON" NA am 12% 91 Lab 7 MA 021 S% 100 114Ao LotOWWdmdd) A *A 9" 6 61 114AoaMLAQWdwWl) 9 IN 29% 73 U4Ae fat ) D L10 46% 17 1 US !11% I CEO —9 (IR1110" NA ON 0% 91 omm*mp*coomn 9 Us 38% a MRoodsF&Cooddlon 9 UP 3696 60 1!4 MM LotQWdddW) A Q74 9% 61 V4 AOM Lot QWddodd) 9 1." 10% 75 1/4 Aara Lot (ltMMON ti) D 134 11% 17 Tilde lCNUNMR - - e1�w11M11Wdf d 1iw (?4MW) > b f STORMWATER DESIGN CONSIDERATIONS FOR SAVANNAH LAKES PRASE 3 PWAMW FOR: CU1= EKSM MWARBD BY: 1Z+ot & I30on Ro®coe ft Co. DATE; JULY 18,E 206 RRV7SD DATR- ALLY 30 2 W 1 RVkLC'ULATIa1+ S �Y b4wvioor NA 0.64 11% 90 _ Ldoe 6A NA 046 11% too >bbe� M+ (woods doodl B om 4% ss V4Aa LotptaddmOd A 032 9% 61 1/4 AWn Lot M ridmdd) B &72 64% 73 Taub Mf 10% s73 1 MEM bwwfkwfwo" WA 032 11% 98 Ldw W MA "1 13% too i 114 Aa WWAddw") A 3.32 0% 61 114Ao LotoWddadd) B 034 7% 75 100 40 um • 71 ' 11d 5 (WOO& 084 A OA 44% 32 Bdf 7Yrdond(91/ood�Ibttj a 0.75 M% 60 7bbb im 1.0 44 soft Woftd(Woob aood) A 133 35% 32 edges Wdmd(1Paodo 1b* B om 7% 6o v4 AmM Lct oWddWd) A ire► 49% 61 V4 Aoir Liic pl.ddoet�d ➢ s Wo 139b Taub My Am A111 1 W WlldRBr('lead. Secdon I - De i I at KMMQdW hwA �sanev111opewtnL xmut All Lout laagpaaflaaSla=■wsrsr�ssssrfs�pr�s�sQs�sWssrPss0ssslr�ssssss�lrsssr sass*ss�sis sass sass�sa:sssressrsrosssssss�esassssssssssssassssasssssssssssssasass aaas�ssss�aas,Mtssrn�wsssasss saasGsaSiaasssisssss�rcaR�a��aygasassaaaylss�ss�slaa�swss� Yeses 6-lbesm Oaoaps f) M Node: XW-3 Types MM Vait M dr status: 4saite Omit Rydse~., Vb323 P00%ing lae:kkkatles 323.0 )leis MI 9i1f1 Resiii Stem vArsti0n(brs) 1 0.00 Raiatall AMMM (im)1 0.000 Time of canc(siu): 49.60 Area (ma) s 16.000 Tim Adit(bs:s) m 0.00 Carve 0usbws. 73.00 Rast A120M title Qtcfs! s 999299.000 W-U(a): 0.00 -------------------------------------------------------r---�---r--.�-----���---^----- Smas 11-p')sase3s Nodot MID-2 Statuas Qcesite Grow; am Tyne& Bea Ahit m"zQOra931 gait RydsoRragpi►1 M323 Vemkift Pac ,. 323.0 Rai:fall Pile: ftaiii Staxim ZIUSationibra) 1 0.00 ainfall axe t(in)1 8.000 TUM 09 Ccnc(mift)1 .22.00 ArealsC)1 8.490 -Tula suft(1it's): 0.00 Cvcw Rat: 63.00 "K Au0mble Q(afa): 999999.000 OCIA(0).1 0.00 --------------------•----------------------------------- -------------------- ---- 31MOS a-lbasew Nods p MID-1 status s Onsite 0lraep: NAM Type.: We VaLt. Nydsrogxweb Omit NydXo0xvSbt Vh323 Rainfall Piles 2csiii Maingall lmusst(w s 0.000 Axea(aa)s 31.590 Chew 3feslsbar: 89.00 Om' (0)s 0.00 Peaki9O lset0es 323.0 Stows Daratieia(bra)s 6.00 Tisss of Cmc wln) : 29. 20 %%xia &I ft Mrs) a 0. 00 Ilan .A2200tbles elates) : 999999.000 -----------i,------------------------- ----------wa------- �-..w-�M-----1-.-...r MM-1-- ymee: 06-1 No"1 UM-3 status! smite Groups am VAR! sea quit WIdrwmb Wait fbdro0rapb: M323 RaWall Met sCsiii Rainfall Asemat(in)1 0..000 Area I-ac) : 9.000 Llano Number: 60.00 amM: 0.00 Pemidaff )lactose 3.23.0 Stem purationthra)s 0.00 Tine of 0=0(milk1s 31.80 Tim 6(sift(5ra) s 0.00 Ilene Lllewable Wars)1 999999.000 awrwssasr�s-�-�naaa<wsfnsyssss�swwasraws�su�ssas:«s.asse�.aa�a,rrawra.w+�are�sseeae tce-ttavWloprrmt she. All bet ssi! �pitiee rsrisssaaria!lssrlisrwiirsrislsswi�=s�esiistisiiisrirrlsssasa=iislsli iriilrii!lla�Oiiri!/slriii!!!ilititll�fii! l�pfiMiiiitya`jlif*ars�4iilrfl/i!i XWO: SM-1 Grows am Types ft"a/st", Time Mrs) ste" (ft) -_ - ------ 0.00 25.4so 24.00 25.4So Sase Pioy(CEa): 0.000 fail Stme(it)r 2S.450 1Nssa Ste"(ft) : 26.000 - - - - - - - - - - - - - ----------------------------------------------------------------------- i0mes U1p-2 now F)"(efa) t 0.000 zxLt stage(ft) s 25.450 G row! Mat Kara Stape(ft) : 26.000 'types 3iM/S &" Timthrm) sts"(it) --------------- ---- ------ 0.00 R - 25.450 24.00 25.450 ----_--•--•- - a -_----«-__---_--•-_•_••-•_•-- Names 9Rs-S Saga llowicfol s 0.000 14t Stive(ftl:. 22.000 Grows Hillis Nun staQe(ft): 26.000 T"Or Titib/Steve TUO(hro) stege(!t) --------------- ------------- 0.00 22.000 24.00 23.000 iiiiiiaissi isnsawsa�aaasssiiglsresas��isssasss�ss�Ygsrswat�=slsssisslwssassssssrsrsa sr=w pfpmsssrisssussrsawsrsssassm+sasirpssssssur�isarrrssaiaeasr..s�lss�as tiwas=�ras�isiassiilsasssssssDislltsiisss�ssiss�rw�trsiissesisswwwrassrisp}sess�is�ssrsf !Imes morn Stod*: L*slgth(ft): 0.00 Grow: W" To no& s Co:mt: 1 Friction swiations ntaez"W UPDZRBM DOr■ AK 9Wut1oa Alowritlm: fttoSeti peooletzys Cis%tiiar Cisculor Mors Both Epm(ie) s 0.00 0.00 Nktramce Lam ilaaf:.0.00 Rise(in)1 0.00 0.00 auit Lose Coot: 0.00 urvert(ft.)s 0..000 0.000 Hand Loss Corfs 0.00 uosmiaa'a Ns 0.000000 0.000000 Outlet Ctil spear Una de o Top CIiP(in)1 0.000 0.000 Inlet Ctsl spec: use da not C239(in) : 0.000 0.000 stabilises Options am* tibatrom . MW Inlet Jkfte 0*0or%ti9a: Chmmed and PbW R.*v ftAlWW M. 62)002 ShamN= Tedomb@1@4 foe. f'ye 2 m .-Drvelap�{e rrAputi All lawt Ci�elar cap�at.: 8que:, ad�r v/ >w6saiY Chas co®asttts iWaza aft* r/ mil sssssssr�essssOsrssss■RswttlN.asss�assasslsssa.Na.sspw.q.■saasw■.#ass3a�s■s■a:rs. woos MY&OlqW $j=1ati<=W =n.Mesa:w■sa■.�rrs�■s�.�wrass■s+ss�r■sws..rras=:■.a one _ an wa■■!asl■s■ssssasssssasssf■s...■■■fraa■�aasssss��. arms 001-Yow rilsaoaaet Ir:�isaa0�+a.�►�arot��xo�.i�ooi-Ya�.�z O,ve=iae Defaults: lee Btom D=etian(brs)0 25.00 Rainfall Hilt: swill Rainfall Aoa=t (W - 3.20 Yias(hrs) 10.000� 15.006 24.000 priest iae(mini --------------- 15,09 20.00 15.00 -----------------------, _....----,--------------------_------------------------------ Wf z 010-'Seas Fil4maMs Xs%ll660%dWim%ftmv tor%Nof1%010-lsau.R32 Ovwwift Dagsnl't*% Yw Altom Ourat:Lan(Ars): 26.00 Rainfall P1209 $Gsiii Ralniall t(W 2 6.00 sire(hrsl --------------- 10.000 15.000 26.000 WSW ma(minl 13.00 10.00 15..00 ------------- 4-------- r---r-s«r-_--.rr-------.---------N wMet 035-':ear Filsam*4 S: NJLB"C% - nlW*j=MtWVMeaai%035-Yaas.A3z Overrift Defaultat Yq Stara Duratfqu(>srsI Is 24.00 Mall t'41ts ScsUl Rainfall as0uat1lals 9-30 Yias(hrs) ------------- le. 000 15.000 2i-000 Print 20a(=Lnl 15.00--------- 10.00 15.00 ..-«----------- ----------- ----------- ....---------- A&-.-------------------------------- Mmos 100-Year ctieoael.�>�oad>sau6�Moddl �IOaQiiee� � �3efi ss>put A.11 =nput Fils�: Na10660\t10ti1r�sT0i066►TBZt�N0��i00-Yearae3Z Oro=ida Delan3tss Yes Storm Duratiea(bra)s 14.00 Rainfall File: Stahl Rawall. t(ip)i 10.00 Tice(brs) -------------- print xW thin) 10.000 - ---------- 15.00 15.000 10.40 24.000 15.00 IAif�/ iNOMONN sIRRiiiKrtitaNiiiaMiOman ■rrr t�8i�111wx3,ODs+��sar.isi��air..i...rs.ri=rs.rr�.a.rais�:.ssiii.r.as..a�s 6iiltiiii/ii='iiYSiiiUS, iliipiigiiUMOMMOMiialam M el 001-Year R d"low Si`: 001-Feat Fileflase: N:%18660%doM%Stas=sator%Nodel\001-Year.=32 Raacuta us amatart% X4 Patch: Lea Alternative: no USK Delta stit): 1.00 Tim Step Optwzer: 10.000 start Tiue(hra<') s 0.000 Miss Cale TlM (SOc)1 0.5000 BOMALry stapes: Tiasathre) Print r9W(win) 20-000 15.000 15.000 10.000 24.000 .15.000 Grow jbM sun TAM Delta E Factor: 0.00500 Bad Ti>l:a(bra): 20.00 max Gila :Ti1M(Mo) 1 60.Ono Boundary Flows --------------------------IaN--M----•---1—_-_-----N--.--'R--- _-------------- .i------.- Navas 010-Yeas ldrology SIM: 010-Year Fileume : Ns 118660%dsm% t+orarater%Uodet\010-Fea:r.I3' ftecutes VOW ilastart: *0 Patch's No alteamtiva: no MM Delta 'aIft)1 1.00 Delta 8 Factors 0.00500 Tian Step Optiai:er: 10.000 start Time two) s 0.000 sold Iflum al s. 24..00 min Calc Tfaetsec): 0.3060 Naas Cole Tinatsec)s 60.0000 SOUS&MYscat es: xoum*wy name 11 and Chased and %ad saellap Mortal ice) cow SO Odk e'It=eo9 Mddp% , arm, Palls of i PMR-O*wlopment mwut All 3eut aS�ss) Print no (Skin) 10.000 IS.000 15.000 10.000 94.000 IS.000 Gram Snn ------------ -- 8888 YM ----—--------------- --------------- -.• Same: 025-Year 3bdsolow Sint 029-Yeas - Filepame: Ms\18860\dOn\slrorplratasti4ioelal�p05-Tiar.T9Z Mumate: Y00 iteatasE r No Altarnative: so. llex Delta s(ft): 1.00 Tine Step Optimiser: 10.000 Start 71"i ues): 0.000 Kin CAU TUM(O a): 0.5000 &tandary stages: Tiw fhra.) Print XW(mt+a1 ---------------------- -- 10.600 --- 13.000 .15.000 10.000 A4.000 15.000 0romv yam -- ---- ------ ----- SAM Yes Patch: No Dolt.* S Factor: 0.00s00 and TIM(bsa) S..245 0 mam Cale T'ime`mm) : so. 0000 Boundary F10w:. -------- ---------------------------------M-----ft---w--------- M.w--•N--N---•---- Miens 100 Year 1%fdrolow "as 100-TOW 71100e:10: U;Yi6660MOROM101110p11'® %N=IIL%IOQ-Tiw—X32 mme-met Yes Mast: 95 Alternative: M0 lax Delta z (it) : 1. 00 TI M gtap Optimiser: 10.006 start 3ae(bsa); 0.000 Nin Cale Tiae(see)a 6.5000 Boundary stagy: Tieua(hVIS) Print Ise Cain) 10.000 16.000 15.000 10.000 30.000 1s.000 fttchr 'ft Delta i Factor: 0.00100 Sid ftm4bxs) Id.0^ MGM Cale Tilme(am): 60.0000 020m-. PXW4%WeUq-mwmV Itut All Input exom AM =r�rrar�esrrrassrr�ss�ws�rrw�r�fr�rr�raarrsar��rawt�sr+e�s�rslrisl�atr! r=ws sos �;�i, rr+errsrrrrrrrr�rssrrrrsrrrrwqsrrsrrassrrsrNaasssaer�rrss ��rr�rs�sasssssss:�sssr�srs�srs�pssf¢�sssaaSsssssisaassssal�sssel�rr=aale- afgii. 1 +o0m Od�9e�dt�adl�M�r��ouli �Bod�ii�t . f1001Q '� Ii�T� hp60[6 Section 7 PW-Dwokpmmt ACM MaM v +s gas" 202 a "a Sa°1ir�ia ii ... ... ... .p sy �0:A s,r :cog �te0.1. Me, Pr. rsonQ aP.RIr avO�.y n1l�ear� illeA an.�n .r«.wQl also "002.4 4xz «h.,, qftp O else ill pnl M 10.0 rlMllflld J► • . . OL7MM1 94 • . OAAW .. OAMr �16{ 1OA�a :Ogg w p P�+� maws OIrNN a.aV.Yl Oi10A 1�rlO• lr /l • mass.4a4i wwa::x A _ Gft� +P �O Yl Yl q! M M Al l�0��► ei ? 1+► O��d Y r .aA :i A 94 :� w w .Ma W4 .ct Mi I l 44 �.i .i 1111 fill 1111 1111 wpiA w« I rl."i~Jijuv Aida iAA &AIL �► '{ QO®ad d g1111111111 et8Sg88SS8'g8 O O O O O O O 00 O 00 H8iROS8:8RO .I M•i�AM�•y•OiAw 000000000000 88888888888g gd�eo�me�aeZ ifieieifta; 111111111111 "iiiiiiiiiiii low, gult Tt Savannah La Phase 3 Post Development Input All Input ssssssssssssssssssmasasas:sssssaxaxsssaslasses;ssss:sassrsssssass;sasssssssaass;ssls;ss sass $aoinB lsssasasaassasssss:ssssx;x=aaalas:;::::asxsass;rss:ssssssssssrss;asssssasslsss; sssssssssss:angssssssssxsasssssae=asaaxxxsasass:::¢!:xsc_sexsslssslssssssss:assssssssssssss Name: DD-1 Group: BASE [snit Hydrograph: Uh323 Rainfall File: Sesi.ii Rainfall Amount(in): 0.000 Area(ac): 1.000 Curve Numbers 84.00 DCIA M : 0.00 geode: OW-3 Type: SCS unit Hydrograph Peaking Factor: Storm Duration(hrs): Time of Coxc (min); Time Shift (hrs) a Max Allowable Q(efs) : Status: Onsite 323.0 0.00 27.00 0.00 999999.000 - - BW-Z Status: Onsite - ----- ----- ------ Name: DD-2 Node: Group: BASE Type: SCS Unit ttydrograph Unit Hydrograph: OU323 Rainfall File: Scsiii Rainfall Amount(in): 0.000 Area(ac): 4.960 Curve Number: 72.00 DCIA M : 0.00 Peaking Factor: 323.0 Storm Duration(hrs): 0.00 Time of Conc(min): 3.6.70 Time Shift(hrs): 0.00 Max Allowable Q(cfs): 999999.000 -- - -__---_------- Name: DD-3 Node: MW-1 Status: Onsite Group: BASS Type: SCS Unit Hydrograph Unit Hydrograph: Uh323 Rainfall File: Scsiii Rainfall Amount(in): 0.000 Area(ac): 13.660 Curve Number: 68.00 DCIA(6): 0.00 Peaking Factor: 323.0 Storm Duration(hra): 0.00 Time of Conc(min): 41.30 Time Shift(hrs): 0.00 Max Allowable Q(cfs): 999999,000 - - ------ Name: Lake 3 Node: Lake 3 Status: Oneite Group: BASS Type-- SC$ [fait Hydrograph Unit Hydrograph: Uh323 Rainfall File: Scsiii Rainfall Amount(in): 0.000 Area(ac): 9.200 Curve Number: 97.0. DCIA M : 0.00 Peaking Factor: 323.0 Storm Duration(hre): 0.00 Time of Conc(min): 23.40 Time Shift(hrs): 0.00 Max Allowable Q(cfa)c 999999.000 Thomas & Hutton Engineering Co. Interconnected Channel and Pond Routing Mode) (ICPR) 02002 Streamline Technologies, lea. Page 1 of is Savannah Lakes Phase 3 Post Development Input All Input ------------------------------------------------------------------------------------------ Name: Lake 3A Node: Lake 3A Status: Onsite Group:. BARB Type: SCS Unit Hydrograph Unit Hydrograph: Uh3.23 Rainfall File; Sesiii. Rainfall Amount(in): 0.000 Area(ac): 6.580 Curve Number; 89.00 DCIA(V): 0.00 Peaking Factor: 323.0 Storm Duration(.hrs): 0.00 Time of Conc(min): 23.90 Time Shift(hrs.): 0.00 Maas Allowable 4(cfs): 999999.000 - - Name: Lake 6 Node: Lake 6 Status: Onsite Group. SASE Type: SCS Unit Hydrograph Unit Hydrograph: Uh323 Rainfall File.: Scsiii Rainfall Amount(in): 0.000 Area(ac): 4.960 Curve Number: 74.00 DCIA(%): 0.00 Peaking Factor; 323.0 Storm Duration(hrs): 0.00 Time of Conc (lain) : 20.40 Time Shift(hrs): 0.00 Max Allowable. Q(cfs); 999999.000 ------- Name: Lake 7 Node: Lake 7 Status': Onsite Group: BASE Type: SCS Unit Hydrograph Unit Hydrograph: Uh323 Rainfall File: Scsiii Rainfall Amount(in): 0.000 Area(ac): 4.320 Curve Number; 83.00 DCIA(8): 0.00 Peaking Factor: 323.0 Storm Duration(hrs): 0.00 Time of Conc(min): 24.90 Time Shift (hrs) : 0.00 Max Allowable Q(cfe); 9.99999.000 ----------------- Name :Lake 8A Node: Lake 8A Status: Onsite Group: BASS Type: SCS Unit Hydrograph Unit Hydrograph: Uh323 Rainfall File: Rainfall Amount(in): 0.000 Area(ac): 5.790 Curve Number. 78.00 DCIA(l): 0.00 Peaking Factor: 323..0 Storm Duration(ars): 0.00 Time of Conc(min): 20.60 Time Shift(hre): 0.00 Max Allowable Q(cfs), 999999.000 -- - - -- - - ------------------------- Name: Lake 8B Node: Lake 8B status: Onsite Thomas Hutton Engineering Co. Interconnected Channel and Pond pouting Model (lCPR) 02002 Sft mlme Technologies, Inc. Pap 2 of 18 Savannah Lakes Phase 3 Post Development Input All Input: Group: SASE Type: SCS gait Hydrograph Unit Hydrograph: Uh323 Peaking Factor: 323.0 Rainfall File:- Storm Duration(hrs): 0.00 Rainfall Amount(in): 0.000 Time of Conc(min): 27.30 Area(ac): 4.690 Time Shift(hrs): 0.00 Curve Number: 71.00 Max Allowable Q(cfs): 999999.000 DCIA(3): 0.00 -- Name: OS-1 Node: Lake 3 Status: Onsite Group: RASE Type: SCS Unit Hydrograph Unit Hydrograph: Vh323 Rainfall File: Scsiii Rainfall Amount(in): 0.000 Area(ac): 8.000 Curve Number: 61.00 DCIAM : 0.00 Peaking Factor: 323.0 Storm Duration (hrs): 0.00 Time of Conc(min): 31.80 Time Shift(hre): 0.00 Nax Allowable Q(cfs): 999999.000 ------------------------------- Name: Wetland (Large) Node: Wetland (Large) Status: Onsite group: RASE Type: SCS Unit Hydrograph Unit Hydrograph: Dh323 Rainfall File: Rainfall Amount(in): 0.000 Area(ac): 3.770 Curve Number: 53.00 DCXA(9): 0.00 Peaking Factor: 323.0 Storm.Duration(hre): 0.00 Time of Conc(min): 31.30 Time Shift(hrs): 0.00 Max Allowable Q(cfs): 999999.000 - --- Name: X-7 Node: WETLAND R-7 Status: Onsite ------ Group: RASE Type: SCS Unit Hydrograph Unit Hydrograph: Uh.323 Rainfall File: Rainfall Amount(iu): 0:000 Area(ac) 1.350 Curve Number: 48.00 DCIA(4r): 0.00 Peaking Factor: 323.0 Storm Duration(hrs): 0.00 Time of Conc(min): 22.70 Time Shift(hre): 0.00 Massy Allowable Q(cfs): 999999.000 sa=asssaaasssasssssssssasssassssass:a sasasasaasssasasssaexsuxssxxsaasssssasssas=aasssssass !ss# Node##!!!a#ilasls#!iliilsliisliislisailasii aiisiaii!lsaass.-jaa aiiiai!'i2#aasislss S'iaa aaS#.a saaT.=#aa�a,a iasssisss'siisaaSsa¢aas=aaassaas;laalsi!#ailata#aasaaiaaaiaa#i!a!a!!!!alis Name: BND-3 Base Flow(cfs): 0.000 Init Stage(ft): 22.000 Thomas & Hutton Engineering Co. Interconnected Channel and Fond Routing Mode) XPR) 02002 Streamline TwAmologies, Inc. Page 3 of 18 Savannah Lakes Phase 3 Post Development Input All Input Group: BASE Warn Stage(ft): 30.000 Type: Time/Stage See Post Development Drainage Basin Exhibit Phase 3C Time(hrs) --------------- 0.00 24.00 Stage(ft) --------------- 22.000 24.000 __- '_ ___-_ Name: BND-2 Base Flow(cfs) 0.000 Init Stage(ft)- 25.450 Group: BASS Warn Stage(ft): 26.000 Type: Time/Stage See Post Development Drainage Basin Exhibit Phase 3B Time(hrs) --------------- 0.00 24.00 Stage(ft) --------------- 25.450 25.450 ______ Name: BND-3 Base Flow(cfs): 0.000 Init Stage(ft): 22.000 Group: HASTE WA-u-M Stage(ft) : 30.000 Type: Time/Stage See Past Development Drainage Basin Exhibit Phase 3A Time(hrs) --------------- 0.00 24.00 Stage(ft) --------------- 22.000 24.000 - Name: Lake 3 Base Flow(cfs): 0.000 Init Stage(ft): 25.000 Group: BASE Warn Stage(ft): 31.000 Type: Stage/Area Lake 3 Phase 3 Stage(ft) 18.000 19.000 20.000 21.000 22.000 23.000 24.000 2S.000 26.000 27.000 29.000 29.000 Area (ac ) 0.2600 0.3000 0.3400 0.3900 0.4400 0.4900 0.5700 0.7000 0.7600 0.8100 0.0600 6.9200 Thomas & Hutton Engineering Co. Interconnected Channel and. Pond Routing Model QCPR) 02002 Streamline Tochnol*es, Inc. Page 4 of I8 Savannah makes Phase 3 Poet Mvelcgxnent Input All Input 30.000 0.9800 31.000 1,0300 -- Name: Lake 3A Base Flow(cfe) . 0.000 Init Stage(ft) 29.000----- Group: BASE Warn Stage(ft): 32.000 Type: Stage/Area. Lake 3A Phase 3 Stage(ft) ---------------- 23,000 24.00.0 25.000 26.000 27.000 28.000 29.000 30.000 31.000 32.000 Area(sc) --------------- 0.0900 0.1300 0.1600 0.2000 0.2400 0.2600 0.3700 0.4300 0.4900 0..5500 Name: Lake 6 Group: BASS Type: Stage/Area Stage(ft) 20.0.00 21.000 22.000 23..000 24.000 25.000 26.000 27.000 28.000 Area(ac) O.1s00 0.1700 0.2000 0.2300 0.2600 0.3200 0.3700 0.4200 0.4700 - - ----- Base Flom(cfe): 0.000 Init Stage(ft)25.000 Warn Stage(ft): 28.000 -- -- - - ---------------------------- Name: Lake 7 Base Flow(cfs): 6.000 Init Stage(ft): 25.000 Group: BASS Warn Stage(ft): 29.000 Type: Stage/Area Stage(ft) 25.000 26.000 27.000 28.000 Area (ac) 0.2100 0.2500 0.2900 0.3300 Thomas & Hutton 8ngineering Co. Ime twneeted Channel and Pend RoutinS Model .(ICPR) 02002 SMmll,ne Twftologies, Inc. Page 5 of is Savannah Lakes Prase 3 Post Development Input All Input 2.9.000 0.3700 - - - - - - - - - - - - - - Name: Lake 6A Base Flow(cfa). 0.000Tait Stage(ft) 25.000 Group: BASE Warn Stag4(ft): 29.000 Type: stage/Area Stage(ft) Area(ac) 25.000 0.4400 26.000 0.4900 27.000 0.5500 28.000 0.6000 29.000 0.6600 Name: LAKE BA - - -------------------------- Base Flow(cfs): 0.000 Init Stage(ft): 25.000 Group: BASE Warn Stage(ft)-. 28,000 Type: stage/Area Stage(ft) Area(ac) 25.000 0.3700 26.000 0.4500 27.000 0.5200 28.000 0.5900 -- ------------------- Name: Wetland (Large) Bags Fiow(cfs)9 . 0.000Init Stage(ft): 22.000 Group: BASS Warn Stage(ft): 28.000 Type: stage/Area Stage(ft) Area(ac) 22.000 1.5400 28,000 1.56.00 30.000 1.5700 ---------------------- Name: WETI AND X-7 Bade Flow(cfs): 0.000 Init Stage(ft): 25.000 Group: BASE Warn stage(ft): 28.000 Type: Stage/Area Stage(ft) Area(ac) 25.000 0 . $800 26.000 0.9000 Thomas & Hutton Engineering Co. lMemonnected Channel and Pond RoU&S Model ([.CPR) C2002 Sh=mline Teci nologles. Inc. Page 6 of 18 Savannah Lakes Phase 3 Post Development Input All Input 27.000 1.0000 sars'i i�si�� s C � Saaa � li.i as asfaCOCxs��ssastas���ssissassssasf srfsssssi ass si.if:as sasi'ss* issa.: a' sums Pipes sseaa�eaaais:'sssiissCxassDaisiiSQssaaGaissCssssasi.sissssisaifsiaassss.arsssssacair ==aaaen-xsssssssaarsarsis=nfsssssssasssassaraaaiaafasxissassasssssxaaxsfiasaefaaassssanassa's Name: Group: BASE Geometry; Span(in): Rise(in): invert(ft): Manning's N: Top Clip(in): Bet Clip(in): UPSTREAM Circular 0.00 0.00 0.0:00 0.000000 0.000 0.000 From Node: To Node: DOWNSTREAM Circular 0.00 0.00 0.000 0.000000 0.000 0.000 Upstream FHWA Inlet Edge Descriptions Circular. Concrete: .Square edge w/ headwall Downstream PENA Inlet Edge Description: Circular Concrete: Square edge w/ headwall Length(ft) : Count: Friction Equation: Solution Algorithm: Flow: Entrance Loss Coat: Exit Loss coef: Bend Loss Cost: Outlet Ctrl Spec: Inlet Ctrl Spec: Stabilizer Option.- 0.00 1 Average Conve Automatic Both 0.00 0.00 0.00 Use do or tw Use do None Name: L7 to LB LOWER From Node: Lake 7 ------- Length(ft). 1037.00------ Group: BASE To Node: Lake BE Count: 1 Friction Equation: Average Conve UPSTREAM DOWNSTREAM Solution Algorithm: Automatic Geometry: Circular Circular Flow: Both Span(in): 3.0.00 30.00 Entrance Loss Coef: 0.50 Rxse(in): 30.00 30.00 Exit Loss Coef: 1.00 Invert(ft): 20.000 20.000 Bend Loss Costs 0.00 Nanning''s N: 0:.013000 0.013000 Outlet Ctrl Spec: Use do or tw Top Clip(in): 0.000 0.000 Inlet Ctrl Spect Use do Bot Clip(in): 0.000 0.000 .Stabilizer Option: None Upstream FHWA inlet Edge Description: Circular Concrete: Groove end projecting Downstream FHWA Inlet Edge Description: Circular Concrete: Groove end projecting -. - -- ---------------------------------- Name: L7 to L8 UPPER From Node: Lake '7 Length(ft): 1004.00 Group: BASE To Node: Lake SA Count: 1 Friction Equation: Average Conve. Thomas & Hutton Engineering Co. Interconnected Chsnne) and Pond Routing Made) (ICPR) C2002 Smonihm Technologies, Inc. Foe 7 of I8 Savannah Lakes Phase 3 Post Development Input All Input UPSTREAM DOWSTREAN Solution Algorithms Automatic Geometry: Circular Circular Flow: Both Span(in): 24.0.0 24.00 Entrance Loss Coef: 0.50 Rise(in): 24.00 24.00 Exit Loss Coef: 1.00 Invert(ft); 20.000 20.000 Bend Lose Coef: 0..00 Manning's N: 0.013000 0.013000 Outlet Ctrl Spec: Use de or tw Top :Clip(in): 0.000 0.000 Inlet Ctrl Spec: Use do Rot Clip(in): 0.000 0.000 Stabilizer Option: Bone Upstream FHWA Inlet Edge Description: Circular Concrete: Groove end projecting Downstream FHWA Inset Edge Description: Circular Concrete: Groove end projecting �ss�a=sass.ansxaasssssssds=Gaasasaasasssssaasaaa=as.a sass.:Cq=agCaaaaaasaraaaaasz�sCpoasasaa ass= Channels,e_aasysasmmssssoraasas:.q�crasasaasasaasraraassaa�sFxraa�sssxx=aaaassasasassa a ss.a sssso s==assess::zsssaaassassess:ar==ese�a-am:=ama=sxxaaxaaoaaxsass=asap es=Cansasssass.*= Name: WETLAND DITCH From Node: Wetland (Large) Length(ft): 335.00 Group: BASE To Node: mm-1 Count: 1 UPSTREAM DOWNSTREAM! Friction Equation: Average Conv Geometry: Trapezoidal Trapezoidal Solution Algorithm: Automatic Inv'ert(ft): 23.000 23..000 Flow.: Both TC1pInitZ(ft): 9999.000 9999.000 Contraction Coef: 0.000 Nanning's N: 0.060000 0.060000 Expansion Coef 0.000 Top. Clip(ft): 0.000 0.000 Entrance Loss Coef: 0.000 Bot Clip(ft): 0.000 0.000 EXit Loss Coef: 0.000 Main Mac: Outlet Ctrl Spec: Use do or tw AuxElevi(ft): Inlet Ctrl Spec: Use do Aux XSeci: Stabilizer option: None AuxRlev2(ft): Aux XSec2: Top Width(ft) : Depth(ft) : Rot Width(ft): 12.000 12.000. LtSdSlp(h/v): 1.00 1.00 RLSdSlp(h/v): 1.00 1.00 Name. X-7 Ditch From Node: - WETLAND X-7 Length(ft): 65-00 r Group: BASIC To Node: MM-1 Count. 1 UPSTREAM DOWNSTREAM Friction Equation: Average Conv: Geometry: Trapezoidal Trapezoidal Solution Algorithm: Automatic Invert(ft): 25.000 22.000 Floor:. Both TC1pinitz(ft)= 9`999.000 9999.000 Contraction Coef: 0.000 Nanning's N. 0.04-0000 0.0.60000 Expansion Coef: 0.000 Thomas & Hutton Engineering Co. Interconnected Channel and Pond Roudog Model (ICPR) C►2002 Sftamline Technalogles, :Inc. Pages of 18 Savannah Lakes Phase 3 Post Development input All Input Top Clip(ft): 0.000.. 0.000 Entrance Loss Cost. 0..000 Bat Clip(ft): 0.000 0.00.0 Exit Loan Cost; 0.000 Main XSec: Outlet Ctrl Spec: Use do or tw AuxBievl(ft): Inlet Ctrl Spec: Use do Aux XSetl: Stabilizer Option: None AuXRlsv2(ft): Aux XSec2: Top .Width(ft) : Depth (ft): Bat Width(ft): 10.000 15.000 LtSdSlp(h/v): 1.00 1.00 RtSdSlp(h/v): 1.00 1.00 ssassessssssa sii asssaseaasaaaasxssssssssasssseassssssasassrxf¢a=;e=aaeoasaeaaaeaeaaaasaaasss ax== Drop Structures ass=ssasasasssax:sasasasasssssssssxsxsssxse�,sss x-ssmssaassaa�e:aassasassasa:asassaastassrssssssssasssasssrsva=ash=a..aooga=as=sssssaxs.a=aaa Name: DS-Lake 3 From Node: Lake 3 Croup; .BASE To Node: BND-3 UPSTREAM DOWNSTREM Geometry: Circular Circulatr Span(in): 36..00 36.00 Rise(in): 36.00 36.00 invert(ft); 20.670 20.670 Manning's N: 0.010000 0.010060 Top Clip(in): 0.000 0.000 Bot Clip(in): 0.00.0 0.0.00 Upstream FHWA Inlet Edge Description: Circular Concrete: Square edge w/ headwall Downstream FHWA Inlet Edge Description.: Circular Concrete: Groove end projecting Drop Sturcute at Exit of Lake 3 Information from Phase 1 Plans but then modified. *** Weir 1 of 3 for .Drop Structure DS-Lake 3 *** LeAgth(ft): 70.00 count: 1 Friction 9quation: average Conve Solution Algorithm: Automatic Flow: Both Entrance Loss Cost: 0.500 Rxit Lose Cost: 1.000 Outlet Ctrl Spec: Use do or tw Inlet Ctrl Spec: Use do Solution Inca: 10 TABLE Count: 1 Type; Horizontal Flo:: Both Geometry: Rectangular Span(in): $0.00 Rise(in): 60.00 Bottom Clip(in): 0.000 Top Clip(in): 0.000 Weir Disc Cost: 3.200 Orifice Disc Coef: 0.600 *** Weir 2 of 3 for Drop Structure DS-Lake 3 *** Invert(ft): 30.000 Control Elev(ft); 30.000 TABLE Count: 1 Bottom Clip(in): 0.000 Type: Vertical: Mavis Top Clip(in): 0.000 Thomas & Hutton Engineering Co. InwconneeW Channel and Pond Routing. Motel (1CPR) C2002 Sh a►llne Tedmolog* Inc. Page 9 of 18 savannah Lakes Phase 3 Post Development Input All Input Flow: Both Weir Disc Coef.: 3.200 Geometry: Rectangular Orifice. Disc Coef: 0.600 span()- 3.00 Invert(ft): 25.000 Rise(): 9.60 Control Blev(ft) 25.000 *** weir 3 of 3 for Drop Structure Ds -Lake 3 *** Count; i Type: Vertical: Mavis Plow: Both Geometry: Rectangular Span(in)s 60.00 Rise(in): 50.40 Bottom Clip(in): 0.000 Top Clip(in): 0.000 Weir Disc Coef: 3,200 Orifice Disc Coef: 0.600 Invert'(ft). 25.800 Control Blev(ft): 25.600 TABLE - - -- - - - - - - -------------------------------------------- Namee Ds -Lake 3A From Node: Lake 3A Length(ft): 237.00 Group: BASE To Node: Lake 3 Count: 1 VPSTRR7IM DOWNSTREAM Geometry: Cii f al" %ircuiar Span(in): 30.00 30.00 Rise(in): 30.00 30.00 invert(ft): 26.200 21.200 Manning's N: 0.010000 0.010000 Top Clip(in):. 0.000 0.000 Dot Clip(in): 0.000 0.000 Upstream PHWA Inlet Edge Description: Circular Concrete: Square edge wj headwall Downstream PHWA Inlet Edge Description: Circular Concrete: Groove end projecting Drop sturcute at Nxit of Lake 3A Information from Phase.I Plans *** Weir 1 of .2 for Drop Structure DS-Lake 3A *** Friction Equation: Average Conve Solution algorithm: Automatic Flow: Both Entrance Loss Coef- 0.50u Exit Loss Coef: 1.000 Outlet Ctrl Spec: Use do or tw Inlet Ctrl Spec: Use do Solution Inca: 10 TABLE'. Counts 1 Types Noriaontal Flog: Both Geometry Rectangular span(in): 60.00 Rise.(in): 60.00 Bottom C13p.