HomeMy WebLinkAboutNCC202998_ESC Approval Submitted_20200721ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
Brian Wrenn
Acting Director
,a. SLATE,,
NORTH CAROLINA
Environmental Quality
March 27, 2020
LETTER OF APPROVAL
Piedmont Triad Land Developers, LLC
Attention: David B Coe
PO Box 36
Wallburg, NC 27373
RE: Project Name: Raven Ridge Subdivision
Project ID: DAVID-2020-034
Total Acres: 11.77
_County: Davidson
River Basin: Yadkin -Pee Dee
Project Location: Arnold Rd - Lexington
Submitted By: LABELLA Associates
Date Received by LQS: March 3, 2020
Plan Type: Residential — Regular - New
This office has received a soil erosion and sediment control plan for the project listed above
which was submitted as required by the North Carolina Sedimentation Pollution Control Act
(G.S. 113A-57 (4)).
The Act requires that all persons disturbing an area of one or more acres of land must obtain
approval of a soil erosion control plan prior to the commencement of the land -disturbing activity
(G.S. 113A-54(d) (4)). The Act further states that this plan must be filed a minimum of 30 days
prior to the activity and the approving authority must approve or disapprove the submitted plan
within 30 days of receipt. Failure of the approving authority to approve or disapprove the
submitted plan within the 30-day period will be deemed approval of the plan.
Commencement or continuation of a land -disturbing activity under the jurisdiction of this Act
prior to the approval of an erosion and sediment control plan is a violation of the Act.
The approval of an erosion and sediment control plan is conditioned on the applicant's
compliance with Federal and State water quality laws, regulations and rules. Please note
additional information may be requested during the review of your ESC plan, and ESC plans are
reviewed in the order received.
North Carolina Department of Environmental Quality I Division Energy, Mineral and Land Resources
EQ�
Winston-Salem Regional Office 1 450 Hanes Mill Road, Suite 300 1Winston-Salem, North Carolina 27105
336-776-9800
Be advised the NC Construction General Permit (also known as "NCGO 1 ") was renewed on
April 1, 2019. The updated permit does not significantly change the measures that are required to
be implemented on construction sites. However, there are some organizational and technical
updates to the permit. Most notably, there is a new process in which construction sites will obtain
official coverage under an NCGO1 permit through an electronic process, after the.soil erosion
and sediment control plan approval is issued. For assistance and guidance with the revised 2019
NCGO1 (Construction Stormwater General Permit NCGO10000) as adopted on April 1, 2019,
please use the following link:
https:Hdeq.nc. gov/aboutldivisions/energy-mineral-land-resources/energy-mineral-land-
permits/stormwater-pennits/construction-sw
If you have questions, please do not hesitate to contact our office at (336) 776-9800. Your
cooperation in this matter is appreciated and we look forward to working with you on this
project.
Sincerely,
Scott Sink
Assistant Regional Engineer
Land Quality Section
Cc:
LaBella Associates
615 St. George Court Suite 300
Winston-Salem, NC 27103