Loading...
HomeMy WebLinkAbout20200321 Ver 1_Stream clean up diagram 07-08-20_20200716Strickland, Bev From: Morgan, Katie <KMorgan@partneresi.com> Sent: Thursday, July 16, 2020 2:16 PM To: Johnson, Alan; 'Roden Reynolds, Bryan K CIV (US)' Cc: 'Larry Ingram'; 'Wayne Hogden'; 'Ken Swayze'; Jonathan C. Boerger; 'Bryson Hall'; 'eric.trumbach@copart.com'; joseph.alm; Lawson, Danon (danonl@cityofgastonia.com) Subject: RE: [External] RE: 07-08-20 Copart - Gastonia Inspection Report Attachments: 102-18-503-R5-07142020-SE-Stream Exhibit.pdf External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to report.spam@nc.gov Hi Alan, Please find attached the conceptual plan for the stream restoration. Have a Great Day! Katie L. Morgan, PWS, EP Senior Project Manager — Professional Wetland Scientist (#3100) PARTNER ENGINEERING AND SCIENCE, INC. New Orleans, LA C:423-838-1845 1 0: 504-777-3956 1 D: 800-419-4923 ext. 3748 More Than Just Assessments. Solutions — For a complete list of services, click here From: Johnson, Alan <alan.johnson@ncdenr.gov> Sent: Friday, July 10, 2020 12:24 PM To: Morgan, Katie <KMorgan@partneresi.com>; 'Roden Reynolds, Bryan K CIV (US)' <Bryan.K.Roden Reynolds@usace.army.miI> Cc: 'Larry Ingram' <lingram@lbyd.com>;'Wayne Hogden' <wayne.hogden@copart.com>;'Ken Swayze' <ken.swayze@copart.com>; Jonathan C. Boerger <Jonathan.Boerger@gastongov.com>; 'Bryson Hall' <bryson.hall @copart.com>; 'eric.trumbach@copart.com' <eric.trumbach@copart.com>; joseph.alm <joseph.alm@gastongov.com>; Lawson, Danon (danonl@cityofgastonia.com) <danon l@cityofgastonia.com> Subject: RE: [External] RE: 07-08-20 Copart - Gastonia Inspection Report Katie, I haven't received a conceptual plan for the stream work. Maybe there is confusion on what is meant by conceptual design. I have the notebook/plan that gives the literary description and general concept, but there was no schematic/diagram submitted. Or call it a visual plan. Alan 1 DWR Dlvlslon of Water Resources Alan D Johnson — Senior Environmental Specialist NC Dept. of Environment & Natural Resources (NCDENR) Division of Water Resources - Water Quality Regional Operations 610 East Center Ave., Suite 301, Mooresville, NC 28115 Phone: (704) 235-2200 Fax:(704) 663-6040 E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties unless the content is exempt by statute or other regulation. From: Morgan, Katie [mailto:KMorgan@partneresi.com] Sent: Friday, July 10, 2020 12:05 PM To: 'Roden Reynolds, Bryan K CIV (US)' <Bryan.K.RodenReynolds@usace.army.mil> Cc: 'Larry Ingram' <lingram@lbvd.com>;'Wayne Hogden' <wayne.hogden@copart.com>;'Ken Swayze' <ken.swavze@copart.com>; Johnson, Alan <alan.iohnson@ncdenr.gov>; Jonathan C. Boerger <Jonathan. Boerger@gastongov.com>; 'Bryson Hall' <bryson.hall@copart.com>;'eric.trumbach@copart.com' <eric.trumbach@copart.com>; joseph.alm <loseph.alm@gastongov.com>; Lawson, Danon (danonl@citvofgastonia.com) <danon I@citvofgastonia.com> Subject: [External] RE: 07-08-20 Copart - Gastonia Inspection Report External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to report.spam@nc.gov Hi Bryan, Can you confirm you