(in): 0.000 Top Clip(in): 0.000 Weir Disc Coef: 3.200 Orifice Disc Coef: 0.600 Invert (ft) : 30.000 Control $lev(ft): 30.000 *** weir 2 of 2 for Drop Structure DS-Lake 3A *** TABLE Count: 1 Bottom Clip(in): 0.000 Type: Vertical: Mavis Top Clip(in): 0.000 Flow: Both Weir Disc Coef: 3.200 Thomas & Hutton Engineering Co. interconnected Channel and Pond Routing Model (I.CPR) W= Streamline Tedinologlea, Inc. Page 10 of is Savannah Lakes Phase 3 Post Development Input All Input Geometry: Rectangular Orifice Disc Coef: 0.600 Span(in): 2.40 Rise(in): 12.00 Invert(ft)-. 29.000 Control Slev(ft): 29.000 ------ Name: DS-Lake 6 From Node: Lake 6 Lmng- ------ th(ft). 70.00 Group: BASE To Node: BND-2 Count: 1 UPSTREAM DOWNSTREAM Geometry: Circular Circular Span(in): 36.00 36.00 Rise(in): 36.00 36.00 Invert(ft): 21.470 21.000 Manning's N: 0.010000 0.010000 Top Clip(in): 0.000 0.000 Bot Clip(in): 0.000 0.000 Upstream FHWA Inlet Edge Description: Circular Concrete: Square edge w/ headwall Dow" : -earn FWOFA 1kilet wge Desc 3p�ci:an: Circular Concrete: Square edge w/ headwall Drop Sturcute at Exit of Lake 6 *** Weir 1 of 4 for Drop structure DS-Labe 6 *** Count: 1 Type: Vertical: Mavis Flow: Both Geometry: Rectangular Span(in): 1.S0 Rise(in): 7.13 Friction Equation: Average Conve Solution Algorithm: Automatic Flour: Both Entrance Loss Coef: 0.500 Exit Loss Coef: 1.000 Outlet Ctrl Spec: Use do or tw Inlet Ctrl Spec: Use do solution Incs• 10 Bottom Clip(in): 0.000 Top Clip(in): 0.000 Weir Disc.Coef: 3.200 Orifice Disc Coef: 0.600 *** Weir 2 of 4 for Drop Structure DS-Lake 6 *** Count: 1 Type: Vertical: Mavis Flow: Both Geometry: Rectangular Span(in): 24.00 Rise(in): 21.16 Invert(ft): 2S.000 Control Slev(ft): 2S.000 Bottom Clip(in): .0.000. Top Clip(in): 0.000 Weir Disc Coat; 3.200 Orifice Disc Coef: 0.600 *** Weir 3 of 4 for Drop Structure DS-Lake 6 *** count: 1 Type: Vertical: Mavis trlow.. Both Geometry: Rectangular Span(in): 36.00 Invert(ft): 2S.S90 Control 81ev(ft)a 2S.S90 Bottom Clip(in): 0.000 Top Clip(in): 0.000 Weir Disc Coef: 3.200 Orifice Disc Coef: 0.600 Invert.(ft): 26.520 TABLE Thomas 1. Hutton Engineering Co. interconnected Charm) and Pond pouting Model (ICPR) C2002 Streamline Technologies, Ina Page 11 of 1s Savannah Lakes Phase 3 Post.Development Input All Input Rise(in): 5.76 *** Nair 4 of 4 for Drop Structure DS-Lake 6 *** Count: 1 Type: Horizontal Flow: Both Geometry: Rectangular Span(in): 60.00 Rise(in): 60.00 Control Elev(ft): 26.520 Bottom Clip(in).. O..o00 Top Clip(in): 0.000 Weir Disc Coef: 3.200 Orifice Disc Coef: 0.600 Invert(€t): 27.000 Control 8lev(ft): 27,000 -- ---------------------------------------;--------_----- Name: DS-Lake 6A From Node: Lake 8A Length(.ft) 75.00 Group:: BASS To Node: BND-1 Count: 1 UPSTREAM DOWNSTREAM Geometry: Circular Circular Span(in):. 30.00 30..00 Riae(in): 30.00 30.00 Invert(ft): 22..080 22.000 Nanning:s N: 6.011000 0.0110.00 Top Clip(in): 0.000 0.000 Rot Clip(in): 0.000 0.000 Upstream FWA Inlet Edge Description: Circular Concrete: Groove end projecting Downstream FHWA 'Inlet Edge Description: Circular Concrete: Groove end projecting *** Weir 1 of 3 for Drop Structure DS-Lake SA *** Count: 1 Type: Vertical: Mavis Flow: Both Geometry: Rectangular Span(in): 2.00 Rise(in): 12.00 Friction Equation: Average Conve Solution Algorithm: Automatic Flow: Both Entrance Loss Coef: 0.500 Exit Loss Coef: 1.000 Outlet Ctrl Spec: Use do or tw Inlet Ctrl.Spec: Use do Solution Inca: 10 Bottom Clip(in): 0.000 Top Clip(in): 0.000 Weir Disc Coof: 3.200 Orifice Disc Coef: 0.600 Invert(ft): 25.000 Control Rlev(ft) 25.000 *** Weir 2 of 3 for Drop Structure DS-Lake SA *** +Count: 1 Type: Vertical: Mavis Flow: Both geometry.. Rectangular Span(in): 30.00 Rise(in): 44.00 Bottom.Clip(in): 0.000 Top Clip(in): 0.000 Weir Disc Coef:'3.200 Orifice Disc Coef.- 0.600 Invert(ft): 26.000 Control Elev(ft) : 26.000 *** Weir 3 of 3 for Drop Structure DS-Lake SA *** TABLE TABLE Thomas & Hutton Engineering Co (merconnecud Channcf and Pond Roudus Model (ICPR) E92;102 StrmUm Twhno)oom Inc. Pop 12 of IS I Savannah Lakes Phase 3 Poet Development input All input TABLE Count: 1 Bottom Clip(in)-. 0.000 Typet Horizontal Top Clip(in): 0.000 Flow: Both, Weir Disc Coat: 3.200 Geometry: Rectangular Orifice Disc Coef: moo Span(in).- 48.00 Invert(ft): 28.000 Rise(in): 48.00 Control.Slev(ft)t 28.0.00 --_•---- Name- DS-LAKE 8B From Node: LAKE BHLength(ft): 81.00 -+--•- Group: BASS To Node: SM-1 Count: 1 UPSTREAM DOWNSTRR&M Geometry: Circular Circular Span(in): 30.00 30.00 Rise(in): 30.00 30.00 ZAvert(ft): 22.090 22.000 Manning's N. 0.011000 0.011000 Tog Clip(in): 0.000 0.000 Sot Clip(in): 0.000 0.000 Upstream FHWA Inlet Edge Description: Circular Concrete. Groove end projecting Downstream FHWA Inlet Edge Description: Circular Concrete: Groove end projecting *** Weir i of 3 for Drop Structure DS-LANM 8B *** Friction Equation: Average Conve Solution Algorithm: Automatic Flow: Both Entrance Loss Coef: 0.500 Skit Loss Coef. 1.000 Outlet Ctr). Epee: Use do or tw Inlet Ctrl Spec: Use do Solution Inca: 10 TABLE Count: 1 Types Vertical: Mavis Flom: Both Geometry: Rectangular Span(in): 2.00 Rise (1n): 13.00 Bottom Clip(in): 0.000 Top C1ip(in)s 0.000 Weir Disc Coef: 3.200 Orifice Disc Coef: 0.600 Invert(ft); 25.000 Control Eley(ft): 25.000 *** Weir 2 of 3 for Drop Structure DS-LAKE $A *** TABLE Count; 1 Typet Vertical: Mavis Flow-. Both Geometry: Rectangular Span(in): 24.00 Rise(iu)t 35.04 Bottom Clip(in): 0.000 Top Clip(in): 0.000 Weir Disc Coef: 3.200 Orifice Dias Coef: 0.500 Invert(ft): 26.080 Control $lev(ft): 26.080 *** Weir 3 of 3 for Drop Structure DO -LAM 88 *** Count: 1 Bottom Clip(in). 0.000 Type: Horizontal Top Clip(in): 0.000 Thomas & Hutton Engineering Co. lnwcomected Channel and Pond. ROudnS Model QCPR) C2002 St=Wine Technologiea,Inc. Pap 13 of 18 Savannah Lakes Phase 3 Post Development Input All Input Flow: Both Heir Disc Coef: 3.200 Geometry: Rectangular Orifice Disc Coef: 0.600 Span(in): 48.00 I vert(ft): 29.000 Rise(in):. 49.00 Control Slev(ft): 29.000 sssssssasasxxassssssassssassizasaxsxassssssssasassssasasssssssaasssassssssssaaaassssxaaass ssss WeirB assasassasssssrsssssasssasasassaasassssacasa:sassassasasasssassxasassssasasssss saFs�sss�sssssasxssasssssasssasmax=sxxxssaxsasslFssss�ssssssss:saa�easssssassssssassssssasssss Name; LMM 6A - OF.S From Node: Lake 8A Group: BASS To Mode: WNTLAND X-7 Flow: Both Count: 1 Type: Vertical: Fread Geometry: Trapezoidal Bottom.Nidth(ft): 5.00 Left Side Slope(h/v): 1.00 Right side Slope(h/v): 1.00 Invert (ft): 27.000 Control Slevation(ft): 27.000 Struct Opening Dim(ft): 9999.00 TABLE Bottom Clip(ft): 0.000 Top Clip(ft): 0.000 Weir Discharge Coef: 3.200 Orifice Discharge Coef: 0.600 Namie: LAKE 6B - OFS - From Node. ---------------------------------- Lake 88 Group: BASS To Node: WBTLKkW X-7 Float: Both Count: 1 Type: Vertical: Fread Geometry: Trapezoidal Bottom Width(ft): 5.00 Left Side Slope(h/v): 1.00 Right Side Slope(h/v): 1.00 Invert (ft) : 26.500 control Klevation(ft): 26.500 StWuct OpeYxlug Dim:(fet) : 9999.00 TABLE Bottom Clip (ft h 0.000 Top Clip(ft): 0.000 Weir Discharge Coef: 3.200 Orifice Discharge Coef: 0.600 mossssssssssssasssssassssszssassxxsxsxasasssrsss:mosssssasacsssszsssssssssssssssassasaassss sssa Hydrology Simulations assassaxxaxssassaaaaaxszxxsxxassassssszssssszsrxayrsssssxssss s ssssxsasssssssasssssassssssssssssssssssssaszxssssassssassssssss=sssasssssxssazassssasssass Name: 001-Yr-post Thomas a Hutton Engineering Co. Interconnected Channel and Pond Routing Model (ICPR) C2002 Streamline Teftoloagic% Inc. Page 14 of Is Savannah bakes Phase 3 Post Development Input All Input Filename: N:\18660\dsgn\Stormwater\Model\001-Yr-post:R32. override Defaults: Yes Storm Duration(hre): 24.00 Rain€all. File: Scsiii Rainfall Amount(in). 3.20 Time(hrs) Print Inc(min) 10.000 15.00 15.000 10.00 24.000 15.00 --------- Name: 010-Yr-post Filename: N:\18660\dsgn\Stormwater\Model\010-Yr-post.R32 Override.Defaults: Yes Storm Duration(hre): 24.00 Rainfall File: Sceiii Rainfall Amount(in): 6.80 `ime(nrs) Print Inc(min) 10.. 000 15.00 15.000 10.00 24.000 15.00 -- Name: 025-Yr-post Filename: K:\18660\dsgn\Stoz:maater\Model\025-Yr-post.R32 Override Defaults: Yes. storm Duration(hrs): 2.4.00 Rainfall File: scsiii Rainfall Amount(in): 8.30 Time(hre) Print Inc(min) 10..000 15..00 15.000 10.00 24.000 15,00 - - Name: 100-Yr-post Filename: N:\18680\dsgn\stornwatzr\Nodcl\lOo=Yr-post.R33 Override Defaults: Yes Storm Duration(hre): 24.00 Rainfall File: Scsiii Rainfall Amount(in): 10.00 Time (hrs) Print Inc (miry) 10.000 '15.00 Thomas & Hutton Bugineering Co. interconnected Channel and Fond Routing Model (ICPR) 02002 Streamline Tedmologies,.lnc. page 15 of is.. r Savannah Lakes Phase 3 Post Development Input Al Input 15.000 10.00 24.000 15.00 o C = x a'= won=Cax xxa.aMsWax .=xa'ar a.==Wsaar=saa =a Routing Simulations j=a=xxxxaama�=_:xx=mxaaa.s::aexsasao=as==ex �a�_sx-xsasa=x::aa:xaas ss=�_�saiaxaasaaaasxaa xxa�;=aa=a-nssxxsxses�sxsssasaasaaarxxs aa e,a ssaawpxsi.esxxaxxsasa=are�x--aa Name:. 001-Yr-post Hydrology Sim: 001-Yr-post Filename: N:\29660\dsgn\Stsrmwater\Model\0o.1-Yr-post_.132 $xecute: Yes Restart: No Alternative: No Max Delta Z(ft): 1.00 Time Step Optimizer: 10.000 Start Time(hre): 0.000 Min Calc Time(sec): 0.5000 Boundary Stages: Time(hrs) Print Inc(min) 10.000 15.000 15.000 10.000 24.000 15.000 Group Run BASE Yes Patch: No Delta Z Factor: 0.60500 End Time(hrs) 24.00 Max Calc Time(sec): 60.0000 Boundary Flows: -- - -------------------- Name: 010-Yr-post hydrology Sim: 010-Yr-post Filename: N:\19660\dsgn\Stormwater\Model\010-Yr-post.I32 Execute: Yes Restart:. No Alternative: No Max Delta Z(ft): 1.00 Time Step Optimizer: 10.000 Start Time(hrs): 0.000 Min Cale Time(Sec): 0.5000 Boundary Stages: Time (hrs) Print Inc (min) 10.000 15.000 15.000 10.000 24.000 15.000 Group Run Patch: No Delta Z Factor: 0.0050.0 End Time(hrs): 24.00 Max Cale Time(seo): 60,0000 Boundary Flows: Thomas & Hutton Engineering Co. intmonneeted Channel and .Pond Routing Model QCPR) C2002 5tmaniline Technologies, Inc. Page 16 of is I I Savannah Lakes Phase 3 Post Development Input All Input BASE Yes - Hydrology Sim. 02S-Yr-post---------- ------------------ Name: 025-Yr-postFilename:.N:\16"0\dsgn\Sto=water\Model\025-Yr-post.I32 Execute: Yes Restart: No Alternative: No Max Delta Z(ft): 1.00 Time Step Optimizer: 10.000 Start Time(hrs): 0.000 Min Cale Time(sec)t 0.5000 Boundary Stages: Time(hrs) Print Inc(min) 10.000 '^R _ 15.000 15.000 1.0.000 24.000 15.000 Group Run BASE Yes Patch: No Delta Z Factor, 0.00500 End Time(hrs): 24.00 Max Cale Time(sec): 60.0000 Boundary Flows: --- ------------------------- Name: 100-Yr-post Hydrology Sim: 100-Yr-post Filename: Xz\18860\dogn\Stormwater\Model\loo-Yr-post.132 Execute: Yes Restart: No Alternative: No Max Delta Z(ft): 1.00 Time Step Optimiser: 10.000 Start Time(hrs): 0.000 Min Cale Time(sec): 0.5000 Boundary Stages: Time(hrs) Print Inc(min) 10.000 15.000 15.000 10.000 24.000 15.000 Group Run BASE Yes Patch: No Delta Z Factor: 0.00500 End Time(hrs): 24.00 Max Cale Time(sec): 60.0000 Boundary Flows: Thomas & Hutton Engineering Co. [ntaconnectad Channel and Pond Routing Model (ICPR) 02002 Sveainilne Tedmologle% Inc. Page 17 of )g Savannah Lakes Phase 3 Post Development Input All input aaaagaaaa4ssCspeaai�Cae:a=ial�aa�a�aswzsaassaf3a:C,�isawasassRswssisasssisssalssaasaSesaa.�.ss as=r. Boundary Conditions s:risesaa.ep�zatsssasasa:s=sawsssa:i*srr:acsssaz:iaaa:sss:sa:sssasQaa =ass=as:.esaazsaassastEaas:.vca=o==aaaazassszssssssasasassaasszasz=ssasisssssmawasaa:wz:as=s Thomas & Nutton Engimmering Co. Interconnected Channel and Pond R:outhig. Model (ICPR) 02002 SUumline Technologies, be. Pop l8 of 18 Section 8 1071 t. F.. • 10 N itdi q 1 q FS 9 D ass* O O sacs . *Sao o o O W f t11 00,40 M W tr ap M e m o Vol M M M V O O 0000 D00000 etr•MYI ftndOO r b,,, FW.4M fnPlrq M o c 0000 0000 0000 rv.Atew M4lIRr ase�.im oMMm faiOtr•i frorl o 0000 0000 0000 Wawa raAW 040A eV in a7 ri Or.I Ili or�a1 O f In N IA M ry A .A .l e4 Pt `4 coo* 0060 oaeo tana�ftN o.'100 Appoint" u►tpptyf atM. Ir gaanM 0 a.000 0000 DOo Mtpp"S toff: fn E Mfrr moappr abafe.r o. coca 0DOO OaOO . tnA 14,H A�a71.4 ��n_ aV M.4rql o. q +al n .a f a► 0 PI pF O MI M f YI M A W Ot f h lot Ok f O ow �V N1 2.ty ty I. f W ri M tpp W ry Mrpp ftpp 46.4 SqA tOpp®fn�1q+ N4No Cgonttfn 8en�1 Ym1M .�A roa antM W ufi qA rni. rngn Mtwa., MF MN Mfpq O/A R`.i tAMQO rallfa MIi YlO f MYl pp1 !r �r.Of l�1 MtppI'1 O nfb .inM Mnr IAwrO rl rvM /A rtn �i el ri .t ntM .i yin Ih 'Moo htg4ei wom.M WV MM MMMM MMMM AMM-tMt vMMwI ofvoO O ipphhO M nn M10Appb IDAIn(1 1yPI 9t7i fli Mt't 11414q1 the 11-11071 MA My �NyW ffOl enM _�..na .n7 InA n• .rva .nI a .nf r1 '! r"IA .i1 .ni .n9 ,A M .na .nA .A ei IM-I .-1 ei rnA .IA m*MR Coco coca. flow- Mh0.r Mrfn 010"M- tAW t� Mlhf M I. IZ tO+r rinNn A WON nIn1 .P01 ent.r/ a6 NNA r�a{fpp•M MMnM N n.nntr R,frwt0•1 agaroaM AA,4: 39144A 9X1 n"AMM b f f f f O 000 f f f f Lt.0 00, o a 0. f MV IO -r Me 0 Pa rM maN 0 a �s♦.A •A 100000 IA aA I:I .1 +'nnn •n tn.ff MMMM -MMMn "MMS MMgm III cco0 Ca0 e00.0 o3oa o0.00 00o-i� oot►O. 0000 ooao es 0000 eaoD 0000 eoofp 0000 0000 0000 0000 0000 0 0000 0000 0000 0000 0000 0000 coop 0000 0000 0 coo* 0 0 O a o 0 0 0 0 0 o3. 0o O a C o c o 0 o a. o 0 0 o O o:0 0 0 0000 0000 Coo$ 0000 0000 aoao oo$a pogo 0000 0 99 a 9.0 0 . 0. 0 0 0 0 0 0 0 0 C CaP -O o o O- O o O O O O o O 0000 omvto 0000 C4v4'Iri Mrfe4 0M040 tr►elanto eiotpat WWQ;fo m M Mon MMNM .f%in MM Mr1MM MMM M. m"rv.ry Ira MMN RVMMN M"44m M coca 0000 DODO fry nri bnrf OMM.i N11Ao0 b,A:A Twoo M 0000 MNnn a0o0 faO Mapp fiatP of mfa4 q.O to fpp 01Aenq gOAO r 00 o d f f I00 mnm 0 m q M tpp ao {mp Pl M W m o n f N rfVNN /`nl rnaMM NNNN NMNN tc9 A109A IwWNMN Nna tfv lraN IiWNN fntl ANN M 000li OaOo OOO,i "Wow O.'I00 Ipp O.IA Ii1 qe M.r Of Yf a7f q1Y Yln O O'o00 00:00 a -00 "Wow a6 ef,r nh'tpn m0aar app OloN fpp a fOr o oo.fi 0000 w000 f•Iamcm rieiriri M A(i Aof� ri t6f•lrvtr An en tp a ry n M N M M M M /A .1 .a M N N ry r l IA A rt fi .A IA . a .a .a .A ,A V4 M s&$.y I01ll�t l kill HU i$I& ���I till Hip a f. I I 1 1• i• I l I, I I, f I , t l I t f t t l t P I I I, I I t t 3t'N }� �t y� br H y� y� N �I }� M M }aM ►, M fa M �t y� }� M 1+ }� ��• y� {a iI it ?I '1+ � SI i+ it i• !+ M i+ � Yf P+'r ?t ?• i/ i� it ?+ 'vI 'vt is �t � >+ � ?+ f l, l 1 1 1 1 t l t 7 l 1, I I f• f. I l I . 1 ! 1 1 1 I I• 1 t, I l I M a nO /A gin .A 01110 IA O YIo A0no ao 1.0110 rlO too IAOn0 .i oleo .A Ilia 1 Milli fill � a cspot I a sd a^7 al "M"M MMMM MMMat 11149 ES mm!9m rrrh t�i 1L "$. p►{iYggfi�)�7�py�jr 10p�j0 fill Hai Oil �� � �� � �.i ►iM14 Aj �y i I $R 000 R010ri W 0 0 0 O 0 M O wu 000 onof.4 � 000 oNm� Ooo CI �M 000 M01 r10 INFFFFFF O O a �. 1 1 `p..:y:3 W ! "AAft wowm W r!W a 01 mr0 !V r1 4R� �'n oAa M rl ItO M IR 1!O-1N► CL' fitly!N N.i .mil e�1�r1 e1 rt a o N N .� • o.4s Zvi+ Nm011t� ��wm.� OfAa e�nme+ maaO I tiv�o nelri� 1} 0"NO it �w NOOj: .i / �iW� O.00 aoo OObO .+�esoo o o o o a g a �u 000 v000 A W S 'cog* co nqn (AAlllImm �w l0 nom 1+:01m aomo Or/NO 0! Imm NNN NNNN 0►. y� 0 0 4 � o �+i 0a1 �f1i W NMN Nr1 rl r! { i�Q= '34�Z Q� i$s lilt t J! i ill vi O 1R O i 00.4 r1 O an 0ENl 14 Aj n� M� ri-i � fl w7� N O N I a _q ri i i E+ a 0 atAmm v0m01 Of WQ 4.4 OWWM N/0vo 0PO10 00mOt Iq 41l+10v i' vmrt v vI- m 101-vaD ONO1N 040Cca, Io0NO1 0 v !- in in Pi 10 10 eq Q 0% a lh ri rl cow 0 m 0% ID rq Ch qr an 0 v rt 4t10Nm of IVNN 13Da M t- VI OOA Nv10.v NOO A I•Iv�1p O o1+aN N0lotri 0t-Nr. Iil1wcri W r41` V'v cowtorl r11•iNri in ,'I M ' • $ : to-. a :V a m '=^ tdD Y1 m Io " td Qa w !- t0 1m ir. Go q Q to P " 101.fn 01 10U1OI10 10AtV.O A10InO mrlww OOt►q.ri t0OtNOt W riNN rtl0=ri N1t0NOt 1Ct-N(6 VIIrl10o r w m " NEl- ON N ri ri N ri Cl N A ri c l ri rl ri CD in0►N+i 4911Oat CO g90W A001l0 rNiCO10O 0v40In In t0+1ID0O1V r0ivW0 r- t0 at 1+1 O ttt 10 O1 v t- N 01 of N i- W O in Ot 10 O to ri t- to /O N a1 N riv10o OAvw Cod"VIo r11o10O "MW O Af"M O rivbt` rl Ot10Oa0 w0riA vIomm a ri ft0 WOOrt NO1Ov Nbo01 10 o Otriol0 AOWO moo r 00v tAI+101% N10riri 10 of1017IN aommi• MIoOIA riNvv aAOtIo OO1OtIn riN1-w c- 0 VeM V� A 0 A VF ILI4DAn M OC` V!H t, at r+ AW 0 10Cg0a in ri rl rt !V rl rt N N v ri N in r/ ri N rl rt ri N10f010 CID o0a 0 L-r-mco aNNN t-NNN aammm to toloto O1 in I"Iri vv v o wN4v mI'rlmA mmmr1 Mmmm mm"m M! rNirM H H A Arr4rNi 4H.l ri rNlrNiHH eH f4Hi l rl rr4 rr4 rr4r4rriA r4 Arir4ri c`INNN NIIOr•trn Np1Alin 100b% I- a-t�t` � pI p� qI 1 1 ��1yy gpI yy► pp/ t r qt Pi 1A t'A Al m .m o .v a O� gag O d iU tl� O b1 �► 31 bJ q3 yl �1.► N t1 b1 �.r �,i J.i *1 j1 yr d.1 i► 1/ i1 J.1 !� a.t yi J� i.1 ♦1 aJ it 1 w W W W M W W W W W W W W W W W W W W W W t l l( A W l t f l r4 01A0 1 1 1 1 V40lo0 ! l l l A000 r s► t r4 0 m 0 1 1 1 1 Homo t► i t rloma t. rt s 0r444O 0r4NO OriNO OrINO 0r4M0 0V4N0 OriN0 o t OOOrt OOOA OOOA 000r1 OO40ri 0 0 0 M OC 0A O I r+1 ai CNN i eN41m N n Nd +oOrn4r) N►wwm NmNO ON01- rrn1aof V VIN M mIoNO 4� ' %! r! Yf 0 In rf 0 N 10 m t, m N N at N e2 0 H%0ri ut94C;a0 rlao.4 u1ofDoth Oair;a; a avIII vInA0 mmatif4 0mt�4h vMWO N ri W ar lA *" wfi WA i+0Q ri w T 10.4 0atN 10+40Nm Nvww Nv1t v %D0AD i MAM Y WWO rlt 010 NM IA Hrl i C dr o► 40 of T4 +o +a to yr .-t ao a% coo o n +D to r� o► w tia n rA .d rA -0 Inn ref A .4 to to an m H ao N+ON 1 IU!0! O 1!IA1o19 1mr:41 9111 NO epInr- oaiae 0rimIn oriN4+► 0.4 C1I" ql VNO W1690A NA4)r1 %a 4nAOD 4700t0 W O ve4at Odn 01ANN d!a►NO IllthIoo r4nN41 NW VPaD rtOatN HAOas 0m40-0 Or4.iN NOa� r441 O19V+n OOr4N ;rai ri 04 W a1a!4+ V 00CID .4 V dr 10InU)IA rrr4mF9 rrl NI M .d+ P1 N1 rh If! d dr a1 Vr .0ro d� r+l N N N N N N N N N N N IN N M N ; N N 44 rlrlrf rlr4 AA r4r4Hri r4riAA rtr4Arl r 1~ R 19 M021 r4rtAr1 ........ nrrn 3 CC maDaom r NWto gtld►ar xmkx 61 Q 0 0 Q > I!•1 W dJ is 4j Aj moo 9 i41ji y"mm �a�" mm� mmw� 114 & R. w °f>r lowR v ow td W r r r pc r r r P. Qr fir r r r r i�4 6�r W r r r r i� G. + e r r119 r B + r r a r e ++ a r + r r rr1 e r a .4 O IA+ O .4 O IA a r•4 O N 0 O IA O ri O In, Os (4 rt.NO Ore NO 0 A N 0 0riNO 0V4Ner W 00 ri b OOr1 0 0 0 A OOO.rI OOOrI } o®® W ao u° 041 BMW 9 Ca 92 ova E+ V �A ro� 01 a tra -r4 l�U .G �w � C! e-1 0! A 0000 VNlnt+ coca o0C0 Coco wwo0 wrlOH a 0 0 0 mordm women 0000 0000 mario a►w04h 0000 "WOW vvvv 0000 Coco mOmC N 0.0AM �d�♦+M 1pha0ao U!UlUIU! Vd��M+t• �!ww� wlprr ��o{�r N N N N N N N N N N N N ""MR N N N N MR"" N N N N 0 0 0 A wmww 0000 ocom ocari mom" atmmw Coco Mwww Coco Coco oo.00 moaot� moaot- aad.� V;'VC C4 o00o 444a4d.r 4.4 C4t11 %Z.;C C; M M M R H rl ri rl MR"" N N N N ri rt ri rt A A rl rt voof- vmra 0"mri wriwri mwoc wriwo wriw0 goom V"mt- rimd�m mwmm Otago mow= mowm w o v r V V 0 40 40 Co C M f" m 0 O.N m m"w a m"v 41hao'Ca coca uiwwr Uisotrt� Iniorr ln%.D*r.r In, wrt: N NNtV fnMMM NNNN NNNN NNNN NNNN NNNN 00w * or4oc woMN C mov moo" mvmw atdvrno +l%Dww md#4 Vv MIrwIrk mom r m0mr m0mr• m0mr r NNMw. NN NNNN NNN MNN wMI MNN wNN wgo, NN rf ri rt A ri ri H A ri A ri A H ri ri rt r4 ri rl M rl rl rt rl ri H rl m M Hv-0 CIO MOyI_ ri ri rt rl "mom NriNO wvow NmHw ovww W M A N NNNN oNMM ONNN al.wow omori Ci r♦ ri rl O O HA r♦ rl rt m 000 O o O to o ri ri n► M rl r{ ri rt 0000 O o 0 d O O O O Coco 000C. Coco Coco 1 1 r f I I t I I l I I I 1 1 1 I Dw VpUI 0Ulr10 in t,m Ammm N w wa r- rlatt• UIMUIN Ar "w vmww t►wriw mmwM ommo InACha NrirN nr %Dto eft lnMh mrrim VvMatN aatrr UlratN Inw.11p 00,440 V Co Of to aw0IV 0t�0IF Oawao r min co aAMon 10 DaO V 4 crioO wO M2 m4hw a mom" rMrtm V AMM w r1 1! It m�1 @ 1PP1 I WIC! m r C00mr .M 0109P MwU!r ���N ��� ��N ,.Mrr�"" wmMm NNNN NNNn1 ri r) ri A ri ri A ri A A rl ri H ri ri m ri aawas pWQ��WpO O Wnoe n�oopte OWN" How 0OR.O1� 01 4 h��+ �" hh her iCyIn Q riOIn0 r40w0 A 0 w 0 Ham0 ri0w0 riOwO 0rIN O 0r4 N0 0rf m0 ariN O 0 riNO ar4m0 0r4N0 D 0 0 A 0 0 a rl OOOri 0 0 0 H 0a 0r4 00Om OOOrt �Mmww;gill alaiMMMM alga a alaimm"M IliaMmMM mmim MR flM1 M M M! r� Mai ,r4p�n�� ran w ,1lw¢�wy w ado a� ,a`l�po� a� w ado m m fill p� pr r7�-i �►7r7 r7 rl� aN N e40oap W n��:a7p�i3 AA'AA iOAyAAAA AW1 mm mAAmAAAAA Ata aa►]a �7Naa a 002 aso41 o arrtr t�ararraraa aa Y Ly 19 Iwo X ri u Gig a "i r-4 A [+ W x 0 .4 P4 r4 All r 00 MV"w M W NO 0000 eAmmm 0Ma0 aInaO 0000 ODOR oIN1n oN AM ea o000 enoenw womof Ooovvav� en en0)en N N N N N N N N N N N N N N N N wMLna Wmmgh CoarI. aaaa AMrra rIMAa 19009 ao►.aa 0mMCi 0menc+4 rt499v e`itvNN NrlArl N.4Ari NNNN Ari.AA WA W ej M10OO MMAM Ln40NO a►L►mm 010r10 L+V.rrOD 0Ma0 00OD r1 m MOON vrlaa OANM • at# so > 1n 10 1-* rr en on, rn M M ui LA M NNNN NIyNN LVNCIO N NN.IVN aa0oyr Moon OOOrr 10MMa 19000r 00000L+ 0000 AMrl01 10e•I NN v m " 0 vvvv Omm" AAAA AAAA N.NNN N0.4AfA OOaA Oa+AW M200 ONaN Conch 0Nr4 00:0 O�10e•f 00040 0000 0 0 0 0 O A M O p O o 0 0 0 0 0 0 0 0 0 O O A M I OOMO OLrNO 40000 a0%42rL 00010 O"Oo OOOO 001N0 000.-1 94Dmv Coco Omm" OOA V OLV100 0000 OLV 10t` A rL OO w * Comm 0000 10MMO OOOOh OOwr- 0000 AMAO p O O 0 0 0 0 Olin, A A A H� A A A "" ppmWr Ppmprr Arp►o4 appWeL g► ue 0e u pW°W p�miAm1Jm► 1R)Nmo1b► s� r N r► ► r r pr M 11 t•L �!e 11 1e �i.. ie }1 iee y ► r r r ► r r r ► r r r r e r i rr-: O :R o v;r O M O r4 0 00'0 0 c-! lZ 1fl 0 OrINO 0AN0 a04N0 OrINO COCA O O O A C O C H 0 0 0 A mm"m I aI aaa"NNIII I V , P�v 0 0 CO�r 04 POh � E+ E+ F+cV v000 oaao � �►+��J �+ M 1.4 M -A Lei •01 "4 r► r e r► r► ppLip CipL L S�#ot� 11 HOLCdoddiM Savannah Lakes Phase 3A, 38 25-Year Storm Thomas S Hutton Engineering Co. Stonnwater Piping and Inlet Design Considerations Date: 6/29/2006 By: JCN Job Edo.: 18660.00 Last Printed: 12/12/2007 CaiculsII6®ras usW input INLET CALCULAT13NS A DRAIN. DRAIN. I]RA(Iv. Tc INLET C INLET l INLET ' n �� l �' Qc S Dm V L hf Ke hm FROM TO INLET TOTAL PATH PATH PATH TIME OF RUNOFF RAINFALL INLET MANNING'S TIME OF RAINFALL RUNOFF ',CUMULATIVE - PIPE MA%N(NG'S A, ANNIN&S, MANNING'S SEGMENT FRAME MINOR POND MAX. INLET ..FREE 0ONDING. BOARD INLET INLET AREA AREA DIST. VEL I TIME. CONC. COEFF. INTENSITY DISCHARGE COEFF- CONC. INTENSITY COEFF. ` DISCHARGE SLOPE 1XI-190 Size VELOCITY LENGTH .TRA1v5 TIME ELEV .0RICTiON •: LOSSES TOTAL LOSSES STAGE - ELEV (AC) (AC) (FT) (FT/SEC) !M!N) (MIN) (IN/HR) (CFS) � (MIN) (IN.IHR.) (CFS) ` (4fr) QA() !EN) (Ftfi%C) (FT) (MIN) (FT) {FT) (FT) ELEV (FT} � (F!� (FT) 133 132 0,07 0.87 150 0.30 8,33 15,00 0.50 6.24 2,7 0.013 q 15.00 6.24 0.50 2.7 0.48% 13 15 2.21 21 0.16 27,50 0.0369 0.50 0.0380 2&85 27.39 0.11 132 LAKE 6 055 1.42 150 0.30 I 8,33 15-00 0,50 6.24 1.7 0.013 I 15.16 6.23 0,60 4.4 0.51% 15 15 3-60 78 0.3E 27.50 0.3640 0.50 0.140$ 26.85 27.31 0.19 'FS8 137 0.47 OA7 150 0.30 8.33 15.00 0.50 6.24 1.5 0-013 15.00 624 0.50 1.5 0A8% 10 15 1.20 21 0.29 29,80 0.0108 0.50 0,0111 26,86 27.37 2.43 137 136 0.17 0.84 150 0.30 8.33 15.00 0.50 6.24 0.5 0.013 15.29 6.22 0.50 3.0 0-499b 12 i8 1.13 24 0.3:i 29,80 0.0086 0.50 O.i7a138 26785 27.35 1.43 138 139 0.08 0.70 150 0.30 8.33 15.00 0.50 6.24 0.2 0 �13 15.65 5.19 0.50 2.2 0.6v'Yo .i i 1$ 123 229 3.11 29.70 0.0970 0.50 0.0117 26:85 27.10 2.80 131 130 0.91 1.61 150 0.30 8.33 15.00 0.50 6.24 2.8 0.013 18-77 5-93 0.50 4.8 1.47% 13 i8 2.70 136 0.84 27.80 0.2798 D.50 0.0567 26.85 27.33 0.47 130 129 0,73 2.34 150 0.30 8.33 15.00 0.50 6.24 2.3 0.013 1941 5.86 0.50 6.9 1 0.63'"0 17 2+L 2.18 63 0.48 27.50 0.0576 0.50 0.037Q 26:85 26.99 0.51 129 LAKE 6 0.46 2.80 150 0.30 11 8.33 15.00 0.50 6.24 1 A 0,013 20.09 5.82 0.50 8.1 0.97°'a 17 i 30 1.66 62 0.62 27.50 0.0244 0.50 0.0214 26.85 26.90 0.60 135 LAKE 3A 0.99 0.99 150 0.30 &33 15.00 0.50 6.24 3.1 0.013 15.00 6.24 0.60 3.1 0.67%1 13 1.5 2.52 148 0.98 31.60 0.3371 0.50 0.0492 30.50 30.89 0.71 Date: 12/12/2007 File: N:1186601dsgnlStormwater118660 - HGL PHASE 3A-3B.XLS Sheet: 25-YEAR STORM Page: 1 of 1 4Dt PHASE 1 �A 1 ! % \ i x � : �`"'�' /"-� :�=•�- _ . fie.—_,.� _ �� � A � - •may ::� �.- y is 1 `, PHXOA 3B 1 It �1 t L•1 1`i� ' 1 I l 1 1 4��'I' J 1 1:1 rJi� 1 1 L-r r f t am' ms rw owe, w Sys �`-y - __-- ...\`` , `\, ` `''`\• PHA 3A 434 J I, PHASE 1 ' - f � 'I 7 POST -DEVELOPMENT DRAINAGE INDIVIDUAL BASIN EXHIBIT !' I FOR SAVANNAH LAKES I PHASE 3A & 3B I (THE MEADOWLANDS) } J / --� PREPARED FOR r % CENTEX HOMES 2060 CORPORATE CENTER DRIVE MYRTLE BEACH, SOUTH CAROLINA 29577 (843) 859-2200 JUNE K 2006 i I R THOMAS Ik HUTTON ENGINEERING CO. 1350 FARROW PARKWAY MYRTLE BEACH, SC 29577 (843) 839-3545 GRAPEX SCALE er veer ) 1 huh . W e. Savannah Lakes Phase 3C 25-Year Storm Thomas & Hutton Engineering Co. Stormwater Piping and inlet Design Considerations Date: 7/912007 By: JCN/JOM Job No.: 18660.00 Last Printed: 1211212007 CaicuWons User Input INLET CALCULATIONS FROM TO INLET DRAIN. DRAIN. DRAIN. Tc C I Qi n Tc I C Qc V MANNINGS D"m FRAME L S PIPE hf Ke hm . POND INLET FREE - PONDING . . "BOARD ELEV INLET INLET INLET TOTAL PATH PATH PATH TIMEOF RUNOFF RAINFALL INLET MANNING'S, TIMEOF RAINFALL RUNOFF CUMULATIVE MANNING'S MAN(VING:'S SEGMENT TRANS FRICTION TOTAL 0.50 MINOR MAX LOSSES STAGE INLET 108 INLET AREA AREA DIST. VEL. TIME CONC. COEFF INTENSITY DISCHARGE COEFF. 0.013 CONC. INTENSITY COEFF. 