Loading...
HomeMy WebLinkAbout15806_1009011 Cape Fear River Bridge Elizabethtown Carpenter,Kristi From:Rerko, James J Sent:Friday, April 03, 2020 12:03 PM To:Hair, Sarah E SAW; Steenhuis, Joanne; Cox, Drew; Kendall, Steve D; Huff, Christy; Price, Gregory W Subject:15806.1009011 Cape Fear River Bridge Elizabethtown Attachments:VH-070880002_Hydro_032420_preliminary.pdf; US701 Bridge Replacement Plans - 4 foot median.pdf; Bladen US 701 Project Description.doc Liz / Joanne Attached, please find the Project Description for the Cape Fear River Bridges along US 701. The river survey show that there has been little change in the scour along the northern shore. The southern shore now has a 13 foot deep scour hole developed creating a critical issue with the factor of safety declining to 1. Stabilization of the river must be initiated immediately to ensure that the bridge structures remain safe. I will be in contact with you in this regards to ensure that you are kept aware of what is going on during this unusual operational period. I have also attached the “Preliminary Bridge Plans” . ICE of the Carolinas was just approved for the final bridge design plans. If you have any questions or comments please feel free to contact me. James J. Rerko, PWS Project Development and Environmental Analysis Engineer North Carolina Department of Transportation 910 364-0834 office 910 486 1959 fax jjrerko@ncdot.gov Email 1000 Transportation Drive Fayetteville, NC 28302 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. _____________________________________________________________ Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. 1