are in receipt of the removal of the NOV status from Jonathan? Based on your last correspondence this is the last piece of the puzzle to move forward with the permit. Have a Great Day! Katie L. Morgan, PWS, EP Senior Project Manager — Professional Wetland Scientist (#3100) PARTNER ENGINEERING AND SCIENCE, INC. New Orleans, LA C:423-838-1845 1 0: 504-777-3956 1 D: 800-419-4923 ext. 3748 More Than Just Assessments. Solutions — For a complete list of services, click here[nam02.safelinks.protection.outlook.com From: Jonathan C. Boerger<Jonathan.Boerger@gastongov.com> Sent: Friday, July 10, 2020 10:57 AM To: 'mikehiser72@gmail.com'<mikehiser72@gmail.com>;'tom@brightexcavation.com' <tom@brightexcavation.com>; 'Ken Swayze' <ken.swayze@copart.com>; 'eric.trumbach@copart.com' <eric.trumbach@copart.com>; 'Bryson Hall' <bryson. hall @copart.com>; 'Wayne Hogden' <wayne.hogden@copart.com> Cc: 'Larry Ingram'<lingram@lbyd.com>;'alan.johnson@ncdenr.gov' <alan.iohnson@ncdenr.gov>; Joseph D. Alm <Joseph.Alm@gastongov.com>; Morgan, Katie <KMorgan@partneresi.com>; 'Roden Reynolds, Bryan K CIV (US)' <Bryan.K.Roden Reynolds@usace.army.mil>; Lawson, Danon (danon l@cityofgastonia.com) <danon I@cityofgastonia.com> Subject: 07-08-20 Copart - Gastonia Inspection Report Good morning, Please find attached, the 07-08-20 SE&SC inspection report for the "Copart-Gastonia" project. Sufficient improvements have been made to allow for removal of the NOV status for this project (for the SE&SC NOV only; this does not affect any other enforcement actions by any other regulatory agency). Please see the attached report for some items that need to be addressed. It is understood that progress has already been made since the inspection as conducted. Thank you, Jonathan Boerger Natural Resources Conservationist Gaston Natural Resources Department 1303 Dallas Cherryville Hwy Dallas, NC 28034 (704) 922-2150 Jonathan. boerger@gastongov.com This message may contain confidential information and is intended only for the individual named. If you are not the named addressee you should not disseminate, distribute or copy this email. Please notify the sender immediately by email if you have received this email by mistake and delete it from your system. Emails that do not contain confidential medical information are subject to North Carolina General Statute, Chapter 132 and may be considered a matter of public record. DWR DhBlon of Water Resources A /o 740 P Q SEEDED AREAS SHALL BE APPLIED AT THE FOLLOWING RATES IN POUNDS PER ACRE: August 1 - June 1 May 1 - September 1 100# Tall Fescue 100# Tall Fescue 15# Kentucky Bluegrass 15# Kentucky Bluegrass 30# Hard Fescue 30# Hard Fescue 25# Rye Grain 10# German or Browntop Millet 500# Fertilizer 500# Fertilizer 4000# Limestone 4000# Limestone rJ o �1 STREAM CHANNEL f 20'BUFFER • � J 50' BUFFER 1 C/. 5' BENCH @ 10:1 W/ RIP -RAP to 0 NOTE: 1. FINAL LOCATIONS OF SPRING BOX TO BE FIELD ADJUSTED TO CORRESPOND TO UPPER OF STREAM. 2. NO GRADING OR IMPACTS SHALL OCCUR WITHIN STREAM OR STREAM BUFFERS UNTIL USACOE AND/OR NCDEQ PERMITS ARE OBTAINED. 