050 DISCHARGE- VELOCITY Dtheo. tIZE ELEV LENGTH SLOPE ':TIME: LOSSES (AC) 0.80 (AC) 0.80 (FT) 150 (FTISEC} 0.30 (MII�1} 8.33 (MIN) 15.00 0.50 (IN/HR) 624 (CFS} 24 (MIN) 15.00 (INJHR.j 6-24 f•C S) 2.5 (FT/SEC) 2.03 (IN) 13 (IN) i5 (FT) 29.92 (FT) 21 (%j 0,48% (MIN) 0.17 (FT) 0.0312 (FT) 0.0321 ELEV. (FT) 27.22 (FT) 27.28 (FT}'" 2.64 705 103 102 0.73 0.73 150 0.30 8.33 15.00 0.50 6.24 2,3 0.013 15.00 6.24 0.50 2.3 1.86 12 15 2942 21 0-48% 0,19 0.0260 0.50 0.0267 27.11 27.17 215 123 0,58 D-58 150 0.30 8.33 15.00 0.50 6.24 1-8 1.0 0.013 - 0.013 15.00 15.OD 6.24 6-?A 0.50 0.50 1.8 1.0 IA8 0.84 11 9 15 15 28.35 27.eB 21 21 0.48% 0,48% 0.24 0-42 0.0164 0.0053 0.50 0.50 0.0169 0.0055 27.18 27.21 2721 27.22 1.14 0.76 122 121 120 0.33 0.33 150 0.30 8.33 15.00 0.50 6.24 15.00 15.25 624 622 0.50 0.50 1.7 3.4 1.40 1.94 -_ 11 15 15 18 28.03 2803 21 143 0.48% 0,3596 0.25 1.23 0.0148 0,1510 _ 0.50 0.50 0.0152 0.0291 2723 27.24 27.45 27-42 0.58 0.61 119 118 118 117 0.55 n.55 0.55 1.10 150 150 0.30 0.30 8.33 9.33 15.00 16.00 0.50 0.50 6.24 6.24 1.7 1.7 0.013 0-013 ill 110 0.36 0.36 150 0.30 5.33 15.00 0.50 6.24 1 A 0.013 15.0D 6.24 0.50 1.1 0.92 9 15 29.00 172 0.48% 3.13 0,0518 0.50 0.0065 27.26 27.69 1,31 113 112 112 110 0.65 0.65 0.65 1.30 150 150 0.30 0.30 8.33 &33 15.00 15.00 0.50 0.50 6.24 6.24 2.0 2.0 0.013 0.013 15.00 15.21 6.24 6.22 0.50 0.50 2.0 4.0 1.65 2.29 12 16 15 18 29.46 29.46 21 151 0.489G 0.35% 0.?i 1.10 0.020fi 0.2230 0.50 0,50 0.4212 0.0407 27.25 27.26 27.90 2T.90 1.52 1.56 1I0 109 108 109 108 107 0.36 0.23 0,40 2.02 2,26 2.65 150 150 150 0.30 0.30 0.30 9,33 8.33 8.33 15.00 15.00 15.00 0.50 0.50 0.50 6.24 6.24 6.24 1.1 0.7 " 0.013 0,013 0.013 16.31 17-24 17,41 613 6.05 6.04 0.50 0.50 0.50 6.2 6.8 8.0 1.97 2.17 1.63 20 20 16 _24 F 24� 30 29.50 29.09 29,09 110 21 85 0.25% 0.25% 1.46% 0.93 0.16 0.87 0.0821 0.0i90 O.0322 0.50 0.50I. 0.50 OA302 0.0365 0..0206 27-2B 2726 2726 27.64 27.52 27.47 _ 1.86 1.57 1.62 116 114 114 107 0.40 0.61 0.40 1.01 150 15fl 0.30 0.30 8.33 8.33 15.00 15.00 0.50 0.50 6.24 fi.24 1.2 1.9 0.013 0.013 15.00 15.3d 6.24 6.21 0.50 0.50 1.2 3.1 1.02 1.78 10 14 15 18 28.42 28,42 21 122 0.48% 0.35% 1.141084E 0.34JjO. .0078 0.50 0.50 0,0080 0.0245 2726 27.26 27.56 27.55 0.86 0A7 107 j LAKE p j 0.00 y 3.66 1 150 1 0N0 8 V3 '.5.00 0.50 _._ . 24 I 0 n n.nig 16.49 6.12 0.50 112 228 25 �J 30 xw 154 0.20% 1.12 0.1145 0.50 0.0405 2T.26 27.41 2.67 File: N:%186601dsgn1St0rmwateA18660 - HGL PHASE 3C.XLS Date: 12/12/2007 Sheet: 25-YEAR STORM Page: 1 of 1 M I 1 I , I IL ' ' r l r /— /`: I\ Ado I f , �`�A�4S5`\ t 11 LAKE 7L14- ylt ) x +1r�AR 1•I 1,1 I 1 • P/ I -7110 i I f � 1 I Ate_-•.,. 1 „ti�►.,�__. i� / _ _ _-_tys•-•- r----`It I it-. ' / %•`, - C---------------------------- A '�'+------ l`-------- ! / I WSTLA4D / (LARGE) / / I 1 I LAKE 88 ISIYFJIR m A-Q� � � J III III III 1�! 1�1 i l Iiil t l I:I 1.l / 11 ,� I'1 I�'1� 1 1 I+'1 / 1--- ----11 �L+--..--i1 1---- J.----- ill -- rL / a 1 tt;t\ 1 WETLAND I ! \ X-7 -- --- a y M \ 07 \ POST —DEVELOPMENT DAINAGE NA` BASIN EXHIBIT FOR SAVANNAH LAKES PHASE 3C (THE MEADOWLANDS) PREPARED FOR CENTEX HOMES 2050 CORPORATE CENTER DRIVE MYRTLE BEACH, SOUTH CAROLINA 28677 (843) 885-2200 JULY 80. 2007 a I THOMAS 81 HUTTON ENGINEERING CO. 1350 FARROW PARKWAY MYRTLE BEACH, SC 29577 (843) 839-3545 GRAPHIC SCALE eI w (a1aT1 Savannah Lakes Phase 3 at The Meadow Lands I Design for Water Ouality Control (POND 8A) Determine percent impervious cover of the drainage area. Is a Vegetated Filter Required (Yes or No)? Drainage Area = Impervious area = % Impervious 8.05 2.92 30% 36.3% 40% ac. _ . 6.& sq. ft. ac. 2? 3. : sq. ft. 12». 2.66 (90% TSS Removal) Determine average permanent pool depth (or select depth for comparison purposes). Temporary Pool Elev: 25.81 ft. Permanent Pool Elev: 25; ft. Bottom of Pond Elev: U U. ft. Start volume talcs at 16.0 Design Permanent Pool Depth: 9.0 ft. Average Permanent Pool Depth: 4.87 ft. Must be between 3.0 and 7.5 Permanent pool surface arm as a percentage of the drainage area: 2.66 % Determine the required surface area of the permanent pool. Required Permanent pool surface area (AC): 0.21 ac Required Permanent pool surface area (SF): 1 9,3251 sq. ft. Provided Permanent Pool surface area (SF) -;_ . ._..:.. : sq. ft. SA/DA ratio Determine the 1.5" design runoff treatment volume to be controlled from the 1-year 24-hour storm. Rv-0.05+0.009(I) Rv = runoff coefficient = storm runoff (inches) / storm rainfall (inches) I = Percent Impervious = Drainage area (acres) / Impervious portion of the drainage area (acres) Runoff Volume (Rv): 0.38 in./in. Volume=(Design rainfall) (Rv) (Drainage Area) Volume to be controlled from the 1.5" storm: 0.38 ac. ft. Required Temporary Pool Volume: 16,553 1 cu. ft. Weir required to drawdown the 1.5" treatment volume from the 1-year 24-hour storm. V Temporary Pool Volume 16,553 cu. ft. Depth of Pond (P) 9.0 ft. Temporary Pool Depth 0.81 ft. (Temporary PV / Provided Permanent Pool SA) Minimum Drawdown time 2 days Maximum Drawdown time S days Q Required 0.0958 efs Minimum Weir Hight in Inches = 10 Required Weir Width in Inches = 2.0 =3.27+0.04 Ir0.2 H'-5 Weir Length (ft.) Weir Height (ft.) H (ft.) Qo(cfs) Dradwadsown Check h 0.809 0.270 0.0211 9.1 Too Slow 0 167 0.809 0.270 0.0518 3.7 OK .: 0.809 0.270 0.1129 1.7 Too Fast N:\18660\dsgn\Stormwater\R•.aport\DENR Stormwater Quality 1.5-inch 12-5-07.xis 1/8/2008 Savannah Lakes Phase 3 at The Meadow Lands Design for Water Quality Control (POND 8A) POND #8A 1. REQUIRED 3:1 RATIO POND INFORMATION TABLE ELEV. AREA ft� fN INCR. VOLUME CUM. VOLUME ft' 17,0, 850i , 493 493 77 1,835' .; 1,242 1,735 19 0 , 2,492- 2,064 3,799 20,.0. 3 22; 2,957 6,756 21 O 4 4 a " ; 3,922 10,676 . 22.0 496,4,959 15,637 23:D- 6641 6,069 21,706 24'0 ; �-���." 7,250 28,956 9,325 8,592 37,548 2. PROVIDED POND INFORMATION TABLE (POND 8A) ELEV. AREA ft' INCR. VOLUME ft' CUM. VOLUME ft' 16 3,758 0 D , 17.0 51565 4,712 4,712 =" 18.0 $976 6,321 11,032 19.0 8,393 7 685 18,717 20 0 9,907 9,150 27,867 21,0 11,518 10,713 38,579 22.0 13,212 12,365 50,944 23.0 14 987 _ 14,100 65,044 24.0 16,845 15,916 80,960 26.0 20,455 18,650 99,610 25.81 1 22 980 17,574 1 117,184 Required Temporary Pool Volume to Control the First 1.5" = 16,553 ft- Provided Temporary Pool Volume to Control the First 1.5" in Pond #8A = 18,650 ft- Additional Storage Volume Provided (Pond 8A only) = 2,097 ft' OK Required Surface Area of the: Permanent Pool = 9,325 111:2 Provided Surface Area of the Permanet Pool = 20,455 ft2 Additional Surface Area Provided = 11,130 ft2 JOK 3. FOREBAY INFORMATION TABLE (FOREBAY 1: Pond 8A) ELEV. AREA ftZ INCR. VOLUME ft' CUM. VOLUME W 16O5'` 0 1i ¢.74 840 840 1,125 1,965 19.0 A1,011,443 3,407 20.0. 1968: '. 1,789 5,196 24tl,: 2;353 2,161 7,357 2,.T.62.:: 2,557 9,914 2.301;7- 3;19B 2,979 12,893 240, U56. 3,426 16,319 2fi.0.. 4r 4,023 20,342 Required Design Forebay Volume (20%' Provided Vol.) = 19,922 ft' Total Provided Forebay Volume = 20,342 ft- Actual % of Permanent Pool = 20% 18%-22% N:\186601dsgnlStormwater\RBport1DENR Stormwater Quality 1.5-inch 12-5-07,x1s 1/8/2008 Permit (to be provided by DWQ) Ill. REQUIRED ITEMS CHECKLIST Please indicate the page or plai sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. SWR = STORMWATER REPORT SDP= SITE DEVELOPMENT PLANS AWTP=: ATTACHED WITH THIS PACKAGE Initials Page/ Plan Sheet No. 1. Plans (1" - 50' or larger) of the entire site shcwing: SDP 6-13 - Design at ultimate build -out _ rN SWR Section 3 - Off -site drainage (if applicable) _M SWR Section 3 - Delineated drainage basins (include Rational C: coefficient per basin) �LrN _ SWR Section 3 - Basin dimensions 1rN SDP 5.4-5131 - Pretreatment system �frN N/A High flow bypass system X/V SDP 6-13 - Maintenance access XN _ SDP 6-13 - Recorded drainage easement and public right of way (ROW) XN SDP 6-13, 25 - Overflow device _CN SDP 6-13 - Boundaries of drainage easement 2. Partial plan (1" = 30' or larger) and details foi the wet detention basin showing: SDP 25 - Outlet structure with trash rack or similar SDP 6-13 - Maintenance access XN SWR Section 3 - Permanent pool dimensions XN SDP 6-13, SWR Section 3, SDP 25 - Forebay and main pond with hardened emergency spillway XN SDP 24A - Basin cross-section XN _ SDP 24A - Vegetation specification for planting shelf . LrN N/A - Filter strip 3. Section view of the dry detenfon basin (1" = 20' or larger) showing: X/V SDP 24A - Side slopes, 3:1 or lower XAI SDP 24A - Pretreatment and treatment areas XN SDP 23-25 - Inlet and Outlet structures. 4. If the basin is used for sediment and erosion control during construction, clean out of the basin is .KN SDP 5A-5D, 25 specified on the plans prior to use as a wet detention basin. 5. A table of elevations, areas, incremental volumes & accumulated volumes for overall pond and XN SWR Section 10-11 for forebay, to verify volume provided. 6. An assurance that the installed system will meet design specifications upon initial operation once XN _ SDP 3 the project is complete and the entire drainage area is stabilized. 7. A construction sequence that shows how the wet detention basin will be protected from sediment . W SDP 5A-51) until the entire drainage area is stabilized. _M SWR Section 10-11 8. The supporting calculations. . Ly _ _ AWPT 9. A copy of the signed and notarb:ed inspection and maintenance (I&M) agreement. . Ly AWPT 10. A copy of the deed restriction. Form SW401-Wet Detention Basin-Rev.3 Part III. Required Items Checklist, Page 1 of 1 Permit (to be provided by DWQ) TAW HtZ'? 4 STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be filled out printed and submitted. The Required Items Checklist (Part /it) must be printed, filled out and submitted along with all of the required information. �i PRO.IECT ! AMATIt]N Project name Savannah Lakes Phase 3 Contact person David C. Gantt, P.E. Phone number 843-839-3545 Date 1/7/2008 Drainage area number Lake 8A D1 SIGN IN GRMATit7N Site Characteristics Drainage area 350,658 { Impervious area 127,369 ft2 % impervious 36.32285589 % Design rainfall depth 1.5 in Storage Volume: Non -SR Waters Minimum volume required 16,553 ft3 Volume provided 18,650 ft3 Storage Volume: SR Waters 1-yr, 24-hr runoff depth in Pre -development 1-yr, 24-hr runoff ft3 Post -development 1-yr, 24-hr runoff ft3 Minimum volume required ft3 Volume provided ft3 Peak Flow Calculations Is pre/post control of the 1-yr 24-hr peak flow required? Y (Y or N) 1-yr, 24-hr rainfall depth 3.7 in Rational C, pre -development 0.2 (unitiess) Rational C, post -development 0.5 (unifiess) Rainfall intensity: 1-yr, 24-hr storm 0.2 irfhr Pre -development 1-yr, 24-hr peak flmu 13.1 ft3/sec Post -development 1-yr, 24-hr peak flow 12.6 ft3/sec Pre/Post 1-yr, 24-ir peak flow control -0.5 ft /sec Basin Elevations Basin bottom elevation 15.00 ft Sediment cleanout elevation 16.00 ft Bottom of shelf elevation 24.50 ft Permanent pool elevation 25.00 ft Top of shelf elevation 25.50 ft Temporary pool elevation 25.81 ft Volume and Surface Area Calculations SAIDA ratio 2.60 (unitless) Surface area at the bottom of shelf 15698.00 ft� Volume at the bottom of shelf 89759.00 ft3 Permanent pool, surface area required 9,325 ft, Permanent pool, surface area provided 20,455 ft2 Permanent pool volume 99,610 ft3 Average depth for SAIDA tables 4.869714006 ft Surface area at the top of shelf 22232 ftz Volume at the top of shelf 110132 ft3 Forebay volume 20,342 ft3 Forebay % of permanent pool volume 20 % Temporary pool, surface area provided 22,980 ft2 Form SW401-Wet Detention Basln-Rev.3 Parts I. & H. Design Summary, Page 1 of 2 Permit (to be provided by DW() (I. DESIGN INFORMATION Drawdown Calculations Treatment volume drawdown time 3.7 days OK Treatment volume discharge rate 0.05 ft3/s Pre -development 1-yr, 24-hr discharge 13.09 ff3/s OK Post -development 1-yr, 24-hr discharge 12.66 ft3/8 OK Additional Information Diameter of orifice 2.00' in Design TSS remcval 90 % Basin side slopes 3 :1 OK Vegetated shelf slope 10 :1 OK Vegetated shelf width 10 ft OK Length of flowpath to width ratio 3 :1 OK Length to width ratio 1.97 :1 OK Trash rack for overflow &'orifice? Y (Y or N) OK Freeboard provided 3.19 ft OK Vegetated filter provided? N (Y or N) Design must be based on 90% TSS removal Recorded drainage easement provided? Y (Y or N) OK Capures all runoff at ultimate build -art? Y (Y or N) OK Drain mechanism for maintenance or emergencies RipRap Overflow Ouffalls Form SW401-Wet Detention Basin-Rev.3 Parts I. & II. Design Summary, Page 2 of 2 Savannah Lakes Phase 3 at The Meadow Lands I Desil?n for Water Oualitv Control (POND 8B) I —` Determine percent impervious cover of the drainage area. Is a Vegetated Filter Required (Yes or No)? — Drainage Area = 6.95 ac. t); sq. ft. Impervious area = 3.12 ac. 1:8 97 . sq. ft. % Impervious 40% • .A,Q("I 44.9% 4.49 (90% TSS Removal) 50% 5.04 Determine average permanent pool depth (or select depth for comparison purposes). Temporary Pool Elev: 25.99 ft. Permanent Pool Elev: 25.0 ft. Bottom of Pond Elev: 16 0 ft. Start Plume calcs at 17.0 ft Design Permanent Pool Depth: 8.0 ft. Average Permanent Pool Depth: 3.50 ft. Must be between 3.0 and 7.5 Permanent pool surface area as a percentage of the drainage area: 4 5 % Determine the required surface area of the permanent pool. Required Permanent pool surface area (AC): 0.31 ac Required Permanent pool surface area (SF): 13 597 sq. ft. Provided Permanent Pool surface area (SF) A ; sq. ft. SA/DA ratio : 4; Determine the 1.5" design runoff treatment volume to be controlled from the 1-year 24-hoar storm. Rv=0.05+0.009(I) Rv = runoff coefficient = storm runoff (inches) / storm rainfall (inches) I = Percent Impervious = Drainage area (acres) / Impervious portion of the drainage area (acres) Runoff Volume (Rv): 0.45 in./in. Volume=(Design rainfall) (Rv) (Drainage Area) Volume to be controlled from the 1.5" storm: 039 ac. ft. Required Temporary Pool Volume: 1 16,9881 cu. ft. Weir required to dra,vdown the 1.5" treatment volume from the 1-year 24-hour storm. Temporary Pool Volume 16,988 cu. ft. Depth of Pond (P) 8.0 ft. Temporary Pool Depth 0.99 ft. (Temporary PV / Provided Permanent Pool SA) Minimum Drawdown time days Maximum Drawdown time days Q Required 0.0983 cfs Minimum Weir Hight in Inches = 12 Required Weir Width in Inches = 2.0 Q=3.27+0.04(H/P)(L-0.21FOH's Dradwadsown Weir Length (ft.) Weir Height (ft.) H (ft.) Q (cfs) Check ^0. t00 0.986 0.329 0.0211 9.3 Too Slow 0.161 0.986 0.329 0.0624 3.2 OK P- -0300 0.986 0.329 0.1447 1.4 Too Fast N:1186601dsgnlStormwaterlReportIDENR Stormwater Quality 1.5-inch 12-5-07.xis 1/8/2008 Savannah Lakes Phase 3 at The Meadow Lands C Design for Water Quality Control (POND 8B) POND #8B 1. REQUIRED 3:1 RATIO POND INFORMATION TABLE ELEV. AREA ft2 INCR. VOLUME ft' CUM. VOLUME ft' 17 2; 0 48,0 ' 3,907. ' : 3,461 3,461 F9 0 5;1.39 .. ` 4,568 8,029 20.0 -. 6,353.." 5,746 13,775 210:' 7.639 .' 6,996 20,771 22.0 `.: 8,997 ': ' 8,318 29,089 234 1fl42a- 9,712 38,802 4,0 k'._=: 11,179 49,980 13,597 12,763 62,744 2. PROVIDED POND INFORMATION TABLE (POND 8B) ELEV. AREA ft2 INCR. VOLUME (ft') CUM. VOLUME ft' 17 1 170 0:' 18.0 2,072 1,621 1,621 = 19.0 3,353 2,712 4,333 20.0... 5,117 4,235 8,568 21.0 7,034 6,076 14,644 22.0 9,038 8,036 22,679 23.0 11,124 10,081 _ 32,760 ": ; 24.0 13,291 12,208 44,968 ?.5.0 17.224 15,257 60,225 25.99 20,836 18,770 78,996 Required Temporary Pool Volume to Control the First 1.5" = 16,988 ft' Provided Temporary Pool Volume to Control the First 1.5" in Pond #8B = 18,770 ft' Additional Storage Volume Provided (Pond 8B only) = 1,782 ft' 1OK Required Surface Area of the Permanent Pool = 13,597 ft2 Provided Surface Area of the Permanet Pool = 17,224 ft2 Additional Surface Area Provided = 3,626 ft2 OK 3. FOREBAY INFORMATION TABLE (FOREBAY 1; Pond 8B) ELEV. AREA ft2 INCR. VOLUME ft' CUM. VOLUME ft' 18 504 Ei: ,9.0 1 835 670 670 20.0 1196 11015 1,685 21.0 1.585 1,390 3,075 22.0 2,000 1,792 4,867 2,440 2,220 7,087 i 2,905 2,672 9759 3,703 3,304 13,063 Required Design Forebay Volume (20% " Provided Vol.) = 12,045 ft' Total Provided Forebay Volume = 13,063 ft' Actual % aT Permanent Pool = 21.7% 18%-22% N:1186601dsgnlStormwaterlReport\DENR Stormwater Quality 1.5-inch 12-5-07.xis 1/8/2008 Permit No. (to be provided by DWQ) A :� �¢ VWATggaG s• � w} _ , NCDENR {"1 Y STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part 111) must be printed, filled out and submitted along with all of the required information. f. PR_O�FOI41Yf_A_TIUH_ Project name Savannah Lakes PhEse 3� Contact person David C. Gantt, P.E. Phone number 843-839-3545 Date 1/7/2008 Drainage area number Lake 813 II. DESIGN INFORHIATION Site Characteristics Drainage area 302,742 ftz Impervious area 135,972 ftz % impervious 44.9134907 % Design rainfall depth 1.5 in Storage Volume: Non -SR Waters Minimum volume required 16,988 ft3 Volume provided 18,770 ft3 Storage Volume: SR Waters 1-yr, 24-hr runoff depth in Pre -development 1-yr, 24-hr runoff to Post -development 1-yr, 24-hr runoff ft3 Minimum volume required 1`0 Volume provided ft3 Peak Flow Calculations Is pre/post control of the 1-yr 24-hr peak flow required? Y (Y or N) 1-yr, 24-hr rainfall depth 3.7 in Rational C, pre -development 0.2 (unitles:) Rational C, post -development 0.5 (unitles: ) Rainfall intensity: 1-yr, 24-hr storm 0.2 in/hr Pre -development 1-yr, 24-hr peak flow 13.1 ft3/sec Post -development 1-yr, 24-hr peak flow 12.6 ft3/sec Pre/Post 1-yr, 24-hr peak flow control -0.5 ft3/sec Basin Elevallons Basin bottom elevation 16.00 ft Sediment cleanout elevation 17.00 ft Bottom of shelf elevation 24.50 ft Permanent pool elevation 25.00 ft Top of shelf elevation 25.50 ft Temporary pool elevation 25.99 ft Volume and Surface Area Calculations SAIDA ratio 4.49 (unitiess) Surface area at the bottom of shelf 14788.00 ftz Volume at the bottom of shelf 51988.00 ft3 Permanent pool, surface area required 13.597 ftz Permanent pool, surface area provided 17,224 ft2 Permanent pool volume 60,225 to Average depth for SAIDA tables 3.496574547 ft Surface area at the top of shelf 19041 ft Volume at the top of shelf 68902 ft3 Forebay volume 13,063 ft3 Forebay % of permanent pool volume 22 % Temporary pool, surface area provided 20,836 ftz Form SW401-Wet Detention Basin-Rev.3 Parts I. & II. Design Summary, Page 1 of 2 Permit (to be provided by DWQ) II. DESIGN INFORMATION — __— - — —•--- -� J_._ �_ �.- -- Drawdown Calculations Treatment volume drawdown time 3.2 days OK Treatment volume discharge rate 0.06 ft3/s Pre -development 1-yr, 24-hr discharge 13.09 ft3/s OK Post -development 1-yr, 24-hr discharge 12.66 ft3/s OK Additional Infonnation Diameter of odfics 2.00 in Design TSS removal 90 % Basin side slopes 3 :1 Vegetated shelf slope 10 :1 Vegetated shelf width 10 ft Length of flowpath to width ratio 3 :1 Length to width ratio 7.73 :1 Trash rack for overflow & orifice? Y (Y or N Freeboard provided 3.01 ft Vegetated fll:er provided? N (Y or N) Recorded drainage easement provided? Y (Y or N Capures all runoff at ultimate build-oit? Y (Y or N) Drain mechanism for maintenance or emergencies RipRap Overflow O.dfalls OK OK OK OK OK OK OK Design must be based on 90% TSS removal OK OK Form SW403-Wet Detention Basin-Rev.3 Parts I. & II. Design Summary, Page 2 of 2 Permit No._ (to be provided by DWQ) [Ill. REQUIRED ITEMS CHECKLIST Please indicate the page or plan sheet numbers where the supporting documentation can be found. An Incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. SWR = STORMWATER REPORT SDP= SITE DEVELOPMENT PLANS AWTP=. ATTACHED WITH THIS PACKAGE Initials Page/ Plan Sheet No. XN SDP 6-13 IM SWR Section 3 XN SWR Section 3 ,.1'N SWR Section 3 X/V SDP 5A-5D _ XN NIA XN SDP 6-13 XN SDP 6-13 _ XN SDP 6-13, 25 XN SDP 6-13 X/V SDP 25 XN _ SDP 6-13 XN SWR Section 3 XIV SDP 6-13, SWR Section 3, SDP 25 XA1 SDP 24A SDP 24A XN N/A .,LAN SDP 24A XA1 SDP 24A XN SDP 23-25 X/V SDP 5A-5D, 25 XN SWR Section 10-11 XN SDP 3 XN SDP 5A-5D X/V SWR Section 10-11 X/V _ AWPT —LAN AWPT Plans (1" - 50' or larger) of the entire site showing: - Design at ultimate build -out - Off -site drainage (if applicable) - Delineated drainage basins (include Rational C coefficient per basin) - Basin dimensions - Pretreatment system - High flow bypass system - Maintenance access - Recorded drainage easement and public right of way (ROW) Overflow device Boundaries of drainage easement 2. Partial plan (1" = 30' or larger I and details for the wet detention basin showing: - Outlet structure with trash rack or similar - Maintenance access - Permanent pool dimensions - Forebay and main pond with hardened emergency spillway - Basin cross-section - Vegetation specification for pleriting shelf - Filter strip 3. Section view of the dry detention basin (1" = 20' or larger) showing: - Side slopes, 3:1 or lower - Pretreatment and treatment areas - Inlet and Outlet structures. 4. If the basin is used for sediment and erosion control during construction, clean out of the basin is specified on the plans prior to use as a wet detention basin. 5. A table of elevations, areas, incremental volumes & accumulated volumes for overall pond and for forebay, to verify volume provided. 6. An assurance that the installed system will meet design specifications upon initial operation once the project is complete and the entire drainage area is stabilized. 7. A construction sequence that shows how the we; detention basin will be protected from sediment until the entire drainage area is :stabilized. 8. The supporting calculations. 9. A copy of the signed and notarized inspection and maintenance (I&M) agreement. 10. A copy of the deed restriction. Form SW401-Wet Detention Basin-Rev.3 Part III. Required Items Checklist, Page 1 of 1 S�Mdl lofts Phae 3 Elm 1, TA17�ON AREW O1 pMECl��rioy arti EnaNa�n CErrrp�o{ PI■r� - A 1. FROMIM POND DWON&TON TAKE ELEV. AWAOM IfrCR.110 CIE R CUY6 VOUDAE M MO 4= =4 X* 23.0 7w NO a" 27.0 1.120 on IX17 21LO 1,m9s 13P 3.174 DAWWWAmn 1.73so Pao* d Tempwwy s m - - - Top vdnmm = %11424 PrTi immy Sent Tmp V knw = 3.174 V AdditW VrWm* PKwkbd - 0010 B14A.�Oii /A SM 02 (fte I a mi EiastoCCOM !Me • ShM l) 1. PROVOW POW UM)N ATION TAILE Ma. ARFAM INCR. CLIAL VO uma 2" 10Q 0 o 274 393 200 230 2LO WS 63d 016 20 0 1,042 m ism 3" tA93 M 2ps DoWn nAMG O im ac Ro**od Timpwwy Sedmant Trap Vi*mw = 2 U 1P Pion Tomponry S9edbum Top 1#dnmo ■ Vlew1N AddOwd g- m - 9 ylpm Raw m as ff NHI-1-1-6—AftoUb 1 OFZ DNS SWMWrXWN OMM M (ftm MdMMY Chmkv and Enmftn C=IW Pin- Shod ig 1. PROVIDED POND INFORMATION TAW. . AREAM iNM CUM. VOLUME OM A V 0 0 28.0 M 145 146 21LA 351 2i7 422 3D.0 539 446 887 31A 75T we 1.5iG . Drakwgo Ales a 0.7740 Temp m" Sedmt Thep yes 1-' flp IPmvkbd Twoponq Sod n4W Trap V kxm s 1151611' AddWwdSWrapVbkwwftw6ftdw 120 IF IPHAilM 1- WOU Nd IENTATION 9AM 1. IPFA MpED POND DfOR MATION TAKE S AREA M INCK VOLUME I MAIL 1CUNE gCL 2&0 871 718 716 24.0 1.231 9os1 1.789 MONO) Ater - OA9 W PAqu ed ywr4x ary led nan* Trap Vaiu►ru - 1,242 fF Pm►tdled Tempg "Seam* Trap vale e • 1,7" fr AdMoanel cgs Vie Pncwlded a 527 A' SUPPOR"NA CAI ULATMO Nil 1N� t1fp�0�Iq �.xls OMMOSM6 do A t m � ■ ti trrtr u ��ti i�dri�r �o•W Prod QM�df ■ � . s �Ih Q1Ms ZOfl7� ■ R1MyRlOdlbl! PII�bIAVhlp411r..ifjs ti.QO w►tdotrdWt� R lidos ■ '6" foR lifer iDQop dWWftftmmW%w 1rw�lof®ondlAon�po�s Af (dtfoo O�Jrf AfrttZi d:1 ��aW d■ 2�1(f�Q ZX) 4 Traffslull Ar Zd' 1t ■ Alf' •� 7dld��Y'od) 0.51Q7iI IAT &a I am I V-yj s °MaaA 1�torrd.Qda 1 s '11 VAM 01lafr AIR fioMtl PWMd Mood Qmft- 6A. PIf��Ad VijMrof- Molwdf Qlffrs dWoloWAWVv /rt�p�N VIKbd� Y� ■ d.00 ��� iMd) onof CIMs -'D' i0flf.(TW N � Ydi1�i+�YlO�wdw: N/�1CMIMfItr110ta fI0111A1ON Q�� Memo O%hwIwftZ■4cl fuWwdd-ZAP Z04 `t-w■Id.Od Aries R•AV■yAljj6L4jYO* R-0.004'li I ILV I film I L04 WAR I V QwQw gap 'A�anff�tObo a t��oeeowp cawforo�rt-pA■r:�r. OM bmdMrwl oftdm"w As' :q ■ s s 1. 1AN� �! t�lrj ProPorMCMoW Gwd� ■ d�� ':, s Mlrw■e�6ir� M Tp� • EjlydY 6rrthbMr PWwAmmOVdmftVpn UO Mo M MMi 9Als) PAMedIn *m a gV vAtTdib Uft VMna Chrraot DMn�n dn�lM� ra ftMl1 brr►eu �t110n (drs "Dh dm*mlDewdVo N4� OIIolMthniZ■ 451(seMy t�nd4= � RpnM} T■:dZs ILMR A-W P2■AIP■291=41r' * S W, O.00OIi I 1 ?A1 J WAR -tin ftm OA®e '911A 6��iltl"a t3qAID An go �0 ri ' m mgm �i�lls 9 vw Input om pmPmw o"W Ooft ■ @dTWw-ftW*Ws b PmdmlliVtdoe. V,ps W ftWtTdb&Oft CDIIgM10CbWdNW ftmdbwl oodf1fdmVl lM 4ftft CMdw1"Z8 d:1 OU* rd d ■ 20 Qmsq tji- Ts;A • 10A It A■Zd" RsAiP■ZdlQ Wslr" Jim .OAM M I A ml *Aodaftm - PhM $jb DbhmdSmbft adokm A* r* L3il 0 as 01hu 1�d� p1U P'apaoad grrlt'iM � * ., PrgsOaad bI�MOoa * 3dtlaaida Itra,a SRif Tdpa * .�.Fiod�lN Vt � � M�aa (Ti3Ua:d.06a� II�IddrnOa ii1MN * '�" oul RIbN LOdgj V4MMONOW alga0: O��IMI�dilMit.blN �Ol�rda1100�011dlII011(OMfO'�'1 dompla mlo Vp M Qrm Dleht haN Z ndh i I and d 41F �+w0 T* 3dZ-1&0 A ANZIP lR•AfPsZd/ +1)"O.4) 3 * D.Q60li C OK '/OIR F�au 0.030 �!C•' w A � * Ms1d )alfir = 1. VOW hod Do" Gnu_ O�MMy _ ow1� °n= soot m BN* Parad som VMOdA►. VM * 500 3irao Rabla 0 OQ� ftbrdmaCWa*'Wad (Tab em" `yDtarrMl DMnuaia� NNme dM fo nMs9 aw ad�ianolro®nd�lion Qdw'D") dM�nlOtaMtVP Memo Cr011�a11NMZ r sa Q111hq apl d s 9 Rpnaq T*2U��.0l An "W R * AP w ZdI VCZ4j " jj M LmZQtN ! OK tdam � `7�on1 Dq. 1d11minC�Nadaroiia- bra O MW dSAIWOoI III W,w A+ 1C mo-w Pwre.�9C--uiloym1wo" Mlowdr►+ . i�nw�= Mon�uil�a det'1�+ �Mrod�le Plomiu b4 Ve k ft Va• a00 MU (n") ILON v6sh"C I of d amonom. Amealbollommlowr 16011"Was(dw4m do1'MrtbagMN� MiHloo Onopolndd+3itvoo 1914 U=1uRY T� i AoIW RpAIPOSIOW" "a SD CLIM 1-m Vs 1 am YiY "I�om F1�o 0.0l1n go AM -;F • As , iG Is 4 IoAn C.. ; � Ywr ugnt Q�oy Plapand VAGNOW ■ awamo emu IM T9.= air wad" Pte111mYNymftVjr LN %Uw(itldo,Oft A -?A MN wWWA(1"f� Vroq ..CbmwmrAm m la it I Io inoo�llw�rlMA4ieti�a Gdln�'1D7 do4etsmdvv M41fao� �dIN11MfZ+�C1 haMilMiddssllplloR} Z=4 T= au ■ lu a ARM R+ AfP • iJIUGM41 A+ataoar fir s �fMnwi�Oig 1ik11 Q*MAdW- Wow*&* om aed sob GIMIwwom 7=7 nt Olfior lnpp! 90� Prsposrd pw�i Orsds• , plop o'sd%lookns owmb amm eo1 Tip Es* asftb PsmboabVdm*. V,• &M ftoombls&om Cbo 0 -W"R" um dnrpnlp w"v" law AI m". bMolNshwsB 4siFlwisndd•2l(n W ZAF s A: ZF R,P AOP=ZdfdW41)?4 @s I= Fbw#Aw �Awft d AI AN 0 K in a b1V %ftm 1.14 C ops OYfari�put'+DesN Plop ssd ChOnM Grads s QM w ftasaft G GOTWOa Ea*�Odo61s Pmmbw* iikx*. VFn Lao fta(Tdb&u* PAWdmoCimm V.Slmps Gut(raDlr LOW dr WftbmWpNr(dmV) dodp b mWVr /IdQrpoa OMGrta hMs 2=49 pne� and0 ■ 1<1(ayoQ T Melba A n zr A3amaZd! {yeA ME I loll SWUM I 1,d7 -'j am I min V o v @3bQw OK brim F1�nod.�s do r7sln �- A Wit Guns-M" 114* DN*aed9wmb A%wvft s A: - m: • tr'Il�C 0 Yew mox adlN Pmpo wcbvm fombs stmar Pmpwwvalmm ■ womuft ti�aN Paadmmb Vto GAD am"POWSAW ftwd� VieMNO� at(T I Iliitom"kbwmftWh wwWftnidmsln dacha rs mw Vt Al fbm CWM hM ZA 41t (mW w d d s 2 i1 OeW 10, 3as f0A 2 A.. Zf R a AIP sZdlOWo4) O.d1 a O O.,M 'N fonaaft 0100ft Alc As «iC is.., ' ` rM11r Cs•af'i t O1AnrMput IDatq P+WgMdCIVOWN I • I�IOOIU Prop" VIg11dOn= so Too sft* emdoo Pwmbnw sb*. Vr. &00 tm.amw smy llwdmwcwno MRatRdb V Clan" o�ea ladpip1dmWkW oo"kVlfdiM4? /E Oma CftdmhMZm4A,p*nl� $041P4a vam-WAt A•M R s AIPs Zdl lrOm S - SAM 'ho•Mt®uft rlfgm wdla oft d A ` I m l Cab*#M • Phan $jb N*Mdo tdpadm*mm 7 Sao A• n i". t ' ' k C @Y�rt�ul0rq PrapaMd CNormd Gmb - sdTwo= awboaft Ps m mm*VdoftVp* &W Wm(TOA)BAiy fttPdWAS Cbw* 9V apt (Tdb V•drrpd �Iwrtel 4MMWOna doh b � Eow eonp7r�n (W ro'0�'1 dMW b P" Vj rmftw CidMsMv�t•4.!{ )andds4N(rua} T*sa■wo t A * t'd' R*AIR=tdJ(tjE*olM j an a.#" aw '@+Ag1P� d06e "ian� MMawr jtt B� A* ' so • '` tAlhr �, ■ @ Yet pglul IQ�) Pftpond C wmd Grafts OMM � Ea�jbodfbla PWWAM"Vdm t vvo Us MM(TotyeOAN R�P�D@ Ciwsa'OPout(Fatil! a� VHIr� CBwrnN Dlmo�ber: Ooalydnp b aMat bra oat�tort (drn'O"� AN Csroro �:hMilt*�Ct (wM�indd* g A� A-Zr fd*AP■?dIOMM Q SWUM OA@0'i 1.@7 ! @1 I Em Ve s dW 'MgIN �b iAio '�'fOrrr QAorrnil� IEq. I, A lEii Gilefi@ani• Phnd�i Dftk mdSwb CmWdg4Ao T-6awOYdW"WDMQ n ON00400MO 0 GA IM OoIT�� B�►fiodoris FAM� � w� • 3�00 �e(htiir tlO�q V *rM Chmin f 0� aA (Tiblt AO?� &IS M9I*ffWdlWrdWdNWCO!dlM(dmWV) .*AplbmmKvv zo T s 2dt. 90 *. Av7$ A at Aff ■ Zd I 7)VA) VMP%M M m*M#A=iW# ft o . C* f s 'i 'f(orinPut Uwj is arm TY0 a &**G&W ps Vf On UM(TOWUNO NeUrdom Cfts-lWws(IWb SMO V4h@POWNWDWWWm d1ra, b MM@1011f 1blo i�t'D'9 AidhMs CWwh Xw*l(pm*wdd■2l(pmO To !OZ ■ 10;00 As Zr R • AIP aZd106MYll M R ■ CAM an O11o1ioba-PU nSib md$w@bC*,l jMr �11 �a0r A* ac [a.NAir OYMMomDA" Propaad Charts fi�a� 'milli" P«n+��{aaq�vp• e�.ao a..�tte{saae� RwadworCUM a "w ad(TWO lam v. edannM Olmentl{aa Zia ,moo io � {aN iaiano. car111�n (a�i'D'►. aoaneaae�Mv, ++� arara arnN�w.z=a:� +bra a •� T�ffi=1¢�a ^ck 1t!1,AlP•ZSPVMNM)VJj 'him PwnLock " hO aft a K AN a�� Y�IIC PIOpOMd GMllf{M Q► _ Prbr *ft- w 9wMMft aMw ftelwo_ Pwa"WWVblDO. Vp w W an crab Loo flo dwMemnarm'a#(RdebLoo i Isa 1amtetlowttlwdrrf®o Mar{ "d'� d1cOON OkbwbmzaAl fawaddi2t(moo¢ Z ■ 4 %;61 7=ffi=7L0t A*Mr 8= 0.#M OAWFWMaoat "bMU I�4 do A, N.11 Cbk doom- Phan Sib MWWA rwdtf GdM tftW f= � Cam. s 13R 81harlrylutDo� P#apand"- th ,"= �►Eradi6la Pl ndwdiVdod4hVI,■ dA0 t111WATMh IAMO Rttndon flips 0 V out iidotot8K01ii V%ypa Cho "WO MONMc I dj , AtonwIOwafto moo oun(onffi 1 dawn 10 wAw Vf Npm& DNdmftnZ■4m Wa4wdd-ZA(ns* T,.2a it A* MF R)rAP■ZddVW*I 'O.ID • . pZp� t.N7 »4f toI V `V ICKda s �16 rt Ale A■ '.sC (a 19NIf ■ a 1 oraa�ueoii pr<opaa de ss PIOp"N umm H/Ill�lr l�Iwe � a* PNnollwtdlVMoCwVs'� so t1Aaa�iadsa�q t�NIdOn0aCy6s I"VA(W* V.�ups CiowoaM DillYnI011M d oodo b n od towntrI aofrtdt�On (aMs'Dr'j' dlMlon � aAMt1/R mama dM DNdwioswZw4t$mapodd ■2filr o4 T■ MMs "At AwZf R ■ A1P=Zdtp�►t1'aA � $=SAM 1.� 8>►.Ai3 V�. CI s . "Mw1Y1�M8n/�E4 .dm Fklk Clwjw na-p"w 3.* GMdldSwdvGdnddbft 1■ t. teAr OYaartspoo plopm- atwm-ormb■ P1 d1AI ata$11I- I -Orin Ro/ 7�e w � t3o0orb PrnrallooblrVdodb Ve• 900 !almaOW*SAO R WftwC Mwb'w (rmbtS=4 V4" chm" M M UINK taMlotmmorram"annom(don "Dry dopbVa, AI l�noo tlMolwat+ar�t■i.H �aadd■ Z1�My Z= -A wr T*aamuse As2r Rw AP•AdIPPF+I M I Ci &toL I im &M I VA %Mft do Ago A ` Q.Of aB Ir PMPNNUN�oMon oMrraMaiOrMos @T�w 9MMI" Prani000 I *- Vpw &W NW (UNI OAN BogotaClm • oru t(yftbsma M�■PMClwrnet dui b e»oR toMr ahoiloEroA ao Klloo'd'� dB14nbMINtV� Aii#rM1i Q�aiwwZ+�4�(�gwdt•ilQ� Zill ',. T-ikAUOC Anar R n A1P a2dl0W%1Y4M S w GAOOL fbi PWW C M#dW*-PM &J* THOMAS & HUTTON ENGINEERING CO. 1350 FARROW PARKWAY POST OFFICE BOX B000 MYRTLE BEACH, SOUTH CAROLINA 29578-8000 TELEPHONE (8431839-3545 FAX (843) 839-3565 January 10, 2008 Christine Nelson Environmental Engineer 127 Cardinal Drive Ext. Wilmington, North Carolina 28405-3845 Re: Request for Additional Information Stormwater Project No. SW8051203MOD Savannah Lakes at the Meadowlands, Phases 1-3 J-18660.303 Dear Ms. Nelson: Tc address the comments faxed/emaiied on 1/3/08 of your review of the above -referenced project, a point -by -point response is provided as follows: I. The provided deed restrictions issued in October 2004 do not include the requirements found in Section 11.12 of Stormwater Project Number SW8051203MOD issued November 7, 2006 Section H..13 of the permit requires a copy of the deed restrictions to be provided within 30 days of recording the plat and prior to selling lots. A modification to this permit cannot be issued until the required deed restrictions for the previously permitted phases are recorded and provided. a. A deed has been obtained that includes the same language as Section H.12 of Stormwater Project Number SW8051203MOD. Sections provided are Section I1.12b, II.12c, 11.12e, II.12f, and II.12h. A copy is attached per your request. 2. The designer's certification required. in Section 119 of Stormwater Permit Number SW8051203MOD issued November 7, 2006 for the stormwater system associated with Phase 2 of the development has not been provided. Please provide the designer's certification, for the ponds that have been built or in the process of being built for Phase 2. A modification to this permit cannot be issued until the required designer's certification for the stormwater system has been provided. a. A designer's certification letter is attached per your request. R E C E V V E JAN 1 1 2008 DWQ NAI8660\Docs\Corresponderce\NCDENER-L-Nelson-Express Permit Comments (1-3-08).doc PROJ #I of 3 SAVANNAH, GEORGIA - CHARLESTON, SOUTH CAROLINA - WILMINGTON, NORTH CAROLINA-BRUNSWICK, GEORGIA 3. Please resubmit page 3 of the Wet Detention Basin Inspection & Maintenance Agreements with the corrected depth at which sediment shall be removed from the permanent pool and forebay. This depth should equal the difference between the permanent pool elevation and the sediment removal elevation. a. Page 3 of the Wet Detention Basin Form has been updated. As requested, the sediment removal depth has been changed from an elevation to a physical depth measured from the permanent pool elevation to the sediment removal elevation. This is revised for Lake 8A and Lake 8B. 4. Provide the seasonal high water table (SHWT) at each pond location. The SHWT must be at or below the proposed permanent pool elevation in order to maintain the state required storage volume. If the temporary pool is taken up by the SHWT, there is no place to store the required runoff. If the SHWT is above the permanent pool, a liner for the pond must be provided or the temporary storage elevation must be raised to ensure sufficient storage will be available and supporting documentation must be provided. Generally, a soils report for all engineered systems is required to estimate the SHWT elevation at each proposed BMP location. The SHWT elevation must also be identified on the pond detail sheet. a. As requested, the SHWT has been estimated by a geotechnical engineer and is evident in the geotech's letter that is attached. In the letter it is estimated that the SHWT is below the permanent pool elevation for Lake 8A and Lake 8B. The SHWT is being reflected as estimates on the Site Development plans Sheet 24A. 5. The average head used to calculate the discharge and drawdown from the pond should be should be calculated based on Section 3.5.2 of the 2007 BMP manual. The September 28, 2007 version of the RMP Manual changed the average head equation from 11/2 to H/3. a. The design for Water Quality Control for Lake 8A and Lake 8B now uses H/3 for the weir calculations, instead of H/2. This change does not affect the design of Lake 8A and Lake 8B as the weir dimensions remain the same and the drawdown time remains within the required 2-5 day period. However, the drawdown time and treatment discharge rate changes are reflected on the Wet Detention Basin Supplement Page 2 for both Lakes 8A and 8B, and is also reflected in our calculations. 6. Please submit a $500 fee for the additional review required for this application. a. The fee has been included per your request. DECEIVED JAN 1 1 2008 DWQ PROJ # N:\18660\Docs\Correspondence\NCDENER••L-Nelson-Express Permit Comments (1-3-08).doc 2 of 3 7. Please note that due to this project being reviewed in the Express Stormwater Permitting program, only two requests for additional information are permitted. If these issues cannot be resolved in the designated timeframe, the project will be returned. a. Understood. If all comments have been sufficiently addressed, we are respectfully requesting approval. Sincerely, THOMAS & HUTTON ENGINEERING CO. //A jl ' ;a Nickey Lewis, E.I.T. D E C E I V E D JAN 1 1 2008 DWQ PROJ # NAI8660\Docs\Correspondence\NCDENER-L-Neison-Express Permit Comments (1-3-08).doc 3 of 3 THOMAS & HUTTON ENGINEERING CO. 1350 FARROW PARKWAY POST OFFICE BOX 8000 MYRTLE BEACH, SOUTH CAROLINA 29578-8000 TELEPHONE (843) 839-3545 FAX (843) 839-3565 January 10, 2008 Ms. Christine Nelson NCDENR — Division of Water Quality 127 Cardinal Drive Extension Wilmington, NC 28405-3845 RE: Savannah Lakes at The Meadowlands — Phase 3 Stormwater Management Application Revisions 3-18660.303 Dear Ms. Nelson: JAN o n'51 On behalf of Centex, we are pleased to submit the Stormwater Management Application for the referenced project. T he following items are attached for your review: Cover Letter and copy of comments •Three (3) sets Construction Plans - revised .Two (2) copies of the Stormwater Report - revised oOne (1) copy of each recorded Declaration of Covenants *One (1) copy Wet Detention Basin Supplement Form (Basins 8A & 8B) a revised *One (1) copy Wet Detention Basin Inspection and Maintenance agreement (Basins 8A and 8B) -revised eOne (1) Designer's Certification for Phase 2 • Check in the amount of $500.00 for Review fee *One (1) copy of the WPC Report (10/13/04) and 1/8/08 Seasonal High Water Table Letter Please review the application, and if everything is in order, we respectfully request NCDENR approval of the application. We appreciate your assistance with this project. Please call if you have any questions. Sincerely, THOMAS & HUTTON ENGINEERING CO. Davt& (�a*ttt David Gantt, P.E. 5Wq or� 1a03 imp E C E I V E D JAN 1 1 2008 DWQ PROJ # N:\18660\Docs\Applications\DENER Stormwater Revisions 10-3-07\Revised to High Density\NCDENR-Nelson-L- PH3 submittal revisions 1-10-08.doc SAVANNAH, GEORGIA-CHARLESTON. SOUTH CAROLINA - WILMINGTON, NORTH CAROLINA-BRUNSWICK, GEORGIA CHECK NO: 070159 PAYEE:NCDENR VENDOR NO: 027218 DATE: 01/07/08 @SAFEGUARD- CMENT)MOC LITHO USA CONT-EX KOKES Ns. 070159 IM-1279 KYRTLE BEACH 611 2050 CattPORAtE CETHE DRIVE DATEJan. 07, 2008 SL)47E 200 . MYRTLE BEA04. Sc 29577 $500.00 Five. ROVE 'red Do -a -d 22 C A, rs m �. Bank of America N.A. Ationta,Dekalb Cty CHECKS GREATER THAN $15,000 00 MAY NOT BE SIGNED BY FACSIMILE PAY TOT "E NfD 7 G-R-SER OF . atdinal Dr Ext Wilmington, Nt 28405 Scjp`ICTRrZEU-SMNATURE ?0 1 Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Coleen H. Sullins Director Division of Water Quality January 3, 2008 Mr. Ken Balogh, Divsion President Centex Homes 2050 Corporate Center Drive, Suite 200 Myrtle Beach, SC 29577 Subject: Request for Additional Information Stormwater Project No. SW8 051203MOD Savannah Lakes at the Meadowland, Phases 1-3 Brunswick County Dear Mr: Balogh: The Wilmington Regional Office received a State Stormwater Management Permit Application for Savannah Lakes at the Meadowlands, Phases 1-3 on November 20, 2007. A review of that information has determined that the followina information is needed to continue the stormwater review: 1. The provided deed restrictions issued in October 2004 do not include the requirements found in Section 11.12 of Stormwater Project Number SW8051203MOD issued November i, 2006. Section 11.13 of the permit requires a copy of the deed 'restrictions to be provided within 30 days of recording the plat and prior to selling lots. A modification to this permit cannot be issued until the required deed restrictions for the previously permitted phases are recorded and provided. 2. The designer's certification required in Section 11.9 of Stormwater Permit Number SW8051203MOD issued November 7, 2006 for the stormwater system associated with Phase 2 of the development has not been provided. Please provide the designer's certification for the ponds that have been built or in the process of being built for Phase 2. A modification to this permit cannot be issued until the required designer's certification for the stormwater system has been provided. 3. Please resubmit page 3 of the Wet Detention Basin Inspection & Maintenance Agreements with the corrected depth at which sediment shall be removed from the permanent pool and forebay. This depth should equal the difference between the permanent pool elevation and the sediment removal elevation. 4. Provide the seasonal high water table (SHWT) at each pond location. The SHWT must be at or below the proposed permanent pool elevation in order to maintain the state required storage volume. If the temporary pool is taken up by the SHWT, there is no place to store the required runoff. 'If the SHWT is above the permanent pool, a liner for the pond must be provided or the temporary storage elevation must be raised to ensure sufficient storage will be available and supporting documentation must be provided. Generally, a soils report for all engineered systems is required to estimate the SHWT elevation at each proposed BMP location. The SHWT elevation must also be identified on the pond detail sheet. IVcrthCaro 'na X,aiuraIAY North Carolina Division of Water Quality 127 Cardinal Drive Extension Wilmington, NC 28405 Phone (910) 796-7215 Customer Service Wilmington Regional Office Internet: www.ncwaterquality.org Fax (910) 350-2004 1-877-623-6748 An Equal Opportunity/Affirmative Action Employer— 50% Recycled110°% Post Consumer Paper Ken Balogh January3, 2008 Stormwater Application No. SW8 051203MOD 5. The average head used to calculate the discharge and drawdown from the pond should be should be calculated based on Section 3.5.2 of the 2007 BMP manual. The September 28, 2007 version of the BMP Manual changed the average head equation from H/2 to H/3. 6. Please submit a $500 fee for the additional review required for this application. 7. Please note that due to this project being reviewed in the Express Stormwater Permitting program, only two requests for additional information are permitted. If these issues cannot be resolved in the designated timeframe, the project will be returned. Please note that this request for additional information is in response to a preliminary review. The requested information should be received in this Office prior to January 11, 2008, or the application will be returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143-215.6A. Please reference the State assigned project number on all correspondence. If you have any questions concerning ning this, matter please feel free to call me at (910) 796-7323 or email me at christine.nelson@ncmail.net. Sincerely, Christine Nelson Environmental Engineer ENB/can: S:IWQSISTORMWATERIADDINFO120071051203MOD.dec07 2 cc: David Gantt, Thomas & Hutton Engineering Co. Christine Nelson Wilmington Regional Office Page 2 of 2 THOMAS & HUTTON ENGINEERING CO. 1350 FARROW PARKWAY POST OFFICE BOX 8000 MYRTLE BEACH, SOUTH CAROLINA 29578-8000 TELEPHONE (8431839-3545 FAX (8431839-3565 December 13, 2007 Ms. Christine Nelson NCDENR — Division of Water Quality 127 Cardinal Drive Extension Wilmington, NC 28405-3845 RE: Savannah Lakes at The Meadowlands — Phase 3 Stormwater Management Application Revisions 1-18660.303 IS � 9G 15 j i( c3,4,1Qcl Dear Ms. Nelson: On behalf of Centex, we are pleased to submit the Stormwater Management Application for the referenced project. The foiiowing items are attached for your review: Cover Letter and copy of comments •One (1) Permit Application *Three (3) sets Construction Plans *Two (2) copies of the Stormwater Report *One (1) copy Wet Detention Basin Inspection and Maintenance agreement (Basins 8A and 8B) --re�✓ised *One (1) copy Wet Detention Basin Supplement Form (Basins 8A) o Check in the amount of $1000.00 for Review fee *Two (2) Overall Post Development Drainage Plan One (1) recorded deed restrictions Please review the application, and if everything is in order, we respectfully request NCDENR approval of the application. We appreciate your assistance with this project. Please call if you have any questions. Sincerely, THOMAS & HUTTON ENGINEERING CO. [D vvi& (�aettt David Gantt, P.E. N:\18660\Docs\Applications\DENER Stormwater Revisions 10-3-07\Revised to High Density\NCDENR-Lewis-L- PH3 submittal revisions.doc SAVANNAH, GEORGIA ' CHARLESTON, SOUTH CAROLINA ' WILMINGTON, NORTH CAROLINA ' BRUNSWICK, GEORGIA 10 120707 12/07/07 10 1120707 1 12/07/07 UJ 71511 ML LP 3 Invoice total Vendor payment 1,000.00 1,000.00 1,000.00 JAN 0 2 2001 D DIVISION COASTAL MANAk'..'EMENT 3. AJ Total vendor payment 1,000.00 1,000 .00 U, 1,000 00 CHECK NO: 069627 PAYEE:NCDENR VENDOR NO: 027218 DATE: 12/12/07 @SAr-EGUARD,,. CK7JCNTX3VCC LITHO USA =W.W 19 1 jLq !Ml�—J Vv- i CENTEX 1114113104ES NO. 069627 64-1278 MYRTLE BEACH .. 611 2050 CORPORATE CENTRE DRIVE DATE. Dec. 12, 2007 SUITE 200 MYRTLE BEACK, SC 2S677 *****"$1,000.00 One Tbogsand Pollars and 02. SQ.gsts G A Bank of America N.A. Atlanta,Dekalb Cty' CHECKS GREATER THAN $15,000 00 MAY NOT BE SIGNED BY FACSIMILE PAY TO THE NCCIENR ORDER OF 121 Cardinal e Ext Wilmington, 28405 SiONATVRE PPWMMT NATURE NP I'm C39 C3 2 WO 1: 0 r3 I L 12 ? 13131: 3 299913 12 3 Slim THOMAS & HUTTON ENGINEERING CO. 1350 FARROW PARKWAY POST OFFICE BOX 8000 MYRTLE BEACH, SOUTH CAROLINA 29578-8000 TELEPHONE 4843) 839-3545 FAX f8431839-3565 December 13, 2007 Christine Nelson Environmental Engineer 127 Cardinal Drive Ext. Wilmington- North Carolina 2R405-IR45 Re: Request for Additional Information Stormwater Project No. SW8051203MOD Savannah Lakes at the Meadowlands, Phases 1-3 J-18660.303 Dear Ms. Nelson: To address the comments faxed on 12/5/07 of your review of the above -referenced project, a point -by -point response is provided as follows: 1. Please provide two copies an overall site map delineating the property boundary, pond drainage areas, and the various phases of the project. a. See the included Overall Post Development Drainage Plan. 2. Please note that Phase I and Phase 2 are now included in Permit No. SW8051203. Update sheet 2 of the plans to remove the rescinded permit number SW8041119. a. Sheet 2 of the Site Development Plans have been changed per your request to only reference Permit No SW805120. 3. Please provide the designers certification for ponds that have been built or in the process of being built for Phases 2, 3A, and 3B. a. A_ designer's certification form is forthcoming upon further field investigation. 4. Provide recorded deed restrictions for Phase 2 and Phase 3, if available. a. The deed restrictions for Meadowlands Golf Course have been utilized for Phase 1 of Savannah hakes and will also be used for Phase 2 and 3. 5. The information presented in Section X..3 through Section X..8 of the application should reflect the entire project area, not just Phase 3. a. All information presented in Section III.3 through Section III.8 now reflect the required data for all 3 phases of the project. 6. Section X..9 should provide information on the drainage areas for each pond in all phases of project. Since Pond 3A is the Forebay for Pond 3, please combine the two drainage areas to detail the entire area treated in Pond 3. N:\18660\Dots\Correspondence\NCDENER-L-Nelson-Express Permit Comments (12-5-07).doc 1 of 4 SAVANNAH, GEORGIA-CHARLESTON, SOUTH CAROLINA - WILMINGTON, NORTH CAROLINA-BRUNSWICK, GEORGIA a. All drainage areas for all phases are now shown. 7. The drainage area for Pond 8A in the table for Section III.9 is slightly different than the drainage are presented in the map for Phase 3C in Section 3 of the Report. Please Verify. a. Since Lake 7 is acting as a forebay for Lakes 8A and 8B it is not modeled thus the Lake 7 Drainage Area has been added to Lake 8A and 8B using the best engineering judgment. Therefore, if you add the areas from the post development Phase 3C exhibit (5.79+4.52+4.69=15AC) and the revised Area used to analyze Lake 8A and 8B (8.05+6.95=15AC) they are now the equal. 8. Verify that the impervious areas presented in the application, supplements, and calculations for Ponds 8A and 8B are consistent. a. All of these values are now consistent. 9. In the calculations, the pond depth used to determine the SAIDA ratio was identified as the permanent pool depth and the sediment removal depth. The Depth of the permanent pool is considered to be from the permanent pool elevation to the top of the sediment cleanout elevation and does not include the minimum 1 foot sediment accumulation depth. However, the average pond depth -crust be used when determining the SAIDA value from the tables provided in the 2007 BMP Manual. (refer to Figure 10-2b of the 2007 BMP manual) a. The average pond depth is now used for all calculations. 10. Please verify the table of elevations, areas, and volumes presented in the calculations for the Ponds 8A and 8B. a. It appears that the permanent pool volume includes the one foot of sediment accumulation depth. The permanent pool is considered to be just the depth from the permanent pool to the sediment cleanout elevation (refer to figure 10-2b of the 2007 BMP manual. i. The permanent pool volume calculations now begin 1 foot above the floor elevation of the permanent pool to account for sediment accumulation depth. b. The Temporary storage volume for these ponds was determined based on a one. - foot difference between the temporary pool elevation and the permanent pool elevation instead of the actual distance. i. The incremental volume calculations are now based off of the actual difference between each elevation. c. The forebay table for Pond 8B only goes to an elevation of 24 ft and does not include the elevation to the permanentpool. i. The forebay volume is now calculated up to the permanent pool elevation. d. When adjusting the permanent pool calculations, please verify the volume calculation for the bottom of the pond. The current calculated incremental N:\18660\Docs\Correspondence\NCDENER-11-Nelson-Express Permit Comments (12-5-07).doc 2 of 4 volume from the bottom elevation of 18.5 to 19.0 is calculated based on a one foot difference instead of a 0.5 foot difference. L The incremental volume calculations are now based off of the actual difference between each elevation. IL The Temporary pool Surface area reported on the supplement sheets for both Pond 8A and 8B are inconsistent with the calculation. a. All of these values are now consistent. 12 For Pond 8A, the supplement sheet appears to be reporting the forebay percent of the permanent pool volume incorrectly. Please verify. a. The supplement sheet has been corrected. 13. On the pond detail located on plan sheet 24A, please identify the following: a. The sediment cleanout elevation for Ponds 8A and 8B. L The sediment cleanout elevation has been added to the summa.-i table as requested. b. The seasonal high water table (SHWT) for Ponds 8A and 8B. The permanent pool must be above the SHWT. Provide a soils report identifying the SHWT and each location. L The permanent pool elevations for Ponds 8A & 8B are set at 25.00, and are above the adjacent permanent pool elevation of the abandoned borrow pit at 24.14 as per field survey. c. The slopes surrounding the pond above the permanent pool will have a 3:1 slope. a. A note stating the required slopes has been added to the detail as requested. 14. Please verify that the permanent pool elevation for Pond 8B is above the lowest elevation of the adjacent wetland. If the permanent pool is below the adjacent wetlands, a liner will need to be needed to prevent draining of the wetlands. a. As seen on the revised Plan Sheet 9 the current water level of the wetland is at 24.14 as per field survey. 15. On the outlet detail located on plan sheet 25, please identify the permanent pool and temporary pool elevations. a. Elevations have been added to the summary tables per your request. N:118660\Docs\Correspondence\NCDENER-L-Nelson-Express Permit Comments (12-5-07).doc 3 of 4 16. Please submit a $1, 000 fee for the additional review required for this application. a. The fee has been included per your request. If all comments have been sufficiently addressed, we are respectfully requesting approval. Please let me know if you have any questions or need further information. Sincerely, THOMAS & HUTTON ENGINEERING CO. 1�4 1141 Nickey Lewis, E.I.T. N:\18660\Docs\Correspondence\NCDENER-L-Nelson-Express Permit Comments (12-5-07).doc 4 of 4 VAT4 Q 0 December 5, 2007 Mr. Ken Balogh, Divsion President Centex Homes 2050 Corporate Center Drive, Suite 200 Myrtle Beach, SC 29577 Michael F. Easley, Governor William G. floss Jr., Secretary North Carolina Department of Environment and Natural Resources Subject: Request for Additional Information Stormwater Project No. SW8 051203MOD Savannah Lakes at the Meadowland, Phases 1-3 Brunswick County Dear Mr. Balogh: Coleen H. Sullins Director Division of Water Quality The Wilmington Regional Office received a State Stormwater Management Permit Application for Savannah Lakes at the Meadowlands, Phases 1-3 an November 20, 2007. A preliminary review of that information has determined that the following information is needed to continue the stormwater review: 1. Please provide two copies an overall site map delineating the property boundary, pond drainage areas, and the various phases of the project. 2. Please note that Phase 1 and Phase 2 are now included in Permit No. SW8051203. Update Sheet 2 of the plans to remove the rescinded permit number SW8 041119. 