3. WOOD STAKES OR OTHER BIODEGRADABLE DEVICE SHALL BE USED IN -LIEU OF METAL OR PLASTIC STAPLES FOR SECURING THE EROSION CONTROL MATTING. PARCEL LINE SILT FENCE t �_l15 725 / INSTALL SEEDED EROSION CONTROL FABRIC WITHIN 20' BUFFER AREA. EROSION CONTROL FABRIC SHALL BE NORTH AMERICAN GREEN, BIONET 700BN, OR APPROVED ALTERNATE 735 SEED AND MULCH AREAS WITHIN THE ZONE BETWEEN THE 20' AND 50' BUFFER AREAS BW: 745 PROPOSED RETAINING WALL �o 10'X20' RIP -RAP PAD FOR ENERGY DISSIPATION W90753 t WETLANDS AREA V TEMPORARY ROCK FILTER DAM TO BE INSTALLED WHILE CLEANUP AND J RESTORATION IS BEING PERFORMED. REMOVE ONCE STABILIZATION ° EFFORTS HAVE BEEN COMPLETED. -RE OVIE SILT AND DEBRIS WITHIN 1•T EXISTING STREAM CHANNEL BW: 718 755. .00 BW: 734 e 745 750 124 LF 6" PERFORATED PIPE IN A GRAVEL ENVELOPE WITH CAP ON UP STREAM END AND RODENT SCREEN ON DISCHARGE 11IV //,___<Z// / ALT 1 - SPRING BOX PER NCDOT DETAIL 840.41; APPROX. INV. 722.00 4' WIDE GRASSED FLAT BOTTOMED DITCH W/ 4:1 SIDE SLOPES @ 2.3% GRADE d 155 GRADING + DRAINAGE LEGEND 101 MINOR CONTOUR 100 MAJOR CONTOUR TOP OF CURB BOTTOM OF CURB SPOT ELEVATION STORM DRAINAGE PIPING (18"0 OR MORE) STORM DRAINAGE -ST- PIPING (15"0 OR LESS) 747. ASS ;\' 111l1 ,'S0 4' WIDE GRASSED FLAT BOTTOMED DITCH W/ 4:1 SIDE SLOPES @ 0.25% GRADE N 0 200 400 100 300 SCALE: 1"=200' 1 z"(3ocm) CHANNEL INSTALLATION 4"(10cm) DETAIL II=III= 6" 1=1 - I 1 I I (15cm) _ „ -III =� f �= =� - - (15cm) 4"(10cm) 6" 1. Prepare soil before installing rolled erosion control (15cm) products (RECPs), including any necessary 2 $ application of lime, fertilizer, and seed. • 1 1 I($-12.SCm) •� I^I 2. Begin at the top of the channel by anchoring the RECPs in a 6"(15cm) deep X 6"(15cm) wide trench with approximately 12"(30cm) of Rl \ •• 4" 6" • (-10-1^SCm-) 1 > > y I `� > ••, _ _ -_ extended beyond the up -slope portion of the trench. Use Shorevlax mat at the channellculverl outlet as supplemental scour protection as I I • yrA^�^ � \�// •� �� � -I � I -I III I =1 needed. Anchor the RECPs with a row of stapleslstakes approximately 12"(30cm) apart in IIII III t \ �.� 1 © - the bottom of the trench. Backfill and compact the • • I I \^, ^ \ �,� ^,_ ^ ^ ^ trench after stapling. Apply seed to the compacted • I I soil and fold the remaining 12"(30cm) portion of _ • -III=1 III I I i=1 RECPs back over the seed and compacted soil. -I 1= 1= I- ® III Secure Rl over compacted soil with a row ••, • �• • of staples/stakes spaced approximately 12" apart across the width of the RECPs. •� • •• • 3. Roll center RECPs in direction of water flow in of channel. RECPs will unroll with IIbottom _ •. •° appropriate side against the soil surface. All • ' RECPs must be securely fastened to soil surface I•, • • ° by placing staples/stakes in appropriate locations • • -III as shown in the staple pattern guide. III I 4. Place consecutive RECPs end -over -end (Shingle -III- I =1 _ _-III-I I style) with a 4"-6" overlap. Use a double row of sta les staggered 4" a art and 4" on center to se ure RECPs. p (15cm) =� Ll-ll I III I -III -III -III -I I 5. Full length edge of Rl at top of side slopes =1 =�- 1=III=III=III=III= _ _ =III=III=III=III=III must be anchored with a row of staples/stakes - g --------------- approximately 12"(30cm) apart in a 6"(15cm) deep X 6"(15cm) wide trench. Backfill and compact the trench after stapling. 