3. Please provide the designers certification for ponds that have been built or in the process of being built for Phases 2, 3A, and 313. 4. Provide recorded deed restrictions for Phase 2 and Phase 3, if available. 5. The information presented in Section 111.3 through Section 111.8 of the application should reflect the entire project area, not just Phase 3. b. Section I1i.9 should provide information on the drainage areas for each pond in all phases of the project. Since Pond 3A is the forebay for Pond 3, please combine the two drainage areas to detail the entire area treated in Pond 3. 7. The drainage area for Pond 8A in the table.for Section 111.9 is slightly different than the drainage area presented in the map for Phase 3C in Section 3 of the Report. Please verify. 8. Verify that the impervious areas presented in the application, supplements, and calculations for Ponds 8A and 8B are consistent. Ale Cu;= aro 8 rat North Carolina Division of Water Quality 127 Cardinal Drive Extension Wilmington, NC 28405 Phone (910) 796-7215 Customer Service Wilmington Regional Office Internet: www.ncwaterauali .or¢ Fax (910)350-2004 1-877-623-6748 An Equal Opportunity/Affirmative Action Employer— 50% Recycledl10% Post Consumer Paper Ken Balogh December 5, 2007 Stormwater Application No. SW8 051203MOD 9. In the calculations, the pond depth used to determine the SA/DA ratio was identified as the permanent pool depth and the sediment removal depth. The depth of the permanent pool is considered to be from the permanent pool elevation to the top of the sediment cleanout elevation and does not include the minimum 1-foot sediment accumulation depth. However, the average pond depth must be used when determining the SA/DA value from the tables provided in the 2007 BMP manual. (refer to Figure 10-2b of the 2007 BMP manual) 10. Please verify the table of elevations, areas, and volumes presented in the calculations for the Ponds 8A and 8B. a. It appears that the permanent pool volume includes the one -foot of sediment accumulation depth. The permanent pool is considered to be just the depth from the permanent pool to the sediment cleanout elevation (refer to Figure 10-2b of the 2007 BMP manual). b. The temporary storage volume for these ponds was determined based on a one -foot difference between the temporary pool elevation and the permanent pool elevation instead of the actual difference. c. The forebay table for Pond 8B only goes to an elevation of 24 ft and does not include the elevation to the permanent pool. d. When adjusting the permanent pool calculations, please verify the volume calculation for the bottom of the pond. The current calculated incremental volume from the bottom elevation of 18.5 to 19.0 is calculated based on a one -foot different instead of a 0.5-foot difference. 11. The temporary pool surface area reported on the supplement sheets for both Pond 8Aand 8B are inconsistent with the calculations. 12. For Pond 8A, the supplement sheet appears to be reporting the forebay percent of the permanent pool volume incorrectly. Please verify. 13. On the pond detail located on plan sheet 24A, please identify the following: a. The sediment cleanout elevation for Ponds 8A and 8B b. The seasonal high water table (SHWT) for Ponds 8A and 8B. The permanent pool must be above the SHWT. Provide a soils report identifying the SHWT at each location. c. The slopes surrounding the pond above the permanent pool will have a 3:1 slope. 14. Please verify that the permanent pool elevation for Pond 8B is above the lowest elevation of the adjacent wetlands. If the permanent pool is below the adjacent wetlands, a liner will be needed to prevent draining the wetlands. 15. On the outlet detail located on plan sheet 25, please identify the permanent pool and temporary pool elevations. 16. Please submit a $1,000 fee for the additional review required for this application. Page 2 of 3 Ken Balogh December 5, 2007 Stormwater Application No. SW8 051203MOD Please keep in mind that changing one number will change other numbers and require the calculations, supplements, and other supporting documentation to be updated. Verify all numbers are correct to ensure consistency in the application documents. Please note that this request for additional information is in response to a preliminary review. The requested information should be received in this Office prior to December 14, 2007, or the application will be returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143-215.6A. Please reference the State assigned project number on all correspondence. If you have any questions concerning this matter please feel free to call me at (910) 796-7323 or email me at christine.nelson@ncmail.net. Sincerely, Christine Nelson Environmental Engineer ENB/can: S:IWQSISTORMWATERIADDINF0120071051203MOD.dec07 cc: David Gantt, Thomas &' Hutton Engineering Co. Christine Nelson Wilmington Regional Office Page 3 of 3 WIDENR North Carolina Departmont of Environment and Natural Resources 127 Cardinal Drive Extension, Wilmington, NC 28405 (910)796-7215 FAX(910)350-2004 Request 'Fen Express Permit Rev ewr Reviewer — Submit Time IC) Confirm %. O-ZZ_- b 4 FILL-IN all information below and CHECK required Permigs). 13 ns % r'\ FAX to Express Coordinator along with a detailed narrative and vicinity main of the project location. Projects must be submitted by 5.00 pm the day before the review date, unless prior arrangements are made. APPLICANT Name K_ en Balogh Title Centex Myrtle Beach Division President Company Name Centex Homes Address 2050 Corporate Center Drive, Suite 200 _City Myrtle Beach, SC Zip 29577 Phone 843-839-3545 Fax 843-839-3565 Email kbalo h@centexhomes.cam PROJECT Name Savannah Lakes at the Meadou-lands Phase 3 County Brunswick Count PROJECT DRAINS TO The Singletree Canal (Stream name) in the Lumber RIVER BASIN ENGINEER/CONSULTANT INFORMATION: Name David GanttP,E. Company Thomas & Hutton Engineerinai Address 1350 Farrow Parkway City My!g Leach State SC Zip 29577 Phone 843-839.3545 Fax 843-839-3565 Email t;d@tho ----------------------------------------------------- 9Anttd@thomas-hutton.co � -- State or National Environmental Polio Acts SEPA _-_._------ �` --------------- -�'S°5:.��� ....,..__�„...................__ y ( or NEPA) EA or EIS Required? Dyes No ........................,.._.._._.._..,,........._......._ ro �SrREAM ORIGIN DETERMINATION i �# of Stream Calls Stream name Shin p r� ietree Swag �.._. -------------------------------------------------------- ----------------------------------------------------------------------------------------- --- ® STORMWA TER [) Low Density El High Density -Detention Pond❑ High Density - Other (check all that apply) ® Low Density -Curb & GutterONPDES High Density -Infiltration Off -site Wetlands MUST be addressed below Phase Il B Plan Revision ------- ---------- ----- ------------------------ CCAiST,�L ❑Excavation &Fill ❑Bridges &Culverts ---"--_-----"""�_____-_-__ M,�NA�vEMEI�lT ❑Structures Information ® Upland Development ❑ Marina Development ❑ Urban Waterfront ---------------------------------------------------------------------------- --------- ------------------------ ----.-------------------- ------------- _LAND QUALITY 0 Erosion and Sedimentation: Control Plan with 31.76 acres to be disturbed _--....,.1-1---------- -..................... .--------- ------------------------------ ,...... ----................ WETLANDS (401) Wetlands on Property? ® Yes ❑ No Isolated Wetlands on Properly?❑ Yes M No (Check all that apply) Wetlands will be impacted? ® Yes ❑ No Wetland impacts: 2.59± acre(s) Wetlands delineation has been completed? Z Yes ❑ No Z Buffers impacted: 0.0.0t Acre(s) USACOE Approval of Delineation completed? ® Yes ❑ No 404 Application in Process w/USACOE? 0 Yes ❑ No / Permit recv'd from USACOE ❑Yes ❑ No 401'Application Required? ® Yes ❑ No If Yes ❑ Regular � Express Additional fees, not to exceed 50% of the original Express Review permit application fee may be charged for subsequent reviews due to the insufficiency of the permit application. Total Feel Stormwater $ LAMA $ LQS $ 401 $ Glo�i�c�. TO d'pwo� ar` to-tp-o-+ to - I D -o1' Date Received E C E I V D OCT 10 2007 DWO PROJ # Project Name: Savannah Lakes Phase 3 Stormwater Express Questionnaire (7/10/2007) What is the applicant's full legal name? Ken Balogh Is the applicant associated with 8 Sole proprietor ® Corporation ❑ LLC Partnership [,I Municipality If it's an LLC, is it ❑ Manager -managed or ❑ Member -managed? OWhat is the applicant's title within the Corp., LLC or Partnership? Division President Will an agent (someone other than the applicant) be signing the application? ❑ Yes ® No If Yes, what is the agent's name and title? pr Please note the application signature requirements are listed in NCAC 2H.1003 (e). in summary, only the sole proprietor of a sole proprietorship, the designated manager, member - manager, president or vice president of a corporation or LLC, the general partner of a partnership, or a ranking official of a munlcipallty may sign permit applications and supplements. The signature of the engineer or other agent can be accepted only if accompanied by a signed letter of authorization from one of the aforementioned individuals. Corporations, LLC's and Partnerships must be registered with the NC Secretary of State's Office, and be active. Please note that speNing, capitalization, and punctuation are extremely important. Please provide the entity name exactly as on lit with the NC Secretary of State. 2 Where is the project located? County of Brunswick Nearest Town is the Town of Carolina Shores gzl (Attach a detailed vicinity map with both local street names and SR, NC, US or interstate W highlway numbers, plus other relevant information such as town or city narnes, directions to, etc. the nearest intersection of two major roads on the vicinity map. A major road is any 1, 2 or ov NC, US or interstate highway.) o project is located in Brunswick, Onslow, or New Hanover Counties, or a small W �—n of northern Pender County or the unincorporated areas outside of Morehead City ,� v �Jd ,tlantic Beach in Carteret County, NPDES Phase 11 Post -Construction rules will o , unless a vested development right, as described in the Session Law, can be W O nstrated, which is dated prior to July 1, 2007. 3. i6at is the name of the receiving stream? Shingle Tree Swamp What River Basin is it located in? Lumber What is the classification of the receiving stream? C Sw For SA or SR waters, a separate scaled topographic map will be required The project must be accurately located on the map and the % mile radius from the property comer closest to the SA or SR receiving stream must he drawn on the map. If you claim that the project is not within, ;x mile of SA or SR waters, you must conduct a series of chlorides tests to demonstrate that the chlorides level at a point in the receiving stream that is at least '/a mile from the project is less than 500 ppm. Samples must be sent to a State certified lab for testing. 4. If the project is high density, what type of stormwater management BMP's are being proposed? (check all that apply) Wet Detention Infiltration Trench Infiltration Basin B Sand Filter Bio-retention Wetlands Alternative Offsite Dry Detention NPDES Phase II Other How many separate BMP's are being proposed? © 2 3 4 5 6 7 8 9 10 11 12 Other 5. Is there offsite runoff from the adjacent properties or public right-of-wa that will drain into any of the proposed BMP's on the project and is not being diverted? [ Yes ® No ❑ NIA 6. is a road across other property required to access the project? ❑ Yes ® No ❑ N/A Page 1 of 2 Project Name: Savannah Lakes Phase 3 7. Is there any existing development or pre-1988 existing BUA located on the pro arty? (Please document, delineate and identify on the plans.) ElYes No ❑ NIA 8. Will the high density project collect all of the proposed BUA? ® Yes ❑ No ❑ N/A (If not, attach a separate explanation sheet) 9. Will the project involve the subdivision and sale of property? ® Yes ❑ No ❑ NIA Is the subdivision ® residential or ❑ commercial? How many lots are proposed? 100 Single Family Lots (Deed restrictions are required for all residential, commercial, low density or high density sub- divisions. Specific language for the various types of subdivisions is available from DENR.) 10. Will the plans show all delineated wetlands? ®Yes ❑ No ❑ N1A (All projects require either a signed wetlands delineation map or a wetlands report to be submitted with the application. Only a trained professional may provide information regarding the presence or absence of wetlands.) 11. Are wet detention ponds or other engineered controls proposed to be located ad'acent wetlands? ® Yes No ❑ NIA (If, yes, a physical means to prevent the dewatering of the wetland must be provided, or the SHWT must be provided to demonstrate that the permanent pool of the BMP is above the SHWT and will not dewater the wetlands over time. Where possible, all BMP's and swales should outlet into back the wetland (with level spreaders). 12. For infiltration projects, a site visit must be completed with the DENR soils scientist to verify the soil type, water table and infiltration rate provided in the soils report. What is/was the scheduled site visit date? N/A (include a copy of the consultant's soil repari with the application.) 13. Level Spreaders are required at the outlet of all engineered controls and swales rior to entering surface waters or wetlands. Will the plans reflect level spreaders? []Yes No ❑ N/A (The purpose of the level spreader is to reduce the energy of the incoming runoff and to promote diffuse sheet flow to prevent erosion and scour into the receiving waters or wetlands.) 14. Is this project A modification to an existing permit A lot that will be treated In an existing, previously permitted BMP? What is the name of the existing permitted facility? Savannah Lakes at the Meadowlands. Phase 3 What is the permit number of the existing permitted facility? SW8 051203 is the permitted facility in compliance with its permit? Yes No NIA Have the deed restrictions been recorded? Yes H No N/A Have the deed restrictions been submitted? Yes No N/A Has the Designer's Certification been submitted? Yes No N/A 15. Do the plans reflect all information in 15A NCAC 2H.1003 (g)? ® Yes ❑ No ❑ NIA 16. Will all of the design requirements for each proposed BMP be met? ® Yes ❑ No ❑ N/A (if not, attach a separate explanation sheet Please note that the Express program is not set up to handle any type of deviation from the standard design.) 17. For each BMP in all high density projects, and low density curb outlet Swale projects, the individual drainage area for each proposed BMP must be clearly delineated. 18. Any revisions made to the application as a result of this review may cause changes to the other documentation. Plans, calculations, application, and supplements should be reviewed for any necessary changes. For example, changing the orifice size will require a modification to the calculations, the pond details on the plans, and page 1 of the supplement. it tr E P4 Page 2 of 2 nrT in 2QQ7 F! il PR®J # PROJECT NARRATIVE FOR SAVANNAH LAKES AT MEADOWLANDS PHASE 3 PREPARED FOR CEllITEX HOMES Savannah Lakes at the Meadowlands, Phase 3 is the final phase of the proposed planned unit development adjacent to the Meadowlands Golf Club in southern Brunswick County. The proposed residential development ultimately consists of 275 combined lots for phases 1 through 3. Phase 3 consists of 100 residential lots, water system, sewer system, drainage system, and roads. This project was previously approved through the Express Permit Review on 3/8/06 and is identified under the existing permit number SW8051203 which is now being submitted for a modification due to the latest changes to the Phase 3C layout. Phase 3A and Phase 3B have not been modified. Sediment and erosion control devices will consist of temporary silt fencing, grassing and sodding, stone check dams, rip -rap stabilization at drainage outlets and ditch intersections, curb inlet protection, and grate inlet protection. All drainage from this project will flow into the Shingletree Canal. The drainage system and detention facilities will be privately owned and maintained. The drainage outfalls to the wet detention ponds have been provided with rip rap stabilization. All sediment and erosion control devices will be in -place prior to construction or constructed as necessary. The project engineer and designated agents for the owner will monitor all sediment and erosion control devices during construction. The sediment and erosion devices will be removed after permanent stabilization of the site has been accomplished. The changes to the previously approved plans are isolated to Phase 3C and include the preservation of the abandoned borrow pit/wetland and the large existing wetland. The previous Phase 3C included one large lake by the name of Proposed Lake 7. There are now 3 separate lakes contained in the Phase 3 by the name of Lake 7, Lake 8A, and Lake 8B. Lake 7 provides an interconnection link to Lake 8A and Lake 8B which discharge to the Shingletree Canal through a weir system designed to meet or exceed the BMP standards. NOTE: Please reference the Stormwater Report for sediment and drainage calculations. CONSTRUCTION SEQUENCE I. SILT FENCEITEMP. SEDIMENT BASINS 2. CLEARING AND GRUBBING/TEMPORARY DIVERSIONS 3. ROUGH GRADING 4. SEWER SYSTEM 5. DRAINAGE SYSTEM 6. OTHER EROSION CONTROL DEVICES INSTALLED 7. WATER SYSTEM 8. ROADS 9. FINAL GRASSING *Construction plans show actual construction sequence, the above sequence is general. D N:1186601DocslApplications\DENER Stormwater Revisions 10-3-071Narrative 10-03-07.doc ECEIVED OCT 10 2007 DW Q PROD # about:blank Savannah Lakes at the Meadowlands, Phase 3 October 10, 2007 Gentlemen: The Express Permitting Group is in receipt of the Express Permit Request for: Stream Origin Determination Stormwater Coastal Management Land Quality 401 The Land Quality portion has been forwarded to Carol Miller and Carol should be in touch with you shortly. Joanne Steenhuis is working with the 401 request which is already in house. She has been in touch with someone named Nicky. The project was submitted in the name of "The McLamb Tract". A copy of your request has been forwarded to Jason Dail with Coastal Management. Please contact Jason directly to determine whether or not you need a Coastal Management Permit. The stormwater submittal date will be set up in the next day or so. I will be back in touch with that. It was determined that you do not need a stream origin determination. Thanks, Janet Russell Express Permitting 1 of 1 10/10/2007 4:48 PM about:blank Savannah Lakes at the Meadowlands, Phase 3 October 12, 2007 Gentlemen: The Express stormwater submittal meeting has been scheduled with Christine Nelson on November 15, 2007 at 10:00 AM herein the Wilmington Regional Office. * Mr. Balogh with Centex Homes is required to attend the submittal meeting. Please carefully review the attached submittal requirements and contact Christine or me if you have questions. Please respond within 2 business days to confirm and reserve the submittal date of Nov. 15th. Thanks, Janet Russell Express Permitting 1 of 1 10/12/2007 12:02 PM aboui.. Savannah Lakes at the Meadowlands, Phase 3 October 19, 2007 Gentlemen: The stormwater submittal meeting for Savannah Lakes at the Meadowlands, Ph. 3 has been scheduled for review by Christine Nelson on November 15, 2007 at 10:00 AM here in the Wilmington Regional Office. The applicant from Centex Homes is required to attend the meeting. We offered you the appointment last week, but have not received a confirmation from you. If this date/time works for you, I must have a written confirmation (by return email) ASAP. Thank you, Janet Russell Express Permitting 1 of 1 10/19/2007 12:18 PM Wilmington Region - Express Permitting - Savannah Lakes Phase 3 Subject: Wilmington Region - Express Permitting - Savannah Lakes Phase 3 From: "Lewis, Nickey" <lewis.n@thomas-hutton.com> Date: Mon, 22 Oct 2007 17:01:50 -0400 To: "Janet Russell' <Janet.Russell@ncmail.net> CC: "Gantt, David" <gantt.d@thomas-hutton.com>, "Hussey, Ida" <hussey.i@thomas-hutton.com> Janet, The NCDENR stormwater review of the Savarmah Lakes Phase 3 project is acceptable for the scheduled date of November 15, 2007, at 10:00 AM. Thanks, Nickey Lewis, E.I.T. Designer II Thomas & Hutton Engineering Co. www.thomas-hutton.com lewis. nathomas-hutton.com (P) 843-839-8444 (F) 843-839-3565 "Relationships and Solutions for Success" From: Janet Russell [mailto:Janet.Russell@ncmail.net] Sent: Friday, October 19, 2007 12:19 PM To: Gantt, David; kbalogh@centexhomes.com Subject: Savannah Lakes at the Meadowlands, Phase 3 Savannah Lakes at the Meadowlands, Phase 3 October 19, 2007 Gentlemen: The stormwater submittal meeting for Savannah Lakes at the Meadowlands, Ph. 3 has been scheduled for review by *Christine Nelson on November 15, 2007 at 10:00 AM here in the Wilmington Regional Office.* The applicant from Centex Homes is required to attend the meeting. We offered you the appointment last week, but have not received a confirmation from you. if this date/time works for you, I must have a written confirmation (by return email) ASAP. Thank you, Janet Russell Express Permitting PRIVILEGED AND CONFIDENTIAL: This electronic message and any attachments are confidential property of Thomas & Hutton Engineering Co. The information is intended only for the use of the person to whom it is addressed. Any other interception, copying, accessing, or disclosure of this message is prohibited. if you have received this message in error, please immediately notify Thomas & Hutton Engineering Co. and purge the message received. Do not forward this message without permission. 1 of 1 10/22/2007 5:12 PM U.S. ARMY CORPS OF ENGINEERS W ILMINGTON DISTRICT Action 1D. SAW-2006-40566 County: Brunswick USGS Quad: Calabash GENERAL PERMIT (REGIONAL AND NATIONWIDE) VERIFICATION Property Owner / Authorized Agent: Meadowlands Golf Club, Inc. Address: PO Box 4159 Calabash, NC 28467 Telephone No.: (910) 579-3737 Size and location ofproperty (water body, road name/number, town, etc.): The 33.594 acre tract is located in the southwest corner of the intersection of SSR 1302 and 1330m near Calabash Brunswick County, NC The Project is for Savannah Lakes subdivision Phase 3C. parcel# 22500098. Description of projects area and activity: Excavation of and discharge of fill material into 0.104 acres of jurisdictional waters and wetlands for the purpose of constructing the infrastructure for the Proposed Savannah Lakes Phase 3C 29).. Savannah Lakes subdivision has received two rior ermits 39 totalling 0.31 acres of impacts to jurisdictional areas fSAW 2006-40566 and S4W 2004-468) 'Phis brines the total Impact for this subdivision to 0.414 acres of waters of the US impacted This Permit is contingent on 401 Water Ouaw Certification. Applicable Law: ® Section 404 (Clean Water Act, 33 USC 1344) [} Section 10 (Rivers and Harbors Act, 33 USC 403) Authorization: Regional General Permit Number: Nationwide Permit Number: 29 Your work is authorized by the above referenced permit provided it is accomplished in strict accordance with the attached conditions and your submitted plans. Any violation of the attached conditions or deviation from your submitted plans may subject the permittee to a stop work order, a restoration order and/or appropriate legal action. This verification will remain valid until the expiration date identified below unless "the nationwide authorization is modified, suspended or revoked. If, prior to the expiration date identified below, the nationwide permit authorization is reissued and/or modified, this verification will remain valid until the expiration date identified below, provided it complies with all requirements of the modified nationwide permit. If the nationwide permit authorization expires or is suspended, revoked, or is modified, such that the activity would no longer comply with the terms and conditions of the nationwide permit, activities which have commenced (i.e., are under construction) or are under contract to commence in reliance upon the nationwide permit, will remain authorized provided the activity is completed within twelve months of the date of the nationwide permit's expiration, modification or revocation, unless discretionary authority has been exercised on a case -by -case basis to modify, suspend or revoke the authorization. Activities subject to Section 404 (as indicated above) may also require an individual Section 40!-Water Quality Certification. Year should contact the NC Division of Water Quality (telephone (919) 733-1786) to determine Section 401 requirements. For activities occurring within the twenty coastal counties subject to regulation under the Coastal Area Management Act (CAMA), prior to beginning work you must contact t. Division of Coastal Management in Wilmington, NC at 910-796-7215 This Department of the Army verifdd does t relieve the permittee of the responsibility to obtain any other required Federal, State or local approvals/permits. ' If there are any questio regartal g this ven c lion, of con ons of the Permit, or the Corps of Engineers regulatory program, please contrad berlyvey at �51 4 8 Corps Regulatory (ffc al N rlovc Date: 8/27/2007 ExpirationDateo Ve' ati 08/2 20The Wilmington District is committed to providing the pp to the public. To help us ensure we continue to do so, please complete the attached customer Satisfaction Survey or visit htt .//vmv.saw.usace.army.miVWETLANDS/index htnil to complete the survey online. Page 1 of 2 ACTION ID # SAW-2006-40566 SPECIAL CONDITIONS: 1) The Permittee shall execute and cause to be recorded in the Brunswick County Register of Deeds the Restrictive Covenant Language or similar mechanism (see attached) for the purpose of maintaining 7.746 acres wetlands and 3.15 acres of upland buffer, as shown on the Wetland Masterplan, dated July 2007 and prepared by S&ME, in their natural and/or mitigated state in perpetuity, prior to the sale or conveyance of any portion or all of the 33.954 acre tract. At the time of recordation of the Covenants, the Permittee must also record with the Brunswick County Register of Deeds, a final survey map of the development, sealed by the licensed surveyor, which clearly depicts the surveyed areas of Conservation and lot/inftastructure layout. 2) These provisions relating to wetlands cannot be amended or modified without the express written consent of the U.S. Army Corps of Engineers, Wilmington District. *This includes changes as a result of any local government drainage easement requirements*. The permittee shall enforce the terms of the Covenants and, prior to conveyance of the property, shall take no action on the property described in the Covenants inconsistent with the terms thereof. The permittee shall provide a copy of the recorded Covenants and recorded Survey to the Corps of Engineers within 15 days of recording. The Permittee, or any future responsible party/laud owner, must obtain written consent of the U.S. Army Corps of Engineers, Wilmington District, prior to any activities associated with the maintenance of or access to the flood -control inlet structures and culverts located in the jurisdictional wetlands. This e reco ation of the su sl n Restrictive Covenants, to ensure provision must be includ continued comuliance_.NAth this Permit ' 'on. Corps Regulatory Determinations of Jurisdiction: ❑ Based on preliminary information, there appear to be waters of the US including wetlands within the above described project area. This preliminary determination is not an appealable action under the Regulatory Program Administrative Appeal Process ( Reference 33 CFR Part 331). ❑ There are Navigable Waters of the United States within the above described project area subject to the permit requirements of Section 10 of the Rivers and Harbors Act and Section 404 of the Clean Water Act. Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification ❑ There are waters of the US and/or wetlands within the above described project area subject to the permit requirements of Section 404 of the Clean Water Act (CWA)(33 USC § 1344). Unless there is a change in the Iaw or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. ® The jurisdictional areas within the above described project area have been identified under a previous action. Please reference jurisdictional determination issuedl/28/2005. Action ID SAW- 2004-468 The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the attached customer Satisfaction Survey or visit http://www.saw.usace.army.rnil/WETLANDS/index html to complete the survey online. Copy Furnished: I&. Charles C. Oates, S&ME, Inc.,1330 Highway 501 Business, Conway, SC 29526 Joanne Steenhuis, DENR-DWQ, WiBO, 127 Cardinal Drive Ext., Wilmington, NC 28405 Page 2of2 Action ID Number: SAW 2006-40566 County:Brunswick Permittee: Meadowlands Golf Club, Inc. Date Verification Issued: 8/27 2007 Project Manager: Kimberl Garve Upon completion of the activity authorized by this permit and any mitigation required by the permit, sign this certification and return it to the following address: US ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT WILMINGTON REGULATORY FIELD OFFICE POST OFFICE BOX 1890 WILMINGTON, NORTH CAROLINA 28402-1890 Please note that your permitted activity is subject to a compliance inspection by a U. S. Army Corps of Engineers representative. If your fail to comply with this permit you are subject to permit suspension, modification, or revocation. I hereby certify that the work authorized by the above referenced permit has been completed in accordance with Cue terms and condition of the said permit, and required mitigation was completed in accordance with the permit conditions. Signature of Permittee Date RESTRICTIVE COVENANT GUIDANCE August, 2003 Often, developers of residential or commercial subdivisions subject the property on which the subdivision is built to restrictive covenants, that include provisions such as setbacks, types of homes/buildings that can be built, etc. If the District has determined that restrictive covenants are acceptable as a means of preserving mitigation property, the following language can be added to those restrictive covenants: "The areas shown on the recorded plat (identify the plat by title, date, and recording data) as conservation areas shall be maintained in perpetuity in their natural or mitigated condition. No person or entity shall perform any of the following activities on such conservation area: a. fill, grade, excavate or perform any other land disturbing activities b. cut,, mow, burn, remove, or harm any vegetation c. construct or place any roads, trails, walkways, buildings, mobile homes, signs, utility poles or towers, or any other permanent or temporary structures d. drain or otherwise disrupt or alter the hydrology or drainage ways of the conservation area e. dump or store soil, trash, or other waste f graze or water animals, or use for any agricultural or horticultural purpose This covenant is intended to ensure continued compliance with the mitigation condition of a Clean Water Act authorization issued by the United States of America, U.S. Army Corps of Engineers, Wilmington District, Action ID , and therefore may be enforced by the United States of America. This covenant is to run with the land, and shall be binding on the Owner, and all parties claiming under it." Usually, restrictive covenants have a provision that the property owners (either all of them or some percentage of them) can amend or modify the restrictive covenants. If that is the case, that provision needs to provide that our required paragraph (usually identified by paragraph number) cannot be amended without the express written consent of the U. S. Army Corps of Engineers, Wilmington District. The permit condition should state that the nermittee will record restrictive cnvenantS_ acceptable to the Corps of Engineers, for the purpose of maintaining the mitigation areas in their natural state in perpetuity, prior to the sale or conveyance of any lots or other property within the subdivision. It is important that the restrictions be recorded prior to the sale of any property within the subdivision (or phase, if it is being developed by phase). If they are not, then any property sold prior to the recording of the restrictive covenant are not subject to those covenants. Suggest the following: 'Termittee shall execute and cause to be recorded in the County Register of Deeds restrictive covenants acceptable to the Corps of Engineers for the purpose of maintaining the conservation areas, as shown on the recorded plat* (identify by title, date, and recording data), in their natural state in perpetuity, prior to the sale or conveyance of any lots or other property within the subdivision. The permittee shall enforce the terms of the restrictive covenants and, prior to conveyance of the property, shall take no action on the property described in the covenants inconsistent with the terms thereof. The permittee shall provide a copy of the recorded restrictive covenants to the Corps of Engineers within 15 days of recording." * It is possible and acceptable that the plat may not be recorded at the time of the issuance of the permit. If that is the case, delete the word "recorded" and be sure you have a copy of a plat showing the conservation areas in the file, and identify it in the permit condition by title and date. The plat, however, must be recorded at the time the restrictive covenants are recorded, and prior to the sale of any lots in the subdivision. 2 ------------------------- PROPOSED ONSITE MITIGATION Proposed upland Buffer: 8.16 Ao. wetlond Preservation: 7.746 Ac. GMPWC SONS f� gIA 12 Kvit-ru itt'N.:UV .a%+aa iJlFt I?7'(1li.Vrf IMPACTSUMMARY Impact Area #'I : Waters of the U.S. - 0,084 Ac, Impact Area #2: Waters of the U,S: 0.020 Ac. TOTAL PROPOSED IMPACTS: 0.104 Ad. NTS i Holton F.n&paMng Co. #S&ME WETLAND MASTERPLAN. ]MURK-W) McLamb Tract Brunawlok County, North Carolina 4 NATIONWIDE PERMIT 29 DEPARTMENT OF THE ARMS CORPS OF ENGINEERS FINAL NOTICE OF ISSUANCE AND MODIFICATION OF NATIONWIDE PERMITS FEDERAL REGISTER . AUTHORIZED MARCH 19, 2007 Residential Developments. Discharges of dredged or fill material into non -tidal waters of the United States for the construction or expansion of a single residence, a multiple unit residential development, or a residential subdivision. This NWP authorizes the construction of building foundations and building pads and attendant features that are necessary for the use -of the residence or residential development. Attendant features may include but are not limited to roads, parking lots, garages, yards, utility lines, storm water management facilities, septic fields, and recreation facilities such as playgrounds, playing fields, and golf courses (provided the golf course is an integral part of the residential development). The discharge must not cause the loss of greater than 1/2-acre of non -tidal waters of the United States, including the loss of no more than 300 linear feet of stream bed, unless for intermittent and ephemeral stream beds this 300 linear foot limit is waived in writing by the district engineer. This NWP does not authorize discharges into non -tidal, wetlands adjacent to tidal waters. Subdivisions: For residential subdivisions, the aggregate total loss of waters of United States authorized by this NWP cannot exceed 1/2 acre. This includes any loss of waters of the United States associated with development of individual subdivision lots. Notification: The permittee must submit a pre -construction notification to the district .engineer prior to commencing the activity. (See general condition 27.) (Sections 10 and 404) ATIO E PFCONDMONS The following General Conditions must be followed in order for any authorization by a N WP to be valid: 1. Navigation. (a) No activity may cause more than a minimal adverse effect on navigation. (b) Any safety lights and signals prescribed by the U.S. Coast Guard, through regulations or otherwise, must be installed and maintained at the permitteds expense on authorized facilities in navigable waters of the United States. '(c) The permittee understands and agrees that, if future operations by the United States require the removal, relocation, or other alteration, of the structure or work herein authorized, or if, in the opinion of the Secretary of the Army or his authorized representative, said structure or work sli cause unreasonable obstruction to the free navigation of the navigable waters, the permitwe will be required, upon due notice from the Corps of Engineers, to remove, relocate, or alter the structural work or obstructions caused thereby, without expense to the United States. No claim shall be made against the United States on account'of any such removal or, alteration. 2. Aquatic Life Movements. No activity may substantially disrupt the necessary life cycle Aovements of those species of aquatic life indigenous to the waterbody, including those species`, that normally migrate through the area, unless the activity's primary purpose is to impound, water. Culverts placed in streams must he installed to maintain low flow conditions. 3. Spawning Areas. Activities in spawning areas during spawning seasons must be avoided to the maximum extent practicable. Activities that result in the physical destruction (e.g., through' excavation, fill, or downstream smothering by substantial turbidity) of an important spawning area are not authorized. 4. Migratory Bird Breed'Breedigg Areas. Activities in waters of the United States that serve as breeding areas for migratory birds must be avoided to the maximum extent practicable. S. Shellfish Beds. No activity may occur in areas of concentrated shellfish populations, unless the activity is directly related to 9 shellfish harvesting activity, authorized by I IVRs 4 and 48. 6. Suitable Material. No activity may use unsuitable material (e.g., trash, debris, car bodies, asphalt, etc.). Material used for construction or discharged must be free from toxic pollutants in toxic amounts (see Section 307 of the Clean Water Act): 7. Water Supply Intakes. No activity may occur in the proximity of a public water supply intake, except where the activity is for the repair or improvement of public water supply intake structures or adjacent bank stabilization. 8. Adverse erects From hmpoundments. If the activity creates an impoundment of water, adverse effects to the aquatic system due to accelerating the passage of water, and/or restricting its flow must be minimized to the maximum extent practicable. 2 9. Management of Water Flows. To the maximum extent practicable, the pre -construction course, cordition, capacity, and location of open waters must be maintained for each activity, including stream channeiization and storm water management activities, except as provided below. The activity must be constructed to withstand expected high flows. The activity must not restrict or impede the passage of normal or high flows, unless the primary purpose of the activity is to impound water or manage high flows. The activity may alter the pre -construction course, condition, capacity, and location of open waters if it benefits the aquatic environment (e.g., stream restoration or relocation activities). 10. Fills Within 100-Year Floodplains. The activity must comply with applicable FEMA- approved state or local floodplain management requirements. I --11. Equipment. Heavy equipment working in wetlands or mudflats must be placed on mats, or other measures must be taken to minimize soil disturbance. . 12. Soil Erosion and Sediment Controls. Appropriate soil erosion and sediment controls must be used and maintained in effective operating condition during construction, and all exposed soil and other fills, as well as any work below the ordinary high water mark or high tide line, must be .permanently stabilized at the.eanlicst practicable date. Permittees arc encouraged to perform work within waters of the United States during periods of low -flow or no -flow. .13. Removal of Temporary Fills. Temporary fills must be removed in their entirety and the affected areas returned to pre -construction elevations. The affected areas must be revegetated, as appropriate. 14. Proper Maintenance. -Any authorized structure or fill shall be properly maintained, including maintenance to ensure public safety. . 15. Wild and Scenic Rivers. No activity may occur in a component of the National Wild and Scenic River System, or in a river officially designated by Congress as a "study river" for possible inclusion in the system while the river is in an official study status, unless the • appropriate Federal agency with direct management responsibility for sucb river, has determined ;n writing that the proposed activity W�?� not adversely, affect the Wild and -Scenic River designation or study status. Information on Wild and Scenic Rivers may be obtained from the appropriate Federal land management agency in the area (e.g., National Park Service, U.S. Forest Service, Bureau of Land Management; U.S. Fish and Wildlife Service). 16. Tribal, Rights. No activity or its operation may impair reserved tribal rights, including, but not limited to, reserved water rights and treaty fishing and hunting rights. 17. Endangered Species. (a) No activity is authorized under airy NWP which is likely to jeopardize the continued existence of a threatened or endangered species or a species proposed for such designation, as identified under the Federal Endangered Species Act (ESA), or which will destroy or adversely modify the critical habitat of such species. No activity is authorized 3 under any NWP which "may affect" a listed species or critical habitat, unless Section 7 consultation addressing the effects of the proposed activity has been completed. (b) Federal agencies should follow their own procedures for complying with the requirements of the ESA. Federal permittees must provide the district engineer with the appropriate documentation to demonstrate compliance with those requirements. - (c) Non-federal permittees shall notify the district engineer if any listed species or designated critical habitat might be affected or is in the vicinity of the project, or if the project is located in designated critical habitat, and shall not begin work on the activity until notified by the district engineer that the requirements of the ESA have been satisfied and that the activity is authorized. For activities that might affect Federally -listed endangered or threatened species or designated critical habitat, the pre -construction notification must include the hame(s) of the endangered or threatened species that may be affected by the proposed work or that utilize the designated critical habitat that may be affected by the proposed work. The district engineer will determine whether the proposed activity "may affect" or will have "no effect" to listed species and designated critical habitat and will notify the non -Federal applicant of the Corps' ' determination within 45 days of receipt of a complete pre -construction notification. In cases where the non -Federal applicant has identified listed species or critical habitat that might be affected or is in the vicinity of the project, and has so notified the Corps, -the applicant shall not began work until the Corps has provided notification the proposed activities will. have "no effect" on listed species or critical habitat, or, iuiui Section 7 consultation has been completed. (d) As aresult of formal or informal consultation with the FWS or NMFS the district engineer may add species -specific regional endangered species conditions to the NWPs. (e) Authorization of an activity by a NWP does not authorize the "take" of a threatened or endangered species as defined under the ESA. In the absence of separate authorization (e.g., an ESA Section 10 Permit, a Biological Opinion with "incidental take" provisions, etc.) from. -the U.S. FWS or the NMFS, both lethal and non -lethal "takes" of protected species are in violation of the ESA. Information on the location .of threatened and endangered species and their critical habitat can be obtained directly from the offices of the U.S. FWS and NMFS or their world wide Web pages at http://www.fws.gov/ and http://www.noaa.gov/fisheries.html respectively. 18. Historic Properties. (a) In cases where the district engineer determines that the activity may affect properties listed, or eligible for listing, in the National. Register of Historic Places, the activity is not authorized, until the requirements of Section 1.06 of the National Historic Preser<sation Act (NM k) have been satisfied: . (b) Federal permittees should follow their own •procedures for complying with the requirements of Section 106 of the National Historic Preservation Act: Federal permittees must provide the district engineer with the appropriate documentation to demonstrate compliance with those -requirements. (c) Nonfederal permittees must submit a pre -construction notification to the district engineer if the authorized activity may have the potential to cause effects to any historic properties listed, determined to be eligible for listing on, or potentially eligible for listing on the National Register of Historic Places, -including previously unidentified properties. For such activities, the pre -construction notification must state which historic properties may be affected by the proposed work or include a vicinity map indicating the location of the historic properties or the potential for the presence of historic properties. Assistance regarding information-onthe location of or potential for the presence of historic resources can be sought from the State 4 Historic Preservation Officer or Tribal Historic Preservation Officer, as appropriate, and the National Register of Historic Places (see 33 CFR 330.4(g)). The district engineer shall make a reasonable and good faith effort to carry out appropriate identification efforts, which may include background research, consultation, oral history interviews, sample field investigation, and field survey. Based on the information submitted and these efforts, the district engineer shall determine whether the proposed activity has the potential to cause an effect on the historic properties. Where the non -Federal applicant has identified historic properties which the activity may have the potential to cause effects and so notified the Corps, the non -Federal applicant shall not begin the activity until notified by the district engineer either that the activity has no potential to cause effects or that consultation under Section 106 of the NHPA has been completed. (d) The district engineer will notify the prospective permittee within 45 ,days of receipt of a complete pre -construction notification whether NHPA Section 106 consultation is required. Section 106 consultation is not required when the Corps determines,that the activity does not have the potential to cause effects on historic properties (see 36 CFR 800.3(a)). If NHPA section 106 consultation is required and will occur, the district engineer will notify the non -Federal . applicant that he or she cannot begin work until Section 106 consultation is completed. (e) Prospective permittees should be aware that section 110k of the NHPA (16 U.S.C. 470h-2(k)) prevents the Corps from granting a permit or other assistance to an applicant who, with intent to avoid the requirements of Section 106 of the NHPA, has intentionally significantly adversely Affected a historic property to ,=rhich the peen t would relate, or having legal power to prevent it, allowed such significant adverse effect to occur, unless the Corps, after consultation with the Advisory Council on Historic Preservation (ACHP), determines that circumstances justify granting such assistance despite the adverse effect created or permitted by the applicant. If circumstances justify granting the assistance, the Corps is required to notify the ACHP and provide documentation specifying the circumstances, explaining the degree of damage to the integrity of any historic properties affected, and proposed mitigation. This documentation must include any views obtained from the applicant, SHPO/THPO, appropriate Indian tribes if the undertaking occurs on or affects historic properties on tribal lands or affects properties of interest to those tribes, and other parties known to have a legitimate interest in the impacts to .the permitted activity on historic properties. 19. Designated Critical Resource Waters. Critical resource waters include, NOAA designated marine sanctuaries, National Estuarine Research Reserves, state natural heritage sites, and outstanding national resource waters or other watery officially designated by a state as having particular environmental or ecological significance and identified by the district engineer after notice and opportunity for public comment. The district engineer may also designate additional critical resource waters after notice and opportunity for comment. • (a) Discharges of dredged or fill material into waters of the United States are not authorized by NWPs 7, 12, 14,16, 17, 21, 29, 31, 35, 39, 40, 42, 43, 44, .49, and 50 for any activity within, or directly affecting, critical resource waters, including wetlands adjacent to such waters. (b) For NWPs 3, 8,10, 13, 15, 18, 19, 22, 23, 25, 27, 28, 30, 33, 34, 36, 37, and 38, notification is required in accordance with general condition 27, for any activity proposed in the designated critical resource waters including wetlands adjacent to those waters. The district engineer may authorize activities under these NWPs only after it is determined that the impacts to the critical resource waters will be no more than minimal. 