6. Adjacent Rl must be overlapped CRITICAL POINTS approximately 2"-5" (5-12.5cm) (Depending on A. Overlaps and Seams NOTES: RECPs type) and stapled. 7. In high flow channel applications a staple check B. Projected Water Line "Horizontal staple spacing should be altered if slot is recommended at 30 to 40 foot (9 -12m) C. Channel Bottom ide Slope Vertices necessary to allow staples to secure the critical points intervals. Use a double row of staples staggered A A along the channel surface. 4"(10cm) apart and 4"(10cm) on center over entire width of the channel. B C B " loose soil conditions, the use of staple or stake B. The terminal end of the Rl must be anchored lengths greater than 6"(15cm) may be necessary to n with a row of stapleslstakes approximately 12" (30cm) apart in a 6"(15cm) deep X 6"(15cm) wide properly secure the RECP's. trench. Backfill and compact the trench after Drawing Not To Scale stapling. Disclaimer: AMERICAN hiNORTH The information presented herein is general design information only. For specific applications, consult an independent GREEN professional for further design guidance. 5401 St. Wendel - Cynthiana Rd. PH: 800-722-2040 Poseyville, IN 47633 www.nagreen.com Drawn on: 54.17 STAPLE PATTERN 2„_5„ � al_ 2„_5" 2„_5,� I� ® I 2„_5„ GUIDE (5-12.5cm ~{ t (5-12.5cm) (5-12.5cm ~I (5-12.5cm) 3' 3' (0.9m) (0.9m) 6' (1.8m) 6' (1.8m0 4:1 Slopes (A) L1. (lm) , (lm) (0.5m) 0 3:1 Slopes (B) (lm) 2:1 Slopes (C) • 0 0 O 1:1 & Steeper Slopes (D) 0.7 Staples per SQ.YD. 1.15 Staples per SQ.YD. Medium/High Flow Channel (D) 2"-5" 2„_5" 2„_5" 2"-5" 0 High Flow Channel And Shoreline (E) IN (5-12.Scm) (5-12.5cm) (5-12.5cm) A (5-11 4, z' (o.6m) 2' 4, (o.6m) it 4, 2' 10" (0.6m) (25cm) 1.6' (1.2m) O (1.2m) 3.3' (O.Sm) O 3.3' • • !0 10"(25cm) .> o o (> 3.3' O O O 1.7 Staples per SQ.YD. 3.4 Staples per SQ.YD. 3.75 Staples per SQ.YD. NOTES: ' Use ECMDS for more accurate staple pattern selection. NORTH Disclaimer: AMERICAN The information presented herein is general design information only. For specific applications, consult an independent GREEN professional for further design guidance. 5401 St. Wendel - Cynthiana Rd. Poseyville, IN 47633 PH: 800-722-2040 www.nagreen.com Drawn on: 5 _17 Drawing Not To Scale LBYD ENGINEERS Birmingham, Alabama Huntsville, Alabama Auburn, Alabama Tampa Bay, Florida www.lbyd.com LBYD, Inc. Civil and Structural Engineers 880 Montclair Road Suite 600 Birmingham, AL 35213 Phone (205) 251-4500 C-2887 © copyright 2018 These drawings and design intent are the sole property of LBYD Inc. which may not be reproduced without written permission. LBYD Project Number 102-18-503 Seal Q\\ ZF ZZ = a SEAL y� v r-i 035360 nli�� u o O O CN � CV O O N O N M N � z z w w 2E 2E 2i 2i O 0 U U Q U o 0 UJ I..I� M UJ z 0 - a Q U LL � 0 F z CYC Q Q z Q 0 o O � (Ji z 0 U a - U 0 Sheet Title STREAM RESTORATION PLAN EXHIBIT Date 07/14/2020 Checked By Drawn By LWI TJR/ARS Sheet Numbe, Sequence S E-1.0 Total