5 20. M ti anon. The district engineer will consider the following factors .when determining appropriate and practicable mitigation necessary to ensure that'adverse effects on the aquatic environment are minimal: (a) The activity must be designed and constricted to avoid and minimize: adverse effects, both temporary and permanent, to waters of the United States to the maximum extent practicable at the project site (i.e., on site). (b) Mitigation in all its forms (avoiding, minimizing, rectifying, reducing, or compensating) will be required to the extent necessary to ensure that the adverse effects to the aquatic environment are minimal. (c) Compensatory mitigation.at a minimum one -for -one ratio will be required for all wetland losses that exceed 1/10 acre and require pre -construction notification, unless the district engineer determines m writing that some other form of mitigation would be more environmentally appropriate and provides a project -specific waiver of this requirement. For wetland losses of 1/10•acre or less that require pre -construction notification, the district engineer may determine on a case -:by -case basis that compensatory mitigation is required to ensure that . the activity results in minimal adverse effects on the aquatic environment. Since the likelihood of success is greater and the impacts to potentially valuable uplands are reduced, wetland restoration should be the first compensatory mitigation option considered. (d) For losses of streams or other open waters that require pre -construction notification, the district engineer may require compensatory mitigation, sucb. as stream restoration; to ensure that the activity results in minimal adverse effects on the aquatic environment. (e) Compensatory mitigation will not be used to increase the acreage losses allowed by the acreage limits of the NWPs. For example, if an NWP• has an acreage limit of 1/2 acre, it cannot be used to authorize any project resulting in the loss of greater than 1/2 acre of waters of the United States, even if compensatory mitigation is provided that replaces or restores some of the lost waters. However, compensatory mitigation can and should be used, as necessary, to ensure that a project already meeting the established acreage limits also satisfies the minimal impact requirement associated with the NWPs. (fl Compensatory mitigation plans for projects in or near streams or other open waters will normally include a requirement for the establishment, maintenance, and legal protection (e.g., conservation easements) of riparian areas next to open waters. In some cases; riparian areas maybe the only compensato.,, mitigation required. Riparian areas should consist ofnative species. The width of the required riparian area All address documented water quality or aquatic habitat loss concerns. Normally, the riparian area will be 25 to 50 feet wide on each side of the stream, but the district engineer may require slightly wider riparian areas to address documented water quality or habitat loss concerns. • Where both wetlands and open waters exist on the project site, the district engineer will determine the appropriate compensatory mitigation (e.g., riparian areas and/or wetlands compensation) based on what is best for the aquatic environment on a watershed basis. Incases where riparian areas are determined to be the most appropriate form of compensatory mitigation, the district engineer may waive or reduce the requirement to provide wetland compensatory mitigation for wetland losses. (g) Permittees may propose the use of mitigation banks, in -lieu fee arrangements or separate activity -specific compensatory mitigation. In all cases, the mitigation provisions will specify the party responsible for accomplishing and/or complying with the mitigation plan. 1.1 (h} Where certain functions and services of waters of the United States are permanently adversely affected, such as the conversion of a forested or scrub -shrub wetland too -a herbaceous wetland in a permanently maintained utility line right-of-way, mitigation may be required to reduce the adverse effects of the project to the minimal level. 21. Water Quality. Where States and authorized Tribes, or EPA whereapplicable, have not previously certified compliance of an NWP with CWA Section 401, individual 401 Water Quality Certification must be obtained or waived (see 33 CFR 330.4(c)). The district engineer or State or Tribe may require additional water quality management measures to ensure that the authorized activity does not result in more than minimal degradation of water quality. 22. Coastal Zone Management. In coastal states where an NWP has not previously received a state coastal zone management consistency concurrence, an individual state coastal zone management consistency concurrence must be obtained, or a presumption of concurrence must occur (see 33 CFR 330.4(d)}. The district engineer or a State may require additional measures to ensf)xe that the authorized activity is consistent with state coastal zone management requirements. .23. Regional and Case -By -Case Conditions. The activity must comply with any regional conditions that may have been added by the Division Engineer (see 33 CFIR 330.4(e}) and with any case. specific conditions added by the Corps or by the state, Indian Tribe, or U.S. EPA in its section 401 Water .Quality. Certification, or by the state in:its Coastal Zone Management Act consistency determination. . 24. Use of Multiple Nationwide Permits. The use of more than one NWP for a single and complete project is prohibited, except when the. acreage loss of waters of.the United States authorized by the NWPs does not exceed the acreage limit of the NWP with the highest specified acreage limit. For example, if a road crossing over tidal waters.is constructed undor NWP 14, with associated bank stabilization authorized by NWP 13, the maximum acreage loss ofwaters of the United States for the total. project cannot exceed 1/3-acre. 25. Transfer of Nationwide Permit Verifications. If the permittee sells the property associated with :a nationwide permit verification, the permittee may transfer.the.nationwide -. permit verification to the new owner by subnait&g a letter to the appropriate Corps district office to validate the transfer. A copy of the nationwide permit verification must be attached to the . letter, and the letter must contain the following statement and signature: "When the structures or work authorized by this nationwide permit are still in existence at the time the property is transferred, the terms and conditions of this nationwide permit, including any special. conditions, will continue to. be binding on the new owners) of the property...To validate 6 the transfer of this nationwide permit and the associated liabilities associated with compliance with its terms and conditions, have the transferee sign and date below." (Transferee) (Date) 26. Comvliance Certification. Each permittee who received an NWP verification from the Corps must submit a signed certification regarding the completed work and airy required mitigation. The certification form must be forwarded by the Corps with the NWP verification letter and will include: (a)' A statement that the authorized work was done in accordance with the NWP authorization, including any general or specific conditions; (b) A statement that any required mitigation was completed in accordance with the permit conditions; and (c) The signature of the permittee certifykgthe completion of the work and mitigation. 27. Pre -Construction Notification. (a) Timine. Where required by. the terms of the NWP, the prospective permittee must notify the district engineer by submitting a pre -construction notification (PCN) as early as possible. The district engineer must determine if the PCN is complete within 30 calendar days of the date of receipt and, as a general rule, will request additional information necessary to make the PCN complete only once:. -However, if the prospective permittee: does not provide all of the requested information, then the district engineer will notify the prospective permittee that the PCN is still incomplete and the PCN review process Will not commence until all of the requested information has been received by the district engineer.- The prospective permittee shall not begin the activity until either: (1) He or she is notified in writing by the district engineer that the activity may proceed under the NWP with any special conditions imposed by the district or division engineer; or (2) Forty-five calendar days have passed from the district engineer's receipt of the cc7np,tetc'PCN and the prospective permittee has not received written notice from the'district or division engineer. However, if the permittee was required to notify the Corps pursuant to general condition 'l7 that listed species or critical habitat might affected or iii the vicinity of the project, or to notify the Corps pursuant to general condition 18 that the activity may have the potential to cause effects to historic properties, the permittee cannot begin the activity until receiving written notification from the Corps that is "no effect" on listed species or "no potential to cause effects" on historic properties, or that any consultation required under Section 7 of the Endangered Species Act (see 33 CFR 330.4(f)) and/or Section 106 of the National Historic Preservation (see 33 CFR 330.4(g)) is completed. ,Also, work cannot begin under NWPs 21, 49, or 50 until the permittee has received written approval from the Corps. If the proposed activity requires a written waiver to exceed specified limits of an NWP, the permittee cannot begin the activity until the district engineer issues the waiver. If the district or division engineer notifies the permittee in writing that an individual permit is required within 45 calendar days of receipt of a complete PCN, the permittee cannot begin the activity until an individual permit has been obtained. 8 Subsequently, the permittee's right to proceed under the NWP may be modified, suspended, or revoked only in accordance with the procedure set forth in 33 CFR 330.5(d)(2). . (b) Contents of Pre -Construction Notification: The PCN must be in writing and include the following information: (1) Name, address and telephone numbers -of the prospective permittee; (2) Location of the proposed project; (3) A description of the proposed project; the project's purpose; direct and indirect adverse environmental effects the project would cause; any other NWP(s), regional general permit(s), or individual permit(s) used -or intended to be used to authorize any part of the proposed project or any related activity. The description should be sufficiently detailed to allow the district engineer to determine that the adverse effects of the project will be minimal and to determine the need for compensatory mitigation. Sketches should be provided when necessary to show that the activity complies with the terms of the NWP. (Sketches usually clarify the project and when provided result in a quicker decision.); (4) The PCN must include a delineation of special aquatic sites and other waters of the United States on the project site. Wetland delineations must be prepared in accordance with the current method required by the Corps. The permittee may ask the Corps to delineate the special aquatic sites and other waters of the United States, but there may be -a delay if the Corps does the delineation, especially if the project site is large or contains many waters of the United States. Furtbermore; the 45 day -period will riot s"tart -until the delineation has been submitted to or completed by the Corps, where appropriate; (5) If the proposed activity will result in the loss of greater than 1/10 acre of wetlands and a PCN is required, the prospective permittee_must submit a statement describing how the mitigation requirement will be satisfied. As an alternative, the prospective permittee may submit a conceptual or detailed .mitigation plan. (6) If any listed species or designated critical habitat might be affected or is in the vicinity of the project, or if the project is located in designated critical habitat, for non Federal applicants the PCN must include the name(s) of those endangered or threatened species that might be affected by the proposed work or utilize the designated critical habitat -that may affected by the proposed work. Federal applicants must provide documentation demonstrating compliance with the Endangered Species Act, and (7) For an activity that may affect a historic property listed on, -determined to be eligible for listing on, or potentially eligible for listing on, the National Register of Historic Places, for non -Federal applicants the PCN must state which historic property may be affectedby the proposed work or include a vicinity map indicating the location of the historic property. Federal applicants must provide documentation demonstrating compliance with Section 106 ofthe National Historic Preservation Act. (c) Form of Pre -Construction Notification: The standard individual permit application form (Form I NG 4345) may be used, but the completed application form must clearly indicate that it is a PCN and must include all of the information required in paragraphs (b)(1) through (7) of this general condition. A letter containing the required information may also be used. (d) Agency Coordination: (1) The district engineer will consider any comments from Federal and state agencies concerning the proposed activity's compliance with the terms and conditions of the NWPs and the need for mitigation to reduce the projeWs adverse environmental effects to a minimal level. E (2) For all NWP 48 activities requiring pre -construction notification, and for other NWP activities requiring pre -construction notification to the district engineer *that result in the loss of greater than 1/2-acre of waters of the United States, the district engineer will immediately provide (e.g., via facsimile transmission, overnight mail, or other expeditious manner) a copy of the PCN to the appropriate Federal or state offices (U.S. FWS, state natural resource or water quality agency, EPA, State Historic Preservation Officer (SHPO) or Tribal Historic Preservation Office (THPO), and, if appropriate, the.NMFS). With the exception of NWP 37, these agencies will then have 10 calendar days from the date the material is transmitted to telephone or fax the district engineer notice that they intend to provide substantive, site -specific comments. If so contacted by an agency, the district engineer will wait an additional 15 calendar days before making a decision on the pre -construction notification. The district engineer will fully consider agency comments received within the specified time frame, but will provide no response to the resource agency, except as provided below. The district engineer will indicate in the administrative record associated with each pre -construction notification that the resource . . agencies' concerns were considered. For NWP 37, the emergency watershed protection and rehabilitation activity may proceed immediately in cases where there is an unacceptable hazard to life or a significant loss of property or economic hardship will occur. The district engineer will consider any comments received to decide whether the NWP 37 authorization should be modified, suspended, or revoked in accordance with the procedures at 33 CFR 330.5. (3) In cases of where the prospective permittee is not a Federal agency, the district engineer will provide a response to NMFS within 30 calendar days of receipt of any Essential Fish Habitat conservation recommendations, as required by Section 305(b)(4)(B) of the Magnuson -Stevens Fishery Conservation and Management Act. (4) Applicants are encouraged to provide the Corps multiple copies of pre -construction notifications to expedite agency coordination. (5) For NWP 48 activities that require reporting, the district engineer will provide a copy of each report. within 10 calendar days of receipt to the appropriate regional office of the NMFS. (e) District Engineer's Decision. In reviewing the PCN for the proposed activity, the district engineer will determine whether the activity authorized by the NWP will result in more than minimal individual or cumulative adverse environmental effects or may be contrary to the public interest. If the proposed activity requires a PCN and will result in a loss of greater than 1/10 acre of wetlands, the prospective permittee should submit a mitigation proposal with the PCN. Applicants may also propose compensatory mitigation for projects with smaller impacts. The district engineer will consider any proposed compensatory mitigation the applicant has included in the proposal in determining whether the net adverse environmental effects to the aquatic environment of the proposed work are minimal. The compensatory mitigation proposal may be either conceptual or detailed. If the district engineer determines that the activity complies with the terms and conditions of the NWP and that the adverse effects on the aquatic environment are minimal, after considering mitigation, the district engineer will notify the permittee and include any conditions the district engineer deems necessary. The district engineer must approve any compensatory mitigation proposal before the permittee commences work. If the prospective permittee elects to submit a compensatory mitigation plan with the PCN, the district engineer will expeditiously review the proposed compensatory mitigation plan. The district engineer must review the plan within 45 calendar days of receiving a complete PCN and determine whether the proposed mitigation would ensure no more than minimal adverse effects on the aquatic environment. If the net adverse effects of the project on the aquatic environment 10 (after consideration of the compensatory mitigation proposal) are determined by the district engineer to be minimal, the'district engineer will provide a timely written response to the . applicant. The response will state that the project can proceed under the terms and conditions of the N`WP. Jf the district engineer determines that the adverse effects of the proposed work are more than minimal, then the district engineer will notify the applicant either: (1) That the project does not qualify for authorization under the NWP and instruct the applicant on the procedures to seek authorization under an individual permit; (2) that the project is authorized under the NWP . subject to the applicant's submission of a mitigation plan that would reduce the adverse effects on the.aquatic'environment to the minimal level; or (3) that the project is authorized under the NWP with specific modifications or conditions. Where the district engineer determines that mitigation is required to ensure no more than minimal adverse effects occur to the aquatic environment, the activity will be authorized within the 45-day P.CN period. The authorization will include the necessary conceptual or specific mitigation or a requirement that the applicant submit a mitigation plan that would reduce the adverse effects on the aquatic environment to the minimal level. When mitigation is required, no wort; in waters of the Unite States may occur until the district engineer has approved a specific mitigation plan. . 28. Sin"1e and Complete Project. The activity must be a single and complete project. The same NWP cannot be used more than once for the same single and complete project. 1: District Engineers have authority to determine if an activity complies with the terms and conditions of an NWP. 2. NWPs do not obviate the need to obtain other federal, state, or local permits, approvals, or authorizations required by law. 3. NWPs do not grant any property rights or exclusive privileges. 4. NWPs do not authorize any injury to the property or rights of others. 5. NWPs do. not authorize interference with any existing or proposed Federal project. DEFMTIONS Best manag: Policies, practices, procedures, or strractmes implemm- ted to mitigate the adverse environmental effec*w on surface water quality resulting from development. BWs are categorized as structural or non-structural. C07Wensatoa mitigation: The restoration, establishment (creation), enhancement, or preservation of aquatic resources for the purpose of compensating for unavoidable adverse impacts which remain after all appropriate and practicable avoidance and minimization has been achieved. Cun-ently servicea le: Useable as is or with some maintenance, but not so degraded as to essentially require reconstruction. Discharge: The term "discharge" means any discharge of dredged or fill material. Enhancement: The manipulation of the physical, chemical, or biological 'characteristics of an aquatic resource to heighten, intensify, or improve a specific aquatic resource function(s). Enhancement results in the gain of selected aquatic resource function(s), but may also lead to a 11 decline in other aquatic resource function(s). Enhancement does not result in a gain in aquatic resource area. Ephemeral stream: An ephemeral stream has flowing water only during, and £or.a short duration after, precipitation events in a typical year. Ephemeral stream beds are located above the water table year-round. Groundwater is not a source of water for the stream. Runoff from rainfall is the primary source of water for stream flow. Establishment (ireation: The manipulation of the physical, chemical, or-biologicalcharacteristics present to develop an aquatic resource that did not previously exist at an upland site. Establishment results in a gain in aquatic resource area. Historic Property: Any prehistoric or historic district, site (including archaeological site), building, structure, or other object included in, or eligible for inclusion in, the National Register of Historic Places maintained by the Secretary of the Interior. This term includes artifacts, records, and remains that are related to and located within such properties. The term includes properties of traditional religious and cultural importance to an Indian tribe or Native Hawaiian organization and that meet the National Register criteria (36 CFR part 60). Independent utility: A test to determine what constitutes a single and complete project in the Corps regulatory program. A project is considered to have independent utility if it would be constructed absent the construction of other projects in the project area. Portions of a multi -phase project that depend upon other phases of the project do not have independent utility. Phases of a project that would be constructed even if the other phases were not built can be considered as separate single and complete projects with independent utility. . ' Intermittent stream: An intermittent stream has flowing water during certain times of the year, when groundwater provides water for stream flow. During dry periods, intermittent streams may not have flowing water. Runoff from rainfall is a supplemental source of water for stream flow. Loss of waters of the United States. Waters of the United States that -are permanently adversely affected by filling, flooding, excavation, or drainage because of the regulated activity. Permanent adverse effects include. permanent discharges of dredged or fill material that change an aquatic area to dry land, increase the bottom elevation of a waterbody, or change the use of a waterbody. The acreage of loss of waters of the United States is a threshold measure gent of the impact to jurisdictional waters for determining. whether a project may qualify for an NWP; it is not a net threshold that is calculated after considering compensatory mitigation that may be used to offse.losses of aquatic functions and services. The loss of stream bed includes the linear feet of stream bed that is riled or excavated. Waters of the United States temporarily tilled, flooded, excavated, or drained, but restored to pre -construction contours and elevations after construction, are not included in the measurement of loss of waters of the United States. Impacts resulting from activities eligible for exemptions under Section 404(f) of the Clean Water .Act are not considered when calculating the loss of waters of the United States. Non -tidal wetland.• A non tidal wetland is a wetland that is not subject to the ebb and flow of tidal waters. The definition of a wetland can be found at 33 CFR 328.3 (b). Non -tidal wetlands contiguous to tidal waters are located landward of the high tide line (i.e., spring high tide line). . . Open water: For purposes of the NWPs, an open water is. any area that in a year with normal patterns of precipitation has water flowing or standing above ground to the extent that an ordinary high water mark can be determined. Aquatic vegetation within the area of standing or 12 flowing water is either non -emergent, sparse, or absent. Vegetated shallows are considered to be open waters. Examples of "open waters" include rivers, streams, lakes, and ponds. a d nala High Water Mark: An ordinary high water mark is a line on the shore established by the fluctuations of water and indicated by physical characteristics, or by other appropriate means that consider the characteristics of the surrounding areas (see 33 CFR. 328.3(e)). Perennial stream: A perennial stream has flowing water year-round during a typical year. The water table. is located above the stream bed for most of the year. Groundwater is the primary source of water for stream flow. Runoff from rainfall is a supplemental source of water for stream flow. Practicable: Available and capable of being done after taking into consideration cost, existing technology, and logistics in light of overall project purposes. Pre -construction noti cation: A request submitted by the project proponent to the Corps for confirmation that a particular activity is authorized by nationwide permit. The request maybe a permit application, letter, or similar dopument that includes information about the proposed work and its anticipated environmental effects. Pre -construction notification may be required by the terms and conditions of a nationwide permit, or by regional conditions. -A pre -construction notification may be voluntarily submitted in cases where pre -construction notification is not required and the project proponent wants confirmation that the activity is authorized by nationwide permit. Preservation: The removal of a threat to; or preventing the decline of, aquatic resources by. an action in or near those aquatic resources. This term includes activities commonly associated with the protection and maintenance of aquatic resources through the impleinentatioii of appropriate legal and physical mechanisms. Preservation does not result in a gain of aquatic resource area or functions. _ I' . Re-establishment: The manipulation of the physical, chemical, or.biological characteristics of a site with the goal of returning natural/historic functions to a former aquatic resource. Re-establishment results in rebuilding a former aquatic resource and results in a gain in aquatic resource area. . . Rehabilitation: The manipulation of the physical, chemical, or biological characteristics of a site with the goal of repairing natural/historic functions to a degraded aquatic resource. Rehabilitation results in a gain in aquatic resource function, but does not result in a gain in aquatic resource area. Restoration: The manipulation of the physical, chemical, or biological characteristics of a site with the goal of returning naturaYMstoric functions to a former or degraded aquatic resource. For the purpose of tracking net gains in aquatic resource area, restoration is divided into two categories: re-establishment and rehabilitation. Riffle and pool complex: Riffle and pool complexes are special aquatic -sites under the 404(b)(1) Guidelines. Riffle and pool complexes sometimes characterize steep gradient sections of streams. Such stream sections are recognizable by their hydraulic characteristics. The rapid movement of water over a course substrate in riffles results in a trough flow, a turbulent surface, and high dissolved oxygen levels in the water. Pools are deeper areas associated with riffles. A slower.stream velocity, a streaming flow, a smooth surface, and a finer substrate characterize Pools. Riparian areas: Riparian areas are lands adjacent to streams, lakes, and estuarine -marine shorelines. Riparian areas are transitional between terrestrial and aquatic ecosystems, through 13 which surface and subsurface hydrology connects waterbodies with their adjacent uplands. Riparian areas provide a variety► of ecological functions and services and help improve or maintain local water quality. (See general condition 20.) ,Shell sh seeding: The placement of shellfish seed and/or suitable substrate to increase shellfish production. Shellfish seed consists of immature individual shellfish or individual shellfish attached to shells or shell fragments (i.e., spat on shell). Suitable substrate may consist of shellfish shells, shell fragments, or other appropriate materials placed into waters for shellfish habitat. Single and complete project. The term "single and complete project" is defined at 33 CPR 330.2(i) as the total project proposed or accomplished by one owner/developer or partnership or other association of owners/developers. A single and complete project must have independent utility (see definition). For linear projects, a "single'and complete project" is all crossings of a single water of the United States (Le., a single waterbody) at.a, specific location. For linear projects crossing a single waterbody several times at separate and- distant -locations, each crossing is considered a single and complete project. However, individual channels in a braided stream or river, or individual arms of a large, irregularly shaped wetland or lake,. etc.; are not separate waterbodies, and crossings of such features cannot be considered separately. Stormwater management: Stormwater management is the mechanism for controlling stormwater runoff for the purposes of reducing downstream erosion, water quality degradation, and flooding and mitigating the adverse effects of changes inland use on the aquatic environment.' Stormwater management facilities: Stormwater management facilities are those facilities, including but not limited to, stormwater retention and detention ponds and best management practices, which retain water for a period of time to control runoff and/or improve -the quality (i.e., by reducing the concentration of nutrients, sediments, hazardous substances and other pollutants) of stormwater runoff. ;Stream be The substrate of the stream channel between the ordinary high water marks. The substrate may be bedrock or inorganic particles that range in size from clay to boulders. Wetlands contiguous to the stream bed, but outside of the ordinary high water marks, are not considered part of the stream bed. Stream channelization: The manipulation of a stream's course, condition, capacity, or location that causes more than minimal interruption of normal stream processes. A channelized stream remains a watea of the United States. -Structure: An object that is arranged in a definite pattern of organization. Examples of structures include, without limitation, any pier, boat dock, boat ramp, wharf, dolphin, weir, boom, breakwater, bulkhead, revetment, riprap, jetty, artificial island, artificial reef, permanent mooring structure, power transmission line, permanently moored floating vessel, piling, aid to navigation, or any other manmade obstacle or obstruction. : - Tidal wetland: A tidal wetland is a wetland (i.e., water of the United States) that is inundated by tidal waters. The definitions of a wetland and tidal waters can be found -at 33 CFR 328.3(b) and 33 CFR 328.3(t), respectively. Tidal waters rise -and fall in a predictable and measurable rhythm or cycle due to the gravitational pulls of the moon.and sun. Tidal waters end where the rise and fall of the water surface can no longer -be practically measured in a predictable rhythm due to masking by other waters, wind, or other effects. Tidal wetlands are located channelward of the high tide line; which is defined at 33 CFR 328.3(d). 14 Vegetated shallows: Vegetated shallows are special aquatic sites under the 404(b)(1) Guidelines. They are areas that are permanently inundated and under normal circumstances have rooted aquatic vegetation, such as seagrasses in marine and estuarine systems and a variety of vascular rooted plants in freshwater systems. ffiaterbo : For purposes of the NWPs, a waterbody is a jurisdictional. water of the United States that, during a year with normal patterns of precipitation, has water flowing or standing above ground to the extent that an ordinary high water mark (OHWM) or other indicators of jurisdiction can be determined, as well as any wetland area (see 33 CFR 328.3(b)). If a jurisdictional wetland is adjacent --meaning bordering, contiguous, or neighboring --to a jurisdictional waterbody displaying an OHWM or other indicators of jurisdiction,. that waterbody and its adjacent wetlands are considered together as a single aquatic unit (see 33 CFR 328.4(c)(2)). Examples of "waterbodies" include streams, rivem, lakes, ponds, and wetlands. 15 1.0 Excluded' Waters The Corps has identified waters that will be excluded from the use of all NWP's during certain timeframes: These waters are: 1.1. Anadromous Fish Spawning Areas Waters of the United States identified by either the North Carolina Division of Marine Fisheries (NCDMF) or the North Carolina Wildlife Resources Commission (NCWRC) as anadromous fish spawning areas are excluded during the period between February 15 and June 30, without prior written approval from NCDMF or NCWRC and the Corps. 1.2. Trout Waters Moratorium Waters of the United States in the twenty-five designated trout counties of North Carolina are excluded during the period between October 15 and April 15 without prior written approval from the NCWRC. (see Section I. b. 7. for a list ofthc twenty-five trout counties). 1.3. Sturgeon Spawning Areas Waters of the United States designated as sturgeon spawning areas are excluded during the period between February 1 and June 30, without prior written approval from the National Marine Fisheries Service (NMFS). 2.0 Waters Requiring Additional Notification The Corps has identified waters that will be subject to additional notification requirements for activities authorized by all NWP's. These waters are: 2.1. Western IBC Counties that Drain to Designated Critical Habitat Waters of the U.S. that requires a Pre -Construction Notification pursuant to General Condition 27 (PCN) and located in the sixteen counties listed below, applicants must provide a copy of the PCN to the US Fish and Wildlife Service,160 Ziilicoa Street, Asheville, North Carolina 28805. This PCN must be sent concurrently to the US Fish and Wildlife Service and the Corps Asheville Regulatory Field Office. Please see General Condition 17 for specific notification requirements related to Federally Endangered Species and the following website for information on the location of designated critical habitat. Counties with tributaries that drain to designated critical habitat that require notification to the Asheville US Fish and Wildlife Service: Avery, Cherokee, Forsyth, Graham, Haywood, 16 Henderson, Jackson, Macon Mecklenburg, Mitchell, Stokes, Sung, Swain, Transylvania, Union and Yancey. Website and office addresses for Endangered Species Act Information: The Wilmington District has developed the following website for applicants which provide guidelines on how to review linked websites: and maps in order.to fiilfill NWP .general condition 17 requirements. httn://www.saw.usace.4 my.mil/wetlands/ESAA Applicants who do not have internet access may contact the appropriate US. Fish and Wildlife Service offices or the US Army Corps of Engineers office listed below. US Fish and Wildlife Send= Asheville Field Office 160 Zillicoa Street Asheville, NC 28801 Telephone: (828) 258-3930 Asheville US Fish and Wildlife Service Office counties: All counties west of and including Anson, Stanly, Davidson, Forsyth and Stokes Counties US Fish and Wildlife Service Raleigh Field Office Post Office Box 33726 Raleigh, NC 27636-3726 Telephone: (919) 856-4520 Raleigh US Fish and Wildlife Service Office counties: all counties east of and including Richmond, Montgomery, Randolph, Guilford, and Rockingham Counties. 2.2. Special Designation Waters Prior to the use of any NWP in any of the following North. Carolina identified waters and contiguous wetlands, applicants must comply with Nationwide Permit General Condition 27 (PCN). The North Carolina waters and contiguous wetlands that require additional notification requirements are: "Outstanding Resource Waters" (ORW) and "High Quality Waters" (HQW) (as designated by the North Carolina Environmental Management Commission), or `inland Primary Nursery Areas" (IPNA) (as designated by the North Carolina Wildlife Resources Commission), or "Contiguous Wetlands" (as defined by the North Carolina Environmental Management Commission), or "Primary Nursery Areas" (PNA) (as designated by the North Carolina Marine Fisheries Commission). 17 2.3. Coastal Area Management Act (LAMA) Areas of Environmental Concern Non -Federal applicants for any NWP in a designated "Area of Environmental Concern' (AEC) in the twenty (20) counties of Eastern North Carolina covered by the North Carolina Coastal Area Management Act (CAMA), must also obtain the required CAMA permit. - Construction activities for non -Federal projects may not commence until a copy of the approved CAMA permit is furnished to the appropriate Wilmington District Regulatory Field Office (Wilmington Field Office — P.O. Box 1890, Wilmington, NC 28402 or Washington Field Office — P.O. Box 1000, Washington, NC 27889). 2.4. Barrier Islands Prior to the use of any NWP on a barrier island of North Carolina, applicants must comply with Nationwide Permit General Condition 27 (PCN). 2.5. Mountain or Piedmont Bogs :prior to the use of any NWP in a "Mountain or Piedmont Bog" ofNorth Carolina, applicants shall comply with Nationwide Permit General Condition 27 (PCN). Note: The following wetland community types identified in the N.C. Natural Heritage Program document, "Classification of Natural communities of North Carolina (Michael P. Schafale and Alan S. Weakley,1990), are subject to this regional condition. Mountain Bo s Piedmont Bogs Swamp Forest -Bog Complex Upland depression Swamp Forest Swamp Forest -Bog Complex _(Spruce Subtype) Southern Appalachian Bog ivordiern Sub" e Southern Appalachian Bog Southern Subtype) Southern A alachian Fen 2.6. Animal Waste Facilities Prior to use of any NWP for construction of animal waste facilities in waters of the US, including wetlands, applicants shall comply with Nationwide Permit General Condition 27 (PCN). 2.7. Trout Waters Prior to any discharge of dredge or fill material into streams or waterbodies within 'the twenty- five (25) designated trout counties of North Carolina, the applicant shall comply with 18 Nationwide Permit General Condition 27 (PCN). The applicant shall also provide a copy of the notification to the appropriate NCWRC office to facilitate the determination of any potential impacts to designated Trout Waters. Notification to the Corps of Engineers will include a statement with the name of the NCWRC biologist contacted, the date of the notification, the . location, of work, a delineation of wetlands, a discussion of alternatives to working in the mountain trout waters, why alternatives were not selected, and a plan to provide compensatory mitigation for all unavoidable adverse impacts to mountain trout waters. NCWRC and NC Trout Counties Mr. Ron Linville Western Piedmont Region Coordinator Alleghany Caldwell Watauga 3855 Idlewild Road Ashe Mitchell Wilkes Kernersville NC 27284-9180 1 Avery Stokes Telephone: (336) 769-9453 - Burke a Mr. Dave McHenry Mountain Region Coordinator Buncombe Henderson Polk 20830 Great Smoky Mtn. Express wa Cherokee Jackson Rutherford Waynesville NC 28786 clay Macon Swain Telephone: 82$ 452-2546 Graham Madison Tramylvania Fax: 828 452-7772 Ha ood McDowell Yance 3.0 List 'of Corps Regional Conditions for All Nationwide Permits The following conditions apply to all Nationwide Permits in the Wilmington District: 3.1. Limitation of Loss of Perennial Stream Bed NWx s may not be used fur activities chat may result in the -loss or degradation of greater than 3000 total linear feet of perennial streams. The NWPs may not be used for activities that may result in the loss or degradation of greater than 300 total linear feet of ephemeral and intermittent streams that exhibit important aquatic fimetion(s)* Loss of stream includes the linear feet of stream bed that is filled, excavated, or flooded by the proposed activity. The District Commander can waive the 300 linear foot limit for ephemeral and intermittent streams on a case - by -case basis if he determines that the proposed activity will result in minimal individual an: ' cumulative adverse impacts to the aquatic environment. Waivers for the loss: of ephemeral and intermittent streams must be in writing. This waiver only applies to the 300 linear feet threshold for NWPs. Mitigation may still be required for impacts to ephemeral and intermittent streams, on a case -by -case basis, depending on the impacts to the aquatic elivironment of the proposed pra ect. r*Note: The Corps uses the Stream Quality Assessment Worksheet, located with Permit Information on the Regulatory Program Web Site, to aid in the determination of aquatic function within the intermittent stream channel.] 19 31. Mfigation for Lows of Stream Bed Exceeding 150 Feet For any NWP that results in a loss of more than 150 linear feet of perennial and/or ephemeral/intermittent stream, the applicant shall .provide a mitigation proposal to compensate for the loss of aquatic function associated with the proposed activity. For stream losses legs than 150 linear feet, that require a PCN, the District Commander may determine, 'on a case -by -case basis that compensatory mitigation is required to ensure that the activity results in minimal adverse effect on the aquatic environment. 3.3. Pre -construction Notification for Loss of Streambed Exceeding 150 Feet. Prior to use of any NWT for any activity which impacts more than 150 total linear feet of perennial stream or ephemeral/ intermittent stream, the applicant must comply -with Nationwide Permit General Condition 27 (PCN). This applies to NWPs that do not have specific notification requirements. if a N-WP has specific notification requirements, the requirements of the N VP should be followed. 3.4. Restriction on Use of Live Concrete For all NWPs which allow the use of concrete as a building material, measures will be taken to prevent live or fresh concrete, including bags of uncured concrete, from coming into contact with waters of the state until the concrete has hardened. 3.5. Requirements for Using Riprap for Bank Stabilization For all NWPs that allow for the use of riprap material for bank stabilization, the following measures shall be applied: 3.5.1. Filter cloth must be placed underneath the riprap as an additional requirement of its use in North Carolina waters. 3.� u. The placement of riprap shall be limited to the areas depicted on submitted wcxn plan drawings. 3.5.3. The riprap material shall be clean and free from loose dirt or any pollutant except in trace quantities that would not have .am adverse environmental effect. 3.54, .It shall be of a size sufficient to prevent its movement from the authorized alignment. by. natural forces under normal conditions. 3.5.5. The riprap material shall consist of clean rock or masonry material such as, but not limited to, granite, marl, or broken concrete. 20 3.5.6. A -waiver from the specifications in thisRegional Condition maybe requested in writing. The waiver will only be issued if it can be demonstrated that the impacts of complying with this Regional condition would result in greater adverse impacts to the aquatic environment. 3.6. Safe Passage Requirements for Culvert Placement For allNWPs that involve the construction/installation of culverts, measures will be included in the construction/installation that will promote the safe passage of fish and other aquatic organisms. The dimension, pattern, and profile of the stream above and below a'pipe or culvert should not be modified by widening the stream channel or by reducing the depth of the stream in connection with the construction activity. The width, height, and gradient of a proposed opening should be such as to pass the average historical low flow and spring flow without adversely . altering flow velocity. Spring flow should be determined from gage data, if available. In the absence of such data, bankfuli flow can be used as a comparable level. In the twenty (20) counties of North, Carolina designated as coastal counties by the Coastal Area Management Act (CAMA): All pipe and culvert bottoms shall be buried at least one foot below normal bed elevation when they are placed within the Public Trust Area of Environmental. Concern (AEC) and/or the Estuarine Waters AEC as designated by LAMA, and/or all streams appearing as bI,TP limes on United States Geological Survey ,%, ISGS) quad sheets. Roadway Appmach rill ]arilcCulvertburied isill belovifstreambed bo aplaropriaW depth (ifrequimd). Bottam In all other counties: Culverts greater than 48 inches in diameter will be buried at least one foot below the bed of the stream. Culverts 48 inches in diameter or less shall be buried or placed on the stream bed as practicable and- appropriate to maintain aquatic passage, and every effort shall be made to maintain the existing channel slope. The bottom of the culvert must be placed at a depth below the natural stream bottom to provide for passage during drought or low flow conditions. Destabilizing the channel and head cutting upstream should be considered in the placement of the culvert. A waiver from the depth specifications in this condition may be requested in writing. The waiver will be issued if it can be demonstrated that the proposal would result in the least impacts to the aquatic environment. All counties: Culverts placed in wetlands do not have to be buried. 21 3.7. Notification to NCDENR Shellfish Sanitation Section Applicants shall notify the NCDENR Shellfish Sanitation Section prior to dredging in or removing sediment from an area closed to shell fishing where the effluent may be released to an area open for shell fishing or swimming in order to avoid contamination from the disposal area and cause a temporary shellfish closure to be made. Such notification shall also be provided to the appropriate Corps of Engineers Regulatory Field Office. Any disposal of sand to the ocean beach should occur between November l and April 30 when recreational usage is low. Only clean sand should be used and no dredged sand from closed shell fishing areas may be used. If beach disposal were to occur at times other than stated- above or if sand from a closed shell fishing area is to be used, a swimming advisory -shall be posted, and a press release shall be issued. 3.8. Preservation of Submerged Aquatic Vegetation Adverse impacts to Submerged Aquatic Vegetation (SAY) are not authorized by any NWP within any of the twenty coastal counties defined by North Carolina's Coastal'Area Management Act of 1974 (CAMA). 4.0 Additional Regional Conditions Applicable to Specific Nationwide Permits The following regional conditions are required for NWP 429-Residential Developments. 4.1. Discharges in wetlands and in perennial streams for stormwater management facilities are prohibited under this NWP. 4.2. Single-family recreational facilities are not authorized by this NWP. Recreational facilities that are incorporated into serving an entire residential development can be authorized by this NWP. 4.3. • Discharges of dredged or fill material into waters of the US, including wetlands, within the floodway, resulting in permanent above -grade fills are not authorized by this NWP. 4A. Discharges of dredged or fill material into waters of the US, including wetiands, within we mapped FEMA 100-year floodplain, below headwaters (i.e. ? five cfs) resulting in permanent above -grade fills are not authorized by this NWP. 4.5. This NWP may not be used to authorize the discharges of dredged or fill material_ into waters of the United States that have been identified or designated by the State of North Carolina as: Outstanding Resource Waters High Quality Waters Coastal Wetlands as defined by North Carolina's Coastal Area Management Act Wetlands adjacent to these waters 22 NC DIVISION OF WATER QUALITY - GENERAL CERTMCATION CONDITIONS For'the most recent General Certification conditions, call the NC Division of Water Quality, Wetlands/401 Certification Unit at (919) 733-1786 or access the following website: hU.-//h2o. enr. state.nc.us/ncwetlands/certs.html NC DIVISION OF COASTAL MANAGEMENT - STATE CONSISTENCY In a letter dated May 7, 2007, the North Carolina Division of Coastal Management found this NWP consistent with the North Carolina. Coastal. Zone Management Program. Updates on CAMA Consistency for NC can be found on the NC DCM web site at: http://dcm2.enr.state.ne.us/Permits/Congst.htm EASTERN BAND OF THE CHEM= INDIANS TRIBAL WATER QUALITY CERTIFICATIONS In a letter dated May 8, 2007, US EPA, on behalf of the Eastern Band of Cherokee Indians, provided Tribal General Conditions for Nationwide Permits on Cherokee Indian Reservation. These Tribal General Conditions are located on the Corps website at: htt://www.saw.usace.gM.miYWETLANDS/NWP2007/EBCI-certs.html 'ta 'ons• 2007 Nationwide Permits Public Notice for Final Issue Date: March 15, 2007 Correction Notice for Nationwide Permits, Federal Register / Vol. 72, No. 88 / Tuesday, May 8, 2007 / Notices p.26082 2007 SAW Regional Conditions -- Authorized June 1, 2007 This and other information can be found on the Corps web site at: http://www.saw.usace.aimy niYWETLANDS/NWP2007/nationwide-Rermits.html 23 State Stormwater Permit Application Tracking Cover Sheet Wil jMton Regional Office Project Name: SAVANNAH LAKES AT THE MEADOWLANDS, PHASE 3 Project Category: MOD Project Type: HD - DETENTION POND App Aecept Date: 11/19/2007 Application Fee Amt.- $ q O O p Fee Check Number: O(D7 SZ 6 Reviewer Name: NELSON, CHRISTINE Record the following information from BIMS after proiect has been entered! Permit Number (BIMS): 5W S C7 J (-zo3 M 0 J8 Please update the SW Access System by entering the Permit Number for the protect! Date Entered in Access. iqa�b 7 Entered in Access By: M I ga 8M q U &I � L� Date Printed: 11/19/200711:36: 03 AM THOMAS & HUTTON ENGINEERING CO. 1350 FARROW PARKWAY POST OFFICE BOX 8000 MYRTLE BEACH, SOUTH CAROLINA 29578-8000 TELEPHONE 18431839-3545 FAX 18431839-3565 November 16, 2007 Ms. Linda Lewis NCDENR — Division of Water Quality 127 Cardinal Drive Extension Wilmington, NC 28405-3845 RE: Savannah Lakes at The Meadowlands — Phase 3 Stormwater Management Application 3-18660.303 Dear Ms. Lewis: CE411v r) N O Y Ilk 1007 WIMP 19 On behalf of Centex, we are pleased to submit the Stormwater Management Application for the referenced project. The following items are attached for your review: • One (1) copy and one (1) original Permit Application •Three (3) sets Construction Plans •Three (3) copies of Construction Specifications — on file •Two (2) copies of the Stormwater Report *One (1) copy and one (1) original Wet Detention Basin Inspection and Maintenance agreement (Basins 8A and 8B) •One (1) copy and one (1) original Wet Detention Basin Supplement Form (copies as previously submitted for Basins 3, 6, and 7) • One (1) copy and one (1) original Wet Detention Basin Supplement Form (Basins 8A and 8B to be re -permitted) • Check in the amount of $4000.00 for Review fee • Two (2) copies of Project Narrative with Construction Sequence • One (1) copy of High Density residential Subdivision Document • One (1) copy of stormwater express questionnaire, cover sheet, and vicinity map *One (1) copy of wetland permit Phase 2 and Phase 3 Please review the application, and if everything is in order, we respectfully request NCDENR approval of the application. We appreciate your assistance with this project. Please call if you have any questions. Sincerely, THOMAS & HUTTON ENGINEERING CO. David Gantt, P.E. N:\18660\Does\Applications\DENER Stormwater Revisions 10-3-07\Revised to High Density\NCDENR-Lewis-L- PH3 submittal.doc SAVANNAH, GEORGIA-CHARLESTON, SOUTH CAROLINA - WILMINGTON, NORTH CAROLINA * BRUNSWICK, GEORGIA